CN207847079U - Hanging mould structure - Google Patents
Hanging mould structure Download PDFInfo
- Publication number
- CN207847079U CN207847079U CN201721666740.4U CN201721666740U CN207847079U CN 207847079 U CN207847079 U CN 207847079U CN 201721666740 U CN201721666740 U CN 201721666740U CN 207847079 U CN207847079 U CN 207847079U
- Authority
- CN
- China
- Prior art keywords
- hanging
- column
- steel
- main back
- formwork structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本实用新型涉及一种吊模结构。所述吊模结构包括立柱、两根限位钢筋、吊梁、底模、主背楞和吊杆,立柱与钢梁连接,两根限位钢筋分别位于立柱的两侧并与立柱连接,限位钢筋与立柱平行并高于立柱,吊梁位于立柱上方并通过限位钢筋卡设在限位钢筋之间,底模位于钢梁的下方,主背楞位于底模的下方,吊杆一端与吊梁连接,另一端穿过底模和主背楞与主背楞连接。上述吊模结构无需使用高支模,节省了钢管的使用量,同时,整个吊模结构连接稳定,提高了施工的安全性。
The utility model relates to a hanging mold structure. The hanging formwork structure includes a column, two limit steel bars, a hanging beam, a bottom form, a main back corrugated and a hanger rod, the column is connected with the steel beam, and the two limit steel bars are respectively located on both sides of the column and connected with the column, limiting The position steel bar is parallel to the column and higher than the column, the hanging beam is located above the column and is clamped between the limit steel bars through the limit steel bar, the base form is located below the steel beam, the main back corrugated is located below the base form, and one end of the suspender is connected to the base form. The hanging beam is connected, and the other end passes through the bottom form and the main back flute to connect with the main back flute. The above hanging formwork structure does not need to use high formwork, which saves the amount of steel pipes used. At the same time, the entire hanging formwork structure is connected stably, which improves the safety of construction.
Description
技术领域technical field
本实用新型涉及建筑施工领域,特别是涉及吊模结构。The utility model relates to the field of building construction, in particular to a hanging formwork structure.
背景技术Background technique
目前,大型商业综合体项目越来越多地采用钢结构体系。其中,裙房结构中庭屋面板大多采用钢梁上浇筑混凝土板的形式。由于中庭采光需要涉及自动扶梯的设置,中庭屋面板下方均为挑空层。因此,中庭屋面板的浇筑一般均采用高支模体系进行施工。然而,高支模排架搭设高度一般均超过20米,施工危险性大。At present, steel structure systems are increasingly used in large-scale commercial complex projects. Among them, the atrium roof panel of the podium structure is mostly in the form of pouring concrete slabs on steel beams. Since the atrium lighting needs to involve the setting of escalators, the lower part of the atrium roof panel is a hollow floor. Therefore, the pouring of the atrium roof slab is generally carried out with a high formwork system. However, the erection height of high formwork bent frames generally exceeds 20 meters, and the construction risk is high.
实用新型内容Utility model content
基于此,有必要针对高支模排架施工危险性大的问题,提供一种安全系数高的吊模结构。Based on this, it is necessary to provide a hanging formwork structure with a high safety factor in view of the high risk of high formwork bent frame construction.
一种吊模结构,包括:A hanging formwork structure, comprising:
立柱,与钢梁连接;Columns, connected with steel beams;
两根限位钢筋,分别位于所述立柱的两侧并与所述立柱连接,所述限位钢筋与所述立柱平行并高于所述立柱;Two limit steel bars are respectively located on both sides of the column and connected to the column, the limit steel bars are parallel to the column and higher than the column;
吊梁,位于所述立柱上方,通过所述限位钢筋卡设在所述限位钢筋之间;The hanging beam is located above the column, and is clamped between the limiting steel bars through the limiting steel bars;
底模,位于所述钢梁的下方;bottom form, located below the steel beam;
主背楞,位于所述底模的下方;The main back flute is located below the bottom mold;
吊杆,一端与所述吊梁连接,另一端穿过所述底模和所述主背楞并与所述主背楞连接。One end of the suspension rod is connected with the suspension beam, and the other end passes through the bottom form and the main back flute and is connected with the main back flute.
在一个实施例中,所述吊梁包括两根槽钢,两根所述槽钢背对背设置,所述槽钢之间存在间隙。In one embodiment, the hanging beam includes two channel steels, the two channel steels are arranged back to back, and there is a gap between the channel steels.
在一个实施例中,所述槽钢与所述限位钢筋之间设有木方,所述木方抵靠所述槽钢和所述限位钢筋。In one embodiment, wooden squares are provided between the channel steel and the limiting steel bars, and the wooden squares are against the channel steel and the limiting steel bars.
在一个实施例中,所述底模和所述主背楞之间还设有次楞。In one embodiment, a secondary flute is provided between the bottom mold and the main back flute.
在一个实施例中,还包括开口钢垫片,所述开口钢垫片套设于所述吊杆。In one embodiment, it also includes an open steel washer, and the open steel washer is sheathed on the suspender.
在一个实施例中,所述立柱为双拼槽钢。In one embodiment, the uprights are double channel steel.
在一个实施例中,还包括缀板,所述缀板位于所述吊梁上方并固定所述吊梁。In one embodiment, it also includes a panel, the panel is located above the suspension beam and fixes the suspension beam.
上述吊模结构通过将整个结构固定在主体结构的钢梁上,采用吊杆一端与吊梁连接,另一端与底模连接,进而实现固定底模,无需使用高支模,节省了钢管的使用量,同时,整个吊模结构连接稳定,提高了施工的安全性。The above hanging formwork structure fixes the entire structure on the steel beam of the main structure, and connects one end of the suspension rod with the suspension beam and the other end with the bottom formwork, thereby realizing the fixed bottom formwork without using high support formwork and saving the use of steel pipes At the same time, the connection of the entire hanging formwork structure is stable, which improves the safety of construction.
附图说明Description of drawings
图1为一实施例的吊模结构的正视图;Fig. 1 is the front view of the hanger structure of an embodiment;
图2为一实施例的吊模结构的右视图;Fig. 2 is the right side view of the hanger structure of an embodiment;
图3为一实施例的吊模结构的俯视图;Fig. 3 is the top view of the hanger structure of an embodiment;
图4为一实施例的吊模结构的部分放大图;Fig. 4 is a partial enlarged view of the hanger structure of an embodiment;
图5为一实施例的吊模结构的应用施工方法流程图。Fig. 5 is a flow chart of the application construction method of the hanging formwork structure of an embodiment.
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其它实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.
如图1-4所示,一实施例的吊模结构1包括立柱10、两根限位钢筋20、吊梁30、底模40、主背楞50和吊杆60,立柱10与钢梁2连接,两根限位钢筋20分别位于立柱10的两侧并与立柱10连接,限位钢筋20与立柱10平行并高于立柱10,吊梁30位于立柱10上方并通过限位钢筋20卡设在限位钢筋20之间,底模40位于钢梁2的下方,主背楞50位于底模40的下方,吊杆60一端与吊梁30连接,另一端穿过底模40和主背楞50与主背楞50连接。As shown in Figures 1-4, the hanging formwork structure 1 of an embodiment includes a column 10, two limit steel bars 20, a hanging beam 30, a bottom form 40, a main back corrugated 50 and a boom 60, and the column 10 and the steel beam 2 connection, two limit steel bars 20 are respectively located on both sides of the column 10 and connected with the column 10, the limit steel bars 20 are parallel to the column 10 and higher than the column 10, and the hanging beam 30 is located above the column 10 and is set by the limit steel bar 20 Between the limit steel bars 20, the bottom form 40 is located below the steel beam 2, the main back flute 50 is located under the bottom form 40, one end of the suspender 60 is connected to the suspension beam 30, and the other end passes through the bottom form 40 and the main back flute 50 is connected with main back corrugated 50.
上述吊模结构1通过将整个结构固定在主体结构的钢梁2上,采用吊杆60一端与吊梁30连接,另一端与底模40连接,进而实现固定底模40,无需使用高支模,节省了钢管的使用量,同时,整个吊模结构1连接稳定,提高了施工的安全性。The above-mentioned hanging formwork structure 1 fixes the whole structure on the steel beam 2 of the main structure, connects one end of the hanging rod 60 to the hanging beam 30, and connects the other end to the bottom formwork 40, so as to realize the fixing of the bottom formwork 40 without using a high support formwork , which saves the amount of steel pipes used, and at the same time, the entire hanging formwork structure 1 is connected stably, which improves the safety of construction.
请继续参阅图4,立柱10与主体结构的钢梁2连接,在本实施例中,立柱10是焊接于主体结构的钢梁2上并与钢梁2垂直。吊模结构1通过立柱10和主体结构产生连接,从而使得吊模结构1能够依附并固定在主体结构上,为施工的安全性提供基础。在本实施例中,立柱10为18a双拼槽钢。Please continue to refer to FIG. 4 , the column 10 is connected to the steel beam 2 of the main structure. In this embodiment, the column 10 is welded to the steel beam 2 of the main structure and is perpendicular to the steel beam 2 . The hanging formwork structure 1 is connected to the main structure through the column 10, so that the hanging formwork structure 1 can be attached and fixed on the main structure, providing a basis for construction safety. In this embodiment, the column 10 is 18a double channel steel.
当立柱10与钢梁2焊接完成后,在立柱10的相对两侧分别设置限位钢筋20,限位钢筋20的高度高于立柱10的高度,从而使得两个限位钢筋20之间存在一定的距离,将吊梁30卡设在限位钢筋20之间。限位钢筋20是用于防止吊梁30的移动。在本实施例中,吊梁30包括两根槽钢,两根槽钢背对背设置并且槽钢之间存在间隙。槽钢的开口处正对限位钢筋20,两个槽钢的背部之间存在间隙以便吊杆60的通过。在本实施例中,限位钢筋20为直径为16mm的钢筋,吊梁30为14a双拼槽钢。After the upright column 10 and the steel beam 2 are welded, the opposite sides of the upright column 10 are respectively provided with limit reinforcing bars 20. The distance between the hanging beams 30 is set between the limit steel bars 20. The limit steel bar 20 is used to prevent the movement of the suspension beam 30 . In this embodiment, the hanging beam 30 includes two channel steels, and the two channel steels are arranged back to back with a gap between the channel steels. The opening of the channel steel is facing the limit steel bar 20, and there is a gap between the backs of the two channel steels so that the suspender 60 can pass through. In this embodiment, the limiting steel bar 20 is a steel bar with a diameter of 16mm, and the hanging beam 30 is a 14a double channel steel.
更进一步地,如图4所示,在本实施例中,槽钢与限位钢筋20之间设有木方32,木方32抵靠槽钢和限位钢筋20。在槽钢的开口处和限位钢筋20之间满塞木方32,可以防止槽钢的移动,进而保证吊梁30位置的稳定性。Furthermore, as shown in FIG. 4 , in this embodiment, a wooden square 32 is provided between the channel steel and the limiting steel bar 20 , and the wooden square 32 abuts against the channel steel and the limiting steel bar 20 . The wooden square 32 can be filled between the opening of the channel steel and the limit steel bar 20 to prevent the movement of the channel steel, thereby ensuring the stability of the suspension beam 30 positions.
吊杆60一端与吊梁30连接,另一端穿过底模40和主背楞50并与主背楞50连接。底模40被固定在吊梁30和主背楞50之间,无需使用高支模结构,提高了施工的安全性。吊杆60靠近吊梁30的一端设有螺纹,吊杆60通过与螺纹匹配的螺帽62与吊梁30连接。在本实施例中,吊模结构1还包括开口钢垫片64,开口钢垫片64套设于吊杆60。其中,开口钢垫片64位于螺帽62和吊梁30之间,以防止螺帽62松动,保证吊杆60和吊梁30连接的稳定性。在本实施例中,底模40为18mm厚的九夹板底模40,主背楞50为8号槽钢,吊杆60为螺杆。One end of the suspension rod 60 is connected with the suspension beam 30 , and the other end passes through the bottom mold 40 and the main back flute 50 and is connected with the main back flute 50 . The bottom form 40 is fixed between the suspension beam 30 and the main back flute 50, without using a high formwork structure, which improves the safety of construction. One end of the suspension rod 60 close to the suspension beam 30 is provided with threads, and the suspension rod 60 is connected with the suspension beam 30 through a nut 62 matching the threads. In this embodiment, the hanging formwork structure 1 further includes an open steel washer 64 , and the open steel washer 64 is sheathed on the suspender 60 . Wherein, the open steel gasket 64 is located between the nut 62 and the suspension beam 30 to prevent the nut 62 from loosening and ensure the stability of the connection between the suspension rod 60 and the suspension beam 30 . In the present embodiment, the bottom mold 40 is a nine-plywood bottom mold 40 with a thickness of 18 mm, the main back flute 50 is No. 8 channel steel, and the suspension rod 60 is a screw rod.
另外,吊杆60靠近主背楞50的一端也设有螺纹,吊杆60通过与螺纹匹配的螺帽与主背楞50连接。在本实施例中,吊模结构1还包括山型卡66,山型卡66套设于吊杆60并位于螺帽和主背楞50之间。山型卡66作为一种紧固件,提高了吊杆60与主背楞50连接的稳定性。In addition, the end of the suspender 60 close to the main back flute 50 is also provided with threads, and the suspender 60 is connected to the main back flute 50 through a nut matching the thread. In this embodiment, the hanger structure 1 further includes a mountain-shaped clip 66 , which is sheathed on the boom 60 and located between the nut and the main back flute 50 . The mountain-shaped clip 66 is used as a fastener to improve the stability of the connection between the suspender 60 and the main back flute 50 .
如图2和图4所示,在本实施例中,底模40和主背楞50之间还设有次楞70。主背楞50和次楞70交错设置,呈井字排列。其中,主背楞50具有抗弯抗剪作用,次楞70主要起到传递荷载的作用。在本实施例中,次楞70为100*100的木方。As shown in FIG. 2 and FIG. 4 , in this embodiment, a secondary flute 70 is provided between the bottom form 40 and the main back flute 50 . The main back flute 50 and the secondary flute 70 are arranged alternately in a well-shaped arrangement. Among them, the main back flute 50 has the function of resisting bending and shearing, and the secondary flute 70 mainly plays the role of transferring load. In this embodiment, the secondary flute 70 is a 100*100 wooden square.
请同时参阅图1、图2和图3,当待支模的主体结构的面积较大时,可以采用多个吊模结构1,进而形成一个整体,将底模40固定起来。当吊模结构1有多个时,吊模结构1还包括缀板80,缀板80位于吊梁30上方并固定吊梁30。缀板80的主要作用时调节吊梁30弯距,降低吊梁30内正负弯距峰值,从而保持吊梁30的稳定。Please refer to Fig. 1, Fig. 2 and Fig. 3 at the same time. When the area of the main structure to be supported is large, multiple hanging formwork structures 1 can be used to form a whole to fix the bottom formwork 40. When there are multiple hanging formwork structures 1 , the hanging formwork structure 1 further includes a panel 80 , and the paneling 80 is located above the hanging beam 30 and fixes the hanging beam 30 . The main function of the trim plate 80 is to adjust the bending moment of the hanging beam 30 to reduce the peak value of positive and negative bending moments in the hanging beam 30 , thereby maintaining the stability of the hanging beam 30 .
以下对上述吊模结构1的应用施工方法进行说明。The application construction method of the above hanging formwork structure 1 will be described below.
请同时参阅图1-图5,一实施例的吊模结构1的应用施工方法包括以下步骤:Please refer to Fig. 1-Fig. 5 at the same time, the application construction method of the hanging formwork structure 1 of an embodiment comprises the following steps:
步骤S500,将立柱10与钢梁2连接。立柱10与主体结构的钢梁2连接并垂直于钢梁2,其中,立柱10可以通过焊接与钢梁2连接。Step S500 , connecting the column 10 with the steel beam 2 . The column 10 is connected to the steel beam 2 of the main structure and is perpendicular to the steel beam 2, wherein the column 10 can be connected to the steel beam 2 by welding.
步骤S510,将两根限位钢筋20连接于立柱10的两侧,限位钢筋20与立柱10平行并高于立柱10。限位钢筋20位于立柱10的相对两侧并高于立柱10,使得两根限位钢筋20与立柱10之间存在一个容置空间。Step S510 , connecting two limit steel bars 20 to both sides of the column 10 , the limit steel bars 20 are parallel to the column 10 and higher than the column 10 . The limiting steel bars 20 are located on opposite sides of the column 10 and are higher than the column 10 , so that there is an accommodating space between the two limiting steel bars 20 and the column 10 .
步骤S520,将吊梁30设置在立柱10的上方,并通过限位钢筋20将吊梁30卡设在限位钢筋20之间。吊梁30位于限位钢筋20和立柱10形成的容置空间内,限位钢筋20限制吊梁30的移动。在本实施例中,吊梁30为两根背对背设置的槽钢,槽钢的开口正对限位钢筋20。更进一步地,在本实施例中,限位钢筋20和槽钢之间满塞木方32,进一步限制吊梁30的移动,保证吊梁30位置的稳定性。Step S520 , setting the hanging beam 30 above the column 10 , and clamping the hanging beam 30 between the limiting steel bars 20 through the limiting steel bars 20 . The hanging beam 30 is located in the accommodating space formed by the limiting steel bar 20 and the column 10 , and the limiting steel bar 20 limits the movement of the hanging beam 30 . In this embodiment, the hanging beam 30 is two channel steels arranged back to back, and the openings of the channel steels face the limit steel bars 20 . Furthermore, in this embodiment, the space between the limit steel bar 20 and the channel steel is filled with wooden squares 32 to further limit the movement of the suspension beam 30 and ensure the stability of the suspension beam 30 position.
步骤S530,安装吊杆60和主背楞50,然后铺设底模40,底模40设置在钢梁2的下方,主背楞50设置在底模40的下方,吊杆60一端与吊梁30连接,另一端穿过底模40和主背楞50并与主背楞50连接,完成吊模结构1的施工。底模40是为浇筑混凝土提供基础,在本实施例中,底模40为18mm厚的九夹板底模40。主背楞50具有抗弯抗剪的作用,为底模40提供保护和支撑。在本实施例中,底模40和主背楞50之间还设有次楞70。在施工前,先铺设主背楞50,然后再铺设次楞70,最后再铺设底模40。当上述吊模结构1施工完成后,便可以进行混凝土浇筑。Step S530, install the suspender 60 and the main back corrugated 50, and then lay the bottom form 40, the bottom form 40 is set under the steel beam 2, the main back corrugated 50 is set under the bottom form 40, one end of the suspender 60 is connected to the suspension beam 30 The other end passes through the bottom form 40 and the main back flute 50 and is connected with the main back flute 50 to complete the construction of the hanging formwork structure 1. The bottom form 40 provides a foundation for pouring concrete. In the present embodiment, the bottom form 40 is a nine-plywood bottom form 40 with a thickness of 18 mm. The main back flute 50 has the function of bending and shearing resistance, and provides protection and support for the bottom form 40 . In this embodiment, a secondary flute 70 is also provided between the bottom mold 40 and the main back flute 50 . Before construction, first lay the main back flute 50, then lay the secondary flute 70, and finally lay the bottom form 40. After the construction of the above hanging formwork structure 1 is completed, concrete pouring can be carried out.
采用上述吊模结构1代替高支模,可避免因搭设高支模而投入的大量劳动力,节约了施工成本,同时,上述吊模结构1安全系数高,在保证施工质量的前提下安全性较高。此外,上述吊模结构1采用槽钢作为搭设材料,可重复投入使用,节省了投入的钢管及模板费用。另外,上述吊模结构1搭设简单,可缩短施工工期。因此,采用上述吊模结构1施工成本低、安全系数高且缩短了施工工期。并且,上述吊模结构的应用施工方法步骤简单,操作方便,适于推广应用。Using the above-mentioned hanging formwork structure 1 instead of the high-support formwork can avoid a large amount of labor invested in setting up the high-support formwork, and save construction costs. high. In addition, the above-mentioned hanging formwork structure 1 adopts channel steel as the building material, which can be put into use repeatedly, saving the cost of steel pipes and formwork. In addition, the above hanging formwork structure 1 is easy to erect and can shorten the construction period. Therefore, the construction cost is low, the safety factor is high, and the construction period is shortened by adopting the above hanging formwork structure 1 . In addition, the application and construction method of the hanging formwork structure has simple steps and convenient operation, and is suitable for popularization and application.
以上所述实施例的各技术特征可以进行任意的组合,为使描述简洁,未对上述实施例中的各个技术特征所有可能的组合都进行描述,然而,只要这些技术特征的组合不存在矛盾,都应当认为是本说明书记载的范围。The technical features of the above-mentioned embodiments can be combined arbitrarily. To make the description concise, all possible combinations of the technical features in the above-mentioned embodiments are not described. However, as long as there is no contradiction in the combination of these technical features, should be considered as within the scope of this specification.
以上所述实施例仅表达了本实用新型的几种实施方式,其描述较为具体和详细,但并不能因此而理解为对实用新型专利范围的限制。应当指出的是,对于本领域的普通技术人员来说,在不脱离本实用新型构思的前提下,还可以做出若干变形和改进,这些都属于本实用新型的保护范围。因此,本实用新型专利的保护范围应以所附权利要求为准。The above-mentioned embodiments only express several implementation modes of the utility model, and the description thereof is relatively specific and detailed, but it should not be understood as limiting the scope of the utility model patent. It should be noted that those skilled in the art can make several modifications and improvements without departing from the concept of the present invention, and these all belong to the protection scope of the present invention. Therefore, the scope of protection of the utility model patent should be based on the appended claims.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721666740.4U CN207847079U (en) | 2017-12-05 | 2017-12-05 | Hanging mould structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721666740.4U CN207847079U (en) | 2017-12-05 | 2017-12-05 | Hanging mould structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN207847079U true CN207847079U (en) | 2018-09-11 |
Family
ID=63423440
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201721666740.4U Expired - Fee Related CN207847079U (en) | 2017-12-05 | 2017-12-05 | Hanging mould structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN207847079U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109519038A (en) * | 2018-11-19 | 2019-03-26 | 上海建工五建集团有限公司 | A kind of removable temporary construction fence and the construction method of constructing of regularization |
| CN111441244A (en) * | 2020-04-17 | 2020-07-24 | 中交二公局第二工程有限公司 | A steel-concrete composite beam concrete bridge deck construction support and construction method thereof |
-
2017
- 2017-12-05 CN CN201721666740.4U patent/CN207847079U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109519038A (en) * | 2018-11-19 | 2019-03-26 | 上海建工五建集团有限公司 | A kind of removable temporary construction fence and the construction method of constructing of regularization |
| CN111441244A (en) * | 2020-04-17 | 2020-07-24 | 中交二公局第二工程有限公司 | A steel-concrete composite beam concrete bridge deck construction support and construction method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101949191B (en) | Method for constructing unsupported super-long irregularly-shaped overhanging floor | |
| CN102418313B (en) | Corrugated Steel Web Composite PC Bridge and Its Construction Method | |
| CN102418416B (en) | Long-slab-span steel beam cast-in-situ floor formwork system | |
| CN205205694U (en) | No. 0 piece multipurpose triangle -shaped bracket construction equipment on continuous beam pier top | |
| CN203430059U (en) | Temporary fixing device used for installing large-span steel structure roof primary truss | |
| CN106121225B (en) | Suspension active erecting device is chosen outside cast-in-place concrete eaves | |
| CN208396106U (en) | Detachable bed die steel bar truss floor support plate | |
| CN103603494A (en) | Ultra-thin steel truss inclined wall construction method and formwork structure | |
| CN205024948U (en) | Make gypsum board of stiffening rib with indulging transverse reinforcement truss | |
| CN207700680U (en) | A kind of roof boarding hangs mould | |
| CN202766974U (en) | Bent cap bearing frame without full framing | |
| CN205712565U (en) | A kind of prefabricated two-sided wall | |
| CN102031869A (en) | Horizontal template steel structure bracket | |
| CN110805141A (en) | Connecting device and method for steel pipe column and shock insulation support after jacking of building | |
| CN105715046A (en) | Steel and wood template component and construction method thereof | |
| CN214302483U (en) | A folded plate structure applied to concrete structural floor slabs | |
| CN214462903U (en) | A floor deck support structure | |
| CN103334585A (en) | Assembling structure for beam/column with wood or bamboo template, and assembling method thereof | |
| CN212404844U (en) | Bracket system for cast-in-situ flange plate of I-shaped steel-concrete composite beam | |
| CN203846655U (en) | Short-cantilever dry-hanging device of stone curtain wall | |
| CN210917962U (en) | Steel bar truss floor support plate framework | |
| CN202164729U (en) | Knee brace structure between beams of different heights | |
| CN202124934U (en) | Connecting device for reinforced concrete beam and shear wall | |
| CN207619942U (en) | Arc triangle door in-site installation three-point support structure | |
| CN206769392U (en) | A kind of falsework |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180911 |