CN204873398U - Crossbeam hoist - Google Patents

Crossbeam hoist Download PDF

Info

Publication number
CN204873398U
CN204873398U CN201520461071.1U CN201520461071U CN204873398U CN 204873398 U CN204873398 U CN 204873398U CN 201520461071 U CN201520461071 U CN 201520461071U CN 204873398 U CN204873398 U CN 204873398U
Authority
CN
China
Prior art keywords
pump tower
suspender
hoist
suspension ring
crossbeam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520461071.1U
Other languages
Chinese (zh)
Inventor
胡家耀
沈杰
刘海洋
徐治中
严磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hudong Zhonghua Shipbuilding Group Co Ltd
Original Assignee
Hudong Zhonghua Shipbuilding Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hudong Zhonghua Shipbuilding Group Co Ltd filed Critical Hudong Zhonghua Shipbuilding Group Co Ltd
Priority to CN201520461071.1U priority Critical patent/CN204873398U/en
Application granted granted Critical
Publication of CN204873398U publication Critical patent/CN204873398U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The utility model discloses a crossbeam hoist, including hoist body and two rings, rings set up respectively the left and right sides of hoist body lower extreme, still be equipped with two bilateral symmetry's support in the inboard of the lower extreme of hoist body, rings the central authorities upper end of hoist body be equipped with connecting portion, two through -holes have on these connecting portion. The utility model discloses when hoist and mount pump tower, the influence of uncertain factors such as morning and evening tides and stormy waves is overcome to the theoretical interval on increase pump tower bottom and hull dome deck, can guarantee the smooth hoist and mount of pump tower.

Description

A kind of crossbeam suspender
Technical field
The utility model relates to the technical field of shipbuilding, particularly a kind of crossbeam suspender and 17.2 ten thousand m 3lNG ship pump tower hanging method.
Background technology
Pump tower crane dress is the large technical barrier of one in LNG ship manufacture process, and be also an important production node, the cycle influences of progress to follow-up tailing in work that pump tower crane fills is larger.
17.2 ten thousand m 3lNG ship and former 14.7 ten thousand m 3lNG ship is compared, and hull and pump tower height degree all increase 700mm in design, amounts to and increases 1400mm.Simulate as calculated, if construct according to former hanging method, when pump tower crane fills, pump tower lowermost end is only higher than hull dome deck 78mm, considers the impact of the uncertain factor such as tide and stormy waves, and pump tower crane dress exists larger risk.
Utility model content
The purpose of this utility model is to overcome above-mentioned the deficiencies in the prior art, provides a kind of crossbeam suspender and 17.2 ten thousand m 3lNG ship pump tower hanging method, when making lifting pump tower, the theoretical pitch of pump tower bottom and deck in ship structure increases, and has enough surpluses, overcomes the impact of the uncertain factor such as tide and stormy waves, can ensure the smooth lifting of pump tower.
For achieving the above object, technical solution of the present utility model is as follows:
A kind of crossbeam suspender, comprise suspender body and two suspension ring, its feature is, described suspension ring are separately positioned on the left and right sides of described suspender body lower end, two symmetrical supports are also provided with in the inner side of the lower end of suspender body, suspension ring, be provided with connecting portion in the central upper end of described suspender body, this connecting portion have two through holes.
The spacing of two described suspension ring is 3500mm, and the thickness of suspension ring is 65mm, and aperture is 70mm.
Two leg spacing of two described supports are 2000mm.
Crossbeam suspender described in utilization is to 17.2 ten thousand m 3lNG ship pump tower carries out the method lifted, and it is characterized in that, the method comprises the steps:
1. install suspension ring by pump tower, the distance making pump tower upper lift ring distance pump tower top end is 4985mm;
2., during pump tower crane dress, hauling rope is tied up at pump tower bottom, by two high hanging, pump tower is winched to harbour from pump tower room;
3. be connected with the connecting portion of crossbeam suspender by two pieces of pins by the suspension hook of crane, be connected, slowly holded up by pump tower with suspender belt through two described suspension ring with the suspension ring on pump tower, hydraulic car coordinates crane pine hook;
4. pump tower is slowly moved to hull by crossbeam suspender and encloses trap deck annex by crane, adjustment pump tower height degree, to correct position, moves to liquid vault overthe openings, and adjustment pump tower is to liquid vault opening middle position, have high input hauling rope bilge portion, slow reduction pump tower, pump tower bottom enters cabin, and lifting work personnel hold hauling rope, traction pump tower direction, continue slowly to reduce pump tower, until pump tower is seated on the pump column foot seat bottom cargo tank, pump tower lift hook unhooking.
Compared with prior art, the beneficial effects of the utility model are:
1) in conjunction with 17.2 ten thousand m 3suspension ring, by changing the position of pump tower upper lift ring, are moved down by the design of LNG ship pump tower, make the distance of the distance of the suspension ring on pump tower pump tower top end be increased to 4985mm by 4250mm, save height 735mm.
2) adopt novel cross-beam suspender, save lifting rope and the shackle of the row of hanging top, can reduce and hang the height of array pitch from suspension hook, reduce height 970mm compared with the former row of hanging.
3) when lifting pump tower, increasing the theoretical pitch on pump tower bottom and hull dome deck, overcoming the impact of the uncertain factor such as tide and stormy waves, the smooth lifting of pump tower can be ensured.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model center member suspender.
Detailed description of the invention
By reference to the accompanying drawings the utility model is further described by the following examples.
Refer to Fig. 1, Fig. 1 is the structural representation of the utility model center member suspender, as shown in the figure, a kind of crossbeam suspender, comprise suspender body 1 and two suspension ring 2, described suspension ring 2 are separately positioned on the left and right sides of described suspender body 1 lower end, and in the lower end of suspender body 1, the inner side of suspension ring 2 is also provided with two symmetrical supports 3, be provided with connecting portion 4 in the central upper end of described suspender body 1, this connecting portion 4 have two through holes.Crossbeam suspender conducts oneself with dignity 1.38 tons, rated load 40 tons.Suspender lateral length 4000mm, top pin width between centers suspender support bottommost height 1280mm.Suspender upper end is directly connected with suspension hook by the pin of 2 pieces of diameter 110mm, 2 pin spacing 365mm, pin centre distance suspender main body upper end level 290mm.So save lifting rope and the shackle of the row of hanging top, can reduce and hang the height of array pitch from suspension hook, reduce height 970mm compared with the former row of hanging.The row of hanging lower end is provided with 2 suspension ring, suspension ring thickness 65mm, aperture 70mm, suspension ring centre distance pin center 980mm, and distance suspender body height 250mm, two suspension ring spacing 3500mm, connect the suspension ring on pump tower by suspender belt.Suspender lower end is provided with 2 supports for shelving, and span is 700mm, and supporting leg bottom is apart from suspender main body 550mm, two leg spacing 2000mm.
Concrete hanging method of the present utility model is as follows:
1.. at prefabricated 17.2 ten thousand m 3during LNG ship pump tower, according to design, pump tower upper lift ring installation site is moved down into preset height, makes the distance of the distance of the suspension ring on pump tower pump tower top end be increased to 4985mm by 4250mm.
2.. before pump tower crane dress, according to tidal level, drauht situation, the concrete period of selected pump tower crane dress.17.2 ten thousand m 3lNG ship is docked in Donggou 7 numbering head, during the tidal level 0.6m drauht 5.6m of high bridge port, carries out the die-filling plan of pump tower crane.
3.. during pump tower crane dress, hauling rope is tied up at pump tower bottom.First with two high hanging, pump tower is winched to harbour from pump tower room.Be connected with crossbeam suspender by 2 pieces of pins by 45 tons of hoist lifting hooks, be connected, slowly holded up by pump tower with suspender belt through 2 suspension ring bottom crossbeam suspender with the suspension ring on pump tower, hydraulic car coordinates 32 tons of crane pine hooks.
4.. pump tower is slowly moved to hull by crossbeam suspender and encloses trap deck annex by crane, and adjustment pump tower height degree, to correct position, moves to liquid vault overthe openings.Adjustment pump tower is to liquid vault opening middle position, and have high input hauling rope bilge portion, slowly reduces pump tower.Pump tower bottom enters cabin, and lifting work personnel hold hauling rope, traction pump tower direction, continues slowly to reduce pump tower, until pump tower is seated on the pump column foot seat bottom cargo tank, and pump tower lift hook unhooking.

Claims (3)

1. a crossbeam suspender, comprise suspender body (1) and two suspension ring (2), it is characterized in that, described suspension ring (2) are separately positioned on the left and right sides of described suspender body (1) lower end, in the lower end of suspender body (1), the inner side of suspension ring (2) is also provided with two symmetrical supports (3), be provided with connecting portion (4) in the central upper end of described suspender body (1), this connecting portion (4) have two through holes.
2. crossbeam suspender according to claim 1, is characterized in that, the spacing of two described suspension ring is 3500mm, and the thickness of suspension ring is 65mm, and aperture is 70mm.
3. crossbeam suspender according to claim 1, is characterized in that, two leg spacing of two described supports are 2000mm.
CN201520461071.1U 2015-06-30 2015-06-30 Crossbeam hoist Active CN204873398U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520461071.1U CN204873398U (en) 2015-06-30 2015-06-30 Crossbeam hoist

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520461071.1U CN204873398U (en) 2015-06-30 2015-06-30 Crossbeam hoist

Publications (1)

Publication Number Publication Date
CN204873398U true CN204873398U (en) 2015-12-16

Family

ID=54817798

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520461071.1U Active CN204873398U (en) 2015-06-30 2015-06-30 Crossbeam hoist

Country Status (1)

Country Link
CN (1) CN204873398U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105016190A (en) * 2015-06-30 2015-11-04 沪东中华造船(集团)有限公司 Cross beam lifting tool and method of hoisting pump tower LNG ship

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105016190A (en) * 2015-06-30 2015-11-04 沪东中华造船(集团)有限公司 Cross beam lifting tool and method of hoisting pump tower LNG ship

Similar Documents

Publication Publication Date Title
CN109502480A (en) The hoisting that high building turns over
CN202080812U (en) Dedicated sling system for large-scaled reinforcing cage
CN101858067B (en) Process for vertically prefabricating, turning, centering and installing semi-circle body on water
CN101224849A (en) Hanging bracket for integral hoisting of ship superstructure and hoisting process
CN101994318B (en) Lifting frame, hoisting system and hoisting method for vertically and rotatably hoisting steel reinforcement cage
CN205204612U (en) Heavy tower segment lifts by crane turnover device
CN105417403A (en) Method for installing ultrahigh ultra-large type floating crane in dock
CN108163694A (en) A kind of body section hanging method with hatch coaming
CN201686432U (en) 800-ton suspensory rigging
CN208454282U (en) A kind of suspender for precast-concrete form overturning and handling
CN107313350A (en) A kind of marine integral hoisting method of profile iron Sarasota
CN107554688B (en) Marine turning-over assembly and use method thereof
CN204873398U (en) Crossbeam hoist
CN105016190A (en) Cross beam lifting tool and method of hoisting pump tower LNG ship
CN205555864U (en) Automatic a tower section of thick bamboo of adjusting stands up hoist
CN206693061U (en) A kind of hoisting device for main cable saddle of suspension bridge lifting
CN104803293A (en) Hanging beam of bridge crane
CN212290248U (en) Large-span light deck triangular ocean production platform upper module
CN102398849A (en) Method for moving whole crawler crane down to dock
CN103193152B (en) Hoisting device and method of chain bucket ship unloader
CN202765232U (en) Handrail for ship
CN201962679U (en) Lifting bracket used for vertically and aswirl lifting steel reinforcement cage and lifting system
CN204251194U (en) A kind of Novel hanging tool
CN207737870U (en) A kind of large-scale storage tank fliping lifting device
CN103552655A (en) On-water mounting method for stinger on pipe-laying ship with lifting capacity of 400 tons

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant