CN102900093B - Plate-type double-cable foundation structure of transmission tower - Google Patents

Plate-type double-cable foundation structure of transmission tower Download PDF

Info

Publication number
CN102900093B
CN102900093B CN201210383543.7A CN201210383543A CN102900093B CN 102900093 B CN102900093 B CN 102900093B CN 201210383543 A CN201210383543 A CN 201210383543A CN 102900093 B CN102900093 B CN 102900093B
Authority
CN
China
Prior art keywords
plate
upper plate
foundation structure
type double
cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210383543.7A
Other languages
Chinese (zh)
Other versions
CN102900093A (en
Inventor
雒亿平
范雪峰
付兵彬
杜鸿
朱文化
邓永婕
夏懿
徐昊亮
杨晶
张中丹
宋汶秦
贾春蓉
张军
杨昌海
余泳
田云飞
孙志宏
魏勇
李玉科
万小花
李麟鹤
韩建锋
梁魁
薛国斌
朱海涛
卢宏达
张琦
丁政中
马国伟
张艳霞
陈兆燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Gansu Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Gansu Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Gansu Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Gansu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Gansu Electric Power Co Ltd, Economic and Technological Research Institute of State Grid Gansu Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201210383543.7A priority Critical patent/CN102900093B/en
Publication of CN102900093A publication Critical patent/CN102900093A/en
Application granted granted Critical
Publication of CN102900093B publication Critical patent/CN102900093B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a plate-type double-cable foundation structure of a transmission tower. The plate-type double-cable foundation structure comprises an upper plate which is spread on the surface of the ground and two lower plates which are embedded underground, wherein the upper plate is connected with each lower plate through a steel twisted rope; the lengths of the two steel twisted ropes are the same; a rubber casing pipe is arranged outside each steel twisted rope between the upper plate and the lower plates; two ends of each rubber casing pipe are in contact with the upper plate and each lower plate respectively; and an anti-corrosion filler is filled into the rubber casing pipes. The plate-type double-cable foundation structure has the advantages of exerting physical and mechanical properties of various materials fully and saving investment along with perfect and clear force-transfer boundary condition, safety, high reliability, simplicity and convenience in construction and the like; and compared with a single-cable foundation structure, the double-cable foundation structure has the advantage that when the physical and mechanical property of line foundation soil is poor, and up-pull loads are large, the excavating depth can be reduced. The plate-type double-cable foundation structure is suitable for loess areas with large up-pull force and poor physical and mechanical property of the foundation soil, for example, line foundations of more than 110kV voltage grade.

Description

Plate-type double-cable foundation structure of transmission tower
Technical field
The present invention is a kind of transmission tower equipment, specifically the basic fixed structure of transmission tower.
Background technology
In heavy thickness Canal in Loess Area, pole and tower foundation mainly adopts " heavy excavation " foundation class, draw and dig spread foundation class, explosion expanded piling foundation class basis." heavy excavation " foundation class means and is embedded in the foundation ditch that digs in advance and the basis of backfill being tamped, it be with the backfill of disturbance is formed the resistance to plucking soil body keep basic on pull out stable.Draw and dig spread foundation class and mean and be poured into machinery or the basis of manually drawing in the native tire that scrapes out with concrete and cage of reinforcement, it be with the resistance to plucking soil body of natural formation keep basis on pull out stable.Explosion expanded piling foundation class means and to be poured into the stub of the bellend in the shaping native tire of explosive expansion basis with concrete and cage of reinforcement, and its resistance to plucking soil body is substantially close to intact natural soil.
The key dimension of " heavy excavation " foundation class determines by its resistance to plucking stability the subject of knowledge and the object of knowledge, in order to pull out the requirement of stability on meeting, must strengthen key dimension, improve foundation cost, simultaneously because spoir is more, also larger to the destruction of environment.Draw and dig spread foundation class and be suitable in the cohesive soil of anhydrous infiltration foundation ditch, simultaneously pile foundation regulation and stipulation, as basis adopts pile foundation, essential bearing stratum need through collapsible loess, and therefore this basis is not suitable for heavy thickness Collapsible Loess District.Explosion expanded piling foundation class difficulty of construction is comparatively large and technique and dimensional gaughing have certain difficulty.
Summary of the invention
In order to solve the problem, the invention provides a kind of plate-type double-cable foundation structure of transmission tower being applicable to large thick Canal in Loess Area.
Object of the present invention carrys out specific implementation by the following technical programs:
Plate-type double-cable foundation structure of transmission tower, comprise the lower plate that a upper plate being laid on earth's surface and two are embedded in underground, connect respectively by a steel strand rope between described upper plate and each lower plate, the length of two steel strand ropes is equal, each described steel strand rope outside is between the upper and lower plates provided with a gum cover pipe, the two ends of each described gum cover pipe contact with a lower plate with upper plate respectively, are filled with anticorrosive packing at described glue inside pipe casing; The two ends of described steel strand rope are respectively equipped with an anchor head, are provided with carrying backing plate between the anchor head on top and upper plate, are provided with lower carrying backing plate between the anchor head of bottom and lower plate; Described upper plate upper has four stone bolt be arranged symmetrically with, and described stone bolt runs through upper plate, and is fixedly connected with the cast backing plate being cast in upper plate bottom surface.Described upper plate, lower plate are Reinforced Concrete Materials moulding by casting.
Two described lower plates are arranged relative to the Central Symmetry of upper plate, and are respectively in the both sides of four described stone bolt.
Described upper plate adopts rectangular structure, and the area of upper plate is much larger than the area sum of two lower plates.
Plate-type double-cable foundation structure of transmission tower provided by the invention, based on upper plate, protective cap uses, having power transmission fringe conditions improves distinct, give full play to the physical and mechanical property of various material, investment reduction, the advantages such as the high and easy construction of safety reliability, when circuit foundation soil physico-mechanical properties is poor, when uplift load is larger, the more single rope foundation structure of two rope foundation structure can reduce cutting depth, owing to adopting two anchor cables, therefore there is good safety and reliability on the more single rope in this basis basis, therefore to be applicable to uplift force larger for this foundation structure, the Canal in Loess Area that foundation soil physico-mechanical properties is poor, as 110kV above line tower foundation.
This foundation structure is flexible foundation, adopts this foundation structure can improve the ability of shaft tower opposing dynamic load; Spoir amount can be reduced simultaneously, preserve the ecological environment; And convenient disassembly, as this basis does not re-use, steel strand directly can be cut off, excavate upper plate, reduce basic projects amount; And double for the load transmission mechanism ground wire that does can be used.This foundation structure load transmission is clear and definite, and structural calculation is easier with construction.Use two rope foundation structure can improve basic reliability, when an anchor cable produces surrender or destroys, an other anchor cable can delay the destruction on basis.
Accompanying drawing explanation
According to drawings and embodiments the present invention is described in further detail below.
Fig. 1 is the structure chart of plate-type double-cable foundation structure of transmission tower described in the embodiment of the present invention.
Fig. 2 is the earth's surface top view of plate-type double-cable foundation structure of transmission tower described in the embodiment of the present invention.
Detailed description of the invention
As shown in Figure 1-2, plate-type double-cable foundation structure of transmission tower described in the embodiment of the present invention, comprise the lower plate 2 that a upper plate 1 being laid on earth's surface and two are embedded in underground, connect respectively by a steel strand rope 3 between described upper plate 1 and each lower plate 2, the length of two steel strand ropes 3 is equal, each described steel strand rope 3 outside between upper plate 1 and lower plate 2 is provided with a gum cover pipe 4, the two ends of each described gum cover pipe 4 contact with a lower plate 2 with upper plate 1 respectively, are filled with anticorrosive packing 5 in described gum cover pipe 4 inside; The two ends of described steel strand rope 3 are respectively equipped with an anchor head 61,62, are provided with carrying backing plate 71 between the anchor head 61 on top and upper plate 1, are provided with lower carrying backing plate 72 between the anchor head 62 of bottom and lower plate 2; Described upper plate 1 upper has four stone bolt be arranged symmetrically with 8, and described stone bolt 8 runs through upper plate 1, and is fixedly connected with the cast backing plate 9 being cast in upper plate 1 bottom surface.Described upper plate 1, lower plate 2 are Reinforced Concrete Materials moulding by casting.Described upper plate 1 adopts rectangular structure, and the area of upper plate 1 is much larger than the area sum of two lower plates 2.
Two described lower plates 2 are arranged relative to the Central Symmetry of upper plate 1, and are respectively in the both sides of four described stone bolt 8.
Plate-type double-cable foundation structure of transmission tower provided by the invention, based on upper plate, protective cap uses, having power transmission fringe conditions improves distinct, give full play to the physical and mechanical property of various material, investment reduction, the advantages such as the high and easy construction of safety reliability, when circuit foundation soil physico-mechanical properties is poor, when uplift load is larger, the more single rope foundation structure of two rope foundation structure can reduce cutting depth, owing to adopting two anchor cables, therefore there is good safety and reliability on the more single rope in this basis basis, therefore to be applicable to uplift force larger for this foundation structure, the Canal in Loess Area that foundation soil physico-mechanical properties is poor, as 110kV above line tower foundation.
This foundation structure is flexible foundation, adopts this foundation structure can improve the ability of shaft tower opposing dynamic load; Spoir amount can be reduced simultaneously, preserve the ecological environment; And convenient disassembly, as this basis does not re-use, steel strand directly can be cut off, excavate upper plate, reduce basic projects amount; And double for the load transmission mechanism ground wire that does can be used.This foundation structure load transmission is clear and definite, and structural calculation is easier with construction.Use two rope foundation structure can improve basic reliability, when an anchor cable produces surrender or destroys, an other anchor cable can delay the destruction on basis.

Claims (2)

1. plate-type double-cable foundation structure of transmission tower, comprise the lower plate that a upper plate being laid on earth's surface and two are embedded in underground, it is characterized in that, connect respectively by a steel strand rope between described upper plate and each lower plate, the length of two steel strand ropes is equal;
Described upper plate, lower plate are Reinforced Concrete Materials moulding by casting,
Described steel strand rope outside between upper plate and each lower plate is provided with a gum cover pipe, and the two ends of each described gum cover pipe contact with a lower plate with upper plate respectively, are filled with anticorrosive packing at described glue inside pipe casing,
The two ends of described steel strand rope are respectively equipped with an anchor head, are provided with carrying backing plate between the anchor head on top and upper plate, are provided with lower carrying backing plate between the anchor head of bottom and lower plate,
Described upper plate upper has four stone bolt be arranged symmetrically with, and described stone bolt runs through upper plate, and is fixedly connected with the cast backing plate being cast in upper plate bottom surface.
2. plate-type double-cable foundation structure of transmission tower as claimed in claim 1, it is characterized in that, two described lower plates are arranged relative to the Central Symmetry of upper plate, and are respectively in the both sides of four described stone bolt.
CN201210383543.7A 2012-10-11 2012-10-11 Plate-type double-cable foundation structure of transmission tower Expired - Fee Related CN102900093B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210383543.7A CN102900093B (en) 2012-10-11 2012-10-11 Plate-type double-cable foundation structure of transmission tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210383543.7A CN102900093B (en) 2012-10-11 2012-10-11 Plate-type double-cable foundation structure of transmission tower

Publications (2)

Publication Number Publication Date
CN102900093A CN102900093A (en) 2013-01-30
CN102900093B true CN102900093B (en) 2015-03-04

Family

ID=47572559

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210383543.7A Expired - Fee Related CN102900093B (en) 2012-10-11 2012-10-11 Plate-type double-cable foundation structure of transmission tower

Country Status (1)

Country Link
CN (1) CN102900093B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105442627B (en) * 2016-01-19 2018-09-14 温州电力设计有限公司 A kind of assembled plate rope basis
CN110528566A (en) * 2019-08-27 2019-12-03 西安理工大学 Transmission line of electricity combines the design method of the anchor pole of three anchor slab foundation structure of plate stem
CN110528564A (en) * 2019-08-27 2019-12-03 西安理工大学 Transmission line of electricity combines the design method of the upper plate of the double anchor slab foundation structures of plate stem
CN110528562A (en) * 2019-08-27 2019-12-03 西安理工大学 Transmission line of electricity combines the design method of the anchor pole of the double anchor slab foundation structures of plate stem
CN110528563A (en) * 2019-08-27 2019-12-03 西安理工大学 A kind of double anchor slab bases fixed structure of transmission line of electricity joint plate stem

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101063509A (en) * 2006-04-30 2007-10-31 通用电气公司 Tower adapter, method of producing a tower foundation and tower foundation
CN201232194Y (en) * 2008-06-13 2009-05-06 中国矿业大学 Anti-deformation power transmission tower
KR100946573B1 (en) * 2009-12-08 2010-03-11 파슨스 브링커호프 아시아 리미티드 Steel base with adjusting leveling and construction method using the same
CN201874004U (en) * 2009-09-25 2011-06-22 山东电力集团公司日照供电公司 Foundation employing rock bottom-enlarging anchor pile for overhead power transmission line
CN202469390U (en) * 2012-03-19 2012-10-03 宁波浩渤工贸有限公司 Foundation bolt
CN202787308U (en) * 2012-10-11 2013-03-13 甘肃省电力公司电力经济技术研究院 Plate type dual-rope foundation structure of power transmission pole tower

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101063509A (en) * 2006-04-30 2007-10-31 通用电气公司 Tower adapter, method of producing a tower foundation and tower foundation
CN201232194Y (en) * 2008-06-13 2009-05-06 中国矿业大学 Anti-deformation power transmission tower
CN201874004U (en) * 2009-09-25 2011-06-22 山东电力集团公司日照供电公司 Foundation employing rock bottom-enlarging anchor pile for overhead power transmission line
KR100946573B1 (en) * 2009-12-08 2010-03-11 파슨스 브링커호프 아시아 리미티드 Steel base with adjusting leveling and construction method using the same
CN202469390U (en) * 2012-03-19 2012-10-03 宁波浩渤工贸有限公司 Foundation bolt
CN202787308U (en) * 2012-10-11 2013-03-13 甘肃省电力公司电力经济技术研究院 Plate type dual-rope foundation structure of power transmission pole tower

Also Published As

Publication number Publication date
CN102900093A (en) 2013-01-30

Similar Documents

Publication Publication Date Title
CN102900095B (en) Transmission tower plate-type single rope foundation structure
Liu et al. Bearing behavior of wide-shallow bucket foundation for offshore wind turbines in drained silty sand
CN102900093B (en) Plate-type double-cable foundation structure of transmission tower
CN102900094B (en) Transmission tower plate-type three-rope foundation structure
CN101798812A (en) Double anchoring section prestressed anchoring system with three-layer protection and anchoring method thereof
CN204199335U (en) A kind of pressure release well reducing PHC tube pile construction soil compaction effect
CN108385673B (en) Miniature upper filling ball sleeve pile and construction method thereof
CN106759442A (en) A kind of single-pile elevated bearing-platform and anchor cable tower-crane foundation structure and its construction method
CN104775447B (en) Composite base framework used for power transmission tower in steep mountainous area and construction technology thereof
CN202881967U (en) Transmission tower plate type three-cable base structure
CN203222795U (en) Manual hole digging pile
CN202850045U (en) Transmission tower plate-type single cable basic structure
CN201502065U (en) Anchor rod joint excavation compound basis
CN202787308U (en) Plate type dual-rope foundation structure of power transmission pole tower
CN102733407A (en) Two-ring grouted single pile foundation
CN206376274U (en) A kind of single-pile elevated bearing-platform and anchor cable tower-crane foundation structure
CN102626946A (en) Manufacture method for concrete irregular fender post
CN107447775A (en) Landslide disaster body makes ground draining reinforced earth retaining wall structure
CN201635073U (en) Pre-stressed anchorage system with three layers of protection and double anchoring sections
CN201588222U (en) Superposed digging/embedding foundation
CN107060837A (en) A kind of asymmetric formula shield arch construction method of Shallow-buried
CN204224990U (en) Towards the high-performance slide device of large-tonnage pushing tow engineering
CN207228130U (en) A kind of city integrated piping lane foundation pit backfill processing combined system
CN207079600U (en) A kind of flat pressure dispersing anchorage cable wall retaining structure of rock matter cut slope
CN201495554U (en) Anchor bolt combination excavating compound base

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150304

Termination date: 20201011

CF01 Termination of patent right due to non-payment of annual fee