CN204898699U - Bridge caisson foundation - Google Patents

Bridge caisson foundation Download PDF

Info

Publication number
CN204898699U
CN204898699U CN201520583604.3U CN201520583604U CN204898699U CN 204898699 U CN204898699 U CN 204898699U CN 201520583604 U CN201520583604 U CN 201520583604U CN 204898699 U CN204898699 U CN 204898699U
Authority
CN
China
Prior art keywords
caisson
top board
bridge
side plate
base plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520583604.3U
Other languages
Chinese (zh)
Inventor
洪英维
赖伟东
嵇其伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
COMMUNICATIONS DESIGN RESEARCH INSTITUTE Co Ltd OF JIANGXI PROV
Original Assignee
COMMUNICATIONS DESIGN RESEARCH INSTITUTE Co Ltd OF JIANGXI PROV
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by COMMUNICATIONS DESIGN RESEARCH INSTITUTE Co Ltd OF JIANGXI PROV filed Critical COMMUNICATIONS DESIGN RESEARCH INSTITUTE Co Ltd OF JIANGXI PROV
Priority to CN201520583604.3U priority Critical patent/CN204898699U/en
Application granted granted Critical
Publication of CN204898699U publication Critical patent/CN204898699U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model discloses a bridge caisson foundation, it includes roof, caisson and bottom plate, on the pier set up the roof, the bottom plate setting was on the supporting course, the caisson is the upper and lower communicating frame box structure compriseed multilateral curb plate, is sidelong the slope in the multilateral curb plate bottom, and the cross -section is the closed angle form, bottom plate and caisson bottom and roof be the back castable with the caisson top, are equipped with connecting reinforcement between roof and bottom plate and the caisson respectively, and the caisson sets up to one or more, and the caisson sets up when a plurality of, passes through the connecting piece connection between the caisson. Compared with the prior art, the utility model discloses need not to excavate the foundation ditch at whole work progress, more be applicable to the geological conditions that the supporting course is deep and weak, groundwater is abundant, and because the caisson is prefabricated for the mill, can guarantee engineering construction quality.

Description

A kind of bridge laying foundation
Technical field
The utility model belongs to ground foundation engineering field, relates to a kind of bridge foundation, is specifically related to a kind of bridge laying foundation.
Background technology
Bridge foundation is the structure of bridge foot, is directly seated on rock or soil base, and its top connects bridge pier or abutment, and effect ensures pier safety and by dynamic changes process to ground.Therefore, in order to safety and the normal use of full-bridge, require that will there be enough intensity, rigidity and resistance to overturning in ground and basis, make it not produce excessive horizontal displacement or differential settlement.Building of bridge foundation, occupies very consequence in whole bridge engineering.
Bridge foundation of the prior art, floor is arranged on bearing stratum, in construction, need excavation pit to construct, when the above thicker soil of bearing stratum and very soft time, be often difficult to excavate out foundation ditch simply, especially when upper soil horizon water content is very large, cannot foundation ditch be formed at all, bring great difficulty to construction, even if form foundation ditch, also cannot ensure concrete pouring quality, bring hidden danger of quality to engineering.
Utility model content
For above-mentioned the deficiencies in the prior art, the utility model provides a kind of bridge laying foundation.
The technical solution adopted in the utility model is:
A kind of bridge laying foundation, it comprises top board, caisson and base plate, and bridge pier arranges on top board, and base plate is arranged on bearing stratum; Caisson is the framework box body structure communicated up and down be made up of polygon side plate, and be sidelong slope in polygon side plate bottom, cross section is tip-angled shape; Bottom base plate and caisson and top board and caisson top is rear castable, top board and be respectively equipped with connecting reinforcement between base plate and caisson, and caisson is set to one or more, when caisson is set to multiple, is connected between caisson by connector.
Connecting reinforcement is divided into vertical connecting reinforcement and lateral connection reinforcing bar, and the top of vertical connecting reinforcement and bottom are stretched in the polygon side plate of top board and caisson respectively, in the polygon side plate bottom that caisson is stretched at the two ends of lateral connection reinforcing bar respectively and base plate.
Bridge pier and top board are integrated builds shaping.
Further, described caisson is the framework box body structure communicated up and down be made up of four side plates.
Connector is anchor, and the polygon side plate of caisson is provided with one or more eyelet for installing anchor; The eyelet at the same position place on side plate adjacent between caisson is connected and is connected by anchor.
Caisson bottom the utility model is transported to scene after prefabricated, and then by the soil body within the scope of excavation caisson, caisson is sunk gradually, whole work progress is without the need to excavation pit.Compared with prior art, be more applicable to that bearing stratum is deep and weak, the geological conditions of rich groundwater; And due to caisson be prefabrication, can engineering construction quality be ensured.When adopting multiple caisson, the weight of single caisson can be reduced, making caisson be convenient to transport, being applicable to the job location that conditions of transportation is very poor.
Accompanying drawing explanation
Fig. 1 is the utility model structural representation.
Fig. 2 is the structural representation of anchor in the utility model.
Fig. 3 is the top plan view of the utility model caisson.
Fig. 4 is the top plan view of the utility model embodiment 1 caisson.
Fig. 5 is the top plan view of the utility model embodiment 2 caisson.
Fig. 6 is the structural representation of prior art.
Reference numeral: bridge pier 1, top board 2, vertical connecting reinforcement 3, caisson 4, lateral connection reinforcing bar 5, base plate 6, anchor 7, anchor cable 8, ground tackle 9.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is described further, but scope of the present utility model is not limited to following embodiment.
Embodiment 1:
A kind of bridge laying foundation, it comprises top board 2, caisson 4 and base plate 6, and bridge pier 1 arranges on top board 2, and base plate 6 is arranged on bearing stratum; Caisson 4 is the framework box body structure communicated up and down be made up of four side plates, and four side plate bottom inside put slope, and cross section is tip-angled shape; Bottom base plate 6 and caisson 4 and top board 2 be rear castable with caisson 4 top, top board 2 and be respectively equipped with connecting reinforcement between base plate 6 and caisson 4.
Caisson 4 is two, and two caissons 4 are consolidated by anchor 7.
Connecting reinforcement is divided into vertical connecting reinforcement 3 and lateral connection reinforcing bar 5, and the top of vertical connecting reinforcement 3 and bottom are stretched in the polygon side plate of top board 2 and caisson 4 respectively, in the polygon side plate bottom that caisson 4 is stretched at the two ends of lateral connection reinforcing bar 5 respectively and base plate 6.
Bridge pier 1 and top board 2 are integrated builds shaping.
Connector is anchor 7, and the polygon side plate of caisson 4 is provided with one or more eyelet for installing anchor 7; The eyelet at the same position place on side plate adjacent between caisson 4 is connected and is connected by anchor 7.Anchor 7 is made up of anchor cable 8 and the ground tackle 9 being placed in two ends.
Caisson 4 prefabrication can be transported to job site again, then by digging out the soil body of caisson 4 internal range, caisson 4 is progressively sunk, until arrive bearing stratum bottom caisson 4, then bottom caisson, cast-in-place concrete forms base plate 6, and top board 2 and bridge pier 1 are formed at top again fluid concrete.
Embodiment 2:
On the basis of embodiment 1, caisson 4 is four, and four caissons 4 are consolidated by anchor 7.
Anchor 7 is made up of anchor cable 8 and the ground tackle 9 being placed in two ends.
Caisson 4 is provided with multiple eyelet for fixedly mounting anchor 7, and the eyelet at different caisson 4 same position place can be connected.
This bridge laying foundation Specific construction order is as follows:
(1) precast caisson 4, vertical connecting reinforcement 3 and lateral connection reinforcing bar 5 in advance on caisson 4, and are transported to job site, locate.
(2) excavate the caisson 4 internal range soil body, caisson 4 is progressively sunk, in sinking watching, can adopt the mode of placing weight at caisson 4 top, auxiliary caisson 4 sinks.
(3) caisson 4 progressively sinks down into bearing stratum design elevation.
(4) formwork concreting forms base plate 6.
(5) other caisson 4 adopts preceding method to sink down into design attitude, builds and forms base plate 6, be consolidated by adjacent caisson 4 by anchor 7.
(6) formed by integrally casting concrete forms bridge pier 1 and top board 2.

Claims (5)

1. a bridge laying foundation, it comprises top board (2), caisson (4) and base plate (6), bridge pier (1) arranges on top board (2), base plate (6) is arranged on bearing stratum, it is characterized in that, caisson (4) is the framework box body structure communicated up and down be made up of polygon side plate, and be sidelong slope in polygon side plate bottom, cross section is tip-angled shape; Base plate (6) and caisson (4) bottom and top board (2) and caisson (4) top are rear castable, top board (2) and be respectively equipped with connecting reinforcement between base plate (6) and caisson (4), caisson (4) is set to one or more, when caisson (4) is set to multiple, caisson is connected by connector between (4).
2. a kind of bridge laying foundation as claimed in claim 1, it is characterized in that, connecting reinforcement is divided into vertical connecting reinforcement (3) and lateral connection reinforcing bar (5), the top of vertical connecting reinforcement (3) and bottom are stretched in the polygon side plate of top board (2) and caisson (4) respectively, in the polygon side plate bottom that caisson (4) is stretched at the two ends of lateral connection reinforcing bar (5) respectively and base plate (6).
3. a kind of bridge laying foundation as claimed in claim 1 or 2, is characterized in that, described bridge pier (1) and top board (2) are integrated builds shaping.
4. a kind of bridge laying foundation as claimed in claim 1 or 2, is characterized in that, described caisson (4) is the framework box body structure communicated up and down be made up of four side plates.
5. a kind of bridge laying foundation as claimed in claim 1 or 2, is characterized in that, described connector is anchor (7), and the polygon side plate of caisson (4) is provided with one or more eyelet for installing anchor (7); The eyelet at the same position place on side plate adjacent between caisson (4) is connected and is connected by anchor (7).
CN201520583604.3U 2015-08-06 2015-08-06 Bridge caisson foundation Expired - Fee Related CN204898699U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520583604.3U CN204898699U (en) 2015-08-06 2015-08-06 Bridge caisson foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520583604.3U CN204898699U (en) 2015-08-06 2015-08-06 Bridge caisson foundation

Publications (1)

Publication Number Publication Date
CN204898699U true CN204898699U (en) 2015-12-23

Family

ID=54920888

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520583604.3U Expired - Fee Related CN204898699U (en) 2015-08-06 2015-08-06 Bridge caisson foundation

Country Status (1)

Country Link
CN (1) CN204898699U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109440796A (en) * 2018-11-30 2019-03-08 中铁第四勘察设计院集团有限公司 Suitable for the inverted T shaped precast caisson of deep water drift net area or shallow overburden basis and its construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109440796A (en) * 2018-11-30 2019-03-08 中铁第四勘察设计院集团有限公司 Suitable for the inverted T shaped precast caisson of deep water drift net area or shallow overburden basis and its construction method

Similar Documents

Publication Publication Date Title
CN103967031B (en) A kind of caisson of consolidated subsoil and stake combination foundation and construction method thereof
CN101914925B (en) Basement by using optimized composite prefabricated arch wall as external wall
CN105089061B (en) Ultra-deep foundation pit supporting method
CN203213136U (en) Caisson and pile combined foundation of consolidated subsoil
CN104947682A (en) Foundation pit support construction method and device thereof
CN101092850A (en) Method and installation for rising building or historical building / cluster of historical building integrally
CN103015456B (en) Rapid pit-in-pit form erecting method in foundation slab of buried concrete structure
CN207987927U (en) Multistage echelon foundation pit supporting system
CN108343071A (en) A kind of foundation pit supporting construction and construction method of steel sheet pile combined deposited pile
CN103938634B (en) A kind of deep foundation pit supporting structure and construction method
CN101418569B (en) Optimization complex arch wall combining prefabricated arch leaf, support and major structure
CN102864780A (en) Supporting structure and supporting method of foundation pit
CN103215889B (en) A kind of arch bridge base for poor geological conditions and construction method thereof
CN103912134A (en) Construction in-situ underground space structure and construction method
CN106013053A (en) Steel sheet pile support construction method for building underground garage open caisson
CN109183838B (en) A kind of high anti-floating cracking resistance basement floor constructions and its design method
CN105239578A (en) Water-rich sand layer deep foundation pit underwater construction method
CN203701127U (en) Underwater gravity type foundation
CN207419519U (en) A kind of campshed supporting is with helping the structural system that arm-type barricade is combined
CN206752667U (en) A kind of basement barrier wall structure
CN104005414B (en) Large-size rebar cast in place concrete pile supports the constructional method of column
CN104195956A (en) Scaffolding type water area continuous beam cast-in-situ supporting frame and erection method thereof
CN204282399U (en) A kind of subway space enclosing structure
CN201991013U (en) High-piled tower footing structure of tower crane concrete-filled steel tube
CN203701139U (en) Jacket with gravity type caisson base

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151223

Termination date: 20170806