CN204740075U - 一种插入式温度测量元件拆卸装置 - Google Patents
一种插入式温度测量元件拆卸装置 Download PDFInfo
- Publication number
- CN204740075U CN204740075U CN201520457295.5U CN201520457295U CN204740075U CN 204740075 U CN204740075 U CN 204740075U CN 201520457295 U CN201520457295 U CN 201520457295U CN 204740075 U CN204740075 U CN 204740075U
- Authority
- CN
- China
- Prior art keywords
- temperature measurement
- sleeve pipe
- lead screw
- thermocouple
- measurement component
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Measuring Temperature Or Quantity Of Heat (AREA)
Abstract
本实用新型提供了一种插入式温度测量元件拆卸装置,包括热电偶测温元件,热电偶测温元件上套装的热电偶起拔器,热电偶起拔器包括固定在电偶杆上的固定夹具,该固定夹具与内螺纹套管相固接,套管的另一端固接有第一旋转件,套管内套装有中空丝杠,丝杠与套管螺纹旋接,该丝杠的一端位于套管内,丝杠另一端固接有第二旋转件。本实用新型可克服高温插入式温度测量元件使用损坏后拆卸所引起的处理时间长、处理工序复杂、处理过程中操作人员风险较大的问题,本实用新型不受安装空间狭小因素影响,能快速进行高温插入式温度测量元件使用损坏后的拆卸,具有安全可靠和快捷方便的特点。
Description
技术领域
本实用新型涉及自动化仪表测量技术领域,尤其涉及一种插入式温度测量元件拆卸装置。
背景技术
冶金企业中插入式温度测量元件对温度的检测应用比较广泛,大多都安装在管道上,以满足对工艺参数的实时掌控,其中以高炉炉身、炉腰、炉底温度测点环境较为恶劣。在生产中,因工况的变化及热电偶安装周期过长及质量问题,会出现热电偶损坏导致该点温度失常及无显示现象。并较为严重的会出现炉皮冷却壁串风,导致炉皮发热乃至漏风,其漏点在高温、高压状态下会持续恶化,严重影响高炉生产。其处理方法一般加强该点冷却水进出温度,加强点检,待高炉休风时重新更换。
目前针对高炉炉身、炉腰、炉底温度测量元件的更换一般为:1.用管钳拧卸,由于空间狭小且插入炉身中的电偶已受热变形卡滞,造成内部电偶杆无法从电偶底座拔出,此方法成功率低,费时费力;2.用倒链拉拽,由于电偶安装位置所限,倒链挂点很难与电偶成一条直线,易产生斜拉外拽,造成危险;3.首先用气焊将电偶底座从炉皮上割离,再次用吹氧管将电偶孔烧溶打开,最后重新焊接安装法兰安装测温元件。整个作业过程极其复杂、危险,很容易造成炉皮受损,其次焊接电偶底座工作量大,用时长也会是即使下次更换热电偶的程序变得比较繁琐。
实用新型内容
本实用新型为了解决现有技术中存在的上述问题,提供一种恶劣环境下对插入式温度测量元件安装、拆卸达到及时、快速处理的拆卸装置。
为解决上述问题,本实用新型采用的技术方案是:一种插入式温度测量元件拆卸装置,包括柱形热电偶测温元件,热电偶测温元件上设有热电偶起拔器,热电偶起拔器包括套装固定在热电偶测温元件上的固定夹具,该固定夹具固接一套管,套管的另一端固接有第一旋转件,套管内安装有中空的丝杠,丝杠与套管螺纹旋接,丝杠套装于热电偶测温元件上,该丝杠的一端位于套管内,丝杠另一端固接有第二旋转件。
优选的,热电偶测温元件为热电偶。
本实用新型与现有技术相比具有以下优点:
1、通过在现有热电偶测温元件上加装一段起拔器,电偶起拔器利用丝杠及旋转件产生的推力,将电偶杆从底座中拔出,解决了空间狭小作业受制、倒链无合适挂点、吹氧管开孔后施工量大,工时长等问题,使平常电偶的拆卸、更换方便、快捷。
2、通过使用电偶起拔器拆卸电偶杆,可有效的省去电气焊工具,解决了空间狭小,作业困难等不利因素,减少了氧管烧溶对炉皮遭成的损坏。
3、使用本实用新型作业时间由原来的6小时缩短为现在的30分钟,降低了维护人员的劳动强度,减少了安全事件发生的可能性。
附图说明
图1.本实用新型的结构示意图。
具体实施方式
一种插入式温度测量元件拆卸装置,热电偶测温元件1上套装热电偶起拔器,热电偶起拔器包括固定在热电偶测温元件1上的固定夹具2,该固定夹具与内螺纹套管3相固接,套管3的另一端固接有第一旋转件4,套管3内套装有中空丝杠5,丝杠5与套管3螺纹旋接,丝杠套装在热电偶测温元件1上,该丝杠5的一端旋接于套管3内,丝杠5另一端固接有第二旋转件7。
如图1所示,在现有测温元件上加装热电偶起拔器,首先将热电偶起拔器旋转至最小状态(最短的状态)套在热电偶测温元件1外部,在热电偶测温元件1上安装底座6,调整热电偶测温元件1的插入深度,在热电偶测温元件1与底座6之间用潮湿的石棉绳进行密封,直至热电偶测温元件1在底座6内按其螺纹缓慢紧固,直至旋转不动为止,热电偶测温元件1完全安装后,将热电偶起拔器末端紧靠底座6,然后调整固定夹具2在热电偶测温元件1上的位置,然后将固定夹具2通过潮湿的石棉绳固定在热电偶测温元件1上,即完成了测温元件的安装。热电偶起拔器的丝杠5与套管3螺纹旋接部分用润滑油脂涂抹,并用塑料布保护,以便锈蚀。当需要拆卸热电偶时,将热电偶底座6的固定螺栓旋松,以便热电偶测温元件1与底座6脱离,同时使热电偶起拔器中第一旋转件4逆时针转动,直至丝杠5缓慢露出,此时热电偶测温元件1会随着丝杠5慢慢被拔出,将测温孔进行清理,具备热电偶安装准备工作。或将第一旋转件4逆时针转动和第二旋转件7顺时针转动,使丝杠5缓慢露出,热电偶测温元件1随着丝杠5慢慢被拔出。
Claims (2)
1.一种插入式温度测量元件拆卸装置,包括柱形热电偶测温元件,其特征在于:热电偶测温元件上设有热电偶起拔器,热电偶起拔器包括套装固定在热电偶测温元件上的固定夹具,该固定夹具固接一套管,套管的另一端固接有第一旋转件,套管内安装有中空的丝杠,丝杠与套管螺纹旋接,丝杠套装于热电偶测温元件上,该丝杠的一端位于套管内,丝杠另一端固接有第二旋转件。
2.如权利要求1所述的一种插入式温度测量元件拆卸装置,其特征在于:热电偶测温元件为热电偶。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520457295.5U CN204740075U (zh) | 2015-06-30 | 2015-06-30 | 一种插入式温度测量元件拆卸装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520457295.5U CN204740075U (zh) | 2015-06-30 | 2015-06-30 | 一种插入式温度测量元件拆卸装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204740075U true CN204740075U (zh) | 2015-11-04 |
Family
ID=54421806
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520457295.5U Expired - Fee Related CN204740075U (zh) | 2015-06-30 | 2015-06-30 | 一种插入式温度测量元件拆卸装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204740075U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106468598A (zh) * | 2015-08-20 | 2017-03-01 | 宝山钢铁股份有限公司 | 一种炼钢用测温枪热电偶探头装卸回收装置 |
CN108220513A (zh) * | 2017-12-26 | 2018-06-29 | 柳州钢铁股份有限公司 | 高炉节能护炉方法 |
-
2015
- 2015-06-30 CN CN201520457295.5U patent/CN204740075U/zh not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106468598A (zh) * | 2015-08-20 | 2017-03-01 | 宝山钢铁股份有限公司 | 一种炼钢用测温枪热电偶探头装卸回收装置 |
CN106468598B (zh) * | 2015-08-20 | 2019-02-05 | 宝山钢铁股份有限公司 | 一种炼钢用测温枪热电偶探头装卸回收装置 |
CN108220513A (zh) * | 2017-12-26 | 2018-06-29 | 柳州钢铁股份有限公司 | 高炉节能护炉方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204740075U (zh) | 一种插入式温度测量元件拆卸装置 | |
CN105089559B (zh) | 一种油井自动清蜡装置 | |
CN105067138B (zh) | 一种回转窑温度检测装置 | |
CN105671232A (zh) | 一种炼铁高炉热电偶的在线安装工艺 | |
CN203642662U (zh) | 铝矾土竖窑的烧嘴砖 | |
CN202501999U (zh) | 高温取样探头 | |
CN105333968A (zh) | 一种回转窑温度检测装置 | |
CN204042964U (zh) | 一种火检探头在线冷却风罩 | |
CN102252782B (zh) | 卧式热电偶检定炉专用降温加速器 | |
CN205710795U (zh) | 高炉直吹管头部温度自动检测装置 | |
CN106868249B (zh) | 基于温度预警机制的冶金炉炉衬安全的判定系统及方法 | |
CN106929620A (zh) | 一种对高炉风口小套进行准确查漏的装置和方法 | |
CN204115902U (zh) | 水冷壁型气化炉的测温装置 | |
CN201355183Y (zh) | 一种热电偶的安装装置 | |
CN206593771U (zh) | 可动外螺纹双金属温度计保护套管装置 | |
CN102322971B (zh) | 炉内锅炉管长寿命壁温测量装置 | |
CN207926470U (zh) | 电机真空启动系统 | |
CN111854842A (zh) | 一种测量rh浸渍管内径和温度的装置和方法 | |
CN219136645U (zh) | 一种具有温度监控功能的玻璃窑炉 | |
CN206670806U (zh) | 改进的高炉十字测温热电偶保护装置 | |
CN107164784B (zh) | 一种自动间断式检测铝电解质温度的系统 | |
CN208595028U (zh) | 一种水轮发电机测温电阻快换套结构 | |
CN221193290U (zh) | 一种可以纵向测温的冻结管 | |
CN206450076U (zh) | 一种工频感应电炉的测温装置 | |
CN215810295U (zh) | 一种全新智能循环冷却水散热塔 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151104 Termination date: 20160630 |