CN204737702U - Maintenance platform of boiler second grade energy -saving appliance - Google Patents
Maintenance platform of boiler second grade energy -saving appliance Download PDFInfo
- Publication number
- CN204737702U CN204737702U CN201520356131.3U CN201520356131U CN204737702U CN 204737702 U CN204737702 U CN 204737702U CN 201520356131 U CN201520356131 U CN 201520356131U CN 204737702 U CN204737702 U CN 204737702U
- Authority
- CN
- China
- Prior art keywords
- platform
- upper strata
- inspection platform
- staircase
- lower floor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
The utility model discloses a maintenance platform of boiler second grade energy -saving appliance, it is including being used for placing the upper platform of second grade energy -saving appliance, be provided with first mount pad on the platform of upper strata, the position punishment that lies in the first mount pad left and right sides on the upper platform do not is provided with first upper strata and examines and repair platform and the upper platform that examines and repair of second, and the platform is examined and repaired on first upper strata and maintenance platform in second upper strata transversely strides across the boiler chimney, upper strata platform below is provided with lower floor's platform, and lower floor's platform and first upper strata are overhauld and be provided with first staircase between the platform, are provided with the middle level platform between lower floor's platform and the upper platform, are provided with the second staircase between lower floor's platform and the middle level platform, and middle level platform and second upper strata are overhauld and be provided with the third staircase between the platform, be provided with the fourth staircase between lower floor's platform and the ground. The utility model discloses made things convenient for personnel to maintain or the operation to the maintenance of the boiler second grade energy -saving appliance of high altitude installation that operation, service equipment be safe and reliable more, has improved labor efficiency.
Description
Technical field
The utility model relates to a kind of inspection platform, particularly relates to a kind of inspection platform of boiler secondary energy saver.
Background technology
Boiler body end is generally all provided with flue gas one-level energy saver (economizer), one-level energy saver and boiler integrated design, and the inspection platform of one-level energy saver also shares an inspection platform with boiler.Though boiler is provided with one-level energy saver, exhaust gas temperature is still higher, and flue gas finally enters air and causes energy dissipation.In recent years, boiler particularly paceaged boiler not only body energy saver is installed, boiler chimney also starts install custom-designed secondary energy saver additional, the softening water preheating that boiler can supplement by secondary energy saver, softening water after preheating utilizes to boiler replenishing water after entering deaerating feed water heater deoxygenation again, such exhaust gas temperature will be reduced to less than 130 DEG C, reduces thermal waste, economize energy.But secondary energy saver is arranged on boiler chimney, secondary energy saver is more heavier, lifting or bottom support is needed to install, installation site is higher, secondary energy saver is generally arranged on the horizontal segment of boiler chimney, and be arranged in the subsidiary engine of boiler room, do not install with boiler chummery (chummery installs room span too greatly, also unsightly).Boiler chimney and secondary energy saver installation site higher, to secondary energy saver body and on annex maintenance maintenance and operation will aloft work, use general ladder dangerous also inconvenient.If installation and repairing platform, because Diameter of chimney is larger, the boiler chimney diameter of industrial enterprise is many more than 1.0 meters, chimney horizontal direction stops that maintenance and operating personal are current on inspection platform, the particularly secondary energy saver inspection platform of boiler of 2 or more, from ground to two or the both sides of multiple stage secondary energy saver or middle operation respectively staircase will be installed, such staircase will take large quantity space and increase cost on ground, installation difficulty is larger.
Utility model content
The utility model is in order to solve weak point of the prior art, a kind of inspection platform of boiler secondary energy saver is provided, the personnel that facilitate are to the maintenance maintenance of the boiler secondary energy saver that high-altitude is installed or operation, and the obstruction that the chimney avoiding laterally installation passes through on inspection platform to operating personal, operation, maintenance equipment is more safe and reliable, and improve efficiency, and below inspection platform, floor area is little, is conducive to personnel and passes through.
For solving the problems of the technologies described above, the utility model adopts following technical scheme: a kind of inspection platform of boiler secondary energy saver, it comprises the upper platform for placing secondary energy saver, described upper platform is provided with first mount pad corresponding with the secondary energy saver of boiler chimney, position upper platform being positioned at the first mount pad left and right sides is respectively arranged with the first upper strata inspection platform and the second upper strata inspection platform, and the first upper strata inspection platform and the second upper strata inspection platform are laterally across boiler chimney; Lower floor's platform is provided with below described upper platform, the first staircase is provided with between lower floor's platform and the first upper strata inspection platform, middle level platform is provided with between lower floor's platform and upper platform, be provided with the second staircase between lower floor's platform and middle level platform, between middle level platform and the second upper strata inspection platform, be provided with the 3rd staircase; The 4th staircase is provided with between described lower floor platform and ground; Described upper platform, middle level platform and all arranged by shore supports between lower floor's platform and ground.
Described first upper strata inspection platform is arranged on the left side of the second upper strata inspection platform; The right side of described first mount pad is provided with the second mount pad, second mount pad is corresponding with another secondary energy saver of boiler chimney, position upper platform being positioned at the second mount pad left and right sides is respectively arranged with the 3rd upper strata inspection platform and the 4th upper strata inspection platform, 3rd upper strata inspection platform is arranged on the left side of the 4th upper strata inspection platform, 3rd upper strata inspection platform and the 4th upper strata inspection platform, laterally across boiler chimney, are provided with the 5th staircase between described middle level platform and the 4th upper strata inspection platform; Be communicated with by being communicated with platform between 3rd upper strata inspection platform and described second upper strata inspection platform.
The outside of described first upper strata inspection platform, the second upper strata inspection platform, the 3rd upper strata inspection platform, the 4th upper strata inspection platform, middle level platform and lower floor's platform is equipped with guard rail, and guard rail bottom is provided with skirting board.
The arranged outside of described upper platform has the 6th staircase.
The beneficial effects of the utility model: adopt technique scheme, upper platform is provided with first mount pad corresponding with the secondary energy saver of boiler chimney, the right side of the first mount pad is provided with the second mount pad, second mount pad is corresponding with another secondary energy saver of boiler chimney, and the support that the first mount pad and the second mount pad are used for the secondary energy saver of boiler chimney is installed; Upper platform, middle level platform and all arranged by shore supports between lower floor's platform and ground, this structure design makes upper platform, middle level platform and lower floor's platform lower ground personnel pass through, other midget plant or storing articles are installed, and the equipment such as secondary energy saver also can directly be supported by upper platform, need not carry out supporting or lifting from roof from ground; Middle level platform is provided with between lower floor's platform and the second upper strata inspection platform, because the spacing between two adjacent secondary energy savers is general all shorter, personnel directly from lower floor's platform directly through climbing up the upper platform described in two secondary energy savers through staircase, not establishing middle level platform directly to arrange staircase can cause staircase more precipitous, personnel climb inconvenience, there is potential safety hazard, middle level platform be provided as transhipment station, personnel can climb up upper platform from through the second staircase, middle level platform, the 3rd staircase, ensure that the safety of personnel.
Position upper platform being positioned at the first mount pad left and right sides is respectively arranged with the first upper strata inspection platform and the second upper strata inspection platform, first upper strata inspection platform and the second upper strata inspection platform are laterally across boiler chimney, position upper platform being positioned at the second mount pad left and right sides is respectively arranged with the 3rd upper strata inspection platform and the 4th upper strata inspection platform, 3rd upper strata inspection platform and the 4th upper strata inspection platform are laterally across boiler chimney, because the boiler chimney diameter of industrial enterprise is larger, chimney horizontal direction stops that maintenance and operating personal are current on inspection platform, first upper strata inspection platform and the second upper strata inspection platform, 3rd upper strata inspection platform and the 4th upper strata inspection platform respectively laterally across boiler chimney, by staircase (first staircase of Aided design, second staircase, 3rd staircase, 4th staircase, 5th staircase), can realize conveniently safeguarding in the left and right sides of secondary energy saver.
The first staircase is provided with between lower floor's platform and the first upper strata inspection platform, the second staircase is provided with between lower floor's platform and middle level platform, the 3rd staircase is provided with between middle level platform and the second upper strata inspection platform, be provided with the 4th staircase between described lower floor platform and ground, between described middle level platform and the 4th upper strata inspection platform, be provided with the 5th staircase; Be communicated with by being communicated with platform between 3rd upper strata inspection platform and the second upper strata inspection platform, personnel come lower floor's platform by the 4th staircase from ground, by the first staircase from lower floor's platform directly to the first upper strata inspection platform, by the second staircase, middle level platform, the 3rd staircase from lower floor's platform directly to the second upper strata inspection platform, by being communicated with platform from the second upper strata inspection platform to the 3rd upper strata inspection platform, by the 5th staircase from lower floor's platform directly to the 4th upper strata inspection platform, be convenient to overhaul corresponding secondary energy saver.
The periphery of described upper platform, middle level platform and lower floor's platform is equipped with guard rail, and guard rail bottom is provided with skirting board, prevents the people on its platform or article to fall ground, causes safety misadventure; The arranged outside of described upper platform has the 6th staircase, and maintenance maintenance or operation are carried out in the top that personnel can climb up by the 6th staircase the equipment such as deaerating feed water heater, water tank installed near secondary energy saver.
The utility model facilitates personnel to the maintenance maintenance of the boiler chimney secondary energy saver that high-altitude is installed or operation, and the obstruction that the chimney avoiding laterally installation passes through on inspection platform to operating personal, operation, maintenance equipment is more safe and reliable, and improve efficiency, below inspection platform, floor area is little, is conducive to personnel and passes through.
Accompanying drawing explanation
Fig. 1 is the structural front view of the utility model embodiment one;
Fig. 2 is the structural front view of the utility model embodiment two;
Fig. 3 is the structure left view of the utility model embodiment two;
Fig. 4 is the structure birds-eye view of the utility model embodiment two;
Fig. 5 is the structural front view of the utility model embodiment two mode of operation;
Fig. 6 is the structure left view of the utility model embodiment two mode of operation;
Fig. 7 is the structure birds-eye view of the utility model embodiment two mode of operation.
Detailed description of the invention
Below in conjunction with Fig. 1 to Fig. 7, structure of the present utility model and working process are further described.
Embodiment one
As shown in Figure 1, the inspection platform of a kind of boiler secondary energy saver of the present utility model, it comprises the upper platform 22 for placing secondary energy saver, described upper platform 22 is provided with first mount pad 14 corresponding with the second from left level energy saver 18 of boiler chimney, first mount pad 14 is for installing the second from left level energy saver 18, position upper platform 22 being positioned at first mount pad 14 left and right sides is respectively arranged with the first upper strata inspection platform 15 and the second upper strata inspection platform 13, described first upper strata inspection platform 15 is arranged on the left side of the second upper strata inspection platform 13, first upper strata inspection platform 15 and the second upper strata inspection platform 13 are laterally across port boiler chimney 20, lower floor's platform 3 is provided with below described upper platform 22, the first staircase 16 is provided with between lower floor's platform 3 and the first upper strata inspection platform 15, middle level platform 10 is provided with between lower floor's platform 3 and upper platform 22, be provided with the second staircase 2 between lower floor's platform 3 and middle level platform 10, between middle level platform 10 and the second upper strata inspection platform 13, be provided with the 3rd staircase 17, the 4th staircase 1 is provided with between described lower floor platform 3 and ground.Personnel come lower floor's platform 3 by the 4th staircase 1 from ground, directly carry out maintenance maintenance or operation to the left side of the first upper strata inspection platform 15 pairs of the second from left level energy savers 18 by the first staircase 16 from lower floor's platform 3, carry out maintenance maintenance or operation by the second staircase 2, middle level platform 10, the 3rd staircase from the right side of 17 lower floor's platform 3 to the second upper strata inspection platforms, 13 pairs of the second from left level energy savers 18.Described upper platform 22, middle level platform 10 and all being supported by pillar 5 between lower floor's platform 3 and ground is arranged, the outside of described first upper strata inspection platform 15, second upper strata inspection platform 13, middle level platform 10 and lower floor's platform 3 is equipped with guard rail 11, and guard rail 11 bottom is provided with skirting board 12.
The present embodiment is applicable to the maintenance of an independent secondary energy saver.
Embodiment two
As shown in Figures 2 to 6, the inspection platform of a kind of boiler secondary energy saver of the present utility model, it comprises the upper platform 22 for placing secondary energy saver, described upper platform 22 is provided with first mount pad 14 corresponding with the second from left level energy saver 18 of boiler chimney, the second from left level energy saver 18 is placed on the first mount pad 14, position upper platform 22 being positioned at first mount pad 14 left and right sides is respectively arranged with the first upper strata inspection platform 15 and the second upper strata inspection platform 13, described first upper strata inspection platform 15 is arranged on the left side of the second upper strata inspection platform 13, first upper strata inspection platform 15 and the second upper strata inspection platform 13 are laterally across port boiler chimney 20, lower floor's platform 3 is provided with below described upper platform 22, the first staircase 16 is provided with between lower floor's platform 3 and the first upper strata inspection platform 15, middle level platform 10 is provided with between lower floor's platform 3 and upper platform 22, be provided with the second staircase 2 between lower floor's platform 3 and middle level platform 10, between middle level platform 10 and the second upper strata inspection platform 13, be provided with the 3rd staircase 17, the 4th staircase 1 is provided with between described lower floor platform 3 and ground.Personnel come lower floor's platform 3 by the 4th staircase 1 from ground, directly carry out maintenance maintenance or operation to the left side of the first upper strata inspection platform 15 pairs of the second from left level energy savers 18 by the first staircase 16 from lower floor's platform 3, carry out maintenance maintenance or operation by the second staircase 2, middle level platform 10, the 3rd staircase from the right side of 17 lower floor's platform 3 to the second upper strata inspection platforms, 13 pairs of the second from left level energy savers 18.
The right side of described first mount pad 14 is provided with the second mount pad 8, second mount pad 8 and right secondary energy saver are 19 corresponding mutually, right secondary energy saver 19 is placed on the second mount pad 8, position upper platform 22 being positioned at second mount pad 8 left and right sides is respectively arranged with the 3rd upper strata inspection platform 9 and the 4th upper strata inspection platform 7, 3rd upper strata inspection platform 9 is arranged on the left side of the 4th upper strata inspection platform 7, 3rd upper strata inspection platform 9 and the 4th upper strata inspection platform 7 are laterally across right boiler chimney 23, the 5th staircase 4 is provided with between described middle level platform 3 and the 4th upper strata inspection platform 7.Position between 3rd upper strata inspection platform 9 and described second upper strata inspection platform 13 is hollow, can save material, and the 3rd upper strata inspection platform 9 is communicated with by being communicated with platform 21 with described second upper strata inspection platform 13.Personnel come lower floor's platform 3 by the 4th staircase 1 from ground, directly carry out maintenance maintenance or operation to the right side of the 4th upper strata inspection platform 7 to right secondary energy saver 18 by the 5th staircase 4 from lower floor's platform 3, by the second staircase 2, middle level platform 10, the 3rd staircase from the 17, second upper strata inspection platform 13, be communicated with the left side of platform 21 to the three upper strata inspection platform 9 to right secondary energy saver 19 and carry out maintenance maintenance or operation.
The outside of described first upper strata inspection platform 15, second upper strata inspection platform 13, the 3rd upper strata inspection platform 9, the 4th upper strata inspection platform 7, middle level platform 10 and lower floor's platform 3 is equipped with guard rail 11, and guard rail 11 bottom is provided with skirting board 12.Described upper platform 22, middle level platform 10 and all being supported by pillar 5 between lower floor's platform 3 and ground is arranged, the arranged outside of described upper platform 22 has the 6th staircase 6, and maintenance maintenance or operation are carried out in the top that personnel can climb up by the 6th staircase 6 equipment such as deaerating feed water heater, water tank installed near secondary energy saver.
The technical scheme of the present embodiment is applicable to the maintenance of two secondary energy savers (the second from left level energy saver phase 18, right secondary energy saver be 19 parallel connections mutually).
The utility model can carry out the maintenance of multiple secondary energy saver, according to quantity and the arrangement of secondary energy saver, the maintenance being namely applicable to multiple secondary energy savers is combined in enforcement one and embodiment two.
The utility model facilitates personnel to the maintenance maintenance of the boiler chimney secondary energy saver that high-altitude is installed or operation, and the obstruction that the chimney avoiding laterally installation passes through on inspection platform to operating personal, operation, maintenance equipment is more safe and reliable, and improve efficiency, below inspection platform, floor area is little, is conducive to personnel and passes through.
Above embodiment is the unrestricted the technical solution of the utility model in order to explanation only, although be described in detail the utility model with reference to above-described embodiment, those of ordinary skill in the art is to be understood that: still can modify to the utility model or equivalent replacement, and not departing from any modification or partial replacement of spirit and scope of the present utility model, it all should be encompassed in the middle of right of the present utility model.
Claims (4)
1. the inspection platform of a boiler secondary energy saver, it is characterized in that: it comprises the upper platform for placing secondary energy saver, described upper platform is provided with first mount pad corresponding with the secondary energy saver of boiler chimney, position upper platform being positioned at the first mount pad left and right sides is respectively arranged with the first upper strata inspection platform and the second upper strata inspection platform, and the first upper strata inspection platform and the second upper strata inspection platform are laterally across boiler chimney; Lower floor's platform is provided with below described upper platform, the first staircase is provided with between lower floor's platform and the first upper strata inspection platform, middle level platform is provided with between lower floor's platform and upper platform, be provided with the second staircase between lower floor's platform and middle level platform, between middle level platform and the second upper strata inspection platform, be provided with the 3rd staircase; The 4th staircase is provided with between described lower floor platform and ground; Described upper platform, middle level platform and all arranged by shore supports between lower floor's platform and ground.
2. the inspection platform of boiler secondary energy saver according to claim 1, is characterized in that: described first upper strata inspection platform is arranged on the left side of the second upper strata inspection platform; The right side of described first mount pad is provided with the second mount pad, second mount pad is corresponding with another secondary energy saver of boiler chimney, position upper platform being positioned at the second mount pad left and right sides is respectively arranged with the 3rd upper strata inspection platform and the 4th upper strata inspection platform, 3rd upper strata inspection platform is arranged on the left side of the 4th upper strata inspection platform, 3rd upper strata inspection platform and the 4th upper strata inspection platform, laterally across boiler chimney, are provided with the 5th staircase between described middle level platform and the 4th upper strata inspection platform; Be communicated with by being communicated with platform between 3rd upper strata inspection platform and described second upper strata inspection platform.
3. the inspection platform of boiler secondary energy saver according to claim 2, it is characterized in that: the outside of described first upper strata inspection platform, the second upper strata inspection platform, the 3rd upper strata inspection platform, the 4th upper strata inspection platform, middle level platform and lower floor's platform is equipped with guard rail, and guard rail bottom is provided with skirting board.
4. the inspection platform of boiler secondary energy saver according to claim 2, is characterized in that: the arranged outside of described upper platform has the 6th staircase.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520356131.3U CN204737702U (en) | 2015-05-29 | 2015-05-29 | Maintenance platform of boiler second grade energy -saving appliance |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520356131.3U CN204737702U (en) | 2015-05-29 | 2015-05-29 | Maintenance platform of boiler second grade energy -saving appliance |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204737702U true CN204737702U (en) | 2015-11-04 |
Family
ID=54419447
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520356131.3U Withdrawn - After Issue CN204737702U (en) | 2015-05-29 | 2015-05-29 | Maintenance platform of boiler second grade energy -saving appliance |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204737702U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104860245A (en) * | 2015-05-29 | 2015-08-26 | 河南中烟工业有限责任公司 | Boiler two-stage economizer overhauling platform |
-
2015
- 2015-05-29 CN CN201520356131.3U patent/CN204737702U/en not_active Withdrawn - After Issue
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104860245A (en) * | 2015-05-29 | 2015-08-26 | 河南中烟工业有限责任公司 | Boiler two-stage economizer overhauling platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203944254U (en) | A kind of tower crane water injection system | |
CN206569235U (en) | A kind of ship hanger bracket and boat scaffold | |
CN104860245A (en) | Boiler two-stage economizer overhauling platform | |
KR20170068524A (en) | Wind Turbine Generator Assemblies | |
CN204737702U (en) | Maintenance platform of boiler second grade energy -saving appliance | |
CN206828042U (en) | A kind of inspection platform of power station main building rack illuminator | |
CN201437647U (en) | Tower | |
CN205777633U (en) | Telescopic lifting formula guard rail | |
CN205890676U (en) | Power equipment repair tools car | |
CN201025366Y (en) | Tower base wet chimney | |
CN206126783U (en) | Detachable work platform | |
CN206128722U (en) | Platform is maintained in multi -functional maintenance of spray column | |
CN205444862U (en) | Step support is used in nozzle installation of heating furnace side | |
CN204209612U (en) | Guide shoe tool specially for attaching and detaching on a kind of turbine-generator units | |
CN203924659U (en) | Hanging frame type construction platform device | |
CN103741939B (en) | The outside climbing type CONSTRUCTION OPERATIONS platform of building and mounting method | |
CN204084321U (en) | V-arrangement economizer exit flue | |
CN207436632U (en) | A kind of environmental protection type moving formula single tube mobile communication tower | |
CN201502145U (en) | Roof walkway plate | |
CN206220459U (en) | Restricted clearance modularization scaffold cat ladder | |
CN204571798U (en) | The special installation ladder of a kind of dynamometer instrument case | |
CN209146509U (en) | A kind of pipe gallery line equipment hanger device | |
CN204179792U (en) | Hydro-generator lower frame inspection platform | |
CN215760356U (en) | Aerial work platform ladder capable of being quickly assembled and disassembled | |
CN204609365U (en) | Solar airflow generating sunlight booth |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee | ||
CP02 | Change in the address of a patent holder |
Address after: 450000 Yulin South Road, Henan, Zheng Dong, No. 16 South Road, Zhengzhou Patentee after: China Tobacco Henan Industrial Co., Ltd. Address before: 450000 Zhengzhou agricultural road, Henan, No. 29 Patentee before: China Tobacco Henan Industrial Co., Ltd. |
|
AV01 | Patent right actively abandoned |
Granted publication date: 20151104 Effective date of abandoning: 20170630 |
|
AV01 | Patent right actively abandoned |