CN204747341U - Special frame of preparation and training on installation of acting as go -between - Google Patents
Special frame of preparation and training on installation of acting as go -between Download PDFInfo
- Publication number
- CN204747341U CN204747341U CN201520284084.6U CN201520284084U CN204747341U CN 204747341 U CN204747341 U CN 204747341U CN 201520284084 U CN201520284084 U CN 201520284084U CN 204747341 U CN204747341 U CN 204747341U
- Authority
- CN
- China
- Prior art keywords
- training
- horizontal beam
- acting
- upper horizontal
- fixed connection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model relates to a special frame of preparation and training on installation of acting as go -between, its characterized in that: the top horizontal beam is long 6000mm, internal diameter 55mm, external diameter 60mm's steel pipe, the length of floorbar and top horizontal beam, interior external conjugate diameter is unanimous, two foundation roof beam parallel arrangement and fixed connection are subaerial, through stub beam fixed connection between the floorbar, stub beam length is 3000mm, two foundation roof beams pass through stub beam and top horizontal beam constitution triangle -shaped's frame, the perpendicular evenly distributed downwards of three extension ring on the horizontal beam of top and with top horizontal beam fixed connection, the three stick of acting as go -between of fixed connection on the two foundation roof beams, acting as go -between, upwards to personally submit 60 angle lappings oblique with the level for the stick, acting as go -between on the two foundation roof beams is excellent to the inboard slope of frame. Stable after its aggregate erection, light, dismantle easily, simple, can realize act as go -between preparation and training on installation to the training student in any level land, cement ground and indoor classroom, has solved and adverse weather and season to training teaching work's influence, has satisfied training teaching requirement.
Description
Technical field
Basis is practical relates to a kind of bracing wire making and training on installation special frame, belongs to the special framework of training in bracing wire making and training on installation.
Background technology
Current bracing wire making and training on installation are in overhead line structures position, by " State Grid Corporation of China production skills personnel vocational ability training standard " requirement, for power transmission and distribution professional training bracing wire fabrication and installation know-how, owing to being subject to weather and the impact in season, train in route lever position, training request cannot be met, simultaneously as the steel strand wires material that the consumption of know-how training need is a large amount of, add training investment, therefore the built up construction that a kind of alternative bracing wire makes and installs is badly in need of, bracing wire for intense session student makes skill training, save consumptive material, training station is increased in effective training scope, meet training request.
Summary of the invention
The purpose of this utility model is to provide a kind of bracing wire making and training on installation special frame, its combination is stable, light after installing, dismounting easily, simply, can on any level land, cement flooring and indoor classroom realize trainee's bracing wire making and training on installation, solve adverse weather and season to the impact of training and teaching work, meet training and teaching requirement.
The technical solution of the utility model is achieved in that a kind of bracing wire making and training on installation special frame, by upper horizontal beam, bottom girder, extend ring, distaff, short beam forms, it is characterized in that: upper horizontal beam is long 6000mm, internal diameter 55mm, the steel pipe of external diameter 60mm, the length of bottom girder and upper horizontal beam, inner and outer diameter is consistent, two foundation beams are arranged in parallel and are fixedly connected with on the ground, be fixedly connected with by short beam between bottom girder, short beam length is 3000mm, two foundation beams form leg-of-mutton framework by short beam and upper horizontal beam, three extend ring and to be evenly distributed in vertically downward on upper horizontal beam and to be fixedly connected with upper horizontal beam, two foundation beams are fixedly connected with three distaffs, distaff is upwards horizontal by 60 ° of overturning angles, distaff on two foundation beams tilts inside framework.
Good effect of the present utility model is that its dismounting is flexible, easy to use, can require to be arranged on open air or indoor according to the needs of the training programmes, making, lower making and the work of complete bracing wire Installation and adjustment on increase training station, according to demand training bracing wire, save training investment, meet training and check requirements, safe and reliable during use, there is stronger using value, meet the requirement of State Grid Corporation of China to trackman's bracing wire making aspect skills training.
Accompanying drawing explanation
Fig. 1 is structure of the present utility model assembling overall schematic.
Fig. 2 is upper horizontal girder construction figure of the present utility model.
Fig. 3 is structure of bottom girder figure of the present utility model.
Fig. 4 is short beam structure chart of the present utility model.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described further: as Figure 1-4, a kind of bracing wire making and training on installation special frame, by upper horizontal beam 1, bottom girder 2, extend ring 3, distaff 4, short beam 5 forms, it is characterized in that: upper horizontal beam 1 is long 6000mm, internal diameter 55mm, the steel pipe of external diameter 60mm, the length of bottom girder 2 and upper horizontal beam 1, inner and outer diameter is consistent, two foundation beams 2 are arranged in parallel and are fixedly connected with on the ground, be fixedly connected with by short beam 5 between bottom girder 2, short beam 5 length is 3000mm, two foundation beams 2 form leg-of-mutton framework by short beam 5 and upper horizontal beam 1, three extend ring 3 and to be evenly distributed in vertically downward on upper horizontal beam 1 and to be fixedly connected with upper horizontal beam 1, two foundation beams 2 are fixedly connected with three distaffs 4, distaff 4 is upwards horizontal by 60 ° of overturning angles, distaff 4 on two foundation beams 2 tilts inside framework.
As shown in Figure 1, in more flat smooth earth or indoor, the distaff 4 of two bottom girders 2 is upwards horizontal by 60 ° of overturning angles; Vertically downward, upper horizontal beam 1, bottom girder 2, short beam 5 form space framework in prolongation ring 3 direction of upper horizontal beam 1, thus the fixing operating position extending ring 3 and distaff 4; Distaff and extend ring effect: 1. make in wedge clamp bracing wire time fixing clamper be wound around iron wiring (10#) use; 2. the bracing wire made extends be bolted on ring, and 3. the bracing wire made (steel strand wires) and UT wire clamp are fastened on distaff 4, adjustment bracing wire degree of tightness (length) is wound around iron wiring (10#) afterwards and completes making, and Student Training examines.
Claims (1)
1. a bracing wire making and training on installation special frame, by upper horizontal beam, bottom girder, extend ring, distaff, short beam forms, it is characterized in that: upper horizontal beam is long 6000mm, internal diameter 55mm, the steel pipe of external diameter 60mm, the length of bottom girder and upper horizontal beam, inner and outer diameter is consistent, two foundation beams are arranged in parallel and are fixedly connected with on the ground, be fixedly connected with by short beam between bottom girder, short beam length is 3000mm, two foundation beams form leg-of-mutton framework by short beam and upper horizontal beam, three extend ring and to be evenly distributed in vertically downward on upper horizontal beam and to be fixedly connected with upper horizontal beam, two foundation beams are fixedly connected with three distaffs, distaff is upwards horizontal by 60 ° of overturning angles, distaff on two foundation beams tilts inside framework.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520284084.6U CN204747341U (en) | 2015-05-06 | 2015-05-06 | Special frame of preparation and training on installation of acting as go -between |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520284084.6U CN204747341U (en) | 2015-05-06 | 2015-05-06 | Special frame of preparation and training on installation of acting as go -between |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204747341U true CN204747341U (en) | 2015-11-11 |
Family
ID=54462096
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520284084.6U Expired - Fee Related CN204747341U (en) | 2015-05-06 | 2015-05-06 | Special frame of preparation and training on installation of acting as go -between |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204747341U (en) |
-
2015
- 2015-05-06 CN CN201520284084.6U patent/CN204747341U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208430687U (en) | Self-anchored type suspended-cable structure support construction and system | |
CN207966282U (en) | Fabricated construction system demonstration lesson platform | |
CN203296361U (en) | Long-span steel structure cross assembling hoisting platform | |
CN104532749A (en) | Support used for construction of upper beam of main tower of suspension bridge | |
CN204401649U (en) | Arch resistance to compression longitudinal prestressing pin-connected panel underground pipe gallery | |
CN204385629U (en) | A kind of support for the construction of suspension bridge king-tower top rail | |
CN204491659U (en) | Jack arch shape prestressed structure pin-connected panel underground pipe gallery | |
CN204747341U (en) | Special frame of preparation and training on installation of acting as go -between | |
CN203741690U (en) | Pedestrian overcrossing assembling type steel truss girder | |
CN205035902U (en) | Crutch supported complicated curved surface rack axle construction in large -scale minute | |
CN203795459U (en) | Foundation structure of tower crane for high-altitude roofs | |
CN204282845U (en) | Buildings in cold roof insulating structure | |
CN103806373A (en) | Stay cable anchor system of cable-stayed assembly type road steel bridge | |
CN104452601B (en) | Bridge floor tapping pipe bush mould and using method | |
CN206956932U (en) | A kind of bar with Pseudobulbus Bletillae (Rhizoma Bletillae) | |
CN202913677U (en) | Multifunctional conversion scaffold capable of lifting steel platform | |
CN205574216U (en) | Many portable wind and rain canopies of point type | |
CN204356658U (en) | Bridge floor tapping pipe bush mould | |
CN204728484U (en) | A kind of precast concrete primary-secondary beam syndeton | |
CN207512968U (en) | A kind of splicing node of steel plate combined shear wall | |
CN205558305U (en) | Steel gallery promotes reinforcing apparatus | |
CN203782540U (en) | Elevated section structure for straddle type monorail transit | |
CN202492803U (en) | Precast beam winter construction simple and easy maintaining cover | |
CN203175134U (en) | Truss used for lifting electric transmission line tower connecting legs | |
CN204940523U (en) | A kind of curved surface net frame four crutch mounting structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151111 Termination date: 20190506 |
|
CF01 | Termination of patent right due to non-payment of annual fee |