CN204825859U - Brill formula foundation pile - Google Patents

Brill formula foundation pile Download PDF

Info

Publication number
CN204825859U
CN204825859U CN201520605939.0U CN201520605939U CN204825859U CN 204825859 U CN204825859 U CN 204825859U CN 201520605939 U CN201520605939 U CN 201520605939U CN 204825859 U CN204825859 U CN 204825859U
Authority
CN
China
Prior art keywords
foundation pile
formula foundation
brill formula
brill
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520605939.0U
Other languages
Chinese (zh)
Inventor
张洪军
丛炳森
张正洵
王金鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WEIFANG HIGHLIGHT TAPERED STEEL TUBE CO Ltd
Original Assignee
WEIFANG HIGHLIGHT TAPERED STEEL TUBE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WEIFANG HIGHLIGHT TAPERED STEEL TUBE CO Ltd filed Critical WEIFANG HIGHLIGHT TAPERED STEEL TUBE CO Ltd
Priority to CN201520605939.0U priority Critical patent/CN204825859U/en
Application granted granted Critical
Publication of CN204825859U publication Critical patent/CN204825859U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model belongs to the technical field of the foundation pile, especially, relate to a brill formula foundation pile, including stake pipe and ring flange, the ring flange level is fixed set up in stake nose end, brill formula foundation pile still includes heliciform brill piece, the heliciform is bored the piece and is fixed in on the stake pipe lateral wall, pass through mechanical equipment during the construction and make brill formula foundation pile is rotatory, and brill formula foundation pile is last to apply certain pressure, lets brill formula foundation pile pierces underground to target depth. The utility model discloses a brill formula foundation pile simple structure, convenient operation, brill formula foundation pile has solved the builder's yard and has not been convenient for to transport the concrete and is not convenient for excavate the difficult problem of the earthwork through directly piercing buried mode.

Description

A kind of brill formula foundation pile
Technical field
The utility model belongs to foundation pile technical field, particularly relates to a kind of brill formula foundation pile.
Background technology
Need the foundation pile being used for fixing lamp stand is installed in job location in the process of lamp stand of installing street lamp.At present, the installation of the foundation pile of lamp stand is by first at job location earth excavation, then foundation pile is put into precalculated position, then to concreting in hole or directly the backfill earthwork compacting realize.But some job locations are not easy to transport concrete and earth excavation construction, for the installation of street lamp brings inconvenience.
Summary of the invention
In view of the defect in prior art, it is simple that the purpose of this utility model is to provide a kind of structure, easy construction, the brill formula foundation pile that reliability is strong.
The technical scheme that the utility model is adopted to achieve these goals is: a kind of brill formula foundation pile, comprise pile pipe, flange, described flange level is fixedly installed on described pile pipe top, described brill formula foundation pile also comprises helical form and bores sheet, and described helical form is bored sheet and is fixedly installed on described pile pipe sidewall.
In work progress, by construction equipment, described brill formula foundation pile is rotated by the direction of rotation making described pile pipe screw in downwards, in rotary course, not only helical form is bored sheet and is played and pile pipe is crept into but also plays as soil layer returns guide effect, while described pile pipe rotates, apply necessarily pressure straight down to described pile pipe by construction equipment, described brill formula foundation pile is pierced down to target depth.Described brill formula foundation pile structure is simple, easy to operate, relies on and directly rotates to it mode piercing target location, and overcome the difficult problem that construction plant is not easy to transport concrete and be not easy to earth excavation, the reliability of described brill formula foundation pile is strong.
Further, termination, described pile pipe bottom is oblique shovel head, and described oblique shovel head is conducive to reducing the described brill formula foundation pile resistance suffered when piercing underground.
Further, described pile pipe sidewall is provided with cable aperture, it is inner that described cable aperture is used for cable being accessed described brill formula foundation pile.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
In figure: 1, pile pipe, 2, flange, 3, helical form bores sheet, 4, cable aperture, 5, oblique shovel head.
Detailed description of the invention
Clearly understand to make the purpose of this utility model, technical scheme and advantage, below in conjunction with Figure of description and embodiment, the utility model is further elaborated, be to be understood that, specific embodiment described herein only in order to explain the utility model, and is not used in restriction the utility model.
As shown in Figure 1, brill formula foundation pile structure of the present utility model comprises pile pipe 1 and flange 2, described flange 2 level is fixedly installed on described pile pipe 1 top, and described brill formula foundation pile also comprises helical form and bores sheet 3, and described helical form is bored sheet 3 and is fixedly installed on described pile pipe 1 sidewall.Concrete using method is: in work progress, by an oblique shovel 5 insertion construction ground, by construction equipment, described brill formula foundation pile is rotated by the direction of rotation making described pile pipe 1 pierce downwards, be that described pile pipe 1 applies necessarily pressure straight down by construction equipment while described pile pipe 1 rotates, described brill formula foundation pile is pierced down to target depth, by equipment such as lamp stands more than flange 2 installation ground.Brill formula foundation pile structure of the present utility model is simple, easy to operate, and described brill formula foundation pile, by directly piercing the mode of underground, solves the difficult problem that construction plant is not easy to transport concrete and be not easy to earth excavation.
Above embodiment is the utility model preferred embodiment, not in order to limit the utility model, every within spirit of the present utility model and principle, and any amendment done, equivalent replacement, improvement etc., all should be included in protection domain of the present utility model.

Claims (3)

1. bore a formula foundation pile, comprising: pile pipe and flange, described flange level is fixed on the top of described pile pipe, it is characterized in that, also comprise helical form and bore sheet, described helical form is bored sheet and is fixedly installed on the sidewall of described pile pipe.
2. a kind of brill formula foundation pile as claimed in claim 1, is characterized in that: the termination, bottom of described pile pipe is oblique shovel head.
3. a kind of brill formula foundation pile as claimed in claim 1 or 2, is characterized in that: the sidewall of described pile pipe is provided with cable aperture.
CN201520605939.0U 2015-08-12 2015-08-12 Brill formula foundation pile Active CN204825859U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520605939.0U CN204825859U (en) 2015-08-12 2015-08-12 Brill formula foundation pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520605939.0U CN204825859U (en) 2015-08-12 2015-08-12 Brill formula foundation pile

Publications (1)

Publication Number Publication Date
CN204825859U true CN204825859U (en) 2015-12-02

Family

ID=54683475

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520605939.0U Active CN204825859U (en) 2015-08-12 2015-08-12 Brill formula foundation pile

Country Status (1)

Country Link
CN (1) CN204825859U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759310A (en) * 2017-01-14 2017-05-31 山东飞越钢结构工程有限公司 A kind of quick slip casting brace foundation device of modularization and grouting method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759310A (en) * 2017-01-14 2017-05-31 山东飞越钢结构工程有限公司 A kind of quick slip casting brace foundation device of modularization and grouting method

Similar Documents

Publication Publication Date Title
CN106759449B (en) Rock-based seabed offshore wind turbine rock-socketed single-pile foundation and construction method thereof
CN106950070B (en) Experimental rig for rectangular top pipe jacking construction Whole Process Simulation
CN103603342B (en) Major diameter assembled casing super-long filling pile construction method
CN204199335U (en) A kind of pressure release well reducing PHC tube pile construction soil compaction effect
CN204253056U (en) A kind of shield machine export & import reinforcing structure
CN102605772A (en) Construction method for revolving digging cast-in-place pile
CN103742157A (en) Method of newly building underground space under ground by pipe jacking method
CN103114599A (en) Deep foundation pit sealed precipitation device and construction method thereof
CN105442532A (en) Construction method for pile-head-expanded bored pile
CN104675405B (en) Rectangular pipe jacking machine tunnel entering auxiliary structure and construction method
CN104131821B (en) A kind of shield tunnel plug-in conduit grooving structure and fixing means thereof
CN105780806A (en) Offshore wind turbine foundation for long-leg jacket of drilling piles and construction method of offshore wind turbine foundation
CN203569561U (en) Novel pile forming device of steel pipe protection wall cast-in-place piles following up drill
CN204825859U (en) Brill formula foundation pile
CN204401612U (en) A kind of super-large diameter all steel casing does operation pore-creating filling pile construction equipment
CN207525758U (en) A kind of reinforced Structure About Soldier Pile
CN102486092A (en) Pipe jacking machine holing-through construction method of rectangular channel construction in deep soil layer
CN105735383A (en) Partial underground obstacle removing construction method capable of reserving structural system
CN107700508A (en) A kind of shaped steel stirs the construction method of water spray soil curtain support pile
CN203008925U (en) Shield barrier-free launching apparatus
CN203498848U (en) Light-weight well point downcast pipe hole forming device
CN203113361U (en) Deep foundation pit sealing precipitation device
CN206916746U (en) High-pressure jet, jetting type are removed obstacles immersed tube
CN103161469A (en) Method for excavating vertical shaft to underground repair pipe-jacking tool pipe
CN102758434B (en) Middle pick prestressed centrifugally pile tube pile-sinking device and pile sinking method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model