CN204719510U - A kind of tubing pretreatment work station control system - Google Patents
A kind of tubing pretreatment work station control system Download PDFInfo
- Publication number
- CN204719510U CN204719510U CN201520237059.2U CN201520237059U CN204719510U CN 204719510 U CN204719510 U CN 204719510U CN 201520237059 U CN201520237059 U CN 201520237059U CN 204719510 U CN204719510 U CN 204719510U
- Authority
- CN
- China
- Prior art keywords
- work station
- equipment
- pretreatment work
- control system
- switch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Landscapes
- General Factory Administration (AREA)
- Selective Calling Equipment (AREA)
Abstract
The utility model proposes a kind of tubing pretreatment work station control system, comprise general service desk and control center, described general service desk realizes communicating by switch with control center; Described switch is connected with the distributed I/O be arranged in tubing pretreatment work station; Described distributed I/O is connected with each process equipment; Described control center is connected with the sub-control cabinet be arranged in tubing pretreatment work station; Described sub-control cabinet is connected with frequency conversion drive equipment or servo driving equipment; Described control center is connected with the robot be arranged in tubing pretreatment work station.The utility model can realize on-site supervision function, warning preprocessing function, privilege feature and production management function; Realize each equipment perfect matching, increase work efficiency; Radio operation equipment can in plant area automatic operation and monitor each equipment running status.
Description
Technical field
The utility model relates to tubular object extruding technical field, specifically a kind of tubing pretreatment work station control system.
Background technology
In tubular object extruding system, need to adopt various processing equipment, as transmission equipment, Pipe Cutting equipment, groove equipment, grinding apparatus and cleaning equipment etc., each equipment forms flow production line, the need of work of each equipment is worked in coordination, and just can make full use of, enhance productivity.And if each equipment needs independent manually or automatically controlling, be then difficult to the perfect cooperation realizing each equipment.
Therefore, in tubular object extruding system, need the control system of a set of entirety, realize controlling and monitoring the overall situation of tubular object extruding system.How to set up a nested structure simple, control convenient, that man-machine interaction is excellent control system and become hot issue in industry.
Utility model content
The utility model proposes a kind of tubing pretreatment work station control system, can be applicable in tubing pretreatment system, realize each equipment perfect matching, increase work efficiency.
The technical solution of the utility model is achieved in that
A kind of tubing pretreatment work station control system, comprises general service desk and control center, and described general service desk realizes communicating by switch with control center;
Described switch is connected with the distributed I/O be arranged in tubing pretreatment work station; Described distributed I/O is connected with each process equipment;
Described control center is connected with the sub-control cabinet be arranged in tubing pretreatment work station; Described sub-control cabinet is connected with frequency conversion drive equipment or servo driving equipment;
Described control center is connected with the robot be arranged in tubing pretreatment work station.
Further, described general service desk has touch-screen.
Further, described control center adopts PLC control system.
Further, described switch adopts industrial ethernet switch.
Further, described process equipment comprises transmission equipment, Pipe Cutting equipment, groove equipment, grinding apparatus and cleaning equipment.
Further, described general service desk with between switch, described control center with between switch, described distributed I/be connected by Profinet bus between O with switch, between described control center with sub-control cabinet.
Further, described control center is connected by Profibus bus with between robot.
Further, also comprise radio operation equipment and wireless router, described wireless router is connected with described switch, and described radio operation equipment and described wireless router realize radio communication.
Further, described wireless router is connected by Profinet bus with described switch.
Further, described radio operation equipment is wireless touch screen.
The beneficial effects of the utility model are:
1, the utility model structure is simple, compact, and floor area is little;
2, on-site supervision function, warning preprocessing function, privilege feature and production management function can be realized;
3, realize each equipment perfect matching, increase work efficiency;
4, radio operation equipment can in plant area automatic operation and monitor each equipment running status.
Accompanying drawing explanation
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only embodiments more of the present utility model, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is the theory diagram of the utility model embodiment.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, be clearly and completely described the technical scheme in the utility model embodiment, obviously, described embodiment is only the utility model part embodiment, instead of whole embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art are not making the every other embodiment obtained under creative work prerequisite, all belong to the scope of the utility model protection.
As shown in Figure 1, the tubing pretreatment work station control system in the present embodiment, comprises general service desk and control center, and general service desk realizes communicating by switch with control center.Switch is connected with the distributed I/O be arranged in tubing pretreatment work station; Distributed I/O is connected with each process equipment; Control center is connected with the sub-control cabinet be arranged in tubing pretreatment work station; Sub-control cabinet is connected with frequency conversion drive equipment or servo driving equipment; Control center is connected with the robot be arranged in tubing pretreatment work station.
In the present embodiment, general service desk has touch-screen; Control center adopts PLC control system; Switch adopts industrial ethernet switch.Between general service desk with switch, between control center with switch, distributed I/be connected by Profinet bus between O with switch, between control center with sub-control cabinet.Be connected by Profibus bus between control center with robot.
Wherein, process equipment comprises transmission equipment, Pipe Cutting equipment, groove equipment, grinding apparatus and cleaning equipment.
Also comprise radio operation equipment and wireless router in the present embodiment, wireless router is connected with switch, and radio operation equipment and wireless router realize radio communication.Wherein, wireless router is connected by Profinet bus with switch; Radio operation equipment adopts wireless touch screen.
In the present embodiment, adopt general service desk touch-screen as production line operation and surveillance, realize functions such as equipment control, setting parameter, condition monitoring, alarm logging and prompting, user right setting, mode of operation changes.
Adopt wireless touch screen as mobile terminal, use this touch-screen automatic operation and monitor each equipment running status in plant area.
Use S7-300 or with class PLC control system as control center, by Profinet bus and each equipment connection of distributed I/O, complete the interactive action of each equipment and transmission line.
Adopt Profine bus to connect between touch-screen, PLC control system, easy to connect, transmission speed is fast.
Profibus bus is adopted to be connected between PLC control system with robot, good stability.
Lay the sub-control cabinet of distributed I/O and driving at each production equipment areas adjacent, realize the signal and communication with each process equipment.Sub-control is provided with anxious stopping cashier's office in a shop, facilitates abnormality processing, ensures equipment and personal safety.Meanwhile, sub-control is also provided with three look tower lamps (band hummer) cashier's office in a shop, in time equipment failure can be passed to staff.
Frequency conversion drive and servo driving all adopt absolute encoder, and lower electricity still can remember Current mechanical locations of structures, and powers on without the need to back to zero; Be connected with control center by Profinet bus, transmission is stable, and communication is convenient.
The present embodiment mainly realizes following functions:
(1) on-site supervision function
The function for monitoring of whole production line realizes the display of correlation parameter in on-line checkingi to the running status of field apparatus, the collection of production data, storage and control system by configuration software, help operating personnel to understand the information of production in time, ensure that field apparatus is high-quality and complete production task.
(2) alert process function
The present embodiment provides abundant warning function, and for showing, the warning message of process for producing line, particular content comprises: alarm indication function, alert process function, alarm level function and filing function of reporting to the police.Alarm indication function: the pages such as the present embodiment provides the warning page, hardware alarms, warning gathers, achieves the real-time text display of warning message.
(3) privilege feature
The present embodiment provides multiple operating right to ensure security of system, the user operation authority classification of the present embodiment under operation state, different operation ranks can be set according to user's request, when the system is operated, user need input legal user profile, just can be allowed to enter control system, and corresponding limiting operation can be provided.
(4) production management function
Production management system is the man-machine system collected various production management information, transmit, process, store and use, the less Operational preparation time can be utilized, the dexterity of carrying out change of product and plurality of devices and technique fast combines, and facilitates the process equipment management of multiple product.
The foregoing is only preferred embodiment of the present utility model; not in order to limit the utility model; all within spirit of the present utility model and principle, any amendment done, equivalent replacement, improvement etc., all should be included within protection domain of the present utility model.
Claims (10)
1. a tubing pretreatment work station control system, is characterized in that, comprises general service desk and control center, and described general service desk realizes communicating by switch with control center;
Described switch is connected with the distributed I/O be arranged in tubing pretreatment work station; Described distributed I/O is connected with each process equipment;
Described control center is connected with the sub-control cabinet be arranged in tubing pretreatment work station; Described sub-control cabinet is connected with frequency conversion drive equipment or servo driving equipment;
Described control center is connected with the robot be arranged in tubing pretreatment work station.
2. a kind of tubing pretreatment work station as claimed in claim 1 control system, it is characterized in that, described general service desk has touch-screen.
3. a kind of tubing pretreatment work station as claimed in claim 1 control system, is characterized in that, described control center adopts PLC control system.
4. a kind of tubing pretreatment work station as claimed in claim 1 control system, is characterized in that, described switch adopts industrial ethernet switch.
5. a kind of tubing pretreatment work station as claimed in claim 1 control system, it is characterized in that, described process equipment comprises transmission equipment, Pipe Cutting equipment, groove equipment, grinding apparatus and cleaning equipment.
6. a kind of tubing pretreatment work station as claimed in claim 1 control system, it is characterized in that, described general service desk with between switch, described control center with between switch, described distributed I/be connected by Profinet bus between O with switch, between described control center with sub-control cabinet.
7. a kind of tubing pretreatment work station as claimed in claim 1 control system, it is characterized in that, described control center is connected by Profibus bus with between robot.
8. a kind of tubing pretreatment work station control system as described in claim 1-7 any one, it is characterized in that, also comprise radio operation equipment and wireless router, described wireless router is connected with described switch, and described radio operation equipment and described wireless router realize radio communication.
9. a kind of tubing pretreatment work station as claimed in claim 8 control system, it is characterized in that, described wireless router is connected by Profinet bus with described switch.
10. a kind of tubing pretreatment work station as claimed in claim 8 control system, is characterized in that, described radio operation equipment is wireless touch screen.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520237059.2U CN204719510U (en) | 2015-04-20 | 2015-04-20 | A kind of tubing pretreatment work station control system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520237059.2U CN204719510U (en) | 2015-04-20 | 2015-04-20 | A kind of tubing pretreatment work station control system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204719510U true CN204719510U (en) | 2015-10-21 |
Family
ID=54318488
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520237059.2U Expired - Fee Related CN204719510U (en) | 2015-04-20 | 2015-04-20 | A kind of tubing pretreatment work station control system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204719510U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104793597A (en) * | 2015-04-20 | 2015-07-22 | 骏马石油装备制造有限公司 | Control system for pipe preprocessing workstations |
-
2015
- 2015-04-20 CN CN201520237059.2U patent/CN204719510U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104793597A (en) * | 2015-04-20 | 2015-07-22 | 骏马石油装备制造有限公司 | Control system for pipe preprocessing workstations |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102913278B (en) | Modularization-based universal intelligent coal mine underground belt transport monitoring and controlling system | |
CN203070033U (en) | PLC remote monitoring system based on Web | |
CN202583857U (en) | Distributed monitoring system of dynamic process of sewage treatment | |
CN202903334U (en) | Cable intermediate joint temperature monitoring system | |
CN104714515A (en) | Well site digital integrated management and control system | |
CN204719510U (en) | A kind of tubing pretreatment work station control system | |
CN102495615A (en) | Remote monitoring management system of large tonnage box girder transport and erection equipment group safety construction | |
CN205507465U (en) | Power management monitored control system | |
CN205969737U (en) | Feed control system is concentrated to injection molding machine | |
CN104793597A (en) | Control system for pipe preprocessing workstations | |
CN202679656U (en) | Wireless serial port equipment connecting device applied to Internet of Things | |
CN204832854U (en) | Building bus duct temperature wetness monitoring system based on zigBee communication | |
CN204287946U (en) | A kind of straight-line machine Internet of Things syndeton | |
CN202035006U (en) | Communication system for hot tandem rolling | |
CN202837944U (en) | Wireless control system used in sanitation system | |
CN205451364U (en) | Conflagration real -time supervision alarm system | |
CN202956649U (en) | Variable frequency energy-saving control and remote wireless management system for air compressor | |
CN204496268U (en) | A kind of digital integration remote training fault diagnosis system of production system | |
CN103471657A (en) | Temperature and humidity monitoring method and device | |
CN202937432U (en) | Frequency conversion air compressor energy-saving control and remote wireless management system | |
CN203376605U (en) | Numerical control machine tool robot real-time operation monitoring system | |
CN202584383U (en) | Monitoring system of alarm device of high-voltage electric transmission line | |
CN205582250U (en) | Mine hydraulic support pressure on -line monitoring system based on zigBee network | |
CN203164682U (en) | Water plant unmanned control system | |
CN105006123A (en) | Mobile network-based data acquiring and monitoring system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151021 Termination date: 20190420 |
|
CF01 | Termination of patent right due to non-payment of annual fee |