CN204875411U - Prop up fender formula roadbed structure - Google Patents

Prop up fender formula roadbed structure Download PDF

Info

Publication number
CN204875411U
CN204875411U CN201520704022.6U CN201520704022U CN204875411U CN 204875411 U CN204875411 U CN 204875411U CN 201520704022 U CN201520704022 U CN 201520704022U CN 204875411 U CN204875411 U CN 204875411U
Authority
CN
China
Prior art keywords
drainage
water layer
row water
barricade
blanket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520704022.6U
Other languages
Chinese (zh)
Inventor
何贵勤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Jiaotong University
Original Assignee
Southwest Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Jiaotong University filed Critical Southwest Jiaotong University
Priority to CN201520704022.6U priority Critical patent/CN204875411U/en
Application granted granted Critical
Publication of CN204875411U publication Critical patent/CN204875411U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a prop up fender formula roadbed structure, including supercrust, barricade and road bed layer, wherein, the road bed layer includes road bed soil, first drainage blanket, second drainage blanket and vertical drainage passageway, the both ends of vertical drainage passageway communicate first drainage blanket and second drainage blanket respectively, the vertical drainage passageway includes wall side drainage channel and central drainage channel, a wall side drainage channel and a barricade contact, the second drainage blanket passes a barricade and outside drainage facility intercommunication. This prop up fender formula roadbed structure is through first drainage blanket, second drainage blanket and vertical drainage passageway, can realize simultaneously horizontal drainage and vertical drainage in order to obtain good drainage system, wherein, wall in a vertical drainage passageway side drainage channel and a barricade contact have approximate side slope drainage's characteristics, and the both ends that make horizontal drainage blanket go out the log raft to the outside drainage facility in along propping up the barricade fast, have strengthened prop up fender formula roadbed structure's stability.

Description

Prop up gear formula road structure
Technical field
The utility model relates to a kind of civil engineering facility, and particularly one props up gear formula road structure.
Background technology
Along with the fast development of special line for passenger trains, high-speed railway and speedway, the fund input of soft foundation settlement Control has occupied the larger specific gravity of construction investment.Railway conventional at present or highway subgrade structure have multiple, wherein a kind of is retaining roadbed structure with retaining wall, the roadbed rectangular in cross-section of this retaining roadbed structure, the outside, both sides of roadbed is respectively equipped with a retaining wall, and railway or highway construction are on the roadbed of centre.This retaining roadbed structure has that area occupied is little, joint space-efficient feature, therefore can protect existing building, thus can reduce expropriation of land and removal etc.But, this retaining roadbed structure with retaining wall of prior art, roadbed inside is too closed, on drainage, often only consider horizontal cross draining, horizontal cross drainage path is long, and drainage effect is poor, do not consider the problem that rainwater infiltrates, subgrade drainage can not be got rid of more in time yet.Therefore, need a kind of have good drainage system be used for get rid of subgrade drainage fast, strengthen the retaining roadbed structure of retaining roadbed stability.
Utility model content
The technical problems to be solved in the utility model is: overcome the problems referred to above, provides a kind of horizontal drainage and vertical drainage of simultaneously realizing to obtain a gear formula road structure of good drainage system.
To achieve these goals, the technical solution adopted in the utility model is such: of the present utility model gear formula road structure, comprise supercrust, prop up barricade and base course, wherein, described base course comprises subgrade soils, first row water layer, second row water layer and vertical drainage passage, the two ends of described vertical drainage passage are communicated with first row water layer and second row water layer respectively, described vertical drainage passage comprises wall side drainage channel and Central Drainage passage, described wall side drainage channel contacts with a barricade, described second row water layer is communicated with externally drained facility through a barricade.
Further, as a kind of concrete form of structure, first row water layer described in the utility model and second row water layer adopt crushed gravel material to fill.
Further, as a kind of concrete form of structure, vertical drainage passage described in the utility model adopts crushed gravel material to fill.
Further, as a kind of concrete form of structure, in second row water layer described in the utility model, be provided with airduct.
Further, as a kind of concrete form of structure, the bottom of second row water layer described in the utility model is equipped with soil engineering drainage material.
Further, as a kind of concrete form of structure, soil engineering drainage material described in the utility model is anti-seepage geomembrane, splash guard or geotextiles.
Compared with prior art, the utility model has the advantage of: this gear formula road structure is by first row water layer, second row water layer and vertical drainage passage, horizontal drainage and vertical drainage can be realized to obtain good drainage system simultaneously, wherein, described vertical drainage passage comprises wall side drainage channel and Central Drainage passage, described wall side drainage channel contacts with a barricade, there is the feature of approximate slope drainage, make the two ends of horizontal drainage layer be discharged to the outside in drainage by water rapidly along a barricade, enhance the stability of a gear formula road structure.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is further illustrated.
Fig. 1 is structural representation of the present utility model;
In figure: 1. supercrust; 2. a barricade; 3. first row water layer; 4. second row water layer; 5. wall side drainage channel; 6. Central Drainage passage; 7. subgrade soils; 8. externally drained facility.
Detailed description of the invention
By reference to the accompanying drawings the utility model is described in further detail now.These accompanying drawings are the schematic diagram of simplification, only basic structure of the present utility model are described in a schematic way, and therefore it only shows the formation relevant with the utility model.
The utility model as shown in Figure 1 props up the preferred embodiment of gear formula road structure, comprise supercrust 1, barricade 2 and base course, wherein, described base course comprises subgrade soils 7, first row water layer 3, second row water layer 4 and vertical drainage passage, the two ends of described vertical drainage passage are communicated with first row water layer 3 and second row water layer 4 respectively, described vertical drainage passage comprises wall side drainage channel 5 and Central Drainage passage 6, described wall side drainage channel 5 contacts with a barricade 2, and described second row water layer 4 is communicated with externally drained facility 8 through a barricade 2.Described first row water layer 3 and second row water layer 4 adopt crushed gravel material to fill.Described vertical drainage passage adopts crushed gravel material to fill.Airduct is provided with in described second row water layer 4.The bottom of described second row water layer 4 is equipped with soil engineering drainage material.Described soil engineering drainage material is anti-seepage geomembrane, splash guard or geotextiles.
Of the present utility model gear formula road structure is by first row water layer 3, second row water layer 4 and vertical drainage passage, horizontal drainage and vertical drainage can be realized to obtain good drainage system simultaneously, wherein, described vertical drainage passage comprises wall side drainage channel 5 and Central Drainage passage 6, described wall side drainage channel 5 contacts with a barricade 2, there is the feature of approximate slope drainage, water is discharged to the outside in drainage 8 along a barricade 2 by the two ends of horizontal drainage layer rapidly, enhances the stability of a gear formula road structure.Described first row water layer 3 and second row water layer 4 adopt crushed gravel material to fill.Described vertical drainage passage adopts crushed gravel material to fill.Be provided with airduct in described second row water layer 4, utilize natural wind or add blast to accelerate the eliminating to roadbed internal water, there is certain environmental benefit.The bottom of described second row water layer 4 is equipped with soil engineering drainage material, and described soil engineering drainage material is anti-seepage geomembrane, splash guard or geotextiles, can prevent the downward seepage flow collecting subgrade drainage in horizontal drainage layer, enhance the drainage effect of roadbed.
With above-mentioned according to desirable embodiment of the present utility model for enlightenment, by above-mentioned description, relevant staff in the scope not departing from this utility model technological thought, can carry out various change and amendment completely.The technical scope of this utility model is not limited to the content on manual, must determine its technical scope according to right.

Claims (6)

1. one kind gear formula road structure, it is characterized in that, comprise supercrust, barricade and base course, wherein, described base course comprises subgrade soils, first row water layer, second row water layer and vertical drainage passage, and the two ends of described vertical drainage passage are communicated with first row water layer and second row water layer respectively, and described vertical drainage passage comprises wall side drainage channel and Central Drainage passage, described wall side drainage channel contacts with a barricade, and described second row water layer is communicated with externally drained facility through a barricade.
2. according to claim 1 gear formula road structure, it is characterized in that, described first row water layer and second row water layer adopt crushed gravel material to fill.
3. according to claim 1 gear formula road structure, it is characterized in that, described vertical drainage passage adopts crushed gravel material to fill.
4. according to claim 1 gear formula road structure, is characterized in that, be provided with airduct in described second row water layer.
5. according to claim 1 gear formula road structure, it is characterized in that, the bottom of described second row water layer is equipped with soil engineering drainage material.
6. according to claim 5 gear formula road structure, it is characterized in that, described soil engineering drainage material is anti-seepage geomembrane, splash guard or geotextiles.
CN201520704022.6U 2015-09-04 2015-09-04 Prop up fender formula roadbed structure Expired - Fee Related CN204875411U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520704022.6U CN204875411U (en) 2015-09-04 2015-09-04 Prop up fender formula roadbed structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520704022.6U CN204875411U (en) 2015-09-04 2015-09-04 Prop up fender formula roadbed structure

Publications (1)

Publication Number Publication Date
CN204875411U true CN204875411U (en) 2015-12-16

Family

ID=54819805

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520704022.6U Expired - Fee Related CN204875411U (en) 2015-09-04 2015-09-04 Prop up fender formula roadbed structure

Country Status (1)

Country Link
CN (1) CN204875411U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105625267A (en) * 2016-02-23 2016-06-01 成都科创佳思科技有限公司 Channel construction structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105625267A (en) * 2016-02-23 2016-06-01 成都科创佳思科技有限公司 Channel construction structure

Similar Documents

Publication Publication Date Title
CN202117155U (en) Efficient leakage drainage device for inner slope of initial dam of tailing pond
CN206352331U (en) The concave herbaceous field structure of sponge the idea of the city
CN207003450U (en) A kind of hydrophobic bank protection of express highway roadbed greening
CN201865023U (en) Closed waterproof type central dividing strip for highway
CN204875411U (en) Prop up fender formula roadbed structure
CN109440554A (en) A kind of assembled greening band structure and its construction method
CN203475267U (en) Curb for water-permeable asphalt greenway pavement
CN205443976U (en) Prevent wind and hinder husky fence
CN210946670U (en) River structure suitable for urban river water ecology and water landscape improvement
CN205604186U (en) Clay core morals and manners material dam
CN104695379A (en) Ecological river channel revetment structure
CN206828900U (en) A kind of chain pavior brick drainage system of flexbile base
CN208363109U (en) A kind of slope protection equipment of roadbed
CN204898453U (en) Quick drainage roadbed structure
CN206267162U (en) A kind of roadbed side slope safeguard structure
CN106149640B (en) A method of it improving rock and permeates safety
CN202369883U (en) Road base treatment structure for soft soil region
CN205529776U (en) Infiltration structure of waterproof road in road surface
CN105350637B (en) Urban green space subsurface stormwater is regulated and stored device
CN205276436U (en) A secret device for rainwater regulation
CN201268851Y (en) Roadbed protecting wall
CN203034335U (en) Silty soil section highway drainage system
CN204000745U (en) A kind of bulwark
CN203625739U (en) Embankment made of red sandstone filler
CN209323289U (en) A kind of assembled greening band structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151216

Termination date: 20160904

CF01 Termination of patent right due to non-payment of annual fee