CN204703956U - A kind of can the waterproof and water drainage system of comprehensive maintenance tunneling drain - Google Patents
A kind of can the waterproof and water drainage system of comprehensive maintenance tunneling drain Download PDFInfo
- Publication number
- CN204703956U CN204703956U CN201520409633.8U CN201520409633U CN204703956U CN 204703956 U CN204703956 U CN 204703956U CN 201520409633 U CN201520409633 U CN 201520409633U CN 204703956 U CN204703956 U CN 204703956U
- Authority
- CN
- China
- Prior art keywords
- drainage
- pipe
- longitudinal
- tunnel
- horizontal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
本实用新型涉及一种可全方位检修隧道排水管的防排水系统。大量隧道出现的渗漏水问题,会给隧道安全运营带来了极大危害。本实用新型于隧道初喷混凝土内侧沿隧道纵向设置多道横向的环向排水管,初喷混凝土内预设汇水管接入环向排水管;环向排水管两侧底端接入纵向排水管;隧道中心线底部预埋有纵向的中心排水沟,纵向排水管与中心排水沟之间设置横向排水管;纵向排水管上向初衬内侧接出纵向管检修管,端部为纵向管检修孔;纵向排水管与横向排水管的连接处向初衬内侧接出横向管检修管,端部为横向管检修孔。本实用新型通过设置与纵向排水管、横向排水管相通的斜、竖向检修管,形成完善的隧道排水与维修构造,具备完善的检修功能。
The utility model relates to an anti-drainage system capable of all-round inspection and maintenance of tunnel drainage pipes. The water leakage problem in a large number of tunnels will bring great harm to the safe operation of tunnels. In the utility model, a plurality of horizontal circular drainage pipes are arranged longitudinally along the inner side of the tunnel's primary sprayed concrete, and the preset water collection pipes in the primary sprayed concrete are connected to the circular drainage pipes; the bottom ends of both sides of the circular drainage pipes are connected to the longitudinal drainage pipes ; There is a longitudinal central drainage ditch pre-buried at the bottom of the tunnel center line, and a horizontal drainage pipe is arranged between the longitudinal drainage pipe and the central drainage ditch; the vertical drainage pipe is connected to the inner side of the primary lining, and the longitudinal pipe inspection pipe is connected at the end, and the longitudinal pipe inspection hole is formed at the end ; The junction of the longitudinal drainage pipe and the horizontal drainage pipe is connected to the inner side of the primary lining to connect the horizontal pipe inspection pipe, and the end is a horizontal pipe inspection hole. The utility model forms a perfect tunnel drainage and maintenance structure by arranging oblique and vertical maintenance pipes connected with the vertical drainage pipe and the horizontal drainage pipe, and has a perfect maintenance function.
Description
技术领域 technical field
本实用新型属于隧道排水工程技术领域,具体涉及一种可全方位检修隧道排水管的防排水系统。 The utility model belongs to the technical field of tunnel drainage engineering, in particular to a waterproof and drainage system capable of all-round maintenance of tunnel drainage pipes.
背景技术 Background technique
我国是世界上隧道数量最多的国家,但在运营过程中,有大量隧道出现了渗漏水问题,俗称“十隧九漏”,给隧道安全运营带来了极大危害。在寒冷地区因渗漏水结冰导致隧道废弃。分析隧道渗漏水的原因,主要是排水系统堵塞,水没有出路,使衬砌背后水压力增高,而导致渗漏水。“通则不漏”,保证隧道排水系统的通畅是防治隧道渗漏水的根本措施,要实现排水系统畅通,全方位养护是必不可少的,为此急需提出一种简单、实用、可靠、可实现对隧道排水系统检修的隧道排水系统与养护方法。 my country is the country with the largest number of tunnels in the world. However, during the operation process, a large number of tunnels have water leakage problems, commonly known as "ten tunnels and nine leaks", which has brought great harm to the safe operation of tunnels. In cold regions, the tunnel was abandoned due to the freezing of seepage water. Analyzing the cause of the water leakage in the tunnel, the main reason is that the drainage system is blocked, and the water has no way out, which increases the water pressure behind the lining, resulting in water leakage. "General means no leakage", ensuring the smoothness of the tunnel drainage system is the fundamental measure to prevent tunnel water leakage. To achieve smooth drainage system, all-round maintenance is essential. Therefore, it is urgent to propose a simple, practical, reliable and reliable The tunnel drainage system and maintenance method for realizing the maintenance of the tunnel drainage system.
发明内容 Contents of the invention
本实用新型的目的是提供一种可全方位检修隧道排水管的防排水系统,实现对隧道纵、横向排水管以及排水沟的全方位检修养护。 The purpose of this utility model is to provide a waterproof and drainage system capable of all-round maintenance of tunnel drainage pipes, so as to realize all-round maintenance of tunnel longitudinal and horizontal drainage pipes and drainage ditches.
本实用新型所采用的技术方案为: The technical scheme adopted by the utility model is:
一种可全方位检修隧道排水管的防排水系统,其特征在于: A waterproof and drainage system capable of all-round maintenance of tunnel drainage pipes, characterized in that:
于隧道初喷混凝土内侧沿隧道纵向设置多道横向的环向排水管,初喷混凝土内预设汇水管接入环向排水管; On the inner side of the primary sprayed concrete of the tunnel, a plurality of horizontal circumferential drainage pipes are arranged along the longitudinal direction of the tunnel, and the preset water collection pipes in the primary sprayed concrete are connected to the circular drainage pipes;
环向排水管两侧底端接入纵向排水管; The bottom ends on both sides of the circumferential drain pipe are connected to the longitudinal drain pipe;
隧道中心线底部预埋有纵向的中心排水沟,纵向排水管与中心排水沟之间设置横向排水管; A longitudinal central drainage ditch is pre-buried at the bottom of the tunnel centerline, and a horizontal drainage pipe is arranged between the longitudinal drainage pipe and the central drainage ditch;
纵向排水管上向初衬内侧接出斜向的纵向管检修管,端部为纵向管检修孔; An oblique longitudinal pipe inspection pipe is connected to the inner side of the primary lining from the longitudinal drainage pipe, and the end is a longitudinal pipe inspection hole;
纵向排水管与横向排水管的连接处向初衬内侧接出斜向的横向管检修管,端部为横向管检修孔。 The connection between the vertical drainage pipe and the horizontal drainage pipe is connected to the inner side of the primary lining to connect the oblique horizontal pipe inspection pipe, and the end is a horizontal pipe inspection hole.
隧道内道路面两侧设置有纵向的侧向排水边沟,侧向排水边沟与中心排水沟之间设置有横向排水管; Longitudinal lateral drainage side ditches are arranged on both sides of the road surface in the tunnel, and horizontal drainage pipes are arranged between the lateral drainage side ditches and the central drainage ditch;
侧向排水边沟上纵向间隔设置有多个竖向的侧向排水沟检修井。 A plurality of vertical lateral drainage maintenance wells are arranged longitudinally at intervals on the lateral drainage side ditch.
中心排水沟上纵向间隔设置有多个竖向的中心排水沟检修井。 A plurality of vertical central drainage maintenance wells are arranged longitudinally at intervals on the central drainage ditch.
纵向排水管与纵向管检修管通过三通接头连接; The longitudinal drainage pipe is connected with the longitudinal pipe maintenance pipe through a three-way joint;
纵向排水管与横向排水管通过三通接头连接; The vertical drain pipe and the horizontal drain pipe are connected through a three-way joint;
纵向排水管、横向排水管与横向管检修管通过四通接头连接。 The longitudinal drain pipe, the transverse drain pipe and the transverse pipe overhaul pipe are connected through a four-way joint.
纵向排水管上半部分为带孔PVC管。 The upper half of the longitudinal drainage pipe is a PVC pipe with holes.
本实用新型具有以下优点: The utility model has the following advantages:
1、针对隧道内纵向、横向排水管检修难度大的特点,通过设置与纵向排水管、横向排水管相通的斜、竖向检修管,形成完善的隧道排水与维修构造,具备完善的检修功能。 1. In view of the difficulty in maintenance of the vertical and horizontal drainage pipes in the tunnel, by setting up oblique and vertical maintenance pipes connected with the vertical drainage pipes and horizontal drainage pipes, a complete tunnel drainage and maintenance structure is formed, with perfect maintenance functions.
2、该方法简便易行,对施工人员的技术素质要求不高,不需专业培训,操作简单,效果明显,费用低廉。 2. This method is simple and easy to implement, does not require high technical quality of construction personnel, does not require professional training, is simple to operate, has obvious effects, and is low in cost.
附图说明 Description of drawings
图1为本实用新型横断面布置图。 Fig. 1 is a cross-sectional layout diagram of the utility model.
图2为本实用新型平面图。 Fig. 2 is a plan view of the utility model.
图3为本实用新型立体图。 Fig. 3 is a perspective view of the utility model.
图4为本实用新型横向排水管检修孔示意图。 Fig. 4 is a schematic diagram of the inspection hole of the horizontal drainage pipe of the present invention.
图中,1-环向排水管,2-纵向排水管,3-横向排水管,4-侧向排水边沟,5-中心排水沟,6-纵向管检修孔,7-横向管检修孔,8-侧向排水沟检修井,9-中心排水沟检修井。 In the figure, 1-circular drainage pipe, 2-longitudinal drainage pipe, 3-horizontal drainage pipe, 4-lateral drainage side ditch, 5-central drainage ditch, 6-longitudinal pipe inspection hole, 7-horizontal pipe inspection hole, 8-Lateral drain maintenance well, 9-Central drainage maintenance well.
具体实施方式 Detailed ways
下面结合具体实施方式对本实用新型进行详细的说明。 The utility model is described in detail below in conjunction with specific embodiments.
本实用新型涉及的一种可全方位检修隧道排水管的防排水系统,于隧道初喷混凝土内侧沿隧道纵向设置多道横向的环向排水管1,初喷混凝土内预设汇水管接入环向排水管1;环向排水管1两侧底端接入纵向排水管2;隧道中心线底部预埋有纵向的中心排水沟5,纵向排水管2与中心排水沟5之间设置横向排水管3。隧道内道路面两侧设置有纵向的侧向排水边沟4,侧向排水边沟4与中心排水沟5之间设置有横向排水管3。 The utility model relates to a waterproof and drainage system capable of all-round inspection and maintenance of tunnel drainage pipes. A plurality of horizontal circular drainage pipes 1 are arranged on the inner side of the tunnel's primary sprayed concrete along the longitudinal direction of the tunnel, and the preset water collection pipes in the primary sprayed concrete connect to the ring The bottom of both sides of the circular drainage pipe 1 is connected to the longitudinal drainage pipe 2; the bottom of the center line of the tunnel is embedded with a longitudinal central drainage ditch 5, and a horizontal drainage pipe is arranged between the longitudinal drainage pipe 2 and the central drainage ditch 5 3. Longitudinal lateral drainage side ditches 4 are arranged on both sides of the road surface in the tunnel, and horizontal drainage pipes 3 are arranged between the lateral drainage side ditches 4 and the central drainage ditch 5 .
纵向排水管2上向二次衬砌内侧接出斜向的纵向管检修管,端部为纵向管检修孔6。纵向排水管2与横向排水管3的连接处向二次衬砌内侧接出斜向的横向管检修管,端部为横向管检修孔7。纵向排水管2与纵向管检修管通过三通接头连接。纵向排水管2、横向排水管3与横向管检修管通过四通接头连接。侧向排水边沟4上纵向间隔设置有多个竖向的侧向排水沟检修井8。中心排水沟5上纵向间隔设置有多个竖向的中心排水沟检修井9。 The vertical drainage pipe 2 is connected with an oblique longitudinal pipe inspection pipe to the inner side of the secondary lining, and the end is a longitudinal pipe inspection hole 6 . The junction of the longitudinal drainage pipe 2 and the horizontal drainage pipe 3 is connected to the inner side of the secondary lining to connect the oblique horizontal pipe inspection pipe, and the end is the horizontal pipe inspection hole 7 . The longitudinal drain pipe 2 is connected with the longitudinal pipe overhaul pipe through a three-way joint. The longitudinal drain pipe 2, the transverse drain pipe 3 and the transverse pipe overhaul pipe are connected through a four-way joint. A plurality of vertical lateral drainage maintenance wells 8 are longitudinally spaced on the lateral drainage side ditch 4 . A plurality of vertical central drainage maintenance wells 9 are longitudinally arranged at intervals on the central drainage ditch 5 .
构建施工过程为: The build construction process is:
1、隧道开挖后,初喷混凝土施工衬砌,对于漏水点或渗水点,设置100-200cm汇水管引水至环向排水管1; 1. After the excavation of the tunnel, the primary sprayed concrete is used for the construction of the lining. For the water leakage point or water seepage point, a 100-200cm water collection pipe is set to divert water to the circular drainage pipe 1;
2、在衬砌背后,敷设纵向排水管2,坡度与隧道纵坡一致。纵向排水管2上半部为带孔眼的PVC管,以利于围岩水的汇入;环向排水管1与纵向排水管2均采用三通相接,铺设土工布、防水板,防水板将纵向排水管2包裹。 2. Lay the longitudinal drainage pipe 2 behind the lining, and the slope is consistent with the longitudinal slope of the tunnel. The upper half of the vertical drainage pipe 2 is a PVC pipe with holes to facilitate the influx of surrounding rock water; the circular drainage pipe 1 and the longitudinal drainage pipe 2 are connected by a tee, and geotextiles and waterproof boards are laid. Longitudinal drain 2 wraps.
3、间隔20-40m设置一道横向排水管3,横向排水管3一端与纵向排水管2相连,一端与侧式排水边沟4或中心排水沟5相接,施工中注意对横向排水管3的保护,防止破损或混凝土浆液灌入。 3. Set up a horizontal drainage pipe 3 at an interval of 20-40m. One end of the horizontal drainage pipe 3 is connected to the vertical drainage pipe 2, and the other end is connected to the side drainage side ditch 4 or the central drainage ditch 5. Pay attention to the horizontal drainage pipe 3 during construction. Protection from breakage or concrete grout pouring.
4、预埋纵向管检修,设置与纵向排水管2相接、具有一定高度且出露于衬砌内表面的纵向排水管2的斜向检修管,管径与纵向排水管2的一致,通过三通管与纵向排水管2相连;按100m间距设置。 4. Pre-embedded vertical pipe inspection and maintenance, set up the oblique inspection pipe of the longitudinal drainage pipe 2 connected with the longitudinal drainage pipe 2, which has a certain height and is exposed on the inner surface of the lining. The pipe diameter is consistent with that of the longitudinal drainage pipe 2. The through pipe is connected with the vertical drainage pipe 2; it is arranged at a distance of 100m.
5、预埋横向管检修管,该检修管通过四通管与纵向排水管2以及横向排水管3相接、具有一定高度且出露于初衬内表面。横向管检修管可以在每道横向排水管3上设置,也可以根据地下水情况,每隔100m设置1个。 5. Pre-embed the inspection pipe of the horizontal pipe, which is connected to the vertical drainage pipe 2 and the horizontal drainage pipe 3 through a four-way pipe, has a certain height and is exposed on the inner surface of the primary lining. Horizontal pipe maintenance pipes can be installed on each horizontal drainage pipe 3, or one can be installed every 100m according to groundwater conditions.
6、设置侧向排水边沟检查井8,间距150-200m。 6. Set up lateral drainage side ditch inspection wells 8 with a spacing of 150-200m.
7、设置中心排水沟检查井9,间距150-200m。 7. Set the central drainage ditch inspection well 9 with a spacing of 150-200m.
8、浇筑二次衬砌混凝土,浇筑过程中应注意对纵、横、竖向排水管的保护,对于检修管应进行临时封堵,防止浆液渗入堵塞排水管;二次衬砌施工完成后在检修管外露孔口处设置可开启板对孔口封闭。 8. Pouring the secondary lining concrete. During the pouring process, attention should be paid to the protection of the vertical, horizontal and vertical drainage pipes. The maintenance pipes should be temporarily blocked to prevent the grout from seeping into the drainage pipes; An openable plate is arranged at the exposed orifice to seal the orifice.
9、检修维护时,可打开检修手孔口封闭板,利用纵向排水管检修管、横向排水管检修管进行检修。 9. During inspection and maintenance, you can open the closing plate of the inspection hand orifice, and use the vertical drainage pipe inspection pipe and the horizontal drainage pipe inspection pipe for inspection.
10、管道内沉积的杂物被从纵向管检修管、横向管检修管的手孔清理,或者被冲到侧向边沟或中心沟内,再通过侧向排水边沟或中心排水沟的检查井,进行检修,并清理杂物,完成养护工作,实现隧道排水系统通畅。 10. The debris deposited in the pipeline is cleaned from the hand holes of the longitudinal pipe inspection pipe and the horizontal pipe inspection pipe, or is washed into the lateral side ditch or the central ditch, and then passed through the inspection of the lateral drainage side ditch or the central drainage ditch well, carry out maintenance, and clean up sundries, complete the maintenance work, and realize the unobstructed drainage system of the tunnel.
本实用新型的内容不限于实施例所列举,本领域普通技术人员通过阅读本实用新型说明书而对本实用新型技术方案采取的任何等效的变换,均为本实用新型的权利要求所涵盖。 The content of the utility model is not limited to the examples listed, and any equivalent transformations taken by those skilled in the art to the technical solution of the utility model by reading the specification of the utility model are covered by the claims of the utility model.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520409633.8U CN204703956U (en) | 2015-06-15 | 2015-06-15 | A kind of can the waterproof and water drainage system of comprehensive maintenance tunneling drain |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520409633.8U CN204703956U (en) | 2015-06-15 | 2015-06-15 | A kind of can the waterproof and water drainage system of comprehensive maintenance tunneling drain |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204703956U true CN204703956U (en) | 2015-10-14 |
Family
ID=54283579
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201520409633.8U Expired - Fee Related CN204703956U (en) | 2015-06-15 | 2015-06-15 | A kind of can the waterproof and water drainage system of comprehensive maintenance tunneling drain |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204703956U (en) |
Cited By (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105781614A (en) * | 2016-04-29 | 2016-07-20 | 广东华路交通科技有限公司 | Novel visual operation highway tunnel side wall foot drainage system |
| CN105909308A (en) * | 2016-05-12 | 2016-08-31 | 中国五冶集团有限公司 | Subsurface tunnel drainage treatment method |
| CN107131001A (en) * | 2017-06-28 | 2017-09-05 | 中铁第四勘察设计院集团有限公司 | A kind of and water delivery and the Railway Tunnel of communication function |
| CN108757027A (en) * | 2018-05-23 | 2018-11-06 | 中铁二院工程集团有限责任公司 | Multi-functional lobby water system in a kind of tunnel |
| CN109505653A (en) * | 2018-12-20 | 2019-03-22 | 中国电建集团华东勘测设计研究院有限公司 | A kind of stifled arrange of convertible type of rich water tunnel combines supporting construction |
| CN109653764A (en) * | 2018-08-15 | 2019-04-19 | 福建陆海工程勘察设计有限公司 | A kind of restorative procedure that water seepage of tunnel stream is white |
| CN109707437A (en) * | 2019-02-27 | 2019-05-03 | 中煤科工集团重庆研究院有限公司 | Tunnel central ditch gas accumulation prevention processing device and processing method thereof |
| CN109915206A (en) * | 2019-03-25 | 2019-06-21 | 泉州市东曼厨卫科技有限公司 | A kind of multilayer vcehicular tunnel |
| CN110130980A (en) * | 2019-04-11 | 2019-08-16 | 中铁隧道集团二处有限公司 | A kind of tunnel drainage device, system and its construction method |
| CN111173562A (en) * | 2020-01-17 | 2020-05-19 | 中交隧道工程局有限公司 | A construction method of tunnel longitudinal drainage pipe inspection well |
| CN111206957A (en) * | 2020-03-10 | 2020-05-29 | 中南大学 | A passive drainage system between tunnel lining layers and its construction and maintenance method |
| CN112031868A (en) * | 2020-09-04 | 2020-12-04 | 中国铁道科学研究院集团有限公司铁道建筑研究所 | A 40t axle load single-track ballast track bottom drainage system for heavy-duty railway tunnels |
| CN112252458A (en) * | 2020-10-28 | 2021-01-22 | 石家庄铁道大学 | Prevent that permanent magnetism ization that crystallization blockked up can wash tunnel drainage system |
-
2015
- 2015-06-15 CN CN201520409633.8U patent/CN204703956U/en not_active Expired - Fee Related
Cited By (18)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105781614A (en) * | 2016-04-29 | 2016-07-20 | 广东华路交通科技有限公司 | Novel visual operation highway tunnel side wall foot drainage system |
| CN105909308A (en) * | 2016-05-12 | 2016-08-31 | 中国五冶集团有限公司 | Subsurface tunnel drainage treatment method |
| CN107131001A (en) * | 2017-06-28 | 2017-09-05 | 中铁第四勘察设计院集团有限公司 | A kind of and water delivery and the Railway Tunnel of communication function |
| CN107131001B (en) * | 2017-06-28 | 2023-09-12 | 中铁第四勘察设计院集团有限公司 | High-speed railway tunnel with water delivery and traffic functions |
| CN108757027A (en) * | 2018-05-23 | 2018-11-06 | 中铁二院工程集团有限责任公司 | Multi-functional lobby water system in a kind of tunnel |
| CN108757027B (en) * | 2018-05-23 | 2023-11-21 | 中铁二院工程集团有限责任公司 | Multifunctional drainage system in tunnel |
| CN109653764A (en) * | 2018-08-15 | 2019-04-19 | 福建陆海工程勘察设计有限公司 | A kind of restorative procedure that water seepage of tunnel stream is white |
| CN109505653A (en) * | 2018-12-20 | 2019-03-22 | 中国电建集团华东勘测设计研究院有限公司 | A kind of stifled arrange of convertible type of rich water tunnel combines supporting construction |
| CN109707437B (en) * | 2019-02-27 | 2021-06-15 | 中煤科工集团重庆研究院有限公司 | A kind of treatment device for preventing gas accumulation in central water ditch of tunnel and treatment method thereof |
| CN109707437A (en) * | 2019-02-27 | 2019-05-03 | 中煤科工集团重庆研究院有限公司 | Tunnel central ditch gas accumulation prevention processing device and processing method thereof |
| CN109915206A (en) * | 2019-03-25 | 2019-06-21 | 泉州市东曼厨卫科技有限公司 | A kind of multilayer vcehicular tunnel |
| CN110130980A (en) * | 2019-04-11 | 2019-08-16 | 中铁隧道集团二处有限公司 | A kind of tunnel drainage device, system and its construction method |
| CN111173562B (en) * | 2020-01-17 | 2021-11-09 | 中交隧道工程局有限公司 | Construction method of tunnel longitudinal drain pipe inspection well |
| CN111173562A (en) * | 2020-01-17 | 2020-05-19 | 中交隧道工程局有限公司 | A construction method of tunnel longitudinal drainage pipe inspection well |
| CN111206957A (en) * | 2020-03-10 | 2020-05-29 | 中南大学 | A passive drainage system between tunnel lining layers and its construction and maintenance method |
| CN111206957B (en) * | 2020-03-10 | 2025-03-28 | 中南大学 | A passive drainage system between tunnel lining layers and its construction and maintenance method |
| CN112031868A (en) * | 2020-09-04 | 2020-12-04 | 中国铁道科学研究院集团有限公司铁道建筑研究所 | A 40t axle load single-track ballast track bottom drainage system for heavy-duty railway tunnels |
| CN112252458A (en) * | 2020-10-28 | 2021-01-22 | 石家庄铁道大学 | Prevent that permanent magnetism ization that crystallization blockked up can wash tunnel drainage system |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN204703956U (en) | A kind of can the waterproof and water drainage system of comprehensive maintenance tunneling drain | |
| CN204098937U (en) | Tunnel deformation joint waterproof construction and constructing tunnel structure | |
| CN101798939B (en) | Maintainable tunnel drainage system | |
| CN104806272B (en) | Tunnel diversion compound waterproof and drainage comprehensive system and its construction method and application method | |
| CN204357484U (en) | The drainage system of anti-tunnel invert constuction joint infiltration | |
| CN204572015U (en) | A kind of tunnel shunting combined type waterproof and water drainage system | |
| CN106120801B (en) | Pipeline crosses the construction method at foundation ditch in water-rich sand layer | |
| CN103225318B (en) | Anti-seepage and leaking-stoppage device for underground consecutive wall groove section joint point and construction method thereof | |
| CN102635402A (en) | Siphon drainage method for tunnel wall water seepage disposal by using dipping borehole | |
| CN107859064B (en) | Waterproof structure for connection of prefabricated pipe gallery and cast-in-situ pipe gallery and construction method | |
| CN207597428U (en) | Prefabricated piping lane is connected waterproof construction with cast-in-place piping lane | |
| CN201650362U (en) | Maintainable Tunnel Drainage System | |
| CN104963693B (en) | Construction Method of Rectangular Parallel Pipe Jacking Connecting Channel | |
| CN108825247A (en) | A kind of flare sidewall horizontal for 8 pilot tunnel PBA engineering methods makes bottom basin shape and freezes sealing engineering method | |
| CN111236986A (en) | A kind of waterproof and drainage structure of prefabricated lining and construction method thereof | |
| CN209637782U (en) | Tunnel waterproof and drainage structure | |
| CN204532364U (en) | Tunneling boring rock tunnel development machine engineering method subway tunnel pressure release type liner structure | |
| CN206554042U (en) | A kind of lining waterproof structure of seepage tunnel | |
| CN207004570U (en) | A kind of tunnel longitudinal drainage blind pipe fixed structure | |
| CN209168539U (en) | A demonstration device of mine method tunnel drainage model used for teaching | |
| CN205206847U (en) | Shield constructs business turn over hole portal annular and freezes sealed sealing device | |
| CN204591314U (en) | Double-arched tunnel mid-board waterproof and water drainage system drainable waterproofing plate | |
| CN204646253U (en) | A kind of small interval Four-Lane Road Shallow-buried Large-span Tunnel structure | |
| CN206753627U (en) | Antiseepage ability of swimming tunnel-liner ruggedized construction | |
| CN207454024U (en) | A kind of inclined shaft and the main tunnel intersection section anti-water damage structure of inclined shaft |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151014 |