CN204875823U - Combination cofferdam structure - Google Patents

Combination cofferdam structure Download PDF

Info

Publication number
CN204875823U
CN204875823U CN201520493791.6U CN201520493791U CN204875823U CN 204875823 U CN204875823 U CN 204875823U CN 201520493791 U CN201520493791 U CN 201520493791U CN 204875823 U CN204875823 U CN 204875823U
Authority
CN
China
Prior art keywords
cofferdam
steel sheet
pile
grid
sheet pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201520493791.6U
Other languages
Chinese (zh)
Inventor
伍夕国
任伟勤
易世森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 7 Co Ltd
Original Assignee
Sinohydro Bureau 7 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 7 Co Ltd filed Critical Sinohydro Bureau 7 Co Ltd
Priority to CN201520493791.6U priority Critical patent/CN204875823U/en
Application granted granted Critical
Publication of CN204875823U publication Critical patent/CN204875823U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a combination cofferdam structure. Constitute by the earth rock cofferdam of river course right bank and left bank phytal zone and the steel sheet piling cofferdam of river course center profundal zone, steel sheet piling cofferdam lies in between the earth rock cofferdam of both sides, and the main cofferdam grid of being packed the grit by the multiunit constitutes with the continuity of vice cofferdam grid interval, steel sheet piling cofferdam bottom riverbed has the manual work to jettisoning the back -up sand to form the basic overburden that is used for the steel sheet pile location. The utility model discloses adopt steel sheet pile embedding consolidation structure to make two kinds of better integrations of structure in embankment dam cofferdam and steel sheet piling cofferdam joint portion, whole cofferdam structure is more stable, the utility model discloses a form the basic overburden in location, mounting groove underwater construction need not carried out to this method, has realized the cofferdam construction of high -efficient high grade.

Description

A kind of combined cofferdam structure
Technical field
The utility model relates to hydraulic engineering technical field, and the cofferdam construction technology particularly in the hydraulic engineering such as river course, specifically, relates to one combined cofferdam structure under water.
Background technology
Cofferdam refers in hydraulic engineering construction, for building the provisional space enclosing structure that permanent water conservancy projects is built, its effect be prevent water and soil from entering underwater structure build position, so that carry out dry groove construction in cofferdam.Cofferdam is generally mainly used in hydraulic architecture, and except the part of minority cofferdam as formal underwater structure, most of cofferdam needs to remove after being finished.
At present, at water conservancy industry, cofferdam design form is all generally single form, such as earth rock cofferdam, gunnysack cofferdam, wood sheet-pile cofferdam, steel sheet-pile cofferdam, Double-Wall Steel Boxed Cofferdam, reinforced concrete bi-flexural beam, snap close pile tube cofferdam etc.
The many employings of steel sheet pile cofferdam construction on exposed bedrock are along the surrounding outline line of steel sheet pile sheet insertion position, employing impact type rig drills through multiple occlusion boring and the corresponding mounting groove formed for fixing bottom cofferdam, then mounting groove is backfilled, again inserted to play and closure construction are carried out to multi-disc steel sheet pile, and form the closed cofferdam after closing up.Although its construction technology can meet not because bottom water currents produces displacement bottom steel sheet pile, it is long in time limit that bore mode forms mounting groove, and costly, and underwater drilling formation mounting groove is high to bore position required precision, controls difficulty larger.
By the cofferdam Combination application that different structure body and material thereof are formed, the structural configuration of its assembly and materials application are not also further studied at present.
Utility model content
The utility model discloses a kind of combined cofferdam structure according to the deficiencies in the prior art.The purpose of this utility model is to provide the cofferdam of a kind of many structure combination, and further provide combined cofferdam under water the naked batholith plinth of plane without the cofferdam structure of steel sheet pile locating slot.
The utility model is achieved through the following technical solutions:
First the utility model provides combined cofferdam structure, it is characterized in that: be made up of the steel sheet-pile cofferdam of the earth rock cofferdam and profundal zone, center, river course that are positioned at phytal zone, two sides, river course; Described steel sheet-pile cofferdam, between the earth rock cofferdam of both sides, combines many groups of main cofferdam grids forming and grid interval, secondary cofferdam by steel sheet pile and continues and form, fill sandstone in main cofferdam grid and secondary cofferdam grid.
Bottom described steel sheet-pile cofferdam, riverbed has manual jettisoning back-up sand to form the basic covering layer of locating for steel sheet pile.
Described main cofferdam grid is columniform structure by multiple steel sheet pile by the cross section that buckle structure connects and composes, and described secondary cofferdam grid is between two main cofferdam grids and the structure connected and composed by buckle structure by multiple steel sheet pile.
There is the steel sheet pile that one end and main cofferdam grid or secondary cofferdam grid are welded to connect, the other end extends into also consolidation in earth rock cofferdam described steel sheet-pile cofferdam and earth rock cofferdam junction, both sides.
The construction construction method of combinations thereof cofferdam structure, comprise: take manual jettisoning back-up sand to form the basic covering layer of locating for steel sheet pile, formed and naked batholithite has tectal construction environment under water, by steel sheet pile through inserted to play and close up cofferdam complete steel sheet pile on basis supratectal cofferdam construction, carry out the throwing sandstone construction of earth rock cofferdam and steel sheet-pile cofferdam each cofferdam grid again, finally consolidation grouting or high pressure phase equilibria Seepage are carried out to sand gravel contact zone, antiseepage position bottom earth rock cofferdam, steel sheet pile and between basement rock.
The utility model helpfulness: the utility model is optionally by earth and rockfill dam cofferdam and steel sheet-pile cofferdam combination, realize the mutual supplement with each other's advantages of earth and rockfill dam cofferdam and steel sheet-pile cofferdam, not only meet the basic demand that cofferdam occupied ground is little, reach the object of cofferdam shelves water, also effectively improve speed of application, reduce operating expenses; Earth and rockfill dam cofferdam and steel sheet-pile cofferdam joint portion adopt steel sheet pile embedding consolidation structure that two kinds of structures are better merged by the utility model, and overall cofferdam structure is more stable; The utility model structure can adopt the method for on-the-spot Cast-in-situ Piles in Sand-filling gravel material to carry out the construction of exposed bedrock upper steel plate pile cofferdam, eliminate the work that water surface boring forms mounting groove, significantly reduce construction cost, shorten the engineering construction cycle, improve operating efficiency; The basic covering layer for steel sheet pile location is formed by back-up sand of jettisoninging, formed and naked batholithite has tectal construction environment under water, again by steel sheet pile through inserted to play with close up cofferdam construction and complete steel sheet pile cofferdam construction, this structure does not need to carry out mounting groove subaqueous construction, steel sheet pile installs accurate positioning and construction difficulty is little, decrease equipment requirement, achieve the cofferdam construction of high-efficiency high-quality.
Accompanying drawing explanation
Fig. 1 is the utility model combined cofferdam structural plan schematic diagram;
Fig. 2 is the utility model combined cofferdam structure vertical cross section structure schematic diagram;
Fig. 3 is that the utility model combined cofferdam joint portion steel sheet pile arranges schematic diagram;
Fig. 4 is that the major and minor grid steel sheet pile of the utility model combined cofferdam arranges schematic diagram;
Fig. 5 is steel sheet pile structural representation;
Tu6Shi branch steel sheet pile structural representation.
In figure, 1 is earth and rockfill dam cofferdam, left bank, and 2 is steel sheet-pile cofferdam main grate, and 3 is the secondary grids of steel sheet-pile cofferdam, and 4 is right bank earth and rockfill dam cofferdam, and 5 is combined cofferdam joint portions, and 6 is back-up sand layers of jettisoninging, and 7 is that exposed bedrock layer is surperficial under water.
Detailed description of the invention
Below by embodiment, the utility model is specifically described; embodiment is only for being further detailed the utility model; can not be interpreted as the restriction to the utility model protection domain, some nonessential improvement that those skilled in the art makes according to above-mentioned content of the present utility model and adjustment also belong to the scope of the utility model protection.
Composition graphs 1 to Fig. 6.
As shown in the figure, combined cofferdam structure, is made up of the steel sheet-pile cofferdam of the earth rock cofferdam and profundal zone, center, river course that are positioned at phytal zone, two sides, river course; Steel sheet-pile cofferdam, between the earth rock cofferdam of both sides, combines many groups of main cofferdam grids forming and grid interval, secondary cofferdam by steel sheet pile and continues and form, fill sandstone in main cofferdam grid and secondary cofferdam grid.
Bottom steel sheet-pile cofferdam, riverbed has manual jettisoning back-up sand to form the basic covering layer of locating for steel sheet pile.
Main cofferdam grid is columniform structure by multiple steel sheet pile by the cross section that buckle structure connects and composes, and secondary cofferdam grid is between two main cofferdam grids and the structure connected and composed by buckle structure by multiple steel sheet pile.
There is the steel sheet pile that one end and main cofferdam grid or secondary cofferdam grid are welded to connect, the other end extends into also consolidation in earth rock cofferdam steel sheet-pile cofferdam and earth rock cofferdam junction, both sides.
The construction construction method of combinations thereof cofferdam structure, manual jettisoning back-up sand is taked to form the basic covering layer of locating for steel sheet pile, formed and naked batholithite has tectal construction environment under water, by steel sheet pile through inserted to play and close up cofferdam complete steel sheet pile on basis supratectal cofferdam construction, carry out the throwing sandstone construction of steel sheet-pile cofferdam grid and earth rock cofferdam again, finally consolidation grouting or high pressure phase equilibria Seepage are carried out to sand gravel contact zone, antiseepage position bottom earth rock cofferdam, steel sheet pile and between basement rock.
As depicted in figs. 1 and 2, figure comprises earth and rockfill dam cofferdam, left bank, middle steel plate pile cofferdam, right bank earth and rockfill dam cofferdam, left and right bank earth and rockfill dam cofferdam lays respectively at left and right banks phytal zone, because water level is more shallow, earth and rockfill dam cofferdam adds both sides side slope, toe position is still no more than the occupation of land scope of construction regulation, and the filler at this position can adopt soil-stone material to fill, and utilizes the closely knit antiseepage of filler self; Middle steel plate pile cofferdam is positioned at profundal zone, adopt insertion steel sheet pile sheet to form closed steel sheet pile grid, multiple steel sheet pile grid is connected into wire, forms steel sheet-pile cofferdam, fill out sandy gravel in steel sheet pile grid, then carry out steel sheet pile and the consolidation grouting that contacts of basis or high pressure phase equilibria antiseepage.
When carrying out steel sheet pile cofferdam construction, in conjunction with the throwing sandstone construction that last earth and rockfill dam cofferdam is carried out, steel sheet pile cofferdam construction is important construction sequence, and it specifically comprises the following steps:
According to cofferdam structure size and the construction location of design, measure in river course and determine on-the-spot particular location;
The working platform that when utilizing steel sheet pile construction, main equipment is stood, increases buoyancy tank and also sets up belt transmission system, to be onstructed first steel sheet pile nominative region conveying sand gravel material throwing, inserts after region throwing thickness is greater than 2m stop throwing until steel sheet pile sheet;
Leading truck is installed, and when carrying out installation drawing strickle guide and enclosing purlin, first carries out accurate location survey, makes guide pile, be fixed after being adjusted to design attitude;
For ensureing that pitching pile closes up smoothly, require that pile body is vertical, first group of steel sheet pile establishes the guide beam being fixed on and enclosing purlin and support, and inserts, make first group of steel sheet pile pile body vertical along under guide beam.Steel sheet pile is assigned to use crawler crane to carry out horizontal and vertical transport to steel sheet pile, steel sheet pile is transported to assigned address, then the upright device of rotation is adopted to make steel sheet pile become plumbness, handling steel sheet pile shifts to placement location, insert in manned steel sheet pile fore shaft adopt large-scale crane on working platform handling steel sheet pile sheet along first steel sheet pile nominative periphery installation in position, then vibropiling inserts in the sand gravel material of backfill, until insert on bedrock surface bottom steel sheet pile sheet;
After the steel sheet pile of first steel sheet pile nominative all inserts, lattice internal guide frame is removed, then belt transmission system is set up, sand gravel material throwing is carried in first steel sheet pile nominative, sand gravel maximum particle diameter is less than 100mm, throwing is while adopt water under high pressure to carry out impulsion stirring on one side, makes sandy gravel closely knit, until first steel sheet pile nominative all fills up;
Repeat above step, carry out second steel sheet pile nominative construction, after completing second steel sheet pile nominative construction, carry out secondary lattice between first and the second nominative and construct, the complete formation steel sheet-pile cofferdam until all steel sheet pile grids are constructed; The throwing sand construction of earth and rockfill dam cofferdam can be carried out when carrying out joint portion steel sheet pile grid construction more simultaneously.
Carry out consolidation grouting or high pressure phase equilibria to sand gravel contact zone, antiseepage position bottom steel sheet pile and between basement rock to construct and form impervious body.
Optionally by earth and rockfill dam cofferdam and steel sheet-pile cofferdam combination, realize the mutual supplement with each other's advantages of earth and rockfill dam cofferdam and steel sheet-pile cofferdam, not only meet the basic demand that cofferdam occupied ground is little, reach the object of cofferdam shelves water, also effectively improve speed of application, reduce operating expenses.
As Fig. 3, Fig. 4 and Fig. 6, Fig. 3 is that combined cofferdam joint portion steel sheet pile arranges schematic diagram; Fig. 4 is that the major and minor grid steel sheet pile of combined cofferdam arranges schematic diagram; There is the steel sheet pile of branched structure can adopt branch's welded construction in figure, branch's buckle structure also can be adopted to connect; Tu6Shi branch steel sheet pile structural representation, figure cathetus shaped steel plate pile is connected by branch's snap close.

Claims (4)

1. a combined cofferdam structure, is characterized in that: be made up of the steel sheet-pile cofferdam of the earth rock cofferdam and profundal zone, center, river course that are positioned at phytal zone, two sides, river course; Described steel sheet-pile cofferdam, between the earth rock cofferdam of both sides, combines many groups of main cofferdam grids forming and grid interval, secondary cofferdam by steel sheet pile and continues and form, fill sandstone in main cofferdam grid and secondary cofferdam grid.
2. combined cofferdam structure according to claim 1, is characterized in that: bottom described steel sheet-pile cofferdam, riverbed has manual jettisoning back-up sand to form the basic covering layer of locating for steel sheet pile.
3. combined cofferdam structure according to claim 2, it is characterized in that: described main cofferdam grid is columniform structure by multiple steel sheet pile by the cross section that buckle structure connects and composes, and described secondary cofferdam grid is between two main cofferdam grids and the structure connected and composed by buckle structure by multiple steel sheet pile.
4. combined cofferdam structure according to claim 3, is characterized in that: there is the steel sheet pile that one end and main cofferdam grid or secondary cofferdam grid are welded to connect, the other end extends into also consolidation in earth rock cofferdam described steel sheet-pile cofferdam and earth rock cofferdam junction, both sides.
CN201520493791.6U 2015-07-09 2015-07-09 Combination cofferdam structure Withdrawn - After Issue CN204875823U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520493791.6U CN204875823U (en) 2015-07-09 2015-07-09 Combination cofferdam structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520493791.6U CN204875823U (en) 2015-07-09 2015-07-09 Combination cofferdam structure

Publications (1)

Publication Number Publication Date
CN204875823U true CN204875823U (en) 2015-12-16

Family

ID=54820215

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520493791.6U Withdrawn - After Issue CN204875823U (en) 2015-07-09 2015-07-09 Combination cofferdam structure

Country Status (1)

Country Link
CN (1) CN204875823U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104929142A (en) * 2015-07-09 2015-09-23 中国水利水电第七工程局有限公司 Combined cofferdam structure and building construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104929142A (en) * 2015-07-09 2015-09-23 中国水利水电第七工程局有限公司 Combined cofferdam structure and building construction method thereof

Similar Documents

Publication Publication Date Title
CN106703050B (en) Cut Slopes of Expansive Soil reinforced earth back-pressure antiseepage supporting construction and its construction method
CN102094425B (en) Foundation pit construction method adopting shallow buried depth Larsen steel plate pile as protective cofferdam
CN104929142B (en) A kind of combined cofferdam structure and construction construction method thereof
CN107299630A (en) A kind of deep & thick silt matter riverbed piping lane crosses the river double steel plate pile cofferdam structure and construction method
CN106930321B (en) The construction method of underground structure is built in a kind of stake of pipe-jacking with large diameter combination hole
CN101949153B (en) Foundation drainage control method
CN104131575A (en) Plugging and drainage method for dam foundation on karst highly developed stratum
CN203729308U (en) Double-row pile supporting system of reinforced concrete pile combined structural steel cement mixing pile wall
CN203684242U (en) Geobag and slurry combined cofferdam type subaqueous construction platform in mud flat
CN102966110A (en) Vertically-combined type impermeable waterproof curtain structure and construction method thereof
CN107489106B (en) A kind of rocky bed subaqueous bearing platform construction method
CN112227401A (en) Method for constructing bearing platform by filling stones in underwater stone abrupt slope area
CN104947698A (en) Construction method for steel sheet pile cofferdam on underwater exposed bedrock
CN104947697A (en) Construction method for rapidly enclosing weir by utilizing Larsen steel sheet piles
CN109898556A (en) A kind of underground pipe gallery structure and sunk type construction method
CN207537975U (en) Deep covering layer top panel Rockfill Dam based moisture barrier structure
CN203939036U (en) A kind of steel sheet pile cofferdam structure that is applicable to river course
CN111335263B (en) Method for building artificial island
CN204875823U (en) Combination cofferdam structure
CN201778330U (en) Clay water-stop curtain wall
CN104727325B (en) A kind of method of construction of polder sea wall
CN107642101A (en) A kind of rocky bed steel cofferdam back cover leak stopping and guarded drainage construction method
CN104499489A (en) Foundation pit construction method
CN104480945A (en) Inversed construction method for foundation pit
CN206220108U (en) Cut Slopes of Expansive Soil reinforced earth back-pressure antiseepage supporting construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20151216

Effective date of abandoning: 20160907

C25 Abandonment of patent right or utility model to avoid double patenting