- CN204725076U CN204725076U CN201520501883.4U CN201520501883U CN204725076U CN 204725076 U CN204725076 U CN 204725076U CN 201520501883 U CN201520501883 U CN 201520501883U CN 204725076 U CN204725076 U CN 204725076U
- Authority
- CN
- China
- Prior art keywords
- crossbeam
- vertical
- vertical beam
- kuppe
- beams
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Butt Welding And Welding Of Specific Article (AREA)
Abstract
The utility model relates to a kind of kuppe after-poppet assembly frock, comprise horizontally disposed platform, platform is symmetrically welded with successively two vertical beams, one, two vertical beams, two, two vertical beams, three, two vertical beams four and two vertical beams five, spaced vertical beam one, vertical beam two, vertical beam three, vertical beam four increase successively with vertical beam five and all vertically with platform to fix, crossbeam one is fixed with between two vertical beams one, crossbeam five is fixed with between two vertical beams five, described crossbeam one welds cant beam with between crossbeam five, and cant beam, crossbeam one, crossbeam five surround the structure of isosceles trapezoid; The crossbeam two corresponding with vertical beam two, the crossbeam three corresponding with vertical beam three and the crossbeam four corresponding with vertical beam four is fixed with successively between two cant beams; The utility model is applicable to the welding assembly of kuppe after-poppet, improves the quality during welding of kuppe after-poppet assembly, raises labour efficiency, expand the opereating specification of instrument, improve working conditions, and reduces cost when cable bearer is produced.
Description
Technical field
The utility model relates to weldment frock technical field, especially a kind of welding tooling being applicable to kuppe after-poppet assembly.
Background technology
Air guide sleeve of wind-driven generator is for the protective device outside axial fan hub.Due under blower fan windward state, air-flow can according to the streamlined uniform divided flows of kuppe, so kuppe serves the effect of drainage heat radiation.
Kuppe is fixed on axial fan hub outside by kuppe support with mechanical connection manner; Kuppe support is generally divided into forward and backward support two parts, wherein kuppe after-poppet (as shown in Figure 1) is in trapezium structure, can by fixing outside kuppe and axial fan hub, usual employing angle iron bracket or cable bearer are made, but cable bearer cost is high, the general fastening assembly and connection of angle iron bracket that adopts forms.But there is no proprietary kuppe after-poppet assembly frock, cause kuppe after-poppet to assemble difficulty, welding process has flaw, and welding precision is lower; Welder needs to take a long time to be well placed workpiece, and the space that soldering appliance is got involved is restricted, and welding process length consuming time, production cost is high.
Utility model content
The applicant, for the shortcoming in above-mentioned existing production technology, provides a kind of kuppe after-poppet assembly frock rational in infrastructure, thus makes product can better enter position accurately, raise labour efficiency, improve working conditions, and reduces the cost of product.
The technical scheme that the utility model adopts is as follows:
A kind of kuppe after-poppet assembly frock, comprise horizontally disposed platform, described platform is symmetrically welded with successively two vertical beams, one, two vertical beams, two, two vertical beams, three, two vertical beams four and two vertical beams five, described spaced vertical beam one, vertical beam two, vertical beam three, vertical beam four increase successively with vertical beam five and all vertically with platform to fix, crossbeam one is fixed with between two vertical beams one, crossbeam five is fixed with between two vertical beams five, described crossbeam one welds cant beam with between crossbeam five, and described cant beam, crossbeam one, crossbeam five surround the structure of isosceles trapezoid; The angle of inclination a of cant beam and level is 12 °, is fixed with the crossbeam two corresponding with vertical beam two, the crossbeam three corresponding with vertical beam three and the crossbeam four corresponding with vertical beam four between two cant beams successively.
Further improvement as technique scheme:
Two vertical beam one upper ends are welded with cushion block one respectively, longitudinally have screwed hole in the middle part of each cushion block one.
Two vertical beam five upper end ends are welded with cushion block three respectively, longitudinally have screwed hole in the middle part of each cushion block three.
Described crossbeam two is welded with the cushion block two parallel with cant beam upper surface respectively with the upper end of crossbeam three.
The beneficial effects of the utility model are as follows:
The utility model adopts the frock corresponding to group welding piece kuppe after-poppet assembly to process it, ensure and improve the quality during welding of kuppe after-poppet assembly, raise labour efficiency, the opereating specification of expansion instrument, improve working conditions, reduce cost when kuppe after-poppet assembly is produced.
Accompanying drawing explanation
Fig. 1 is the front view of existing kuppe after-poppet.
Fig. 2 is the left view of Fig. 1
Fig. 3 is front view of the present utility model.
Fig. 4 is the top view of Fig. 3.
Fig. 5 is the schematic flow sheet (omission platform) of the utility model assembling process.
Wherein: 1, upper cross plate; 101, U-shaped hole one; 102, gripper shoe; 2, curb girder; 201, upper end notch; 202, lower end notch; 3, part standby plate; 4, sill; 5, connecting plate; 501, U-shaped hole two; 6, platform; 7, vertical beam one; 8, cushion block one; 9, cant beam; 10, vertical beam two; 11, vertical beam three; 12, cushion block two; 13, vertical beam four; 14, vertical beam five; 15, cushion block three; 16, crossbeam one; 17, crossbeam two; 18, crossbeam three; 19, crossbeam four; 20, crossbeam five.
Detailed description of the invention
Below in conjunction with accompanying drawing, detailed description of the invention of the present utility model is described.
As shown in Figure 1 and Figure 2, the structure being suitable for kuppe after-poppet assembly of the present utility model is as follows: the upper cross plate 1 comprising concave character type structure, and upper cross plate 1 is extended with semicircle above two ends, has U-shaped hole 1 in semicircle; Roll laterally in the middle part of upper cross plate 1 lower end and form gripper shoe 102, the columned curb girder 2 of gripper shoe 102 bilateral symmetry clamping, two curb girder 2 upper/lower terminals all have notch, upper end notch 201 clamping upper cross plate 1, lower end notch 202 is clamping two bending-type connecting plates 5 respectively, and connecting plate 5 bottom has the U-shaped hole 2 501 of level; The lower end horizontal direction of two curb girders 2 is fixed with sill 4, and upper cross plate 1, curb girder 2 and sill 4 form the structure of isosceles trapezoid; Between two curb girders 2, middle part frame has the part standby plate 3 of trapezium structure.
As Fig. 3, shown in Fig. 4, as shown in Figure 1, the kuppe after-poppet assembly frock of the present embodiment, comprise horizontally disposed platform 6, platform 6 is symmetrically welded with successively two vertical beams 1, two vertical beams 2 10, two vertical beams 3 11, two vertical beams 4 13 and two vertical beams 5 14, spaced vertical beam 1, vertical beam 2 10, vertical beam 3 11, vertical beam 4 13 increases successively with vertical beam 5 14 and all vertically with platform 6 to fix, crossbeam 1 is fixed with between two vertical beams 1, crossbeam 5 20 is fixed with between two vertical beams 5 14, cant beam 9 is welded between crossbeam 1 with crossbeam 5 20, cant beam 9, crossbeam 1, crossbeam 5 20 surrounds the structure of isosceles trapezoid, cant beam 9 is 12 ° with the angle of inclination a of level, is fixed with the crossbeam two 17 corresponding with vertical beam 2 10, the crossbeam three 18 corresponding with vertical beam 3 11 and the crossbeam four 19 corresponding with vertical beam 4 13 between two cant beams 9 successively.
In order to be fixed on vertical beam 1 by upper cross plate 1 better, vertical beam 1 upper end is welded with cushion block 1 respectively, longitudinally has screwed hole in the middle part of each cushion block 1.
In order to make two connecting plates 5 fix with on vertical beam 5 14, vertical beam 5 14 upper end is welded with cushion block 3 15 respectively, longitudinally has screwed hole in the middle part of each cushion block 3 15.
In order to make part standby plate 3 fit better the utility model, crossbeam 2 17 is welded with the cushion block two 12 parallel with cant beam 9 upper surface respectively with the two ends of crossbeam 3 18.
As shown in Figure 5 (wherein platform 6 omits and do not draw), the utility model concrete operations flow process is as follows:
The first step, by the utility model horizontal positioned, platform 6 is fixed on ground, is positioned over by upper cross plate 1 on crossbeam 1, and U-shaped hole 1 is corresponding with the screwed hole on cushion block 1, the lower plane of upper cross plate 1 and cushion block 1 lower plane is fastened by securing member; In like manner, be positioned on crossbeam 5 20 by two connecting plates 5, U-shaped hole 2 501 is corresponding with the screwed hole on cushion block 3 15, is individually fixed on two cushion blocks 3 15 by securing member by two connecting plates 5;
Second step, is connected in curb girder 2 between upper cross plate 1 and connecting plate 5, and keeps curb girder 2 to fit with the upper surface of cant beam 9; Between two curb girders 2, place a sill 4, lower surface and the crossbeam 4 19 of sill 4 are fitted;
3rd step, is positioned over part standby plate 3 between crossbeam 2 17 and crossbeam 3 18, and the corner place of part standby plate 3 fits with the upper surface of four cushion blocks 2 12 respectively; Treat that above-mentioned part is all located, require to weld kuppe after-poppet according to drawing.
Cushion block 1 in the utility model is that the screwed hole on cushion block 1 is corresponding with the U-shaped hole 1 on upper cross plate 1 in order to be fixed on vertical beam 1 by upper cross plate 1 better, can guarantee that upper cross plate 1 does not move after fixing.
Be provided with four pieces of cushion blocks 2 12 in the utility model, make part standby plate 3 be fitted in crossbeam 2 17 better and convenient to weld with curb girder 2 with on crossbeam 3 18.
Cushion block 3 15 in the utility model to make two connecting plates 5 fixing with on vertical beam 5 14, and the screwed hole on cushion block 3 15 can just be corresponding with the U-shaped hole 2 501 on connecting plate 5, guarantees that connecting plate 5 is in correct welding position.
Arranging crossbeam 4 19 in the utility model is to place sill 4 better, and sill 4 can be fixedly connected with curb girder 2, is convenient to positioning welding.
The utility model adopts the frock corresponding to group welding piece kuppe after-poppet assembly to process it, product is made can better to enter position accurately, Welder's prodigiosin has better operating environment, improve efficiency, ensure that welding quality, reduce cost when kuppe after-poppet assembly is produced.
More than describing is to explanation of the present utility model, and be not the restriction to utility model, the utility model limited range, see claim, within protection domain of the present utility model, can do any type of amendment.
Claims (4)
1. a kuppe after-poppet assembly frock, it is characterized in that: comprise horizontally disposed platform (6), described platform (6) is symmetrically welded with successively two vertical beams one (7), two vertical beams two (10), two vertical beams three (11), two vertical beams four (13) and two vertical beams five (14), described spaced vertical beam one (7), vertical beam two (10), vertical beam three (11), vertical beam four (13) increases successively with vertical beam five (14) and all vertically with platform (6) to fix, crossbeam one (16) is fixed with between two vertical beams one (7), crossbeam five (20) is fixed with between two vertical beams five (14), described crossbeam one (16) welds cant beam (9) with between crossbeam five (20), described cant beam (9), crossbeam one (16), crossbeam five (20) surrounds the structure of isosceles trapezoid, cant beam (9) is 12 ° with the angle of inclination a of level, is fixed with the crossbeam two (17) corresponding with vertical beam two (10), the crossbeam three (18) corresponding with vertical beam three (11) and the crossbeam four (19) corresponding with vertical beam four (13) between two cant beams (9) successively.
2. kuppe after-poppet assembly frock as claimed in claim 1, is characterized in that: two vertical beam one (7) upper ends are welded with cushion block one (8) respectively, and each cushion block one (8) middle part longitudinally has screwed hole.
3. kuppe after-poppet assembly frock as claimed in claim 1, is characterized in that: two vertical beam five (14) upper end ends are welded with cushion block three (15) respectively, and each cushion block three (15) middle part longitudinally has screwed hole.
4. kuppe after-poppet assembly frock as claimed in claim 1, is characterized in that: described crossbeam two (17) and the upper end of crossbeam three (18) are welded with the cushion block two (12) parallel with cant beam (9) upper surface respectively.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520501883.4U CN204725076U (en) | 2015-07-13 | 2015-07-13 | Kuppe after-poppet assembly frock |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520501883.4U CN204725076U (en) | 2015-07-13 | 2015-07-13 | Kuppe after-poppet assembly frock |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204725076U true CN204725076U (en) | 2015-10-28 |
Family
ID=54383459
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520501883.4U Expired - Fee Related CN204725076U (en) | 2015-07-13 | 2015-07-13 | Kuppe after-poppet assembly frock |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204725076U (en) |
-
2015
- 2015-07-13 CN CN201520501883.4U patent/CN204725076U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101700608A (en) | Reversely deformed jig frame for welding U ribs of steel box girder | |
CN103331551B (en) | Baking oven furnace body welding robot double work station | |
CN103317292B (en) | Novel connecting and assembling jig and method for pipe flanges | |
CN203380542U (en) | Double-position work station of welding robot for oven furnace body | |
CN201505792U (en) | Reverse deformation tire rack for steel box beam U rib welding | |
CN204725076U (en) | Kuppe after-poppet assembly frock | |
CN207481638U (en) | Engine-mounting bracket assembly and vehicle | |
CN214054222U (en) | Adjustable welding tool rack for steel pipe pole cross arm | |
CN204639516U (en) | A kind of weld jig adjustable supports structure | |
CN203853727U (en) | High-speed rail support assembly structure | |
CN104475928B (en) | Boiler steel structure superposed beam manufacturing process | |
CN203649710U (en) | Automatic welding jig | |
CN203284886U (en) | Connection node structure of rectangular steel pipe column and I-shaped steel beam | |
CN204747886U (en) | Scaffold weldment frock before kuppe | |
CN207914851U (en) | A kind of straight seam welding special plane of forklift door frame weldment | |
CN206535658U (en) | A kind of electric precipitator positive plate fast calibrating device | |
CN205166277U (en) | Frock is assembled to wind -powered electricity generation roof beam | |
CN202984894U (en) | Gas-shielded arc welding protective device | |
CN205520201U (en) | Device is held on adjustable top of solebar system of assembling | |
CN202616279U (en) | Combined rack used for rapidly positioning solar cell serial welding machine | |
CN204639512U (en) | A kind of weld jig adjustable supports structure | |
CN219493287U (en) | Square tube connecting base | |
CN209954061U (en) | Welding tool for rail transit reactor supporting framework | |
CN204128228U (en) | A kind of fixed structure of heat dump tube panel | |
CN218926752U (en) | A cross gusset welding position frock for I-steel beam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151028 Termination date: 20190713 |