CN204711265U - A kind of rail Manual damage producing device - Google Patents
A kind of rail Manual damage producing device Download PDFInfo
- Publication number
- CN204711265U CN204711265U CN201520459260.5U CN201520459260U CN204711265U CN 204711265 U CN204711265 U CN 204711265U CN 201520459260 U CN201520459260 U CN 201520459260U CN 204711265 U CN204711265 U CN 204711265U
- Authority
- CN
- China
- Prior art keywords
- rail
- web
- artificial damage
- damage
- manufacturing device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Drilling And Boring (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及一种试验工装,尤其是涉及一种应用于人工制作钢轨伤损,尤其是用于制作模拟轨头核伤的钻孔装置。The utility model relates to a test tool, in particular to a drilling device for artificially manufacturing steel rail damage, especially for manufacturing simulated rail head nuclear damage.
背景技术Background technique
钢轨探伤车的标定试验是在试验线路上进行探伤检测,通过反复检测人工伤损来对探伤系统进行调试,以此调试出探伤系统最高检出率与最低的误报率。如果人工伤损误差很大,就不能准确反映探伤检测系统的实际检测性能,更无法对检测系统进行优化调试。所以,标定线路钢轨的人工伤损精度对探伤检测系统有着重要意义,一套能保证伤损制作精度的工装对整个探伤车的标定试验意义重大。The calibration test of the rail flaw detection vehicle is to carry out flaw detection on the test line, and to debug the flaw detection system by repeatedly detecting artificial damage, so as to debug the flaw detection system with the highest detection rate and the lowest false alarm rate. If the artificial damage error is very large, it cannot accurately reflect the actual detection performance of the flaw detection detection system, let alone optimize and debug the detection system. Therefore, it is of great significance to calibrate the artificial damage accuracy of the line rail for the flaw detection system, and a set of tooling that can ensure the accuracy of damage production is of great significance to the calibration test of the entire flaw detection vehicle.
《大型超声波钢轨探伤车》(GB/T28246-2012)对探伤车的动态试验线路提出了明确的规定,要求试验线路中必须铺设含人工伤损的钢轨,并对伤损的大小、位置、角度、伤轨的铺设次序提出了明确要求,以保证探伤车探伤检测试验中探伤系统的标定效果。"Large Ultrasonic Rail Flaw Detection Vehicle" (GB/T28246-2012) puts forward clear regulations on the dynamic test line of the flaw detection vehicle, requiring that rails with artificial damage must be laid in the test line, and the size, position, and angle of the damage must be laid. 1. The laying sequence of the damaged rails puts forward clear requirements to ensure the calibration effect of the flaw detection system in the flaw detection test of the flaw detection vehicle.
现有技术对钢轨人工伤损的制作需要特殊的专业设备才能保证伤损的精度,以检验钢轨探伤车的探伤检测能力。目前,国内还没有出现按照上述标准对人工伤损进行制作的成套专业辅助设备,而只能依靠手电钻等简易的工具进行人工钻孔做伤。人工钻孔做伤的方法不但过程繁琐复杂,更为重要的是无法保证伤损制作的精度,从而不能满足钢轨探伤车的探伤试验测试要求。In the prior art, special professional equipment is needed to make the artificial damage to the rail to ensure the accuracy of the damage, so as to test the flaw detection ability of the rail flaw detection vehicle. At present, there is no complete set of professional auxiliary equipment for artificial damage according to the above-mentioned standards in China, and only simple tools such as electric hand drills can be used to manually drill holes. The method of manual drilling to make damage is not only cumbersome and complicated, but more importantly, it cannot guarantee the accuracy of damage production, so it cannot meet the requirements of the flaw detection test of the rail flaw detection vehicle.
实用新型内容Utility model content
有鉴于此,本实用新型的目的在于提供一种钢轨人工伤损制作装置,能够克服采用现有方式制作钢轨人工伤损时,伤损精度难以保证,无法满足钢轨探伤车的探伤试验测试要求的技术问题。In view of this, the purpose of this utility model is to provide a rail artificial damage manufacturing device, which can overcome the difficulty in ensuring the accuracy of the damage when the existing method is used to manufacture the artificial damage of the rail, and cannot meet the flaw detection test requirements of the rail flaw detection vehicle. technical problem.
为了实现上述实用新型目的,本实用新型具体提供了一种钢轨人工伤损制作装置的技术实现方案,钢轨人工伤损制作装置,用于制作模拟钢轨轨头核伤的人工伤损,所述装置包括:不少于两个为所述钢轨提供支撑和定位的支撑块,所述支撑块进一步包括第一腹板、第二腹板、底板,以及相对设置的两块侧板。所述第一腹板、第二腹板设置在所述侧板之间的两侧,所述底板设置在所述第一腹板、第二腹板、侧板的底部。所述侧板为所述钢轨的侧部提供支撑,所述侧板的顶部外形与所述钢轨的侧部外形相配合,使得所述钢轨的轨头侧面平行于水平面。In order to achieve the purpose of the above-mentioned utility model, the utility model specifically provides a technical realization scheme of a rail artificial damage manufacturing device. The rail artificial damage manufacturing device is used to make artificial damage simulating rail head nuclear damage. It includes: no less than two support blocks providing support and positioning for the rail, and the support block further includes a first web, a second web, a bottom plate, and two opposite side plates. The first web and the second web are disposed on both sides between the side plates, and the bottom plate is disposed at the bottom of the first web, the second web and the side plates. The side plates provide support for the sides of the rail, and the top profile of the side plates matches the profile of the side portions of the rail so that the head side of the rail is parallel to the horizontal plane.
优选的,所述第一腹板靠近所述钢轨的轨头设置,所述第二腹板靠近所述钢轨的轨底设置。Preferably, the first web is arranged close to the rail head of the rail, and the second web is arranged near the bottom of the rail.
优选的,所述装置还包括用于对所述钢轨进行翻轨操作的翻轨撬杠,所述第一腹板高于所述第二腹板,所述第一腹板为所述翻轨撬杠的翻轨操作提供支撑。Preferably, the device further includes a rail turning crowbar for turning over the rail, the first web is higher than the second web, and the first web is the The rail overturn operation of the crowbar provides support.
优选的,所述装置还包括对钢轨进行钻孔操作的钻床,所述钻床的钻头垂直于所述钢轨的侧面,用于加工与所述钢轨的轨头断面平行的直孔。Preferably, the device further includes a drilling machine for drilling the rail, the drill bit of the drilling machine is perpendicular to the side of the rail, and is used to process a straight hole parallel to the rail head section of the rail.
优选的,所述侧板上设置有吊装孔,所述吊装孔在为所述装置提供吊装位置的同时还能实现所述装置的减重。Preferably, a hoisting hole is provided on the side plate, and the hoisting hole can provide a hoisting position for the device and at the same time reduce the weight of the device.
优选的,所述装置还包括为所述钻床提供倾斜支撑的垫块,所述垫块设置在所述钻床的底部,使得所述钻床的钻头与所述钢轨的轨头侧面呈一定的倾斜角度。Preferably, the device further includes a spacer that provides inclined support for the drill press, and the spacer is arranged at the bottom of the drill press so that the drill bit of the drill press forms a certain inclination angle with the side of the rail head of the rail .
优选的,所述垫块的倾斜角度为17.5°,用于加工与所述钢轨的轨头断面呈17.5°夹角的斜孔。Preferably, the pad has an inclination angle of 17.5°, which is used for processing an oblique hole forming an angle of 17.5° with the rail head section of the rail.
优选的,所述装置包括两个支撑块,所述钻床设置于所述的两个支撑块之间。Preferably, the device includes two support blocks, and the drilling machine is arranged between the two support blocks.
通过实施上述本实用新型提供的钢轨人工伤损制作装置的技术方案,具有如下有益效果:By implementing the technical scheme of the above-mentioned rail artificial damage manufacturing device provided by the utility model, it has the following beneficial effects:
(1)本实用新型设计思路巧妙、结构简单实用、成本低廉;(1) The design idea of the utility model is ingenious, the structure is simple and practical, and the cost is low;
(2)本实用新型基准参照准确,有效保证了国标中规定的伤损制作精度,能够很好地满足钢轨探伤车探伤试验的测试要求。(2) The benchmark reference of the utility model is accurate, effectively guarantees the damage manufacturing precision stipulated in the national standard, and can well meet the test requirements of the flaw detection test of the rail flaw detection vehicle.
附图说明Description of drawings
为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单的介绍。显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的实施例。In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following will briefly introduce the accompanying drawings that are required in the description of the embodiments or the prior art. Apparently, the accompanying drawings in the following description are only some embodiments of the present utility model, and those skilled in the art can obtain other embodiments according to these drawings without creative efforts.
图1是利用本实用新型制作的第一种钢轨人工伤损的横向剖面结构示意图;Fig. 1 is the transverse sectional structure schematic diagram of the first artificial damage of the rail made by the utility model;
图2是利用本实用新型制作的第二种钢轨人工伤损的横向剖面结构示意图;Fig. 2 is the transverse cross-sectional structure schematic diagram of the second artificial damage of the rail produced by the utility model;
图3是利用本实用新型制作的第三种钢轨人工伤损的横向剖面结构示意图;Fig. 3 is the transverse cross-sectional structure schematic diagram of the third kind of rail artificial damage produced by the utility model;
图4是利用本实用新型制作的第四种钢轨人工伤损的横向剖面结构示意图;Fig. 4 is a schematic diagram of the cross-sectional structure of the fourth rail artificial damage produced by the utility model;
图5是利用本实用新型制作的第四种钢轨人工伤损的纵向剖面结构示意图;Fig. 5 is a schematic diagram of a longitudinal section structure of a fourth rail artificial damage produced by the utility model;
图6是本实用新型钢轨人工伤损制作装置一种具体实施方式的剖面结构示意图;Fig. 6 is a schematic cross-sectional structure diagram of a specific embodiment of the utility model rail artificial damage manufacturing device;
图7是本实用新型钢轨人工伤损制作装置另一种具体实施方式的立体结构示意图;Fig. 7 is a three-dimensional structural schematic diagram of another specific embodiment of the artificial rail damage manufacturing device of the present invention;
图8是本实用新型钢轨人工伤损制作装置中垫块的结构示意图;Fig. 8 is a schematic structural view of the cushion block in the rail artificial damage manufacturing device of the present invention;
图9是本实用新型钢轨人工伤损制作装置第三种具体实施方式的立体结构示意图;Fig. 9 is a three-dimensional structural schematic diagram of the third specific embodiment of the artificial rail damage manufacturing device of the present invention;
图中:1-支撑块,2-侧板,3-第一腹板,4-第二腹板,5-底板,6-吊装孔,7-翻轨撬杠,8-钻床,9-垫块,10-钢轨,20-人工伤损。In the figure: 1-support block, 2-side plate, 3-first web, 4-second web, 5-bottom plate, 6-hoisting hole, 7-rail turning crowbar, 8-drilling machine, 9-pad block, 10-rail, 20-artificial damage.
具体实施方式detailed description
为了引用和清楚起见,将下文中使用的技术名词、简写或缩写记载如下:For the sake of reference and clarity, the technical terms, abbreviations or abbreviations used below are recorded as follows:
标定:即钢轨探伤车的探伤检测系统对标准伤损进行的检测试验;Calibration: that is, the detection test of the standard damage by the flaw detection system of the rail flaw detection vehicle;
动态试验:钢轨探伤车以一定速度运行的探伤检测试验;Dynamic test: a flaw detection test in which the rail flaw detection vehicle runs at a certain speed;
轨头:钢轨与车轮的接触承载部位;Rail head: the contact bearing part between the rail and the wheel;
轨底:钢轨与地面接触的承载部位;Rail bottom: the bearing part where the rail is in contact with the ground;
轨腰:轨头与轨底的承载部位;Rail waist: the bearing part of the rail head and rail bottom;
核伤:是一种起源于轨头内部的细小裂纹,在钢轨轨面以下的轨头内部出现的极为复杂的应力组合,使细小裂纹先是成核,然后向轨头四周发展,直至核伤周围的钢料不足以提供足够的抵抗,钢轨在毫无预兆的情况下最终将会猝然折断;Nuclear damage: It is a small crack originating from the inside of the rail head. The extremely complex stress combination that appears inside the rail head below the rail surface makes the small crack nucleate first, and then develop around the rail head until it reaches the periphery of the nuclear damage. The steel material is not enough to provide enough resistance, and the rail will eventually snap suddenly without warning;
伤轨:做完人工伤损后的钢轨。Damaged rail: the rail after artificial damage.
为使本实用新型实施例的目的、技术方案和优点更加清楚,下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整的描述。显然,所描述的实施例仅仅是本实用新型的一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其它实施例,都属于本实用新型保护的范围。In order to make the purpose, technical solutions and advantages of the embodiments of the utility model clearer, the technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Apparently, the described embodiments are only some of the embodiments of the present invention, but not all of them. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without creative efforts belong to the scope of protection of the present utility model.
如附图6至附图9所示,给出了本实用新型钢轨人工伤损制作装置的具体实施例,下面结合附图和具体实施例对本实用新型作进一步说明。As shown in accompanying drawings 6 to 9, specific embodiments of the rail artificial damage manufacturing device of the present invention are provided, and the utility model will be further described below in conjunction with the accompanying drawings and specific embodiments.
如附图1至附图5所示,为利用本实用新型具体实施例描述的钢轨人工伤损制作装置制作的四种钢轨10的人工伤损20的结构示意图。如图中所示的钢轨10通常被分为轨头、轨腰和轨底三个位置,在钢轨10的轨头部位设置有不同类型的人工伤损20。根据《大型超声波钢轨探伤车》(GB/T28246-2012)中的规定,轨头核伤是人工伤损模拟的一种重要伤损类型。如附图1至附图4所示分别为具有四种不同类型人工伤损20的轨头断面结构示意图,其中轨头的核伤又分为平行于轨头断面的孔,以及与轨头断面成17.5°夹角的孔。As shown in accompanying drawings 1 to 5, it is a structural schematic diagram of artificial damage 20 of four kinds of rails 10 manufactured by using the artificial damage manufacturing device described in the specific embodiment of the present invention. As shown in the figure, the rail 10 is generally divided into three positions: a rail head, a rail waist and a rail bottom, and different types of artificial damage 20 are arranged on the rail head of the rail 10 . According to the regulations in "Large Ultrasonic Rail Flaw Detection Vehicle" (GB/T28246-2012), rail head nuclear damage is an important damage type for artificial damage simulation. As shown in accompanying drawings 1 to 4, there are four different types of artificial damage 20 rail head cross-sectional structural schematic diagrams, wherein the nuclear damage of the rail head is divided into holes parallel to the rail head section, and rail head section Holes at an angle of 17.5°.
实施例1Example 1
如附图6所示,一种钢轨人工伤损制作装置的具体实施例,用于制作模拟钢轨10轨头核伤的人工伤损20,钢轨人工伤损制作装置包括:不少于两个为钢轨10提供支撑和定位的支撑块1。支撑块1进一步包括第一腹板3、第二腹板4、底板5,以及相对设置的两块侧板2。第一腹板3、第二腹板4设置在侧板2之间的两侧,底板5设置在第一腹板3、第二腹板4、侧板2的底部。侧板2为钢轨10的侧部提供支撑,侧板2的顶部外形与钢轨10的侧部外形相配合,使得钢轨10的轨头侧面平行于水平面。As shown in accompanying drawing 6, a kind of concrete embodiment of rail artificial damage making device is used for making the artificial damage 20 of simulation rail 10 rail head nuclear damage, and rail artificial damage making device comprises: no less than two for Rails 10 provide support and position the support block 1 . The support block 1 further includes a first web 3 , a second web 4 , a bottom plate 5 , and two side plates 2 oppositely arranged. The first web 3 and the second web 4 are arranged on both sides between the side plates 2 , and the bottom plate 5 is arranged on the bottom of the first web 3 , the second web 4 and the side plates 2 . The side plate 2 provides support for the side of the rail 10, and the top profile of the side plate 2 matches the profile of the side of the rail 10, so that the rail head side of the rail 10 is parallel to the horizontal plane.
如附图6所示,第一腹板3靠近钢轨10的轨头设置,第二腹板4靠近钢轨10的轨底设置。钢轨人工伤损制作装置还进一步包括用于对钢轨10进行翻轨操作的翻轨撬杠7,第一腹板3高于第二腹板4,第一腹板3为翻轨撬杠7的翻轨操作提供支撑位置。侧板2上设置有吊装孔6,吊装孔6在为装置提供吊装位置的同时还能实现装置的减重。As shown in FIG. 6 , the first web 3 is set close to the head of the rail 10 , and the second web 4 is set close to the bottom of the rail 10 . The rail artificial damage manufacturing device further includes a rail turning crowbar 7 for turning over the rail 10. The first web 3 is higher than the second web 4, and the first web 3 is the top of the turning rail 7. The flipping operation provides a support position. The side plate 2 is provided with a hoisting hole 6, and the hoisting hole 6 can also realize weight reduction of the device while providing a hoisting position for the device.
如附图7所示,作为本实用新型一种较佳的具体实施例,钢轨人工伤损制作装置还进一步包括对钢轨10进行钻孔操作的钻床8,钻床8的钻头垂直于钢轨10的侧面,用于加工与钢轨10的轨头断面平行的直孔。作为本实用新型一种典型的具体实施例,钢轨人工伤损制作装置进一步包括两个支撑块1,钻床8进一步设置于两个支撑块1之间。As shown in accompanying drawing 7, as a kind of preferred concrete embodiment of the utility model, the rail artificial damage manufacturing device further comprises the drilling machine 8 that the rail 10 is carried out drilling operation, and the drill bit of the drilling machine 8 is perpendicular to the side of the rail 10 , used to process a straight hole parallel to the rail head section of the rail 10. As a typical specific embodiment of the present invention, the rail artificial damage manufacturing device further includes two support blocks 1 , and the drilling machine 8 is further arranged between the two support blocks 1 .
当利用实施例1描述的钢轨人工伤损制作装置(直孔工装)进行操作时,先将标准60kg/m的钢轨10侧放在支撑块1上,支撑块1与钻床8的放置面通过角度测量仪保证平行,以保证钢轨10的轨头侧面与钻床8的钻头方向垂直,这样可以保证如附图1至附图5所示的四种轨头核伤的做伤要求。此外,为了进一步考虑现场作业的翻轨操作工序,实施例1描述的钢轨人工伤损制作装置还进一步设计了为翻轨撬杠7的翻轨操作提供支撑位置的第一腹板3。When utilizing the rail artificial damage manufacturing device (straight hole frock) described in embodiment 1 to operate, earlier the rail 10 side of the standard 60kg/m is placed on the support block 1, and the placement surface of the support block 1 and the drilling machine 8 passes through the angle Measuring instrument guarantees parallelism, to guarantee that the rail head side of rail 10 is perpendicular to the drill bit direction of drilling machine 8, can guarantee like this four kinds of rail head nuclei damage requirements shown in accompanying drawing 1 to accompanying drawing 5. In addition, in order to further consider the on-site rail turning operation process, the rail artificial damage manufacturing device described in Embodiment 1 is further designed with the first web 3 providing a support position for the rail turning operation of the turning lever 7 .
实施例2Example 2
如附图8所示,另一种钢轨人工伤损制作装置的具体实施例,在前述实施例1的基础上,钢轨人工伤损制作装置还进一步包括为钻床8提供倾斜支撑的垫块9,垫块9设置在钻床8的底部,使得钻床8的钻头与钢轨10的轨头侧面呈一定的倾斜角度。垫块9的倾斜角度为17.5°,用于加工与钢轨10的轨头断面呈17.5°夹角的斜孔。As shown in accompanying drawing 8, another specific embodiment of the device for making artificial damage to the rail, on the basis of the foregoing embodiment 1, the device for making artificial damage to the rail further includes a pad 9 that provides inclined support for the drill press 8, The pad 9 is arranged on the bottom of the drill press 8, so that the drill bit of the drill press 8 and the rail head side of the rail 10 form a certain inclination angle. The inclination angle of the spacer 9 is 17.5°, which is used for processing the inclined hole with the rail head section of the steel rail 10 at an angle of 17.5°.
如附图9所示,为针对平行于钢轨10的轨底,并与钢轨10的轨头断面成17.5°夹角的人工伤损20的钢轨人工伤损制作装置(斜孔工装)。当利用实施例2描述的钢轨人工伤损制作装置进行操作时,由于钻床8只能垂直与放置的基准面作业,所以在平放钢轨10的同时,钻床8必须以17.5度进行倾斜。此时,支撑块1与垫块9的放置平面之间通过角度测量仪保证平行,而将钢轨10侧放在支撑块1上并平行于支撑块1的放置平面,钻床8的底部通过增加垫块9保证钻床8的安装基准面倾斜17.5°,这样既保证了钢轨10人工伤损20的做伤位置,又满足了人工伤损20的角度要求。As shown in accompanying drawing 9, be for the rail bottom that is parallel to rail 10, and the rail artificial damage making device (oblique hole frock) of the artificial damage 20 that forms 17.5 ° angle with the rail head section of rail 10. When utilizing the rail artificial damage manufacturing device described in embodiment 2 to operate, since the drill press 8 can only operate vertically with the reference plane placed, the drill press 8 must be inclined at 17.5 degrees while the rail 10 is laid flat. At this time, between the placement plane of the support block 1 and the pad 9, the angle measuring instrument is used to ensure parallelism, and the side of the rail 10 is placed on the support block 1 and parallel to the placement plane of the support block 1, and the bottom of the drilling machine 8 is adjusted by adding pads. Block 9 guarantees that the installation datum plane of drilling machine 8 is inclined 17.5 °, has not only guaranteed the position of doing damage of steel rail 10 artificial damage 20 like this, has satisfied the angle requirement of artificial damage 20 again.
通过实施本实用新型具体实施例描述的钢轨人工伤损制作装置的技术方案,能够产生如下技术效果:By implementing the technical scheme of the rail artificial damage manufacturing device described in the specific embodiment of the utility model, the following technical effects can be produced:
(1)本实用新型具体实施例描述的钢轨人工伤损制作装置设计思路巧妙、结构简单实用、成本低廉;(1) The rail artificial damage manufacturing device described in the specific embodiment of the utility model has ingenious design ideas, simple and practical structure, and low cost;
(2)本实用新型具体实施例描述的钢轨人工伤损制作装置基准参照准确,有效保证了国标中规定的伤损制作精度,能够很好地满足钢轨探伤车探伤试验的测试要求。(2) The reference reference of the rail artificial damage manufacturing device described in the specific embodiment of the utility model is accurate, effectively ensuring the damage manufacturing accuracy specified in the national standard, and can well meet the test requirements of the rail flaw detection vehicle flaw detection test.
本说明书中各个实施例采用递进的方式描述,每个实施例重点说明的都是与其他实施例的不同之处,各个实施例之间相同相似部分互相参见即可。Each embodiment in this specification is described in a progressive manner, each embodiment focuses on the difference from other embodiments, and the same and similar parts of each embodiment can be referred to each other.
以上所述,仅是本实用新型的较佳实施例而已,并非对本实用新型作任何形式上的限制。虽然本实用新型已以较佳实施例揭示如上,然而并非用以限定本实用新型。任何熟悉本领域的技术人员,在不脱离本实用新型的精神实质和技术方案的情况下,都可利用上述揭示的方法和技术内容对本实用新型技术方案做出许多可能的变动和修饰,或修改为等同变化的等效实施例。因此,凡是未脱离本实用新型技术方案的内容,依据本实用新型的技术实质对以上实施例所做的任何简单修改、等同替换、等效变化及修饰,均仍属于本实用新型技术方案保护的范围。The above descriptions are only preferred embodiments of the present utility model, and are not intended to limit the present utility model in any form. Although the present invention has been disclosed above with preferred embodiments, it is not intended to limit the present invention. Any person familiar with the art, without departing from the spirit and technical solutions of the present utility model, can utilize the methods and technical contents disclosed above to make many possible changes and modifications to the technical solution of the utility model, or modify are equivalent embodiments with equivalent variations. Therefore, any simple modifications, equivalent replacements, equivalent changes and modifications made to the above embodiments according to the technical essence of the present invention are still protected by the technical solutions of the present invention. scope.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520459260.5U CN204711265U (en) | 2015-06-30 | 2015-06-30 | A kind of rail Manual damage producing device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520459260.5U CN204711265U (en) | 2015-06-30 | 2015-06-30 | A kind of rail Manual damage producing device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204711265U true CN204711265U (en) | 2015-10-21 |
Family
ID=54310293
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201520459260.5U Expired - Fee Related CN204711265U (en) | 2015-06-30 | 2015-06-30 | A kind of rail Manual damage producing device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204711265U (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105522194A (en) * | 2016-02-29 | 2016-04-27 | 苏州大器精密机械有限公司 | Tilting-pad overturning type drill jig |
| CN108318588A (en) * | 2018-02-01 | 2018-07-24 | 株洲时代电子技术有限公司 | A kind of rail examination verification method |
| CN110814396A (en) * | 2019-11-27 | 2020-02-21 | 中石化四机石油机械有限公司 | Machining method of arc-shaped groove based on conical surface |
| CN115144470A (en) * | 2022-03-08 | 2022-10-04 | 国能新朔铁路有限责任公司 | Calibration rail test block |
-
2015
- 2015-06-30 CN CN201520459260.5U patent/CN204711265U/en not_active Expired - Fee Related
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105522194A (en) * | 2016-02-29 | 2016-04-27 | 苏州大器精密机械有限公司 | Tilting-pad overturning type drill jig |
| CN108318588A (en) * | 2018-02-01 | 2018-07-24 | 株洲时代电子技术有限公司 | A kind of rail examination verification method |
| CN110814396A (en) * | 2019-11-27 | 2020-02-21 | 中石化四机石油机械有限公司 | Machining method of arc-shaped groove based on conical surface |
| CN115144470A (en) * | 2022-03-08 | 2022-10-04 | 国能新朔铁路有限责任公司 | Calibration rail test block |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN204711265U (en) | A kind of rail Manual damage producing device | |
| CN107478162B (en) | A kind of rack mounting coordinate system construction method | |
| CN103454061A (en) | Test system and method for manufacturing metal sheet impact pit with specified dimension | |
| CN103558094B (en) | A kind of subsize rock model structural structural fece sample representative sampling method based on stratified probability sampling | |
| CN110887749B (en) | Method for determining size of structural surface shear strength size effect test sample | |
| CN204115609U (en) | A kind of quantification detection apparatus for detecting hole in piece part | |
| CN205981004U (en) | Segmentation inspects that line and board mouth are with face degree deviation dipperstick | |
| CN102607386A (en) | Method for measuring local geometric initial defects of steel member with box-shaped section | |
| CN205748193U (en) | A kind of portable deck-siding survey tool | |
| CN203405318U (en) | A test system for making impact craters of specified size in sheet metal | |
| CN205691033U (en) | Slab thickness detection device | |
| CN206399353U (en) | A kind of weld seam camber measuring scale | |
| CN202126228U (en) | Drawing ruler special for positioning hole | |
| CN105258687A (en) | Detection device and method for cast-in-place concrete wall perpendicularity | |
| CN102435127A (en) | Verification method of evenness of transformer for rail vehicle | |
| CN203443493U (en) | Body-in-white assembly gauge | |
| CN103245267B (en) | The instruments of inspection of jigsaw size and the method for inspection in sleeper steel mould | |
| CN205898089U (en) | Travel switch operation position detection device | |
| CN108534938A (en) | High-precision three-dimensional stress test device and computational methods based on octahedra pedestal | |
| CN103353360B (en) | Method for measuring residual stress of welded rotor | |
| CN204495259U (en) | Concrete cut hole slope measurement apparatus | |
| CN204101041U (en) | Overhead surveyor's staff | |
| CN204286270U (en) | Bend pipe detection platform | |
| WO2017215303A1 (en) | Method for detecting assembling precision of medium-low speed maglev track panel | |
| CN205669977U (en) | A kind of measurer of cylinder external diameter |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151021 |