CN204825533U - Adopt existing circuit reinforcerment system of D type roof beam - Google Patents

Adopt existing circuit reinforcerment system of D type roof beam Download PDF

Info

Publication number
CN204825533U
CN204825533U CN201520428515.1U CN201520428515U CN204825533U CN 204825533 U CN204825533 U CN 204825533U CN 201520428515 U CN201520428515 U CN 201520428515U CN 204825533 U CN204825533 U CN 204825533U
Authority
CN
China
Prior art keywords
existing line
roof beam
bored pile
horizontal
violently
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520428515.1U
Other languages
Chinese (zh)
Inventor
王金海
李辰
赵振杰
张华强
王敏
刘军峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Sixth Group Co Ltd
Tianjin Railway Construction Co Ltd of China Railway Sixth Group Co Ltd
Original Assignee
China Railway Sixth Group Co Ltd
Tianjin Railway Construction Co Ltd of China Railway Sixth Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Sixth Group Co Ltd, Tianjin Railway Construction Co Ltd of China Railway Sixth Group Co Ltd filed Critical China Railway Sixth Group Co Ltd
Priority to CN201520428515.1U priority Critical patent/CN204825533U/en
Application granted granted Critical
Publication of CN204825533U publication Critical patent/CN204825533U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides an adopt existing circuit reinforcerment system of D type roof beam. It includes that four drilled pile bases, the four sets of connecting device, two violently lift roof beam and the D type roof beam system of consolidating, during four drilled pile bases set up respectively and treat that the outside foundation soil in frame bridge section front and back end both sides is advanced on the top on the existing line way, and lie in beyond the driving safety boundary limit, connecting device comprises pre -buried steel sheet and duo gen bolt, the middle part of violently lifting the roof beam sets up in existing circuit below, and every both ends of violently lifting the roof beam are connected with two drilled pile bases that lie in the existing line way corresponding position in both sides through the upper end of bolt respectively, the D type roof beam system of reinforcing comprises two longerons and duo gen crossbeam. The utility model provides a move original drilled pile basis to the outside construction of railway safety boundary limit, its upper portion is erect and is violently lifted the roof beam, violently lifts the roof beam top and erects the longeron in the D type roof beam reinforcement system, because drilled pile foundation construction process does not receive railway driving restriction, consequently can be under construction at any time, and preparation of construction cycle and time control.

Description

Adopt the existing line hardened system of D type beam
Technical field
The utility model belongs to rail facility technical field, particularly relates to a kind of existing line hardened system adopting D type beam.
Background technology
Along with the repeatedly speed raising of china railway, most of circuit has all carried out full isolation and has closed, therefore need to build on existing line a lot of on across or under the passage worn so that railway both sides pedestrian and vehicle is current.Relative to bridge crossing, because underground frame bridge can adopt pipe jacking method, therefore have to take up an area and remove less, the advantages such as interference on the road is little, and speed is fast, quality is good, so generally applied.Need in jacking construction to reinforce existing line, to ensure railway operation safety.At present, to adopt the hardened system of D type beam comparatively extensive, Fig. 1 is a kind of existing line hardened system structure top view of employing D type beam of prior art.Fig. 2 is the existing line hardened system structure side view of the employing D type beam shown in Fig. 1.As shown in Figure 1 and Figure 2, the existing line hardened system of the employing D type beam of this prior art comprises four Bored Pile Foundations, 1, four cushion caps 2 and D type beam reinforcement system; Wherein Bored Pile Foundation 1 adopts hand excavated pile, and four Bored Pile Foundations 1 are separately positioned in foundation soil existing line 3 being treated position, both sides, jacked frame bridge section front and back end; The end face of each Bored Pile Foundation 1 is provided with a cushion cap 2; D type beam reinforcement system is made up of two longerons 4 and Duo Gen crossbeam 5, and wherein the two ends of two longerons 4 are separately positioned on and are positioned on two cushion cap 2 end faces of existing line 3 the same side; Existing line 3 is provided with a crossbeam 5 between adjacent two sleepers 6, and the two ends of all crossbeams 5 are connected on two longerons 4.But, there is following point in the existing line hardened system of the employing D type beam of this prior art: in order to meet the matching requirements of D type beam reinforcement system, within Bored Pile Foundation 1 and cushion cap 2 need to be arranged on the traffic safety gauge of existing line 3, railway main points are just needed to construct during such construction, therefore examination and approval procedures are complicated, but also need jointly to determine the engineering time in conjunction with engineerings all in Railway Bureau's pipeline section, so the Specific construction time is uncertain, the preparation of construction cycle is also uncertain.
Summary of the invention
In order to solve the problem, the purpose of this utility model is to provide a kind of existing line hardened system adopting D type beam.
In order to achieve the above object, the existing line hardened system of employing D type beam that the utility model provides comprise four Bored Pile Foundations, four set of connection devices, two horizontally lift beam and D type beam reinforcement system; Wherein four Bored Pile Foundations are separately positioned in foundation soil existing line being treated outside, both sides, jacked frame bridge section front and back end, and are positioned at beyond traffic safety gauge; Linkage is made up of at least one piece of pre-embedded steel slab and Duo Gen bolt, and the end face of each Bored Pile Foundation is provided with at least one piece of pre-embedded steel slab, and the middle part of many bolts is run through pre-embedded steel slab and arranged, and bottom is fixed in Bored Pile Foundation; Horizontal middle part of lifting beam is arranged on below existing line, and the two ends that every root is horizontal lifts beam are connected with two Bored Pile Foundations being positioned at existing line both sides opposite position respectively by the upper end of bolt; D type beam reinforcement system is made up of two longerons and Duo Gen crossbeam, and wherein the two ends of two longerons are connected to that two of being positioned at existing line the same side are horizontal to lift on one end of beam; Existing line is provided with a crossbeam between adjacent two sleepers, and the two ends of all crossbeams are connected on two longerons.
Described horizontal beam of lifting adopts i iron to make.
Described longeron lifts connection between beam for welding with horizontal.
The existing line hardened system of the employing D type beam that the utility model provides is moved to outside railway security gauge by original Bored Pile Foundation to construct, the erection of its top is horizontal lifts beam, horizontally lift the longeron set up above beam in D type beam reinforcement system, because Bored Pile Foundation work progress does not limit by railways train operation, therefore can construct at any time, and the preparation of construction cycle and the time controlled.
Accompanying drawing explanation
Fig. 1 is a kind of existing line hardened system structure top view of employing D type beam of prior art.
Fig. 2 is the existing line hardened system structure side view of the employing D type beam shown in Fig. 1.
The existing line hardened system structure top view of the employing D type beam that Fig. 3 provides for the utility model.
Fig. 4 is the existing line hardened system structure side view of the employing D type beam shown in Fig. 3.
Detailed description of the invention
Be described in detail below in conjunction with the existing line hardened system of the drawings and specific embodiments to the employing D type beam that the utility model provides.The parts identical with prior art adopt identical drawing reference numeral.
As shown in Figure 3, Figure 4, the existing line hardened system of employing D type beam that the utility model provides comprises that four Bored Pile Foundations 1, four set of connection devices 7, two is horizontal lifts beam 8 and D type beam reinforcement system; Wherein four Bored Pile Foundations 1 are separately positioned in foundation soil existing line 3 being treated outside, both sides, jacked frame bridge section front and back end, and are positioned at beyond traffic safety gauge; Linkage 7 is made up of at least one piece of pre-embedded steel slab 9 and Duo Gen bolt 10, and the end face of each Bored Pile Foundation 1 is provided with at least one piece of pre-embedded steel slab 9, and the middle part of many bolts 10 is run through pre-embedded steel slab 9 and arranged, and bottom is fixed in Bored Pile Foundation 1; Horizontal middle part of lifting beam 8 is arranged on below existing line 3, and the two ends that every root is horizontal lifts beam 8 are connected with two Bored Pile Foundations 1 being positioned at existing line 3 both sides opposite position respectively by the upper end of bolt 10; D type beam reinforcement system is made up of two longerons 4 and Duo Gen crossbeam 5, wherein the two ends of two longerons 4 be connected to be positioned at existing line 3 the same side two horizontal one end of lifting beam 8 on; Existing line 3 is provided with a crossbeam 5 between adjacent two sleepers 6, and the two ends of all crossbeams 5 are connected on two longerons 4.
Described horizontal beam 8 of lifting adopts i iron to make.
Described longeron 4 lifts connection between beam 8 for welding with horizontal.
The construction method of the existing line hardened system of the employing D type beam now provided by the utility model is described below: on existing line 3, first treat that both sides, jacked frame bridge section front and back end are outside and the foundation soil be arranged in beyond traffic safety gauge carries out manually digging hole, then the installation of pre-embedded steel slab and connecting bolt is completed in this upper end, hole, carry out concreting afterwards and make Bored Pile Foundation 1, then horizontal one end of lifting beam 8 is passed below existing line 3, and the upper end of two ends respectively by bolt 10 is connected with two Bored Pile Foundations 1 being positioned at existing line 3 both sides opposite position, longeron 4 welding edges on the end of finally lifting beam 8 by horizontal and D type beam reinforcement system, thus complete integral installation process.

Claims (3)

1. adopt an existing line hardened system for D type beam, it is characterized in that: it comprise four Bored Pile Foundations (1), four set of connection devices (7), two horizontally lift beam (8) and D type beam reinforcement system; Wherein four Bored Pile Foundations (1) are separately positioned on existing line (3) and treat in the foundation soil of outside, both sides, jacked frame bridge section front and back end, and are positioned at beyond traffic safety gauge; Linkage (7) is made up of at least one piece of pre-embedded steel slab (9) and many bolts (10), the end face of each Bored Pile Foundation (1) is provided with at least one piece of pre-embedded steel slab (9), the middle part of many bolts (10) is run through pre-embedded steel slab (9) and is arranged, and bottom is fixed in Bored Pile Foundation (1); Horizontal middle part of lifting beam (8) is arranged on existing line (3) below, and the two ends that every root is horizontal lifts beam (8) are connected with two Bored Pile Foundations (1) being positioned at existing line (3) both sides opposite position respectively by the upper end of bolt (10); D type beam reinforcement system is made up of two longerons (4) and many crossbeams (5), wherein the two ends of two longerons (4) be connected to be positioned at existing line (3) the same side two horizontal one end of lifting beam (8) on; Be provided with a crossbeam (5) between upper adjacent two sleepers (6) of existing line (3), the two ends of all crossbeams (5) are connected on two longerons (4).
2. the existing line hardened system of employing D type beam according to claim 1, is characterized in that: described horizontal beam (8) of lifting adopts i iron to make.
3. the existing line hardened system of employing D type beam according to claim 1, is characterized in that: described longeron (4) lifts connection between beam (8) for welding with horizontal.
CN201520428515.1U 2015-06-19 2015-06-19 Adopt existing circuit reinforcerment system of D type roof beam Expired - Fee Related CN204825533U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520428515.1U CN204825533U (en) 2015-06-19 2015-06-19 Adopt existing circuit reinforcerment system of D type roof beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520428515.1U CN204825533U (en) 2015-06-19 2015-06-19 Adopt existing circuit reinforcerment system of D type roof beam

Publications (1)

Publication Number Publication Date
CN204825533U true CN204825533U (en) 2015-12-02

Family

ID=54683149

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520428515.1U Expired - Fee Related CN204825533U (en) 2015-06-19 2015-06-19 Adopt existing circuit reinforcerment system of D type roof beam

Country Status (1)

Country Link
CN (1) CN204825533U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20190034815A (en) * 2017-09-25 2019-04-03 주식회사 포스코건설 Railroad bridge construction method for keeping preexistence railroad track and rail service
KR20190034814A (en) * 2017-09-25 2019-04-03 주식회사 포스코건설 Temporary facility construction method for underground construction fo railroad track lower pass
CN113356077A (en) * 2021-07-01 2021-09-07 中铁一局集团(广州)建设工程有限公司 Construction method for overhead line jacking downward-penetrating reinforced concrete frame bridge by convenient beam lifting method
CN114318979A (en) * 2021-12-31 2022-04-12 中铁六局集团石家庄铁路建设有限公司 Automatic pulling-through system and method for reinforcing I-steel of jacking line of frame-structured bridge
CN114541479A (en) * 2021-12-31 2022-05-27 四川省铁路建设有限公司 In-situ reinforcing structure with small curve radius for existing rail transit without stopping and construction method

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20190034815A (en) * 2017-09-25 2019-04-03 주식회사 포스코건설 Railroad bridge construction method for keeping preexistence railroad track and rail service
KR20190034814A (en) * 2017-09-25 2019-04-03 주식회사 포스코건설 Temporary facility construction method for underground construction fo railroad track lower pass
KR102105229B1 (en) * 2017-09-25 2020-04-27 주식회사 포스코건설 Temporary facility construction method for underground construction fo railroad track lower pass
KR102105230B1 (en) * 2017-09-25 2020-04-27 주식회사 포스코건설 Railroad bridge construction method for keeping preexistence railroad track and rail service
CN113356077A (en) * 2021-07-01 2021-09-07 中铁一局集团(广州)建设工程有限公司 Construction method for overhead line jacking downward-penetrating reinforced concrete frame bridge by convenient beam lifting method
CN113356077B (en) * 2021-07-01 2022-03-18 中铁一局集团(广州)建设工程有限公司 Roof beam lifting frame empty line jacking downward-penetrating type reinforced concrete frame bridge construction method
CN114318979A (en) * 2021-12-31 2022-04-12 中铁六局集团石家庄铁路建设有限公司 Automatic pulling-through system and method for reinforcing I-steel of jacking line of frame-structured bridge
CN114541479A (en) * 2021-12-31 2022-05-27 四川省铁路建设有限公司 In-situ reinforcing structure with small curve radius for existing rail transit without stopping and construction method
CN114318979B (en) * 2021-12-31 2023-08-18 中铁六局集团石家庄铁路建设有限公司 Automatic penetrating and pulling system and method for frame bridge jacking line reinforcement I-steel
CN114541479B (en) * 2021-12-31 2024-06-11 四川省铁路建设有限公司 Small curve radius existing rail transit non-stop in-situ reinforcing structure and construction method

Similar Documents

Publication Publication Date Title
CN204825533U (en) Adopt existing circuit reinforcerment system of D type roof beam
CN101838955B (en) Existing line transverse lifting strengthening method and structure
CN106065577B (en) A kind of structure and method of new pile foundation underpinning
CN103643640B (en) Jacking-first and line-reinforcement-second jacking construction method for frame bridge
CN101858222B (en) Method for controlling deformation in zero-distance tunneling of new tunnel under existing subway construction
CN102979041B (en) Soft overhead reinforcing jacking method for construction of span box bridge of jacking block of underpass turnout group of railway
CN104563158B (en) Existing subway station realizes the construction method of transfer with new subway station platform layer
CN204385634U (en) Railway is not stopped transport the overall jacking mechanism of cross-line box culvert
CN206722852U (en) A kind of mobile inverted arch trestle of growing up for carrying inverted arch template
CN107620261B (en) Based on the horizontal existing railway track reinforcement means for holding formula just beam
CN104481546B (en) A kind of soft rock tunnel inclined shaft enters the construction method of the double curvature arch in positive hole
CN105464008B (en) Large longitudinal beam system line reinforcement construction device and method
CN104294769B (en) A kind of piling and the construction method increasing the built bridge abutment structure of platform cap composite reinforcement
CN106245526A (en) The splicing structure of mining under railways protecting wall, straight wall and shield and construction method
CN110242305A (en) A kind of inclined shaft applies the construction technique in main hole into single side heading method
CN205591131U (en) Whole superelevation of multispan case roof beam is jacking construction system in turn
CN202659247U (en) Back templates and combined steel die for tunnel inverted arch construction
CN204097889U (en) A kind of piling and the built bridge abutment structure of increase platform cap composite reinforcement
CN105603838A (en) Track board lifting trolley and method
CN213269911U (en) Multifunctional two-lining trolley construction equipment for long and wide tunnel
CN104141264B (en) Plate-type slag-free orbit lays precision keeping method
CN108277750A (en) The porous cast-in-place box culvert construct method of high roadbed deep soft foundation pile formula big cross section
CN102747725B (en) Bored pile construction method with tiny disturbance
CN108166395A (en) A kind of construction method that beam bridge is built across Business Line
CN204174481U (en) Soft clay area modern tram abutment rebound structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151202