CN207003450U - A kind of hydrophobic bank protection of express highway roadbed greening - Google Patents

A kind of hydrophobic bank protection of express highway roadbed greening Download PDF

Info

Publication number
CN207003450U
CN207003450U CN201720472835.6U CN201720472835U CN207003450U CN 207003450 U CN207003450 U CN 207003450U CN 201720472835 U CN201720472835 U CN 201720472835U CN 207003450 U CN207003450 U CN 207003450U
Authority
CN
China
Prior art keywords
hole
slopes
fixed plate
concrete brick
roadbed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720472835.6U
Other languages
Chinese (zh)
Inventor
张朝晖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yangling Vocational and Technical College
Original Assignee
张朝晖
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 张朝晖 filed Critical 张朝晖
Priority to CN201720472835.6U priority Critical patent/CN207003450U/en
Application granted granted Critical
Publication of CN207003450U publication Critical patent/CN207003450U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Abstract

The utility model discloses a kind of hydrophobic bank protection of express highway roadbed greening, including slopes, gutter, gravel layer, drainpipe, nutrition soil layer, concrete brick and fixed plate, the slopes upper end is provided with roadbed and gutter, and slopes right end face is equipped with gravel layer, drainpipe, nutrition soil layer and concrete brick;Drainpipe lower end is connected with sewage draining exit;Implantation hole, permeable hole, arc gap and screwed hole are provided with concrete brick;Fixed plate is provided with concrete brick, hole, fixing bolt and ground connection rivet are provided through in fixed plate.The utility model ensures dredging and discharging for rainwater by the matching design of gutter, drainpipe and sewage draining exit;The stability of slopes is ensured by the matching design of gravel layer, nutrition soil layer, concrete brick and fixed plate, avoids that landslide phenomenon occurs.

Description

A kind of hydrophobic bank protection of express highway roadbed greening
Technical field
A kind of roadbed bank protection is the utility model is related to, specifically a kind of hydrophobic bank protection of express highway roadbed greening.
Background technology
Highway belongs to high-grade highway.Chinese transportation portion《Highway technical standard》Regulation, highway refer to " energy Adapt to annual round the clock the minibus volume of traffic be more than 25000, specialize in automobile shunting run at high speed and all control discrepancy Highway ".Although name of the various countries to highway is different, referred exclusively to more than 4 tracks, two to separating traveling, completely control Make entrance, all using the highway of crossings on different level.In addition, there are many countries to partly controlling gateway, be not all using vertical The through main line that body intersects is also referred to as highway.The importance of highway is self-evident, in order to prevent the side of both sides of highway Slope is washed out by rainwater, and highway is caused to damage, and influences the normal service life of highway, it is necessary to set bank protection to be protected in side slope Shield.
Existing roadbed bank protection varies because of the difference of location economic condition and the difference of actual requirement, but one As all simply possess basic protective effect, less stable, while in hydrophobic aspect and all relative shortcoming in terms of greening.
Utility model content
The purpose of this utility model is to provide a kind of hydrophobic bank protection of express highway roadbed greening, to solve above-mentioned background The problem of being proposed in technology.
To achieve the above object, the utility model provides following technical scheme:
A kind of hydrophobic bank protection of express highway roadbed greening, including slopes, gutter, gravel layer, drainpipe, Nutrition Soil Layer, concrete brick and fixed plate, the slopes upper end are provided with roadbed, and the slopes upper end, which is located to inlay on the right side of the roadbed, to be set Gutter is equipped with, the slopes right end face is equipped with gravel layer, and slopes right part, which is located to inlay below the gravel layer, to be provided with Drainpipe, the drainpipe lower end are connected with sewage draining exit, and the drainpipe upper end is provided with nutrition soil layer, the battalion Support and inlay in soil layer and be provided with concrete brick, be provided through implantation hole in the middle part of the concrete brick, in the concrete brick and For the implantation hole through permeable hole is connected with, described four turnings of concrete brick symmetrically offer arc gap, the concrete Screwed hole is provided through on the inside of the arc gap on brick, the concrete brick upper end is provided with fixed plate, described solid Fixed board surface is provided through through hole, fixing bolt is connected with the through hole, the fixing bolt is through described Through hole and the screwed hole are connected through a screw thread, and the fixed plate will by the cooperation of the fixing bolt and the screwed hole Four adjacent concrete bricks are connected, and are provided through being grounded rivet in the middle part of the fixed plate.
As further program of the utility model:The slopes right-hand member is in inclined-plane.
As further program of the utility model:The drainpipe upper end is connected with the gutter lower end, described Slopes bottom right-hand member is stretched into drainpipe lower end.
As further program of the utility model:The sewage draining exit end is connected with municipal drainage passage.
As further program of the utility model:The nutrition soil layer is the soil mixed through overnutrition waste material.
As further program of the utility model:The concrete brick is mixed by multigroup 40cm*40cm*15cm water penetration Coagulate native material fragment of brick and piece together composition.
As further program of the utility model:The implantation hole be 20cm*20cm*15cm through hole, the kind Plant and be used to plant green plants in hole.
As further program of the utility model:1/4 circular gap of the arc gap depression, adjacent four institutes State its described arc gap after concrete brick is pieced together and form complete circle.
As further program of the utility model:It is described on the through hole and adjacent four concrete bricks The corresponding setting of screwed hole.
As further program of the utility model:It is welded and fixed in the middle part of the ground connection rivet and the fixed plate, it is described Ground connection rivet lower end is extended in the slopes after sequentially passing through the nutrition soil layer and the gravel layer.
Compared with prior art, the beneficial effects of the utility model are:Rainwater and dirt punching on expressway above roadbed Leaching enters in gutter, and sewage is entered in municipal pipeline by drainpipe and sewage draining exit, so being capable of high-efficient dirt exhausting;Gravel layer is spread Slope surface is located at, can tentatively consolidate the domatic of slopes, while adjacent concrete brick passes through the fixing bolt in fixed plate It is fixedly connected with screwed hole, adjacent concrete brick and fixed plate are fixed in nutrition soil layer by being grounded rivet, simultaneously By nutrition soil layer and gravel layer be pressed on slopes it is domatic on, so can effectively place soil erosion, improve the stabilization of slopes Property, so as to keep the stability of roadbed, the service life of roadbed has been effectively ensured;Filled with battalion in implantation hole in concrete brick Soil layer is supported, can be used for planting green plants, the stabilization of nutrition soil layer can either be kept, and can enough improves the ring around roadbed Border.
Brief description of the drawings
Fig. 1 is a kind of structural representation of the express highway roadbed hydrophobic bank protection of greening.
Fig. 2 is a kind of structural representation of concrete brick in express highway roadbed hydrophobic bank protection of greening.
Fig. 3 is the attachment structure signal of fixed plate and ground connection rivet in a kind of express highway roadbed hydrophobic bank protection of greening Figure.
Fig. 4 is a kind of structural representation of fixed plate in express highway roadbed hydrophobic bank protection of greening.
In figure:1- slopes, 2- roadbeds, 3- gutters, 4- gravel layers, 5- drainpipes, 6- sewage draining exits, 7- nutrition soil layers, 8- Concrete brick, 81- implantation holes, 82- permeable holes, 83- arc gap, 84- screwed holes, 9- fixed plates, 91- through holes, 92- are fixed Bolt, 93- ground connection rivets.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
Refer to Fig. 1~4, in the utility model embodiment, a kind of hydrophobic bank protection of express highway roadbed greening, including slope Body 1, gutter 3, gravel layer 4, drainpipe 5, nutrition soil layer 7, concrete brick 8 and fixed plate 9, the right-hand member of slopes 1 are in inclined-plane, The upper end of slopes 1 is provided with roadbed 2, and the upper end of slopes 1 is inlayed positioned at the right side of roadbed 2 is provided with gutter 3, described Sewage on roadbed 2, which is concentrated, to be flowed into the gutter 3, and the right end face of slopes 1 is equipped with gravel layer 4, the right part position of slopes 1 Inlayed in the lower section of gravel layer 4 and be provided with drainpipe 5, the upper end of drainpipe 5 is connected with the lower end of gutter 3, institute State the lower end of drainpipe 5 and stretch into the bottom right-hand member of slopes 1, the lower end of drainpipe 5 is connected with sewage draining exit 6, the blowdown 6 ends of mouth are connected with municipal drainage passage, and the sewage collected in the gutter 3 is flowed out by the drainpipe 5, so as to logical Cross the sewage draining exit 6 to be discharged into municipal drainage passage, the upper end of drainpipe 5 is provided with nutrition soil layer 7, the Nutrition Soil Layer 7 is the soil mixed through overnutrition waste material, is inlayed in the nutrition soil layer 7 and is provided with concrete brick 8, the concrete brick 8 Pieced together and formed by multigroup 40cm*40cm*15cm permeable concrete material fragment of brick, the middle part of concrete brick 8 is through setting There is implantation hole 81, the implantation hole 81 is 20cm*20cm*15cm through hole, is used to plant green plant in the implantation hole 81 Thing, in the concrete brick 8 and the implantation hole 81 is through permeable hole 82 is connected with, and the permeable hole 82 is to be multigroup through connection Duct, described 8 four turnings of concrete brick symmetrically offer arc gap 83, and the arc gap 83 is recessed 1/4 circular Gap, its described arc gap 83 forms complete circle, the concrete brick after adjacent four concrete bricks 8 are pieced together Screwed hole 84 is provided through positioned at the inner side of arc gap 83 on 8, the upper end of concrete brick 8 is provided with fixed plate 9, institute State the surface of fixed plate 9 and be provided through through hole 91, it is described on the through hole 91 and adjacent four concrete bricks 8 84 corresponding setting of screwed hole, fixing bolt 92 is connected with the through hole 91, the fixing bolt 92 is through described Through hole 91 and the screwed hole 84 are connected through a screw thread, and the fixed plate 9 passes through the fixing bolt 92 and the screwed hole Four adjacent concrete bricks 8 are connected by 84 cooperation, and the middle part of fixed plate 9 is provided through being grounded rivet 93, the ground connection rivet 93 and the middle part of the fixed plate 9 are welded and fixed, and ground connection rivet 93 lower end sequentially passes through the nutrition Extended to after soil layer 7 and the gravel layer 4 in the slopes 1, the ground connection rivet 93 can be by the fixed plate 9 and described mixed Solidifying cob brick 8 is fixed in the nutrition soil layer 7.
Operation principle of the present utility model is:The rainwater of the top of roadbed 2 and dirt shower enter gutter 3 on expressway In, sewage is entered in municipal pipeline by drainpipe 5 and sewage draining exit 6, so being capable of high-efficient dirt exhausting;Gravel layer 4 is laid on slopes 1 Surface, the domatic of slopes 1 can be tentatively consolidated, while adjacent concrete brick 8 passes through the fixing bolt 92 and spiral shell in fixed plate 9 Pit 84 is fixedly connected, and adjacent concrete brick 8 and fixed plate 9 are fixed in nutrition soil layer 7 by being grounded rivet 93, together When by nutrition soil layer 7 and gravel layer 4 be pressed on slopes 1 it is domatic on, so can effectively place soil erosion, improve slopes 1 Stability, so as to keep the stability of roadbed 2, the service life of roadbed 2 has been effectively ensured;Implantation hole in concrete brick 8 Nutrition soil layer 7 is filled with 81, can be used for planting green plants, the stabilization of nutrition soil layer 7 can either be kept, and can enough improves Environment around roadbed 2.
The standardized element that the utility model uses can commercially, shaped piece according to specification and accompanying drawing Record can carry out customized, the specific connected mode of each part is using bolt ripe in the prior art, rivet, weldering The conventional meanses such as connect, machinery, part and equipment are using in the prior art, conventional model, plus circuit connection using existing Conventional connected mode, will not be described in detail herein in technology.
It is obvious to a person skilled in the art that the utility model is not limited to the details of above-mentioned one exemplary embodiment, and And in the case of without departing substantially from spirit or essential attributes of the present utility model, it can realize that this practicality is new in other specific forms Type.Therefore, no matter from the point of view of which point, embodiment all should be regarded as exemplary, and is nonrestrictive, this practicality is new The scope of type limits by appended claims rather than described above, it is intended that the equivalency fallen in claim is contained All changes in justice and scope are included in the utility model.Any reference in claim should not be considered as limitation Involved claim.
Moreover, it will be appreciated that although the present specification is described in terms of embodiments, not each embodiment is only wrapped Containing an independent technical scheme, this narrating mode of specification is only that those skilled in the art should for clarity Using specification as an entirety, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art It is appreciated that other embodiment.

Claims (8)

1. a kind of hydrophobic bank protection of express highway roadbed greening, including slopes (1), gutter (3), gravel layer (4), drainpipe (5), nutrition soil layer (7), concrete brick (8) and fixed plate (9), it is characterised in that slopes (1) upper end is provided with roadbed (2), slopes (1) upper end, which is located to inlay on the right side of the roadbed (2), is provided with gutter (3), slopes (1) right end face Gravel layer (4) is equipped with, slopes (1) right part, which is located to inlay below the gravel layer (4), is provided with drainpipe (5), the draining Pipe (5) lower end is connected with sewage draining exit (6), and drainpipe (5) upper end is provided with nutrition soil layer (7), the nutrition Inlayed in soil layer (7) and be provided with concrete brick (8), the concrete brick (8) is mixed by multigroup 40cm*40cm*15cm water penetration Coagulate native material fragment of brick and piece together composition, implantation hole (81), the concrete brick (8) are provided through in the middle part of the concrete brick (8) For interior and described implantation hole (81) through permeable hole (82) is connected with, described (8) four turnings of concrete brick symmetrically offer arc Gap (83), 1/4 circular gap of the arc gap (83) depression, after adjacent four concrete bricks (8) are pieced together its The arc gap (83) forms complete circle, runs through on the concrete brick (8) on the inside of the arc gap (83) Screwed hole (84) is provided with, concrete brick (8) upper end is provided with fixed plate (9), and fixed plate (9) surface is through setting There is through hole (91), fixing bolt (92) is connected with the through hole (91), the fixing bolt (92) is through described Through hole (91) and the screwed hole (84) are connected through a screw thread, and the fixed plate (9) passes through the fixing bolt (92) and institute Four adjacent concrete bricks (8) are connected by the cooperation for stating screwed hole (84), run through setting in the middle part of the fixed plate (9) It is equipped with ground connection rivet (93).
A kind of 2. hydrophobic bank protection of express highway roadbed greening according to claim 1, it is characterised in that the slopes (1) right-hand member is in inclined-plane.
A kind of 3. hydrophobic bank protection of express highway roadbed greening according to claim 1, it is characterised in that the drainpipe (5) upper end is connected with the gutter (3) lower end, and the slopes (1) bottom right-hand member is stretched into drainpipe (5) lower end.
A kind of 4. hydrophobic bank protection of express highway roadbed greening according to claim 1, it is characterised in that the sewage draining exit (6) end is connected with municipal drainage passage.
A kind of 5. hydrophobic bank protection of express highway roadbed greening according to claim 1, it is characterised in that the Nutrition Soil Layer (7) is the soil mixed through overnutrition waste material.
A kind of 6. hydrophobic bank protection of express highway roadbed greening according to claim 1, it is characterised in that the implantation hole (81) it is 20cm*20cm*15cm through hole, is used to plant green plants in the implantation hole (81).
A kind of 7. hydrophobic bank protection of express highway roadbed greening according to claim 1, it is characterised in that the through hole And the screwed hole (84) corresponding setting on adjacent four concrete bricks (8) (91).
A kind of 8. hydrophobic bank protection of express highway roadbed greening according to claim 1, it is characterised in that the ground connection riveting It is welded and fixed in the middle part of nail (93) and the fixed plate (9), described ground connection rivet (93) lower end sequentially passes through the nutrition soil layer (7) Extended to after the gravel layer (4) in the slopes (1).
CN201720472835.6U 2017-04-28 2017-04-28 A kind of hydrophobic bank protection of express highway roadbed greening Expired - Fee Related CN207003450U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720472835.6U CN207003450U (en) 2017-04-28 2017-04-28 A kind of hydrophobic bank protection of express highway roadbed greening

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720472835.6U CN207003450U (en) 2017-04-28 2017-04-28 A kind of hydrophobic bank protection of express highway roadbed greening

Publications (1)

Publication Number Publication Date
CN207003450U true CN207003450U (en) 2018-02-13

Family

ID=61441931

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720472835.6U Expired - Fee Related CN207003450U (en) 2017-04-28 2017-04-28 A kind of hydrophobic bank protection of express highway roadbed greening

Country Status (1)

Country Link
CN (1) CN207003450U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108385702A (en) * 2018-03-15 2018-08-10 江苏省林业科学研究院 A kind of two edge ecological slope protection structure of highway and its construction method
CN109588300A (en) * 2018-12-25 2019-04-09 深圳华熙环境建设有限公司 A kind of greening structure on highway mountain forest ground
CN109914182A (en) * 2019-04-11 2019-06-21 张健俣 A kind of road drainage system and express highway
CN110499684A (en) * 2019-08-30 2019-11-26 李桂军 A kind of anti-rain-impact device of Ecological Road
CN110924408A (en) * 2019-12-11 2020-03-27 冯翠娟 Highway side slope landslide prevention device
CN113424756A (en) * 2021-08-04 2021-09-24 南通木易永华景观工程有限公司 Irrigation method for three-dimensional greening channel

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108385702A (en) * 2018-03-15 2018-08-10 江苏省林业科学研究院 A kind of two edge ecological slope protection structure of highway and its construction method
CN108385702B (en) * 2018-03-15 2020-04-14 江苏省林业科学研究院 Highway two-edge ecological slope protection structure and construction method thereof
CN109588300A (en) * 2018-12-25 2019-04-09 深圳华熙环境建设有限公司 A kind of greening structure on highway mountain forest ground
CN109914182A (en) * 2019-04-11 2019-06-21 张健俣 A kind of road drainage system and express highway
CN110499684A (en) * 2019-08-30 2019-11-26 李桂军 A kind of anti-rain-impact device of Ecological Road
CN110499684B (en) * 2019-08-30 2021-11-09 山东神匠建设工程有限公司聊城分公司 Anti-rainwater impact device for ecological road
CN110924408A (en) * 2019-12-11 2020-03-27 冯翠娟 Highway side slope landslide prevention device
CN110924408B (en) * 2019-12-11 2021-06-04 胡小青 Highway side slope landslide prevention device
CN113424756A (en) * 2021-08-04 2021-09-24 南通木易永华景观工程有限公司 Irrigation method for three-dimensional greening channel

Similar Documents

Publication Publication Date Title
CN207003450U (en) A kind of hydrophobic bank protection of express highway roadbed greening
CN102910787B (en) Garden-type rainwater processing and recycling integrated system in residential community
CN206256454U (en) A kind of massif ecological slope protection structure
CN106801403A (en) A kind of method for preventing mud-stone flow disaster and mudstone apoblema to recycle
CN104032793A (en) Garden type rainwater impact resistance system used for residential area road
CN105839605A (en) Novel slope water interception and drainage ditch and design method thereof
CN106087648B (en) A kind of special Quick drainage of urban road and irrigation system
CN106759778A (en) For the scattered collection mating type waterproof and water drainage system of highway median strip
CN106499002A (en) Green grassland rainwater cyclic utilization system
CN109537525A (en) A kind of system that environmental protection prevents erosion
CN206428785U (en) It is a kind of to remove the Multifunctional rain management and control facility become silted up
CN109024131A (en) Pervious environment protection type road
CN207891684U (en) A kind of urban road system for reclaiming rainwater
CN203977495U (en) The anti-rainwater impact system of garden type for residential quarter road
CN106368288A (en) Shallow disc type moniliform wave type water-cutting off and drainage system for refuse dump
CN206233301U (en) Green grassland rainwater cyclic utilization system
CN105350637B (en) Urban green space subsurface stormwater is regulated and stored device
CN101962936B (en) Drainage system for overhead bridge
CN204753300U (en) Locate hydrophobic means of road surface both sides
CN207919284U (en) A kind of sponge city, which can ooze, can store water-permeable pavement
CN209429109U (en) A kind of discharge structure of hillside ditch
CN109423937A (en) A kind of residential quarters system for reclaiming rainwater
CN109423939A (en) Ecological garden all-purpose road
CN207435843U (en) A kind of low influence exploitation storm-water system based on concave herbaceous field
CN208733653U (en) A kind of ecological slope protection structure of breakage mountain body

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180125

Address after: 712100 Xianyang city of Shaanxi province Yangling Demonstration Zone Road No. 24 in Yangling Vocational and Technical College

Patentee after: Yangling Polytechnic college

Address before: 712100 Xianyang city of Shaanxi province Yangling Demonstration Zone Road No. 24 in Yangling Vocational and Technical College

Patentee before: Zhang Chaohui

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180213

Termination date: 20190428