CN204850474U - Concrete feeding pump line fixing system - Google Patents

Concrete feeding pump line fixing system Download PDF

Info

Publication number
CN204850474U
CN204850474U CN201520535273.6U CN201520535273U CN204850474U CN 204850474 U CN204850474 U CN 204850474U CN 201520535273 U CN201520535273 U CN 201520535273U CN 204850474 U CN204850474 U CN 204850474U
Authority
CN
China
Prior art keywords
truss
delivery pump
pump pipe
fixed
concrete delivery
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520535273.6U
Other languages
Chinese (zh)
Inventor
王磊
秦晓峰
李平
吴立锋
蒋永佳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Engineering Group Co Ltd
China Railway Construction Engineering Group Shandong Co Ltd
Original Assignee
China Railway Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Engineering Group Co Ltd filed Critical China Railway Construction Engineering Group Co Ltd
Priority to CN201520535273.6U priority Critical patent/CN204850474U/en
Application granted granted Critical
Publication of CN204850474U publication Critical patent/CN204850474U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The application discloses concrete feeding pump line fixing system, its characterized in that, including connecting piece, mounting and truss, the truss includes a plurality of truss standard festivals that splice one by one in vertical direction, the mounting is used for being in the setting the concrete feeding pump line at truss center is fixed on the truss, the connecting piece be used for with the truss is fixed on the building. This application is fixed the concrete feeding pump line on the building through the connecting piece, can play antidumping and strengthening effect, has solved the actual construction problem that the concrete feeding pump line was fixed to on -the -spot unavailability major structure, not only beautifully but also can guarantee the safety of constructing, this application installation, dismantle simple and convenient, can be at a plurality of engineering used repeatedly, improved the utilization ratio of system, the cost is reduced.

Description

A kind of concrete delivery pump pipe fixed system
Technical field
The application relates to the realm of building construction, particularly relates to a kind of concrete delivery pump pipe fixed system.
Background technology
When high-building construction concreting, the equipment such as usual employing concrete pump and supporting pump line and component and fitting construction, the fixation of vertical section pump line has two kinds usually: 1, set up steel pipe scaffold and fix pump line, pump line and contiguous structure is connected firmly; 2, steel clamping band is adopted to be fixed in contiguous structure by vertical section pump line.But adopt steel pipe scaffold or steel clamping band, be generally used for and close on the fixing of the pump line that has structure wall column or beam slab as drawknot point.And during concreting, delivery pump pipe vibration is larger, need vertically concrete delivery pump pipe to be fixed in reliable structure every one section, if concrete delivery pump pipe does not have the strong point to fix in the certain altitude of interval, easily cause pump pipe union to get loose and even occur the situations such as booster, will normal construction be affected, and there is potential safety hazard, if concrete delivery pump pipe all arranges the strong point at interval of certain altitude and fixes, then affect attractive in appearance.
Summary of the invention
The technical problem that the application will solve is for the deficiencies in the prior art, provides a kind of concrete delivery pump pipe fixed system.
The technical problem that the application will solve is solved by the following technical programs:
A kind of concrete delivery pump pipe fixed system, comprise connector, fixture and truss, described truss comprises the truss standard knot that multiple in the vertical direction splices one by one, described fixture is for being fixed on described truss by the concrete delivery pump pipe being arranged on described truss center, and described connector is arranged on truss top and for described truss is fixed on building.
Said system, described truss standard knot is cube shaped framework and comprises column, horizon bar and skew web plate, and described column is vertically arranged, and the column top that described horizon bar is arranged on, described skew web plate is arranged on the diagonal of oblong lateral surface framework.
Said system, described truss standard knot also comprises connection web, and described connection web is arranged on column, and described skew web plate is fixed on described column by described connection web.
Said system, described truss standard knot also comprises and oblong lateral surface framework is divided into upper and lower two-part by-level bar.
Said system, described truss standard knot also comprises connection otic placode, and described connection otic placode comprises fixed end and link, and described fixed end is fixed on described column upper end, and described link is provided with installing hole.
Said system, described connector comprises connecting rod and junction plate, and described connecting rod one end is connected on described column, and the described connecting rod other end is connected with described junction plate, and described junction plate is for being fixed on building.
Said system, described fixture comprises support member and clip, and described clip is for being fixed on described support member by concrete delivery pump pipe, and described support member two ends are separately fixed on described horizon bar.
Said system, described support member is vertical with the described horizon bar of fixing described support member.
Said system, also comprises the pedestal for fixing described truss.
Said system, described pedestal is reinforced concrete plinth, and the bend pipe of concrete delivery pump pipe is cast in reinforced concrete plinth.
Owing to have employed above technical scheme, the beneficial effect that the application is possessed is:
In the detailed description of the invention of the application, owing to comprising connector, fixture and truss, truss comprises the truss standard knot that multiple in the vertical direction splices one by one, fixture states truss for being fixed on by the concrete delivery pump pipe being arranged on truss center, connector is for being fixed on building by truss, concrete delivery pump pipe is fixed on building by connector by the application, overturning or slip resistance analysis and reinforcement effect can be played, the scene of solving cannot utilize agent structure to fix the practice of construction problem of concrete delivery pump pipe, not only attractive in appearance but also can ensure construction safety; The application installs, easy removal, can reuse, improve the utilization rate of system, reduce cost in multiple engineering.
Accompanying drawing explanation
Fig. 1 is the truss standard knot structural representation in one embodiment of the application;
Fig. 2 is the concrete delivery pump pipe fixed system structural representation in one embodiment of the application.
Detailed description of the invention
By reference to the accompanying drawings the application is described in further detail below by detailed description of the invention.
As shown in Figure 1 and Figure 2, the concrete delivery pump pipe fixed system of the application, its a kind of embodiment, comprises connector, fixture and truss, and truss comprises multiple truss standard knot, and multiple truss standard knot in the vertical direction splices one by one.Fixture is for being fixed on truss by the concrete delivery pump pipe 500 being arranged on truss center, and connector is for being fixed on building by truss.The quantity of truss standard knot is relevant with utilizing the height of fabric structure fixing concrete pump line, and concrete quantity highly can be determined according to this.
In one embodiment, truss standard knot is cube shaped framework, and comprise column 110, horizon bar 120 and skew web plate 130, column 110 is vertically arranged, and in present embodiment, column 110 has four.In another embodiment, column 110 also can have three.Column 110 top that horizon bar 120 is horizontally set on, close to the position at top, skew web plate 130 is arranged on the diagonal of oblong lateral surface framework.Rigidity and stability that skew web plate 130 can increase steel truss standard knot are set.In one embodiment, truss standard knot is welded or bolt by angle steel by column 110, horizon bar 120 and skew web plate 130.
The truss standard knot of the application can also comprise and connect web 140, connects web 140 and is arranged on column 110, and skew web plate 130 is fixed on column 110 by connecting web 140.In one embodiment, truss standard knot can also comprise by-level bar 150, and oblong lateral surface framework can be put as upper and lower two parts by by-level bar 150.In one embodiment, truss standard knot can also comprise and connect otic placode 160, connect otic placode 160 and comprise fixed end and link, fixed end is fixed on column 110 upper end, specifically fix by welding or the mode be spirally connected, link is provided with installing hole, and the lower end of the column 110 of each truss standard knot can be provided with screw, for being linked together by upper and lower two truss standard knots by bolt.
In one embodiment, connector comprises connecting rod 210 and junction plate 220, and connecting rod 210 one end is connected on column 110, and the other end of connecting rod 210 is connected with junction plate 220, and junction plate 220 is for being fixed on building.Connecting rod 210 can adopt i iron or channel-section steel, and its two ends are welded with steel truss column 110 and junction plate 220, and junction plate 220 is fixed on building by connecting bolt.
Fixture comprises support member 310 and clip 320, and clip 320 is for being fixed on support member 310 by concrete delivery pump pipe 500, and support member 310 two ends are separately fixed on horizon bar 120.In one is implemented, support member 310 is vertical with the horizon bar 120 of securing supports 310.The vertical pump line of concrete delivery pump pipe is by semicircle clip and connecting bolt and support member 310 bolt.Support member 310 can adopt i iron or channel-section steel, and often saving the setting of steel truss standard knot top, support member 310 two ends are welded with steel truss horizon bar.Arrange rubber sheet gasket between the vertical pump line of concrete delivery pump pipe and semicircle clip, formation flexibly connects, the impact force in dilution concreting process.
The concrete delivery pump pipe fixed system of the application, can also comprise pedestal 400, and pedestal 400 is for fixing truss.Pedestal 400 is reinforced concrete plinth, and the bend pipe of concrete delivery pump pipe is cast in reinforced concrete plinth.Reinforced concrete plinth, before building pedestal concrete, delivery pump pipe bend pipe can be wherein pre-buried, and fix with pedestal bar connecting, off normal when preventing concreting.
Above content is the further description done the application in conjunction with concrete embodiment, can not assert that the concrete enforcement of the application is confined to these explanations.For the application person of an ordinary skill in the technical field, under the prerequisite not departing from the application's design, some simple deduction or replace can also be made.

Claims (10)

1. a concrete delivery pump pipe fixed system, it is characterized in that, comprise connector, fixture and truss, described truss comprises the truss standard knot that multiple in the vertical direction splices one by one, described fixture is for being fixed on described truss by the concrete delivery pump pipe being arranged on described truss center, and described connector is arranged on truss top and for described truss is fixed on building.
2. concrete delivery pump pipe fixed system as claimed in claim 1, it is characterized in that, described truss standard knot is cube shaped framework and comprises column, horizon bar and skew web plate, described column is vertically arranged, the column top that described horizon bar is arranged on, described skew web plate is arranged on the diagonal of oblong lateral surface framework.
3. concrete delivery pump pipe fixed system as claimed in claim 2, it is characterized in that, described truss standard knot also comprises connection web, and described connection web is arranged on column, and described skew web plate is fixed on described column by described connection web.
4. concrete delivery pump pipe fixed system as claimed in claim 2, it is characterized in that, described truss standard knot also comprises and oblong lateral surface framework is divided into upper and lower two-part by-level bar.
5. concrete delivery pump pipe fixed system as claimed in claim 2, it is characterized in that, described truss standard knot also comprises connection otic placode, and described connection otic placode comprises fixed end and link, described fixed end is fixed on described column upper end, and described link is provided with installing hole.
6. concrete delivery pump pipe fixed system as claimed in claim 2, it is characterized in that, described connector comprises connecting rod and junction plate, described connecting rod one end is connected on described column, the described connecting rod other end is connected with described junction plate, and described junction plate is for being fixed on building.
7. the concrete delivery pump pipe fixed system according to any one of claim 2 to 6, it is characterized in that, described fixture comprises support member and clip, and described clip is for being fixed on described support member by concrete delivery pump pipe, and described support member two ends are separately fixed on described horizon bar.
8. concrete delivery pump pipe fixed system as claimed in claim 7, is characterized in that, described support member is vertical with the described horizon bar of fixing described support member.
9. the concrete delivery pump pipe fixed system according to any one of claim 1 to 6, is characterized in that, also comprises the pedestal for fixing described truss.
10. concrete delivery pump pipe fixed system as claimed in claim 9, it is characterized in that, described pedestal is reinforced concrete plinth, and the bend pipe of concrete delivery pump pipe is cast in reinforced concrete plinth.
CN201520535273.6U 2015-07-22 2015-07-22 Concrete feeding pump line fixing system Expired - Fee Related CN204850474U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520535273.6U CN204850474U (en) 2015-07-22 2015-07-22 Concrete feeding pump line fixing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520535273.6U CN204850474U (en) 2015-07-22 2015-07-22 Concrete feeding pump line fixing system

Publications (1)

Publication Number Publication Date
CN204850474U true CN204850474U (en) 2015-12-09

Family

ID=54741039

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520535273.6U Expired - Fee Related CN204850474U (en) 2015-07-22 2015-07-22 Concrete feeding pump line fixing system

Country Status (1)

Country Link
CN (1) CN204850474U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108868146A (en) * 2018-07-04 2018-11-23 上海建工七建集团有限公司 A kind of vertical pump line room external fixer of concrete and construction method
CN109403636A (en) * 2018-12-24 2019-03-01 陈兴龙 A kind of conveying based on skyscraper concrete construction pours device
CN111042535A (en) * 2019-12-31 2020-04-21 吕光华 Concrete grouting conveying device for high-rise building construction
CN113531265A (en) * 2021-06-08 2021-10-22 福建建工工程集团有限公司 Vertical concrete pump pipe damping and reinforcing structure and construction method thereof
CN115306153A (en) * 2021-05-07 2022-11-08 振中建设集团有限公司 High-rise building concrete pouring structure and method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108868146A (en) * 2018-07-04 2018-11-23 上海建工七建集团有限公司 A kind of vertical pump line room external fixer of concrete and construction method
CN109403636A (en) * 2018-12-24 2019-03-01 陈兴龙 A kind of conveying based on skyscraper concrete construction pours device
CN111042535A (en) * 2019-12-31 2020-04-21 吕光华 Concrete grouting conveying device for high-rise building construction
CN115306153A (en) * 2021-05-07 2022-11-08 振中建设集团有限公司 High-rise building concrete pouring structure and method
CN113531265A (en) * 2021-06-08 2021-10-22 福建建工工程集团有限公司 Vertical concrete pump pipe damping and reinforcing structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN204850474U (en) Concrete feeding pump line fixing system
CN201763002U (en) Independent adjustable steel supporting device
CN206128597U (en) Assembly type structure work platform
KR101334071B1 (en) The needless filling structure in the junction of pc beam and vertical member
CN204590344U (en) Sheet material curtain wall antidetonation connects Combined hanger
CN104695605B (en) A kind of rib floor assembled mould
KR20110010248A (en) Multi u-head bracket apparatus for bridge construction
CN205637119U (en) Connection structure of steel pipe concrete pillar and reinforced concrete girders
CN205822787U (en) Cast-in-place shear wall formwork reinforcement assembly
CN207847079U (en) Hanging mould structure
CN206971499U (en) A kind of copper plate curtain wall system for being mounted in parallel plate
CN204662938U (en) A kind of overhang steel platform fixed end
CN208072970U (en) The template system of concrete type seam construction
CN209494093U (en) A kind of assembled architecture installation curtain wall connection component
CN208235601U (en) A kind of concrete foundation and the reinforced base isolation reinforcement structure in foundation beam junction
CN112942777A (en) Ultrahigh-layer periphery protection cyclic telescopic detachable cantilever structure and mounting method
CN203531349U (en) Novel high-bearing easily-dismantled overhanging type scaffold
CN208088817U (en) A kind of easy-to-dismount overhanging type scaffold bolt anchoring assembly
CN207846750U (en) Light steel concrete building block faced wall
KR101080924B1 (en) Beams reinforced structures and reinforcement method
CN202509779U (en) Vertical elbow fixing device for concrete pump pipe
CN206971716U (en) A kind of concrete exterior wall body fixed-type device
CN205822779U (en) A kind of dish buckle type scaffold floor side bar template install structure
CN210217165U (en) Novel concrete conveying accessory
CN205116740U (en) Concrete pump pipe fixes cassette

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Wang Lei

Inventor after: Qin Xiaofeng

Inventor after: Li Ping

Inventor after: Wu Lifeng

Inventor after: Jiang Yongjia

Inventor after: Gao Ping

Inventor before: Wang Lei

Inventor before: Qin Xiaofeng

Inventor before: Li Ping

Inventor before: Wu Lifeng

Inventor before: Jiang Yongjia

TR01 Transfer of patent right

Effective date of registration: 20170704

Address after: 100000 No. 128 West Fourth Ring Road, Beijing, Fengtai District

Co-patentee after: CHINA RAILWAY CONSTRUCTION ENGINEERING GROUP SHANDONG Co.,Ltd.

Patentee after: China Railway Construction Engineering Group

Address before: 100000 No. 128 West Fourth Ring Road, Beijing, Fengtai District

Patentee before: China Railway Construction Engineering Group

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151209

CF01 Termination of patent right due to non-payment of annual fee