CN204959769U - Lower part has stagnant water centrifugation side of strutting stake envelope in clamping orient groove - Google Patents

Lower part has stagnant water centrifugation side of strutting stake envelope in clamping orient groove Download PDF

Info

Publication number
CN204959769U
CN204959769U CN201520724670.8U CN201520724670U CN204959769U CN 204959769 U CN204959769 U CN 204959769U CN 201520724670 U CN201520724670 U CN 201520724670U CN 204959769 U CN204959769 U CN 204959769U
Authority
CN
China
Prior art keywords
positioning
square pile
supporting square
guiding groove
enclosing structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520724670.8U
Other languages
Chinese (zh)
Inventor
詹金林
常晓宾
李猛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai King Tongji Civil Engineering Co Ltd
Original Assignee
Shanghai King Tongji Civil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai King Tongji Civil Engineering Co Ltd filed Critical Shanghai King Tongji Civil Engineering Co Ltd
Priority to CN201520724670.8U priority Critical patent/CN204959769U/en
Application granted granted Critical
Publication of CN204959769U publication Critical patent/CN204959769U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a lower part has stagnant water centrifugation side of strutting stake envelope in clamping orient groove, including the stake of the stagnant water centrifugation side of strutting, the stake of the stagnant water centrifugation side of strutting is the precast concrete stake of built -in arrangement of reinforcement, the both sides limit of the stagnant water centrifugation side of strutting stake is equipped with the clamping orient groove respectively, and the clamping orient inslot of one of them side lower part is equipped with the clamping orient chase mortise, and the lower part of another side is the hypotenuse, the clamping orient groove of the stagnant water centrifugation side of strutting stake is arranged at relative both sides edge in non - corner, arranges on double -phase adjacent side in the corner. Compared with the prior art, the utility model discloses the stake has the intensity height, rigidity is big, construction cycle is short, construction is simple and easy, green, envelope stability by force, engineering cost hangs down, influences advantages such as little to the surrounding environment.

Description

A kind of bottom has the sealing centrifugal supporting square pile space enclosing structure of positioning and guiding groove
Technical field
The utility model relates to a kind of novel foundation pit enclosure structure with the native function of gear, water stopping function.
Background technology
The soil-baffling structure that in current China bracing of foundation pit, traditional handicraft adopts mainly contains diaphragm wall, castinplace pile, the stake of SMW engineering method, soil nail wall and piled anchor structure, and the construction technology of these structures respectively has pluses and minuses.As agitation pile gravity dam: cement consumption is high, cost is high, speed of application is slow, distortion is large, affects larger by construction quality; Reinforced concrete circular fender post: reinforcing bar and concrete amount greatly, about have the reinforcing bar of 1/3 to can not get abundant application, and construction exists mud contamination, and cost is high, and curing period is long, and speed of application is slow; SMW engineering method stake: there is Shaped steel recovery difficulty, cost affects by the duration and is usually difficult to comparatively greatly control; Soil nail wall and piled anchor structure are usually because land red-line scope and local environmental conditions are difficult to apply.The centrifugal supporting square pile of the sealing with chase mortise space enclosing structure involved by the utility model, be pressed in place or implant prefabricated units as supporting and protection structure, solve the deficiency of above-mentioned several technique, give full play to the effect of strong concrete compressive strength, prestressed steel bar tensile strength.Than traditional space enclosing structure, the utility model significantly shortens the construction period, reduces cost and environmentally safe.
Utility model content
For the deficiencies in the prior art, the purpose of this utility model is to provide that a kind of structural performance is high, simple and easy, the short construction period of constructing, pollution-free, low noise, cost reduce, the sealing that the duration significantly shortens centrifugal supporting square pile space enclosing structure.
The utility model is achieved through the following technical solutions:
Bottom has a sealing centrifugal supporting square pile space enclosing structure for positioning and guiding groove, and described sealing centrifugal supporting square pile is the concrete precast pile of built-in arrangement of reinforcement; The dual-side of the centrifugal supporting square pile of described sealing is respectively equipped with positioning and guiding groove, and be provided with positioning and guiding chase mortise in the positioning and guiding groove of a wherein side bottom, the bottom of another side is hypotenuse; The positioning and guiding groove of described sealing centrifugal supporting square pile is arranged on relative dual-side in non-corner, is arranged in around the corner in two adjacent side.
The length of described positioning and guiding chase mortise is 1/5 to 1/2 of described sealing centrifugal supporting square pile 1 length.
Described adjacent stake positioning and guiding groove forms cavity, is marked with cement grout in this cavity.
The concrete of the centrifugal supporting square pile of described sealing is strong concrete.
The cross section of described arrangement of reinforcement is irregularly shaped.
Described arrangement of reinforcement is high-strength prestress rod iron.
Outside described sealing centrifugal supporting square pile space enclosing structure, agitation pile water-stop curtain or TRD water-stop curtain can be set.
Described sealing centrifugal supporting square pile space enclosing structure, can insert cement mixing method within the walls or in TRD cement soil wall.
Than traditional handicraft, bottom involved by the utility model has the sealing centrifugal supporting square pile space enclosing structure of positioning and guiding groove, precast square pile is brought in bracing of foundation pit field from building pile foundation field, this structure solves the deficiency of existing technique, bending resistance and the structural performance of prefabricated units are merged, give full play to the effect of strong concrete compressive strength, prestressed reinforcement tensile strength, solve the sealing problem between square pile simultaneously.Than traditional space enclosing structure, the utility model has increased substantially overall structure performance, has shortened the construction period, has reduced cost and environmentally safe.
Accompanying drawing explanation
Fig. 1: bottom of the present utility model has the sealing centrifugal supporting square pile space enclosing structure schematic diagram of positioning and guiding groove.
Fig. 2: pile sinking of the present utility model forms campshed floor map.
Fig. 3: pile sinking of the present utility model forms the schematic side view of piling wall.
Fig. 4: corner square pile schematic diagram of the present utility model.
Fig. 5: pile foundation arrangement of reinforcement lower section figure of the present utility model.
Fig. 6: pile foundation arrangement of reinforcement upper section figure of the present utility model.
Fig. 7: the combining form of space enclosing structure of the present utility model and agitation pile water-stop curtain.
Fig. 8: the combining form of space enclosing structure of the present utility model and TRD water-stop curtain.
Fig. 9: space enclosing structure of the present utility model is embedded in the structural representation of agitation pile water-stop curtain.
Figure 10: space enclosing structure of the present utility model is embedded in the structural representation of TRD water-stop curtain.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is described in detail.The present embodiment is implemented premised on technical solutions of the utility model, give detailed embodiment and concrete operating process, but protection domain of the present utility model is not limited to following embodiment.
As shown in Figures 1 to 4, a kind of bottom has the sealing centrifugal supporting square pile space enclosing structure of positioning and guiding groove, comprise the centrifugal supporting square pile 1 of sealing, its both sides are respectively equipped with positioning and guiding groove 11, be provided with positioning and guiding chase mortise 12 in the positioning and guiding groove 11 of a wherein side bottom, the bottom of another side is hypotenuse 13.The positioning and guiding groove 11 of above-mentioned sealing offcenter squared pile 1 is arranged in (see figure 2) on relative dual-side in non-corner, is arranged in (see figure 4) in two adjacent side around the corner.
The length of positioning and guiding chase mortise 12 needs to carry out corresponding adjustment according to design, is generally 1/5 to 1/2 of sealing centrifugal supporting square pile 1 length.Form piling wall (see figure 3) by the occlusion of positioning and guiding groove 11 and positioning and guiding chase mortise 12 during construction, so both improve the overall structure performance of piling wall, constraint guide effect can be played in piling process again.The cavity 14 of positioning and guiding groove 11 formation on adjacent sealing centrifugal supporting square pile 1 top, its inside is marked with cement grout, can play water seepage prevention effect after cement grout solidifies.
This sealing centrifugal supporting square pile 1 is the concrete precast pile of built-in arrangement of reinforcement, and its prefab form is special, in template, usually arranges counterweight to balance the centrifugal angular force produced in irregularly shaped sealing centrifugal supporting square pile 1 high-speed rotation.This water centrifugal supporting square pile 1 be a kind of can batch production, assemblingization foundation pit supporting construction.
The concrete that the centrifugal supporting square pile 1 of sealing adopts is strong concrete, and its intensity is not less than C60.
The cross section of the built-in arrangement of reinforcement 15 of sealing centrifugal supporting square pile 1 is irregularly shaped, volume cage and manual colligation is automatically needed to combine, the material of arrangement of reinforcement 15 is high-strength prestress rod iron, and its stretching force, within lifting does not produce the tension stress in crack, adopts pre-tensioning system construction usually.
As required, the outside of the centrifugal supporting square pile 1 of sealing, can arrange agitation pile water-stop curtain 2 or TRD water-stop curtain 3, see Fig. 7 and Fig. 8; Also by the above-mentioned sealing centrifugal supporting square pile space enclosing structure with positioning and guiding groove, can insert in churned pile wall or in TRD cement soil wall, see Fig. 9 and 10.
Adopt the above-mentioned sealing centrifugal supporting square pile space enclosing structure with positioning and guiding groove, after piling wall of having constructed, the cavity 14 that positioning and guiding groove 11 between stake is formed is rinsed and injects cement grout, after solidifying, plays water seepage prevention effect.Its construction method concrete steps are as follows:
1) levelling of the land;
2) surveying setting-out;
3) excavate guide channel and mark square pile insertion position;
4) heavy initial stake;
5) pitching pile, adopts two two-way check verticality of transit;
6) pile sinking;
7) move guiding trestle and continue construction;
8) cavity that groove between stake is formed is rinsed and injects cement grout;
9) secure ID is carried out.
The adjacent close slotting body of wall of square pile that the present embodiment adopts, due to the interlocking of positioning and guiding chase mortise and positioning and guiding groove between the stake of bottom, improve whole space enclosing structure bending resistance and the structural performance of body of wall, between the stake of top, positioning and guiding groove is formed in cavity and injects cement grout, plays water seepage prevention effect.

Claims (8)

1. bottom has a sealing centrifugal supporting square pile space enclosing structure for positioning and guiding groove, it is characterized in that, described sealing centrifugal supporting square pile is the concrete precast pile of built-in arrangement of reinforcement (15); The dual-side of the centrifugal supporting square pile (1) of described sealing is respectively equipped with positioning and guiding groove (11), and be provided with positioning and guiding chase mortise (12) in the positioning and guiding groove (11) of a wherein side bottom, the bottom of another side is hypotenuse (13); The positioning and guiding groove (11) of described sealing centrifugal supporting square pile (1) is arranged on relative dual-side in non-corner, is arranged in around the corner in two adjacent side.
2. bottom according to claim 1 has the sealing centrifugal supporting square pile space enclosing structure of positioning and guiding groove, it is characterized in that, the length of described positioning and guiding chase mortise (12) is 1/5 to 1/2 of described sealing centrifugal supporting square pile (1) length.
3. bottom according to claim 1 has the sealing centrifugal supporting square pile space enclosing structure of positioning and guiding groove, it is characterized in that, described adjacent stake positioning and guiding groove (11) forms cavity (14), and this cavity is marked with cement grout in (14).
4. bottom according to claim 1 has the sealing centrifugal supporting square pile space enclosing structure of positioning and guiding groove, and the concrete of the centrifugal supporting square pile (1) of described sealing is strong concrete.
5. bottom according to claim 1 has the sealing centrifugal supporting square pile space enclosing structure of positioning and guiding groove, it is characterized in that, the cross section of described arrangement of reinforcement (15) is irregularly shaped.
6. bottom according to claim 1 has the sealing centrifugal supporting square pile space enclosing structure of positioning and guiding groove, it is characterized in that, described arrangement of reinforcement (15) is high-strength prestress rod iron.
7. bottom according to claim 1 has the sealing centrifugal supporting square pile space enclosing structure of positioning and guiding groove, it is characterized in that, outside described sealing centrifugal supporting square pile space enclosing structure, can arrange agitation pile water-stop curtain (2) or TRD water-stop curtain (3).
8. bottom according to claim 1 has the sealing centrifugal supporting square pile space enclosing structure of positioning and guiding groove, it is characterized in that, described sealing centrifugal supporting square pile space enclosing structure, can insert cement mixing method within the walls or in TRD cement soil wall.
CN201520724670.8U 2015-09-18 2015-09-18 Lower part has stagnant water centrifugation side of strutting stake envelope in clamping orient groove Expired - Fee Related CN204959769U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520724670.8U CN204959769U (en) 2015-09-18 2015-09-18 Lower part has stagnant water centrifugation side of strutting stake envelope in clamping orient groove

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520724670.8U CN204959769U (en) 2015-09-18 2015-09-18 Lower part has stagnant water centrifugation side of strutting stake envelope in clamping orient groove

Publications (1)

Publication Number Publication Date
CN204959769U true CN204959769U (en) 2016-01-13

Family

ID=55054844

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520724670.8U Expired - Fee Related CN204959769U (en) 2015-09-18 2015-09-18 Lower part has stagnant water centrifugation side of strutting stake envelope in clamping orient groove

Country Status (1)

Country Link
CN (1) CN204959769U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105544531A (en) * 2016-01-25 2016-05-04 李文明 Prestressed high-strength concrete hollow support pile and manufacturing method thereof
CN107938653A (en) * 2017-12-23 2018-04-20 天津建城基业集团有限公司 A kind of chain piling wall slip casting brush wall device of chain concrete

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105544531A (en) * 2016-01-25 2016-05-04 李文明 Prestressed high-strength concrete hollow support pile and manufacturing method thereof
CN113718765A (en) * 2016-01-25 2021-11-30 湖南卓工建材科技有限公司 Hollow fender pile of prestressing force high-strength concrete
CN107938653A (en) * 2017-12-23 2018-04-20 天津建城基业集团有限公司 A kind of chain piling wall slip casting brush wall device of chain concrete

Similar Documents

Publication Publication Date Title
CN105908869B (en) The pillar structure formed based on 3D printing filled wall
CN106869321A (en) The prefabricated regeneration concrete bean column node and its construction method of a kind of reinforcement
CN203213136U (en) Caisson and pile combined foundation of consolidated subsoil
CN206737118U (en) A kind of prefabricated regeneration concrete bean column node of reinforcement
CN103898916A (en) Mini-pile combined support structure and construction method thereof
CN107338801B (en) Prestressing force assembled Complex retaining wall structure and construction method
CN201873997U (en) Support structure of foundation pit
CN102864780A (en) Supporting structure and supporting method of foundation pit
CN111236260A (en) Variable-rigidity combined type prefabricated double-row pile supporting structure and construction method thereof
CN204780969U (en) Compound bored concrete pile basis of expanding of large -scale transmission tower
CN104790423B (en) A kind of large-scale transmission tower is combined and expands top bored concrete pile foundation
CN105369799A (en) Concrete precast pile of precast pile underground diaphragm wall and construction method of precast pile underground diaphragm wall
CN202323958U (en) Deep-water foundation pit support and water-stop self-locking supporting pile structure
CN204959769U (en) Lower part has stagnant water centrifugation side of strutting stake envelope in clamping orient groove
CN204825925U (en) Centrifugation side's stake envelope with chase mortise
CN104074197A (en) Large-diameter thin-walled tubular pile composite anchor rod type foundation pit support structure and construction method thereof
CN208088311U (en) Back-pressure de-bowed type pile slab supporting structure after stake
CN204825867U (en) As composite pile structure of secretly digging garage stand
CN201406687Y (en) Deep foundation pit supporting structure
CN205116180U (en) Stagnant water centrifugation side stake envelope with clamping orient groove
CN205662920U (en) Take secret assembled precast pile in anchor rope hole
CN203768913U (en) Cast-in-place foundation pit enclosure structure combined with cemented soil
CN211006701U (en) Foundation pit supporting structure integrating pile and wall
CN108330986A (en) Back-pressure de-bowed type pile slab supporting structure and construction method after stake
CN104032732B (en) Cast-type pre-stressed steel plate concrete-pile and construction method thereof and supporting piling wall

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160113

Termination date: 20210918