CN201437647U - Tower - Google Patents

Tower Download PDF

Info

Publication number
CN201437647U
CN201437647U CN2009202078522U CN200920207852U CN201437647U CN 201437647 U CN201437647 U CN 201437647U CN 2009202078522 U CN2009202078522 U CN 2009202078522U CN 200920207852 U CN200920207852 U CN 200920207852U CN 201437647 U CN201437647 U CN 201437647U
Authority
CN
China
Prior art keywords
pylon
metal frame
platform
bolt
guard chamber
Prior art date
Application number
CN2009202078522U
Other languages
Chinese (zh)
Inventor
李静如
Original Assignee
上海凯鸿环保工程有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 上海凯鸿环保工程有限公司 filed Critical 上海凯鸿环保工程有限公司
Priority to CN2009202078522U priority Critical patent/CN201437647U/en
Application granted granted Critical
Publication of CN201437647U publication Critical patent/CN201437647U/en

Links

Abstract

The utility model discloses a novel torch tower for supporting torch discharge barrels, molecule sealers and burners. The tower comprises a metal frame and platforms arranged on the metal frame, wherein the joints of the metal frame adopt the flange bolt connection or the catch plate connection, the butt joints of the metal frame adopt the flange bolt connection, and the cross connection parts of the metal frame adopt the catch plate connection. The utility model has the beneficial effects of smaller on-site construction amount, shorter construction period, guaranteed construction progress and quality, as well as lower rent of on-site heavy lifting appliance and construction cost.

Description

Pylon

Affiliated technical field

The utility model relates to a kind of burner that is used to handle combustible exhaust gas, relates to a kind of high-altitude especially and supports the pylon that the mix flare burner of processing combustible exhaust gas is used.

Background technology

Common former pylon adopts welding manner usually, be welded into high-rise pylon with sheet metal is piecemeal from ground, therefore must install at the scene, field Welding, yet, often be subjected to the influence of environment during welding, thereby pad rigidity and the assurance of intensity relative difficult, be difficult to make pylon more than hundred meters, promptly allow to make the safety that also is difficult to guarantee pylon more than hundred meters, and the site operation environment is poor, and construction quality is difficult to control.Because of weather conditions Chang Wufa controls construction speed.

Simultaneously, existing pylon adopts cat ladder (cage) usually, and so structure is carried maintenance tool, material etc. to the maintenance personal and brought inconvenience, and the hidden danger on the safety is arranged, and is prone to accidents;

In a word, along with the gradually raising of people to industrial environmental requirement, need improve the structure of the installing flare tower frame of above-mentioned many defectives, therefore a kind of new safety is good, easy to maintenance, the invention of the utility model installing flare tower frame that Practical Performance is high is imperative.

The utility model content

Be to solve the problem that exists in the aforementioned background art, as: the site operation amount is big, long construction period, and construction speed and construction quality be difficult to guarantee, the rent of on-the-spot heavy suspender is too high, construction cost is too high, poor safety performance etc.

The utility model provides a kind of novel installing flare tower frame, a kind of pylon, be used to support flare discharge tube, molecular sealer and burner, comprise: metal frame and be located at platform on the metal frame, it is characterized in that: described metal frame junction is adopted flat or clamp plate type connects.The joint of described metal frame adopts flange bolt to connect, and clamp plate type or flat connection are adopted in interconnection place.Describedly be provided with the plurality of strengthening ribs plate at the metal frame flange connections.Described metal frame comprises principal post and diagonal brace, and the base for post of described principal post comprises double-deck base plate, foundation bolt sleeve pipe and stiffened panel.Platform on the described metal frame comprises top layer platform and next stage platform thereof, is provided with geometrical stair between top layer platform and next stage platform thereof, and described geometrical stair is provided with guardrail.Described pylon is provided with the stair that can walk and the Skidproof structure that cooperates with it.Described platform is provided with the guard chamber of thermal radiation resistant.Described platform adopts anticorrosion zinc-plated grid plate material to constitute.The constituent material of described guard chamber comprises: steel and thermal insulation material, described guard chamber comprises guard chamber body of wall and protective door.Described pylon adopts the template way location and installation when construction, the bolt that is adopted covers anticorrosion bolt for the chromic acid epithelium is roasting, and described bolt is that double nut is strengthened set bolt.

The beneficial effects of the utility model are, can reduce the site operation amount, shorten construction period, guarantee construction speed and construction quality, reduce the rent of on-the-spot heavy suspender, reduce construction cost.

Description of drawings

Below in conjunction with drawings and Examples the utility model is further detailed.

Fig. 1 is the overall schematic of pylon.

Fig. 2 is the local enlarged diagram of the metal frame junction of pylon.

Fig. 3 is the whole enlarged diagram of the guard chamber of pylon.

Fig. 4 is the local enlarged diagram of base for post.

The specific embodiment

Specifically introduce various embodiment of the present invention with reference to the accompanying drawings, structure or function identical among the figure mark with identical numeral.Should be noted that the purpose of accompanying drawing just is convenient to the explanation to the specific embodiment of the invention, is not a kind of unnecessary narration or limitation of the scope of the invention, and in addition, accompanying drawing there is no need to draw in proportion.

Usually overhead torch is used to burn the chemical plant installations exhaust gas discharged, for avoiding causing the injury to ground staff and device, can exhaust gases into tens meters to more than 100 meters usually and burn.The effect of installing flare tower frame is exactly the burner 103 that is used for supporting from bottom to top the torch gas discharge drum 101, the molecular sealer 102 that are positioned at installing flare tower frame that is positioned at heart position wherein and is positioned at the installing flare tower frame upper end.

Provide a kind of torch pylon as figure the utility model, it comprises metal frame and is located at some platforms 202 on the metal frame, described metal frame comprises diagonal brace 2011 and principal post 2012, some diagonal braces 2011 are interconnected together to constitute the installing flare tower frame main body with principal post 2012, its overall structure connects employing triangle, hyperbolic configuration design, i.e. interconnecting all based on these two kinds of geometries between metal frame.The base for post 10 that described principal post 2012 is positioned at ground comprises: double-deck base plate, foundation bolt sleeve pipe and stiffened panel 2035, it has good anti seismic efficiency, and further strengthens the fixation to principal post 2012.The base for post 10 of pylon structure principal post 2012 adopts double-deck base plate: upper end base plate 2032, lower end base plate 2034, stiffened panel 2035, as figure upper end base plate 2032 and lower end base plate 2034, the centre is a stiffened panel 2035.This structure has strengthened the rigidity and the intensity of junction greatly, has good anti seismic efficiency.The pedestal arranged around has foundation bolt 2038, and foundation bolt 2038 is provided with double nut 2033, makes connection more fixing.The bolt skin is provided with foundation bolt sleeve pipe 2037.Described bolt 2038 adopts the baking of chromate epithelium to cover processing, strengthens resistance to corrosion greatly, is much higher than galvanized bolt application life.Certainly, other used bolts of this pylon also adopt above-mentioned PROCESS FOR TREATMENT, do not repeat them here.

Described metal frame junction adopts flange bolt or clamp plate type to connect, the joint that is described metal frame all adopts flange bolt to connect, interconnection place adopts clamp plate type to connect, what being connected between diagonal brace 2011 and the principal post 2012 adopted is that clamp plate type connects 501, dock between principal post and principal post, all employings flange bolt formula 501 of docking between diagonal brace and diagonal brace is connected.Evenly be provided with plurality of strengthening ribs plate 2020 at flange face and 2011 of diagonal braces, it can be regarded as centerbody and several cross sections are the assembly of hollow rectangle, when saving material, strengthens the rigidity and the intensity of junction greatly, make pylon integral body more firm, safety.

Described metal frame is provided with some for having a rest and placing the platform that keeps in repair purposes such as article, and the material that described platform adopted is anticorrosion zinc-plated grid plate.The top that is positioned at metal frame is provided with a platform: first platform, be placed with burner 103 on this first platform center, be positioned at this first platform lower end certain distance (about 9 meters) and locate to be provided with second platform, be provided with geometrical stair 301 between described first platform and second platform, comprise step and guardrail 3012, this geometrical stair 301 all adopts structural steel design, has the characteristics such as convenient, handsome in appearance of climbing.On the metal frame of the second platform lower end, all be provided with stair, be provided with 45 degree stair between pylon platform, comprise step and guardrail.All adopt structural steel design.Step adopts riffled iron or flase floor on-slip material and Skidproof structure (not shown), has the characteristics such as convenient, handsome in appearance of climbing.All adopt catladder, can directly climb walking for the staff.

In addition, be provided with guard chamber 401 at the second platform place, this guard chamber 401 all is that steel material and thermal insulation material are made, and described guard chamber comprises guard chamber body of wall 4012 and protective door 4013.This guard chamber 401 guarantees torch when normal combustion for checking or the maintenance personal provides and has a rest and protection, and the heat radiation of generation can not damage the personnel in the guard chamber.The indoor refractory material and the insulation materials 4015 of being embedded with of this guard chamber 401 can effectively prevent heat radiation and thunderbolt electric shock.

Certainly the platform quantity on the installing flare tower frame and the quantity of the guard chamber on the platform can be provided with as required flexibly, position that neither one is fixing and fixing quantity.

The utility model installing flare tower frame is in installation process, adopt basic mounting template, promptly when the installing flare tower frame foundation bolt is pre-buried, adopted the pre-buried location of template space, because the actual bolt hole of template and equipment position is identical, but assurance equipment and foundation bolt Dock With Precision Position.As do not have this template, can't guarantee that pre-embedded bolt can clearly really insert in the equipment bolt hole.Cause butt joint not go up, influence installation.In a word, described pylon adopts the template way location and installation when construction, and the bolt that is adopted covers anticorrosion bolt for the chromic acid epithelium is roasting, and described bolt is that double nut is strengthened set bolt.Adopt template that basic 2036 embedded foundation bolts are located, not the problem that can occur misplacing.

In a word, the stair of the utility model installing flare tower frame, the design of spiral stairs hommization more, convenient maintenance; The guarantee that its guard chamber that is provided with is bigger maintenance personal or staff's safety; The connected mode that it adopts, it is more firm to make that whole framework connects, and it is more convenient to construct, and has saved construction cost.

The above only is preferred embodiment of the present invention, is not the present invention is done any pro forma restriction.Any those of ordinary skill in the art are not breaking away under the technology of the present invention method scope situation, utilize the method content of above-mentioned announcement that the technology of the present invention method is made many possible changes and modification, all belong to the scope of claims protection.

Claims (10)

1. a pylon is used to support flare discharge tube, molecular sealer and burner, comprising: metal frame and be located at platform on the metal frame, it is characterized in that: described metal frame junction is adopted flat or clamp plate type connects.
2. installing flare tower frame as claimed in claim 1 is characterized in that: the joint of described metal frame adopts flange bolt to connect, and clamp plate type or flat connection are adopted in interconnection place.
3. pylon as claimed in claim 2 is characterized in that: describedly be provided with the plurality of strengthening ribs plate at the metal frame flange connections.
4. pylon as claimed in claim 1 is characterized in that: described metal frame comprises principal post and diagonal brace, and the base for post of described principal post comprises double-deck base plate, foundation bolt sleeve pipe and stiffened panel.
5. pylon as claimed in claim 1 is characterized in that: the platform on the described metal frame comprises top layer platform and next stage platform thereof, is provided with geometrical stair between top layer platform and next stage platform thereof, and described geometrical stair is provided with guardrail.
6. pylon as claimed in claim 1 is characterized in that: described pylon is provided with the stair that can walk and the Skidproof structure that cooperates with it.
7. as the described pylon in one of claim 1 or 5, it is characterized in that: described platform is provided with the guard chamber of thermal radiation resistant.
8. as claim 1,5, one of 7 described pylons, it is characterized in that: described platform adopts anticorrosion zinc-plated grid plate material to constitute.
9. pylon as claimed in claim 7 is characterized in that: the constituent material of described guard chamber comprises: steel and thermal insulation material, described guard chamber comprises guard chamber body of wall and protective door.
10. pylon as claimed in claim 1 is characterized in that: described pylon adopts the template way location and installation when construction, and the bolt that is adopted covers anticorrosion bolt for the chromic acid epithelium is roasting, and described bolt is that double nut is strengthened set bolt.
CN2009202078522U 2009-08-13 2009-08-13 Tower CN201437647U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009202078522U CN201437647U (en) 2009-08-13 2009-08-13 Tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009202078522U CN201437647U (en) 2009-08-13 2009-08-13 Tower

Publications (1)

Publication Number Publication Date
CN201437647U true CN201437647U (en) 2010-04-14

Family

ID=42399623

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009202078522U CN201437647U (en) 2009-08-13 2009-08-13 Tower

Country Status (1)

Country Link
CN (1) CN201437647U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101858163A (en) * 2010-07-15 2010-10-13 中国化学工程第四建设公司 Method for installing flare tower frame in bulk
CN104234494A (en) * 2013-06-21 2014-12-24 吴晓阳 Detachable tower and using method thereof
CN105526592A (en) * 2015-12-25 2016-04-27 天津恒天冠辰科技有限公司 Petrochemical tower
CN107989448A (en) * 2017-12-11 2018-05-04 合肥霞康电子商务有限公司 A kind of grain depot with side ladder

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101858163A (en) * 2010-07-15 2010-10-13 中国化学工程第四建设公司 Method for installing flare tower frame in bulk
CN104234494A (en) * 2013-06-21 2014-12-24 吴晓阳 Detachable tower and using method thereof
CN105526592A (en) * 2015-12-25 2016-04-27 天津恒天冠辰科技有限公司 Petrochemical tower
CN107989448A (en) * 2017-12-11 2018-05-04 合肥霞康电子商务有限公司 A kind of grain depot with side ladder

Similar Documents

Publication Publication Date Title
DE602005002760T2 (en) Wind turbine tower, prefabricated metallic wall section for use in this tower, and method of making this tower
KR20130009731A (en) Tubular building structure with hingedly connected platform segment
US20100257797A1 (en) Assembly structure and procedure for concrete towers used in wind turbines
US10100525B2 (en) Wind turbine with a concrete tower and method for the assembly thereof
CN100590277C (en) High-altitude bridge type cantilever scaffold
JP4159933B2 (en) Repair methods and equipment for wind power towers, etc.
JPH11514063A (en) Top-to-foundation lifting method for building construction
AU2013334190A1 (en) Hoisting platform system
CN204804298U (en) Building material hoist and mount construction scaffold
CN103061506B (en) Construction method of steel structure dome
CN202194365U (en) Hydraulic self-climbing type discharging platform
CN202810173U (en) Mounting and construction platform for steel lining bracket and circular crane track girder of nuclear power plant
US7000733B2 (en) Work platform
CN206408952U (en) A kind of construction adhesion type lifts discharging platform
CN103015781A (en) Method for top lift installation of inner tank and outer tank of double-wall storage tank
EP1553244A1 (en) Scaffolding device for work on inner wall face of tower vessel body, and method of work on inner wall face using the scaffolding device
CN103711301A (en) Construction method and device for two-track movable electric basket and lifting hoist
CN102864936A (en) Combination lifting construction method for large-scale high hollow building roof of steel structure
CN106223650A (en) Dismounting Combined multifunctional energy-conservation tea booth
CN101725271B (en) Rapid construction method of reinforced concrete chimney
GB2487797A (en) Wind turbine rotor service platform
CN205637541U (en) Balanced automatic hanging flower basket
CN102102344A (en) Method for quickly assembling assembled corrugated culvert
US10260284B2 (en) Ladder installation for equipment tower
CN102296858A (en) Roof steel structure for cement production line clinker warehouse and construction method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20100414

DD01 Delivery of document by public notice
DD01 Delivery of document by public notice

Addressee: Shanghai Kentex Int'l & Engineering Corp.

Document name: Notification of Expiration of Patent Right Duration