CN207512968U - A kind of splicing node of steel plate combined shear wall - Google Patents
A kind of splicing node of steel plate combined shear wall Download PDFInfo
- Publication number
- CN207512968U CN207512968U CN201721505523.7U CN201721505523U CN207512968U CN 207512968 U CN207512968 U CN 207512968U CN 201721505523 U CN201721505523 U CN 201721505523U CN 207512968 U CN207512968 U CN 207512968U
- Authority
- CN
- China
- Prior art keywords
- steel plate
- shear wall
- combined shear
- splicing
- floor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Load-Bearing And Curtain Walls (AREA)
Abstract
本实用新型涉及一种钢板组合剪力墙的拼接节点,拼接节点设置于楼板标高处,下部钢板组合剪力墙顶部设置有顶板,上部钢板组合剪力墙的两侧对应内部肋板所在的位置和下部钢板组合剪力墙的两侧对应内部肋板所在的位置均设置有劲板;上部钢板组合剪力墙、下部钢板组合剪力墙和劲板均与顶板焊接;顶板中间开设有通孔,孔的位置与钢板组合剪力墙的腔体对应;顶板延伸出下部钢板组合剪力墙,作为楼板的支承托板。其有益效果是:本实用新型的拼接节点具有构造简单、传力合理、施工便捷等特点。拼接点设置在楼板内,由于节点由耐腐蚀性得到极大提高,外观上得到极大改善,拼接点处的劲板可以传递钢板组合剪力墙内通常肋板的载荷,能够很大程度上提高承载力。
The utility model relates to a splicing node of a steel plate combined shear wall. The splicing node is arranged at the floor elevation, the top of the lower steel plate combined shear wall is provided with a top plate, and the two sides of the upper steel plate combined shear wall correspond to the position of the internal rib plate Both sides of the steel plate combined shear wall and the lower steel plate combined shear wall are provided with stiffeners corresponding to the positions of the internal ribs; the upper steel plate combined shear wall, the lower steel plate combined shear wall and stiffeners are all welded to the top plate; a through hole is opened in the middle of the top plate, The position of the hole corresponds to the cavity of the steel plate composite shear wall; the top plate extends out of the lower steel plate composite shear wall as a supporting plate for the floor. The beneficial effect is that the splicing joint of the utility model has the characteristics of simple structure, reasonable force transmission, convenient construction and the like. The splicing point is set in the floor. Since the corrosion resistance of the joint is greatly improved, the appearance is greatly improved. The stiffener at the splicing point can transmit the load of the usual rib plate in the steel plate composite shear wall, which can largely Improve bearing capacity.
Description
技术领域technical field
本实用新型涉及建筑结构领域,尤其涉及一种钢板组合剪力墙的拼接节点。The utility model relates to the field of building structures, in particular to a splicing node of a steel plate composite shear wall.
背景技术Background technique
目前,钢结构在建筑结构技术领域的使用越来越多,各种各样的新式钢结构形式不断涌现,已在工程领域应用,并且数量也在不断攀升,拥有广阔的前景。其主要优点有:与混凝土建筑结构相比,具有更好的适用性和可行性。如减少构件体积,增大使用空间;减轻结构自重,减少或完全不需要施工所需的模板和支撑;减少预埋件,改善抗震性能;方便施工,缩短工期。At present, steel structures are used more and more in the field of building structure technology, and various new steel structures are emerging, which have been applied in the engineering field, and the number is also rising, with broad prospects. Its main advantages are: compared with concrete building structures, it has better applicability and feasibility. Such as reducing the volume of components, increasing the use of space; reducing the weight of the structure, reducing or completely eliminating the formwork and support required for construction; reducing embedded parts, improving seismic performance; facilitating construction and shortening the construction period.
钢板组合剪力墙是指用钢板弯曲定型制成的剪力墙结构,其内部包括由钢板弯曲形成的腔体和将腔体隔开的肋板,该腔体内可以根据需要选择性地填充其他建筑材料,具有承载力高、自重轻、建造速度快和抗剪性能好等优点,尤其适用于高烈度区的高层和超高层建筑以及抗震加固工程。抗震性能方面的优越表现,使其在超高层建筑领域得到了广泛的应用。但国内外对钢板组合剪力墙的研究并不成熟,对于钢板与混凝土的连接方式,规范中尚未有相关计算规定,而钢板与混凝土连接构造直接影响到二者的共同作用以及结构的稳定性与安全性,同时也影响结构用钢量及经济性。与传统钢结构相比,能较多地节约钢材,提高构件的稳定性和抗扭性能,增大刚度,增强防锈和耐火极限性能、做到经济美观。与传统的混凝土剪力墙相比,具有自重轻、施工快、易维修等技术优势。The steel plate composite shear wall refers to the shear wall structure made by bending and shaping the steel plate. Its interior includes a cavity formed by bending the steel plate and ribs separating the cavity. The cavity can be selectively filled with other materials as required. As a building material, it has the advantages of high bearing capacity, light weight, fast construction speed and good shear resistance. It is especially suitable for high-rise and super high-rise buildings and seismic reinforcement projects in high-intensity areas. The superior performance in seismic performance makes it widely used in the field of super high-rise buildings. However, the research on steel plate composite shear walls is not mature at home and abroad. There are no relevant calculation provisions in the code for the connection method of steel plate and concrete, and the connection structure of steel plate and concrete directly affects the interaction between the two and the stability of the structure. And safety, but also affect the amount of structural steel and economical. Compared with traditional steel structures, it can save more steel, improve the stability and torsional performance of components, increase rigidity, enhance rust resistance and fire resistance performance, and achieve economical beauty. Compared with traditional concrete shear walls, it has technical advantages such as light weight, fast construction and easy maintenance.
但是,钢板组合剪力墙作为一种新的结构形式,相关的节点在工程应用中,也在不断地更新改良中,其中也有一些暴露了现有的节点的不足。However, steel plate composite shear wall is a new structural form, and the related joints are constantly being updated and improved in engineering applications, and some of them have exposed the shortcomings of the existing joints.
现阶段钢板组合剪力墙中,使用比较多的形式主要是钢管混凝土束组合剪力墙以及其他形式的多腔体钢板组合剪力墙。而这些形式的钢板组合剪力墙的现场竖向拼接节点中,由于钢板组合剪力墙内部存在通常劲板,因而在内部无法焊接,从而导致了节点处劲板不连续,出现薄弱区的问题,故而,需要采用节点加强措施解决,而目前主要采用的手段是在节点处的钢板组合剪力墙的内部插钢筋补强。如图1所示,通过在下部钢板组合剪力墙1和上部钢板组合剪力墙2之间设置顶板4,并通过设置贯通上、下部钢板组合剪力墙的插筋10来进行节点处的补强。此措施存在以下几个问题:1.所述钢筋量较大,不经济;2.由于拼接处顶板为中间开方孔,本身尺寸较小,而插入钢筋进一步占用开空空间,使得钢板组合剪力墙在浇筑内部混凝土时更加困难,从而影响混凝土浇注的密实度;3.钢筋插入式,需要对钢筋进行固定,而此部分固定工作需要耗费不少工时;4.钢板墙吊装时,插入钢筋容易被钢板碰到,导致钢筋弯折,妨碍钢板墙吊装,增加安装难度,加大安装时间,延长了施工周期;5.插筋在传力过程中通过混凝土间接传力,存在较大的安全隐患。此外,目前现场拼接点的位置一般位于楼板上方1.2m处,由于顶板突出剪力墙,因此,在涂刷油漆时容易出现漏点,造成钢板墙锈蚀;并且,由于顶板的突出,因此,在进行防火施工时,需要进行特殊处理,例如将伸出的顶板边缘切割掉,从而进一步加大了施工难度,延长了施工周期。At present, in the steel plate composite shear wall, the most commonly used forms are the steel tube concrete beam composite shear wall and other forms of multi-cavity steel plate composite shear wall. However, in the on-site vertical splicing joints of these forms of steel plate composite shear walls, due to the usual stiffeners inside the steel plate composite shear walls, they cannot be welded inside, which leads to the discontinuity of the stiffeners at the joints and the problem of weak areas. , Therefore, it is necessary to adopt joint strengthening measures to solve the problem, and the main method currently used is to insert steel bars inside the steel plate composite shear walls at the joints for reinforcement. As shown in Figure 1, by setting the top plate 4 between the lower steel plate combined shear wall 1 and the upper steel plate combined shear wall 2, and by setting the insertion ribs 10 through the upper and lower steel plate combined shear walls to carry out joints. reinforcement. This measure has the following problems: 1. The amount of steel bars is large, which is uneconomical; 2. Since the top plate at the joint is a square hole in the middle, the size itself is small, and the inserted steel bars further occupy the open space, making the combination of steel plates shear It is more difficult for the force wall to pour the internal concrete, which affects the compactness of the concrete pouring; 3. The steel bar insertion type needs to fix the steel bar, and this part of the fixing work takes a lot of man-hours; 4. When the steel plate wall is hoisted, insert the steel bar It is easy to be touched by the steel plate, which will cause the steel bar to bend, hinder the hoisting of the steel plate wall, increase the difficulty of installation, increase the installation time, and prolong the construction period; Hidden danger. In addition, the splicing point on site is generally located 1.2m above the floor. Since the roof protrudes from the shear wall, leaks are prone to occur when painting paint, causing corrosion of the steel plate wall; and, due to the protrusion of the roof, the When carrying out fire protection construction, special treatment is required, such as cutting off the edge of the protruding roof, which further increases the difficulty of construction and prolongs the construction period.
另外,现行使用的钢板组合剪力墙结构中,由于制作、施工等各种误差,造成在进行吊装时,上、下部钢板组合剪力墙较难对齐。误差较大时甚至需要使用千斤顶对上部钢板组合剪力墙进行矫正,如果不进行调整,一旦调斜将会造成很严重的质量事故,因此需要千斤顶多次顶靠调整,直至上部钢板组合剪力墙与下部钢板组合剪力墙精准对齐。如果在整个工程的施工过程中,每一次吊装过程都需要千斤顶顶靠调整,这将严重影响吊机的吊次,并进而影响整个工程的施工周期。众所周知,对于建筑物的建造者来说,施工工期对于其作业成本来说占有非常大的比重。因此,如何能够最大限度地缩短工期对于建造者来说是必须考虑的因素。如上所述,现有技术中的拼接节点很大程度地影响了建筑工期的缩短,给建造者带来了很大的作业成本。In addition, in the currently used steel plate combined shear wall structure, due to various errors in manufacturing and construction, it is difficult to align the upper and lower steel plate combined shear walls during hoisting. When the error is large, it is even necessary to use a jack to correct the upper steel plate combined shear wall. If no adjustment is made, once the inclination is adjusted, it will cause a serious quality accident. Therefore, the jack needs to be adjusted several times until the upper steel plate combined shear wall The wall is precisely aligned with the lower steel plate composite shear wall. If in the construction process of the whole project, every lifting process needs to be adjusted by the jack, this will seriously affect the number of liftings of the crane, and then affect the construction period of the whole project. As we all know, for builders of buildings, the construction period occupies a very large proportion for their operating costs. Therefore, how to minimize the construction period is a factor that must be considered by the builder. As mentioned above, the splicing joints in the prior art have greatly affected the shortening of the construction period, and brought a large operating cost to the builder.
本实用新型针对钢板组合剪力墙的拼接节点,提出了一种新的现场竖向拼接节点,与现有的拼接节点相比,具有构造简单、传力合理、施工便捷等特点。拼接点还可以设置在楼板内,由于节点由混凝土包裹,耐腐蚀性得到极大提高,外观上得到极大改善,此外,拼接点处的劲板可以传递钢板组合剪力墙内通长肋板的载荷,能够提高15%以上的承载力。The utility model proposes a new on-site vertical splicing node for the splicing joint of the steel plate composite shear wall. Compared with the existing splicing joint, it has the characteristics of simple structure, reasonable force transmission and convenient construction. The splicing point can also be set in the floor slab. Because the joint is wrapped by concrete, the corrosion resistance is greatly improved, and the appearance is greatly improved. In addition, the stiffener at the splicing point can transmit the long ribs in the steel plate composite shear wall The load can increase the bearing capacity by more than 15%.
实用新型内容Utility model content
本实用新型的目的在于克服现有技术的不足,提供一种钢板组合剪力墙的拼接节点。The purpose of the utility model is to overcome the deficiencies of the prior art and provide a splicing node of a steel plate composite shear wall.
本实用新型提供的一种钢板组合剪力墙的拼接节点,其技术方案为:The utility model provides a splicing node of a steel plate combined shear wall, and its technical scheme is:
一种钢板组合剪力墙的拼接节点,包括上部钢板组合剪力墙和下部钢板组合剪力墙,其特征在于:拼接节点设置于楼板标高处,所述下部钢板组合剪力墙顶部设置有顶板,所述上部钢板组合剪力墙的两侧和下部钢板组合剪力墙的两侧均设置有劲板;所述上部钢板组合剪力墙、下部钢板组合剪力墙和劲板均与所述顶板固定连接;所述顶板中间开设有通孔,所述通孔连通所述上部钢板组合剪力墙的腔体和所述下部钢板组合剪力墙的腔体;所述顶板延伸出所述下部钢板组合剪力墙或上部钢板组合剪力墙,作为楼板的支撑托板;所述上部钢板组合剪力墙上设置有钢筋孔,所述上部钢板组合剪力墙上设置有穿过所述钢筋孔的连接钢筋。A splicing node of a steel plate combined shear wall, comprising an upper steel plate combined shear wall and a lower steel plate combined shear wall, characterized in that: the splicing node is set at the floor level, and the top of the lower steel plate combined shear wall is provided with a top plate , both sides of the upper steel plate combined shear wall and both sides of the lower steel plate combined shear wall are provided with stiffeners; the upper steel plate combined shear wall, the lower steel plate combined shear wall and stiffeners are all connected Fixed connection; a through hole is opened in the middle of the top plate, and the through hole communicates with the cavity of the upper steel plate combined shear wall and the cavity of the lower steel plate combined shear wall; the top plate extends out of the lower steel plate The combined shear wall or the upper steel plate combined shear wall is used as a supporting plate for the floor; the upper steel plate combined shear wall is provided with reinforcement holes, and the upper steel plate combined shear wall is provided with holes passing through the steel bars connecting steel bars.
本实用新型提供的一种钢板组合剪力墙的拼接节点,还包括如下附属技术方案:The splicing node of a steel plate combined shear wall provided by the utility model also includes the following subsidiary technical solutions:
其中,所述楼板为钢筋混凝土楼板,其底部与所述顶板的下表面平齐,所述钢筋混凝土楼板中的钢筋通过设置在所述上部钢板组合剪力墙上的所述连接钢筋进行连接。Wherein, the floor is a reinforced concrete floor, the bottom of which is flush with the lower surface of the roof, and the steel bars in the reinforced concrete floor are connected by the connecting steel bars arranged on the upper steel plate composite shear wall.
其中,所述楼板为钢筋桁架楼板;Wherein, the floor is a reinforced truss floor;
所述钢筋桁架楼板的底模板与顶板的上表面平齐,其上、下弦钢筋均通过设置在所述上部钢板组合剪力墙上的所述连接钢筋进行连接;或者所述钢筋桁架楼板的底模板与顶板的下表面平齐,其上弦钢筋通过设置在所述上部钢板组合剪力墙上的所述连接钢筋进行连接,其下弦钢筋直接与顶板固定连接。The bottom formwork of the steel truss floor is flush with the upper surface of the roof, and the upper and lower chord steel bars are connected through the connecting steel bars arranged on the upper steel plate composite shear wall; or the bottom of the steel truss floor The template is flush with the lower surface of the roof, and its upper chord reinforcement is connected through the connecting reinforcement set on the upper steel plate composite shear wall, and its lower chord reinforcement is directly fixedly connected with the roof.
其中所述劲板设置在与所述上部钢板组合剪力墙和/或所述下部钢板组合剪力墙的内部肋板对应的位置。Wherein the stiffener is arranged at a position corresponding to the inner ribs of the upper steel plate combined shear wall and/or the lower steel plate combined shear wall.
其中,所述顶板延伸出所述下部钢板组合剪力墙的长度不小于30mm。Wherein, the length of the top plate extending out of the lower steel plate combined shear wall is not less than 30mm.
其中,所述下部钢板组合剪力墙的两侧的劲板为平板。Wherein, the stiffeners on both sides of the lower steel plate composite shear wall are flat plates.
其中,所述平板为通长钢板、多块钢板或锯齿形钢板;当所述平板为长钢板时,所述平板上设置有塞焊孔;当所述平板为锯齿形钢板时,所述锯齿形钢板的锯齿尖端位于内部肋板处的钢板组合剪力墙外侧。Wherein, the flat plate is a long steel plate, a plurality of steel plates or a zigzag steel plate; when the flat plate is a long steel plate, plug welding holes are arranged on the flat plate; when the flat plate is a zigzag steel plate, the sawtooth The sawtooth tip of the shaped steel plate is located on the outside of the steel plate composite shear wall at the inner rib.
其中,上部钢板组合剪力墙底部处的所述劲板的部分兼做上部拼接耳板,在所述顶板上焊接下部拼接耳板,所述上部拼接耳板与下部拼接耳板通过螺栓连接。Wherein, the part of the stiffener at the bottom of the upper steel plate composite shear wall is also used as the upper splicing lug, and the lower splicing lug is welded on the top plate, and the upper splicing lug and the lower splicing lug are connected by bolts.
其中,所述下部拼接耳板的内侧边为斜边,并作为上部钢板组合剪力墙吊装时的导向板。Wherein, the inner side of the lower splicing ear plate is a hypotenuse, and serves as a guide plate when the upper steel plate composite shear wall is hoisted.
其中,每个所述通孔对应钢板组合剪力墙的一个腔体,或,每个所述通孔对应钢板组合剪力墙的多个腔体。Wherein, each of the through holes corresponds to one cavity of the steel plate composite shear wall, or each of the through holes corresponds to a plurality of cavities of the steel plate composite shear wall.
本实用新型的实施包含以下技术效果:The implementation of the utility model includes the following technical effects:
本实用新型提供的钢板组合剪力墙的拼接节点:1.通过将拼接点设置在楼板内,不仅在外观上得到了较大的改善,并且可以使防腐防火得到更好的解决;2.拼接节点处劲板的设置可以传递钢板组合剪力墙内肋板的荷载,比钢筋间接传力更有效,能够很大程度上提高其承载力;3.通过将顶板加宽后,使得顶板内部开孔宽度可以有一定的增大,从而有利于混凝土的浇筑;4.顶板兼做楼板托板,而劲板兼做楼板抗剪件,节省材料,更经济;5.劲板兼做楼板抗剪件,节省材料;6.楼板底部与顶板下表面平齐,顶板藏于楼板内,在进行施工时,不需要将顶板锯掉,也不需要对此处做特殊处理,从而有利于室内装修;7.钢筋桁架下弦钢筋与顶板上表面焊接,取消楼板连接钢筋,节省材料,减少现场穿钢筋的工作量;8.下部拼接耳板用作吊装导向板,可以有效地提高安装精度,节省安装时间,加工工程的安装速度。The splicing nodes of the steel plate composite shear wall provided by the utility model: 1. By setting the splicing points in the floor, not only the appearance is greatly improved, but also the anti-corrosion and fire prevention can be better solved; 2. Splicing The setting of the stiffener at the node can transmit the load of the inner ribs of the steel plate composite shear wall, which is more effective than the indirect force transmission of steel bars, and can greatly improve its bearing capacity; 3. By widening the roof, the interior of the roof is opened The width of the hole can be increased to a certain extent, which is beneficial to the pouring of concrete; 4. The top plate is also used as a floor supporting plate, and the stiffener is also used as a shearing part of the floor, which saves materials and is more economical; 6. The bottom of the floor is flush with the lower surface of the roof, and the roof is hidden in the floor. During construction, there is no need to saw off the roof or do special treatment here, which is conducive to interior decoration; 7. The lower chord steel bar of the steel bar truss is welded to the top surface of the roof, canceling the connecting steel bar of the floor, saving materials and reducing the workload of wearing steel bars on site; 8. The lower spliced lug plate is used as a hoisting guide plate, which can effectively improve the installation accuracy and save installation time , The installation speed of processing engineering.
附图说明Description of drawings
图1为现有技术中的钢板组合剪力墙的拼接点剖面图。Fig. 1 is a cross-sectional view of a splicing point of a steel plate composite shear wall in the prior art.
图2为本实用新型的一种钢板组合剪力墙的拼接节点的剖面图,其中拼接节点位于楼板处。Fig. 2 is a cross-sectional view of a splicing node of a steel plate composite shear wall of the present invention, wherein the splicing node is located at the floor.
图3为本实用新型的一种钢板组合剪力墙的拼接节点的剖面图,其中楼板底部与顶板的上表面齐平。Fig. 3 is a cross-sectional view of a joint joint of a steel plate combined shear wall of the present invention, wherein the bottom of the floor is flush with the upper surface of the roof.
图4为本实用新型的一种钢板组合剪力墙的拼接节点的剖面图,其中楼板底部与顶板的下表面齐平。Fig. 4 is a cross-sectional view of a joint joint of a steel plate combined shear wall of the present invention, wherein the bottom of the floor is flush with the lower surface of the roof.
图5为本实用新型的一种钢板组合剪力墙的拼接节点的剖面图,其中下部劲板为平板。Fig. 5 is a cross-sectional view of a joint joint of a steel plate composite shear wall of the present invention, wherein the lower stiffener is a flat plate.
图6为本实用新型的一种钢板组合剪力墙的拼接节点的剖面图,其中部分劲板的兼做耳板。Fig. 6 is a cross-sectional view of a splicing node of a steel plate composite shear wall of the present invention, in which some stiffeners are also used as ear plates.
图7为钢板组合剪力墙的水平断面图。Figure 7 is a horizontal cross-sectional view of a steel plate composite shear wall.
图8为本实用新型的一种钢板组合剪力墙的拼接节点的拼接点处的水平断面图。Fig. 8 is a horizontal cross-sectional view at the splicing point of a splicing node of a steel plate composite shear wall of the present invention.
具体实施方式Detailed ways
下面将结合实施例以及附图对本实用新型加以详细说明,需要指出的是,所描述的实施例仅旨在便于对本实用新型的理解,而对其不起任何限定作用。The utility model will be described in detail below in conjunction with the embodiments and accompanying drawings. It should be noted that the described embodiments are only intended to facilitate the understanding of the utility model, and have no limiting effect on it.
参见图2-8所示,本实施例提供的一种钢板组合剪力墙的拼接节点,包括上部钢板组合剪力墙2和下部钢板组合剪力墙1,拼接节点设置于楼板标高处,下部钢板组合剪力墙1顶部设置有顶板4,在上部钢板组合剪力墙2的两侧,对应内部肋板3所在的位置设置有上部劲板5,在下部钢板组合剪力墙的的两侧,对应内部肋板3所在的位置设置有下部劲板6;上部钢板组合剪力墙2、下部钢板组合剪力墙1、上部劲板5和下部劲板6均与顶板4固定连接,例如可以焊接;顶板4中间开设有通孔,该通孔连通上部钢板组合剪力墙2的腔体和下部钢板组合剪力墙1的腔体;顶板4延伸出下部钢板组合剪力墙1或上部钢板组合剪力墙2,作为楼板7的支承托板;顶板4伸出下部钢板组合剪力墙的长度不小于30mm;所述上部钢板组合剪力墙2上设置有钢筋孔,所述上部钢板组合剪力墙上设置有穿过所述钢筋孔的连接钢筋8。其中,上部劲板5埋入楼板7内或仅劲板5的靠下部分埋入楼板7内;每个通孔对应钢板组合剪力墙的一个腔体,或,每个通孔对应钢板组合剪力墙的多个腔体。本实施例提供的钢板组合剪力墙的拼接节点,通过将拼接点设置在楼板标高处,在进行施工时,不需要将伸出的顶板边缘切割,也不需要进行特殊处理,从而不仅在外观上得到了较大的改善,并且可以使防腐防火得到更好的解决,也进一步简化了施工程序,降低了施工难度;并且本实施例中取消插筋,改用劲板补强,在上部钢板组合剪力墙2的两侧对应内部肋板3所在的位置焊接上部劲板5,在下部钢板组合剪力墙1的两侧对应内部肋板3所在位置焊接下部劲板6,并使上部劲板5和下部劲板6均与顶板4焊接,使得上部钢板组合剪力墙2内部肋板上的荷载首先传递至上部劲板5,再通过顶板4将上部劲板5上的荷载传递至下部劲板6,最后由下部劲板6将荷载传递至下部钢板组合剪力墙1内部的肋板3。拼接节点处劲板的设置可以传递钢板组合剪力墙内的肋板的荷载,比钢筋间接传力更有效,能够很大程度上提高其承载力;通过将顶板4加宽后,使得顶板内部开孔宽度可以有一定的增大,从而有利于混凝土的浇筑;顶板兼做楼板托板,而劲板兼做楼板抗剪件,节省材料,更经济;本实施例通过在上部钢板组合剪力墙上设置有钢筋孔,并在所述上部钢板组合剪力墙2上设置有穿过所述钢筋孔的连接钢筋8,使得楼板中的钢筋通过所述连接钢筋8进行搭接,从而提高了楼板与剪力墙连接的可靠性,简化了施工工序,节省了施工周期。Referring to Fig. 2-8, a splicing node of a steel plate composite shear wall provided in this embodiment includes an upper steel plate composite shear wall 2 and a lower steel plate composite shear wall 1, the splicing node is set at the floor level, and the lower The top plate 4 is set on the top of the steel plate combined shear wall 1, and the upper stiffener 5 is set on both sides of the upper steel plate combined shear wall 2 corresponding to the position of the internal rib 3, and on both sides of the lower steel plate combined shear wall , the lower stiffener 6 is arranged corresponding to the position where the inner rib 3 is located; the upper steel plate combined shear wall 2, the lower steel plate combined shear wall 1, the upper stiffener 5 and the lower stiffener 6 are all fixedly connected with the top plate 4, for example, Welding; there is a through hole in the middle of the top plate 4, which connects the cavity of the upper steel plate combined shear wall 2 and the cavity of the lower steel plate combined shear wall 1; the top plate 4 extends out of the lower steel plate combined shear wall 1 or the upper steel plate The combined shear wall 2 is used as a supporting plate for the floor 7; the length of the top plate 4 protruding from the lower steel plate combined shear wall is not less than 30mm; the upper steel plate combined shear wall 2 is provided with reinforcement holes, and the upper steel plate combined shear wall The shear wall is provided with connecting reinforcement bars 8 passing through the reinforcement holes. Among them, the upper stiffener 5 is buried in the floor 7 or only the lower part of the stiffener 5 is buried in the floor 7; each through hole corresponds to a cavity of the steel plate composite shear wall, or each through hole corresponds to the steel plate composite Multiple cavities for shear walls. The splicing joints of the steel plate composite shear wall provided in this embodiment, by setting the splicing point at the floor elevation, do not need to cut the edge of the protruding roof during construction, and do not need special treatment, so that not only the appearance It has been greatly improved, and it can better solve the problem of anti-corrosion and fire prevention, and further simplifies the construction procedure and reduces the difficulty of construction; and in this embodiment, inserting ribs are canceled and reinforcement plates are used instead, and the upper steel plate The upper stiffener 5 is welded at the position corresponding to the inner rib 3 on both sides of the composite shear wall 2, and the lower stiffener 6 is welded at the position corresponding to the inner rib 3 on both sides of the lower steel plate composite shear wall 1, and the upper stiffener Both the plate 5 and the lower stiffener 6 are welded to the top plate 4, so that the load on the internal ribs of the upper steel plate combined shear wall 2 is first transmitted to the upper stiffener 5, and then the load on the upper stiffener 5 is transferred to the lower part through the top plate 4 The stiffener 6 , and finally the lower stiffener 6 transmits the load to the rib 3 inside the lower steel plate composite shear wall 1 . The setting of the stiffener at the joint joint can transmit the load of the ribs in the steel plate composite shear wall, which is more effective than the indirect force transmission of steel bars, and can greatly improve its bearing capacity; by widening the roof 4, the inside of the roof The width of the opening can be increased to a certain extent, which is beneficial to the pouring of concrete; the top plate is also used as a floor supporting plate, and the stiffener is also used as a shear member of the floor, which saves materials and is more economical; A reinforcement hole is provided on the wall, and a connection reinforcement 8 passing through the reinforcement hole is provided on the upper steel plate composite shear wall 2, so that the reinforcement in the floor slab is overlapped through the connection reinforcement 8, thereby improving the The reliability of the connection between the floor slab and the shear wall simplifies the construction process and saves the construction period.
可选地,如图2所示,楼板7为钢筋混凝土楼板,其底部与顶板4的下表面平齐,钢筋混凝土楼板7中的钢筋通过穿过过设置在所述上部钢板组合剪力墙2上的连接钢筋8进行连接。本实施例中,通过在上部钢板组合剪力墙2和下部钢板组合剪力墙1中开孔,使连接钢筋8穿过钢板组合剪力墙,将楼板中的上下层钢筋进行连接。通过将楼板7的底部设置成与顶板4的下表面平齐,使得顶板4藏于楼板7内,有利于室内装修,也不需要额外的切割工序。Optionally, as shown in Figure 2, the floor slab 7 is a reinforced concrete floor slab, the bottom of which is flush with the lower surface of the top slab 4, and the steel bars in the reinforced concrete floor slab 7 pass through the composite shear wall 2 arranged on the upper steel plate The connecting steel bars 8 on the top are connected. In this embodiment, holes are opened in the upper steel plate combined shear wall 2 and the lower steel plate combined shear wall 1, so that the connecting steel bar 8 passes through the steel plate combined shear wall to connect the upper and lower steel bars in the floor. By arranging the bottom of the floor 7 to be flush with the lower surface of the top 4, the top 4 is hidden in the floor 7, which is beneficial for interior decoration and does not require additional cutting process.
可选地,如图3所示,楼板7为钢筋桁架楼板,钢筋桁架楼板7的底模板71与顶板4的上表面平齐,其上弦钢筋72和下弦钢筋73均通过设置在所述上部钢板组合剪力墙2上的所述连接钢筋8进行连接。或如图4所示,钢筋桁架楼板7的底模板71与顶板4的下表面平齐,其上弦钢筋72通过设置在所述上部钢板组合剪力墙2上的所述连接钢筋8进行连接,其下弦钢筋73直接与顶板4焊接。本实施例通过将钢筋桁架楼板7的底模板71与顶板4的下表面平齐,其上弦钢筋72通过穿过钢板组合剪力墙的连接钢筋8进行搭接,其下弦钢筋73直接与顶板4焊接,节省了材料,减少了现场穿钢筋的工作量,缩短了工期。Optionally, as shown in FIG. 3 , the floor slab 7 is a reinforced truss floor, the bottom template 71 of the reinforced truss floor 7 is flush with the upper surface of the roof 4, and its upper chord reinforcement 72 and lower chord reinforcement 73 are all passed through the upper steel plate Combine the connecting steel bars 8 on the shear wall 2 for connection. Or as shown in Figure 4, the bottom template 71 of the reinforced truss floor 7 is flush with the lower surface of the roof 4, and its upper chord reinforcement 72 is connected by the connecting reinforcement 8 arranged on the upper steel plate composite shear wall 2, Its lower chord steel bar 73 is directly welded with top plate 4. In this embodiment, the bottom formwork 71 of the steel bar truss floor 7 is flush with the lower surface of the roof 4, and its upper chord reinforcement 72 is lapped through the connecting reinforcement 8 passing through the steel plate composite shear wall, and its lower chord reinforcement 73 is directly connected to the roof 4. Welding saves materials, reduces the workload of wearing steel bars on site, and shortens the construction period.
可选地,如图5-7所示,下部钢板组合剪力墙1的两侧对应内部肋板的位置的下部劲板为平板9,所述平板9为通长钢板、多块钢板或锯齿形钢板;当所述平板为长钢板时,所述平板上设置有塞焊孔;当所述平板为锯齿形钢板时,所述锯齿形钢板的锯齿尖端位于内部肋板处的钢板组合剪力墙外侧。本实施例通过将平板设置为多块钢板或锯齿形钢板,以节省钢材的用量。Optionally, as shown in Figure 5-7, the lower stiffeners on both sides of the lower steel plate composite shear wall 1 corresponding to the positions of the internal ribs are flat plates 9, and the flat plates 9 are full-length steel plates, multiple steel plates or sawtooth shaped steel plate; when the flat plate is a long steel plate, plug welding holes are provided on the flat plate; when the flat plate is a zigzag steel plate, the saw tooth tip of the zigzag steel plate is located at the combined shear force of the steel plate at the internal rib outside the wall. In this embodiment, the consumption of steel is saved by setting the flat plate as multiple steel plates or zigzag steel plates.
还可以将上部钢板组合剪力墙2的部分上部劲板5兼做上部拼接耳板91,在顶板4上焊接下部拼接耳板92,并使上部拼接耳板91与下部拼接耳板92通过螺栓连接。更优选地,下部拼接耳板92的内侧边为斜边,作为上部钢板组合剪力墙2吊装时的导向板;平板为通长钢板或多块钢板。本实施例将下部拼接耳板92用作吊装导向板,可以有效地提高上部钢板组合剪力墙与下部钢板组合剪力墙的对准精度,从而省去了现有技术中通过使用千斤顶来调整上部钢板组合剪力墙,以使其与下部钢板组合剪力墙的精确对准,从而不仅提高了安装精度,还大大地节省了安装时间,加快了工程的安装速度。It is also possible to use part of the upper stiffener 5 of the upper steel plate combined shear wall 2 as the upper splicing lug 91, weld the lower splicing lug 92 on the top plate 4, and make the upper splicing lug 91 and the lower splicing lug 92 pass through the bolts. connect. More preferably, the inner side of the lower splicing ear plate 92 is a hypotenuse, which is used as a guide plate when the upper steel plate composite shear wall 2 is hoisted; the flat plate is a long steel plate or multiple steel plates. In this embodiment, the lower splicing lug plate 92 is used as a hoisting guide plate, which can effectively improve the alignment accuracy of the upper steel plate combined shear wall and the lower steel plate combined shear wall, thus eliminating the need to use jacks in the prior art to adjust The upper steel plate combined shear wall is precisely aligned with the lower steel plate combined shear wall, which not only improves the installation accuracy, but also greatly saves the installation time and speeds up the installation speed of the project.
最后应当说明的是,以上实施例仅用以说明本实用新型的技术方案,而非对本实用新型保护范围的限制,尽管参照较佳实施例对本实用新型作了详细地说明,本领域的普通技术人员应当理解,可以对本实用新型的技术方案进行修改或者等同替换,而不脱离本实用新型技术方案的实质和范围。Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present utility model, rather than limiting the protection scope of the present utility model. Although the utility model has been described in detail with reference to the preferred embodiments, those skilled in the art Personnel should understand that the technical solution of the utility model can be modified or equivalently replaced without departing from the essence and scope of the technical solution of the utility model.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721505523.7U CN207512968U (en) | 2017-11-13 | 2017-11-13 | A kind of splicing node of steel plate combined shear wall |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721505523.7U CN207512968U (en) | 2017-11-13 | 2017-11-13 | A kind of splicing node of steel plate combined shear wall |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN207512968U true CN207512968U (en) | 2018-06-19 |
Family
ID=62537467
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201721505523.7U Expired - Fee Related CN207512968U (en) | 2017-11-13 | 2017-11-13 | A kind of splicing node of steel plate combined shear wall |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN207512968U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107740509A (en) * | 2017-11-13 | 2018-02-27 | 杭萧钢构股份有限公司 | A kind of splicing node of steel plate combined shear wall |
-
2017
- 2017-11-13 CN CN201721505523.7U patent/CN207512968U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107740509A (en) * | 2017-11-13 | 2018-02-27 | 杭萧钢构股份有限公司 | A kind of splicing node of steel plate combined shear wall |
| CN107740509B (en) * | 2017-11-13 | 2023-09-12 | 杭萧钢构股份有限公司 | Splicing node of steel plate combined shear wall |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN203514196U (en) | Corrugated steel web combination-beam cable-stayed bridge cable beam anchoring structure | |
| CN206737199U (en) | A kind of light steel foam concrete assembled wall of assembled | |
| CN103603496A (en) | Deviation integral elevation steel corridor carrying method and lateral limiting device thereof | |
| CN202248298U (en) | Section steel concrete frame node | |
| CN109469204A (en) | Fabricated steel reinforced concrete mixed frame structure based on superposed beams and construction method | |
| CN207419711U (en) | Steel plate shear force wall and the connection structure of steel bar girder floor plates | |
| CN205224288U (en) | Connection node of reinforced concrete superposed beam and steel pipe column | |
| CN108999281A (en) | A kind of novel precast concrete bean column node and its construction method | |
| CN205637120U (en) | Assembly structure of precast concrete beam and steel core concrete column | |
| CN108005259A (en) | A kind of steel plate combined shear wall splices node | |
| CN105239668B (en) | A kind of internal partition formula concrete filled steel tube switching node structure and its construction method | |
| CN107653997A (en) | Assembled soft steel energy dissipation wall and its construction method | |
| CN207512968U (en) | A kind of splicing node of steel plate combined shear wall | |
| CN104032861B (en) | Connecting joint structure of mixed coupled wall section steel column and non-energy dissipation beam and construction method thereof | |
| CN207525933U (en) | A kind of steel plate combined shear wall splices node | |
| CN105821903A (en) | Synthesized pipe rack with frame composite structure | |
| CN203834692U (en) | Connection joint structure of hybrid connected-wall steel columns and non-energy-dissipating steel short beams | |
| CN209603182U (en) | A kind of adjustable die system of pipe gallery automatic control section | |
| CN208039477U (en) | A kind of reinforced concrete combination floor and encased steel plate compound shear wall connecting node | |
| CN110747741A (en) | Wet joint construction template and construction method | |
| CN207392509U (en) | Assembled soft steel energy dissipation wall | |
| CN107740509B (en) | Splicing node of steel plate combined shear wall | |
| CN106869403B (en) | Multilayer prefabricated square steel pipe concrete connecting beam | |
| CN206189650U (en) | Prefabricated exterior wall board seam connecting piece | |
| CN209817179U (en) | A prefabricated assembly shear wall structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180619 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |