CN204679497U CN201520416586.XU CN201520416586U CN204679497U CN 204679497 U CN204679497 U CN 204679497U CN 201520416586 U CN201520416586 U CN 201520416586U CN 204679497 U CN204679497 U CN 204679497U
Authority
CN
China
Prior art keywords
chamber
abutment ring
lateral pressure
filling material
proving installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520416586.XU
Other languages
Chinese (zh)
Inventor
刘文永
许延辉
李亚清
郭军
李海涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian University of Science and Technology
Original Assignee
Xian University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian University of Science and Technology filed Critical Xian University of Science and Technology
Priority to CN201520416586.XU priority Critical patent/CN204679497U/en
Application granted granted Critical
Publication of CN204679497U publication Critical patent/CN204679497U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of form lateral pressure proving installation of grouting filling material, comprise chamber, lateral pressure data acquisition system (DAS) and chamber deformation measurement support, chamber is the cube structure of sidewall sealing, upper and lower opening, and the lower opening of chamber is sealedly connected with lower cover; Lateral pressure data acquisition system (DAS) comprises multiple pressure transducer, pressure logging and power supply; Chamber deformation measurement support comprises the first fixed support and the second fixed support, horizontal wire rope is connected with between the first abutment ring on first fixed support and the second abutment ring on the second fixed support, horizontal wire rope is connected with pedal line, bottom pedal line, is connected with mass.The utility model is reasonable in design, and realization is convenient and cost is low, uses easy to operate, safe and reliable, and can be cycled to repeat utilization, practical, is convenient to promote the use of.

Description

A kind of form lateral pressure proving installation of grouting filling material
Technical field
The utility model belongs to mine expansion filling technical field of construction, is specifically related to a kind of form lateral pressure proving installation of grouting filling material.
Background technology
Coal mine down-hole tunnel confined space expansion filling becomes the best mode of underground coal mine fire extinguishing Air leakage control gradually, build with traditional expanded material, compared with thick loess grouting, under heavy load, expansion filling material creates larger lateral pressure to template, thus result in a series of problem, as swollen mould, burst-mode and malformation etc.The application example of airtight filling and injecting slurry increases gradually in recent years, and the flowing property of cement foaming material is better, and it is more remarkable on the impact of the lateral pressure of template that this makes newly to water cement grout.At present, the test of template lateral pressure or the physical dimension of site test mostly by reality on plank sheathing are measured, and for higher filling and injecting slurry position, during construction, often adopt placement layer by layer, be difficult to so objectively reflect maximum lateral pressure value.In addition, the lateral pressure measurement cost of carrying out physical size is larger, and often some measuring equipment is stayed in obturation and is difficult to take out at the end of test, causes very large resource and waste of material.
Utility model content
Technical problem to be solved in the utility model is for above-mentioned deficiency of the prior art, a kind of form lateral pressure proving installation of grouting filling material is provided, its structure is simple, realize convenient and cost is low, it is easy to operate, safe and reliable to use and can be cycled to repeat utilization, practical.
For solving the problems of the technologies described above, the technical solution adopted in the utility model is: a kind of form lateral pressure proving installation of grouting filling material, it is characterized in that: comprise be made up of tempered glass chamber, lateral pressure data acquisition system (DAS) and chamber deformation measurement support, described chamber is the cube structure of sidewall sealing, upper and lower opening, and the lower opening of described chamber is sealedly connected with lower cover; Described lateral pressure data acquisition system (DAS) comprises multiple being evenly arranged on chamber sidewall and the pressure transducer stretching into chamber inside and the pressure logging be all connected with the output terminal of multiple pressure transducer, and the power supply for powering for multiple pressure transducer and pressure logging, the surface that described pressure transducer stretches into chamber interior section is mutually concordant with the inner wall surface of chamber; Described chamber deformation measurement support comprises the first fixed support and the second fixed support, described first fixed support is fixedly connected with the first abutment ring, described second fixed support is fixedly connected with the second abutment ring, described first abutment ring and the second abutment ring are positioned at sustained height place, the minimum point of described first abutment ring and the minimum point of the second abutment ring are all higher than the height of chamber, horizontal wire rope is connected with between described first abutment ring and the second abutment ring, described horizontal wire rope is connected with pedal line, bottom described pedal line, is connected with mass.
The form lateral pressure proving installation of above-mentioned a kind of grouting filling material, it is characterized in that: the quantity making the tempered glass of chamber is four pieces, the thickness of four blocks of described tempered glass is 6mm ~ 10mm, two blocks of adjacent tempered glass are fixedly connected with by clip, and the seam of two blocks of adjacent tempered glass is sealed by glass cement.
The form lateral pressure proving installation of above-mentioned a kind of grouting filling material, it is characterized in that: described lower cover is fixedly connected with chamber by bolt, the seam of described lower cover and chamber is sealed by glass cement.
The form lateral pressure proving installation of above-mentioned a kind of grouting filling material, is characterized in that: the thickness of described lower cover is 5mm ~ 20mm.
The form lateral pressure proving installation of above-mentioned a kind of grouting filling material, is characterized in that: the minimum point of described first abutment ring and the minimum point of the second abutment ring are all than the height height 3cm ~ 10cm of chamber.
The form lateral pressure proving installation of above-mentioned a kind of grouting filling material, is characterized in that: described first abutment ring and the second abutment ring are the iron annulus that diameter is 1cm ~ 3cm.
The form lateral pressure proving installation of above-mentioned a kind of grouting filling material, is characterized in that: the quantity of described pressure transducer is six, and six described pressure transducers are flat-die pressure transducer.
The utility model compared with prior art has the following advantages:
1, structure of the present utility model is simple, reasonable in design, and realization is convenient and cost is low.
2, when the utility model uses, without the need to charger, when producing lateral pressure to test wall after injection compaction material under upper strata compaction material gravity and self gravitation effect, be used for simulating expanded material expand after for the destructiveness of confined space template, use easy to operate.
3, the utility model after filling expanded foamed material by simulation test case not in the same time expanded foamed material to the distortion tested after the lateral pressure of wall and expanded foamed material cured, the destructiveness of grouting filling material to underground airtight space template can be obtained, economical, high efficiencyly can measure the grouting filling material of different ratio and different position height to the impact of template lateral pressure.
4, of the present utility model safe and reliable, and can utilization be cycled to repeat, economic environmental protection.
5, adopt the utility model to carry out from the method step of the form lateral pressure test of heavy load bet slurry compaction material simple, it is convenient to realize.
6, of the present utility model practical, result of use is good, is convenient to promote the use of.
In sum, the utility model is reasonable in design, and realization is convenient and cost is low, uses easy to operate, safe and reliable, and can be cycled to repeat utilization, and practical, result of use is good, is convenient to promote the use of.
Below by drawings and Examples, the technical solution of the utility model is described in further detail.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Description of reference numerals:
1-chamber; 2-lower cover; 3-pressure transducer;
4-pressure logging; 5-power supply; 6-the first fixed support;
7-the second fixed support; 8-the first abutment ring; 9-the second abutment ring;
10-horizontal wire rope; 11-pedal line; 12-mass.
Embodiment
As shown in Figure 1, the utility model comprise be made up of tempered glass chamber 1, lateral pressure data acquisition system (DAS) and chamber deformation measurement support, described chamber 1 is the cube structure of sidewall sealing, upper and lower opening, and the lower opening of described chamber 1 is sealedly connected with lower cover 2, described lateral pressure data acquisition system (DAS) comprises multiple being evenly arranged on chamber 1 sidewall and the pressure transducer 3 stretching into chamber 1 inside and the pressure logging 4 be all connected with the output terminal of multiple pressure transducer 3, and the power supply 5 for powering for multiple pressure transducer 3 and pressure logging 4, the surface that described pressure transducer 3 stretches into chamber 1 interior section is mutually concordant with the inner wall surface of chamber 1, can make pressure transducer 3 and expanded foamed material good contact, described chamber deformation measurement support comprises the first fixed support 6 and the second fixed support 7, described first fixed support 6 is fixedly connected with the first abutment ring 8, described second fixed support 7 is fixedly connected with the second abutment ring 9, described first abutment ring 8 and the second abutment ring 9 are positioned at sustained height place, the minimum point of described first abutment ring 8 and the minimum point of the second abutment ring 9 are all higher than the height of chamber 1, horizontal wire rope 10 is connected with between described first abutment ring 8 and the second abutment ring 9, described horizontal wire rope 10 is connected with pedal line 11, mass 12 is connected with bottom described pedal line 11.
As shown in Figure 1, in the present embodiment, the quantity making the tempered glass of chamber 1 is four pieces, and the thickness of four blocks of described tempered glass is 6mm ~ 10mm, two blocks of adjacent tempered glass are fixedly connected with by clip, and the seam of two blocks of adjacent tempered glass is sealed by glass cement.During concrete enforcement, wherein the length of two blocks of tempered glass and width are 1m, and the length of another two blocks of tempered glass is 1m, and width is 0.983m, and the thickness of four blocks of described tempered glass is all preferably 8mm.
In the present embodiment, described lower cover 2 is fixedly connected with chamber 1 by bolt, and described lower cover 2 is sealed by glass cement with the seam of chamber 1.The thickness of described lower cover 2 is 5mm ~ 20mm.During concrete enforcement, length and the width of described lower cover 2 are 1.4m, and the thickness of described lower cover 2 is preferably 10mm.
As shown in Figure 1, in the present embodiment, the minimum point of described first abutment ring 8 and the minimum point of the second abutment ring 9 are all than the height height 3cm ~ 10cm of chamber 1.Preferably, the minimum point of described first abutment ring 8 and the minimum point of the second abutment ring 9 are all than the height height 5cm of chamber 1.Described first abutment ring 8 and the second abutment ring 9 are the iron annulus that diameter is 1cm ~ 3cm.Preferably, the diameter of described first abutment ring 8 and the second abutment ring 9 is 2cm.
During concrete enforcement, described pressure transducer 3 is sealed by glass cement with the seam of chamber 1 sidewall.The height of described first fixed support 6 and the second fixed support 7 is 1.2m, and the length of described horizontal wire rope 10 is 1.2m,
As shown in Figure 1, in the present embodiment, the quantity of described pressure transducer 3 is six, and six described pressure transducers 3 are flat-die pressure transducer.The surface that described pressure transducer 3 stretches into chamber 1 interior section is pressure transducer 3 flat-die surface.During concrete enforcement, the range of six described pressure transducers 3 is 0 ~ 2MPa, and six described pressure transducers 3 all have employed BW type foil micro pressure box.
Adopt the utility model to carry out the method for the form lateral pressure test from heavy load bet slurry compaction material, comprise the following steps:
Step one, employing grouting equipment pour into expanded foamed material in chamber 1, until the expanded foamed material height of perfusion is concordant with the coboundary of chamber 1;
In the present embodiment, when adopting grouting equipment to pour into expanded foamed material in step one in chamber 1, the grouting pipe of grouting equipment exports alignment test case 1 one side relative with setting pressure sensor 3, and the flow velocity of described expanded foamed material is 1m/s; Because pressure transducer 3 flat-die is relatively rich, run into hard object or acrimonious material very easily scratches, therefore, the flow velocity of expanded foamed material is strictly controlled when pouring into expanded foamed material, and make the grouting pipe of grouting equipment export alignment test case 1 one side relative with setting pressure sensor 3, to the pressure that chamber 1 sidewall produces when can simulate expanded foamed material expansion exactly and after solidification, and extend the serviceable life of pressure transducer 3.
Step 2, in the process of step one, the per interval T of described pressure logging 4 1gather and record the pressure data that multiple pressure transducer 3 detects;
In the present embodiment, T in step 2 1value be 1min;
Step 3, poured into after, the per interval T of described pressure logging 4 2gather and record the pressure data that multiple pressure transducer 3 detects, till variable quantity is less than 0.01Pa ~ 0.1Pa compared with the pressure data that the pressure data of the multiple pressure transducers 3 collected until described pressure logging 4 all collects with the last time.Compared with the pressure data that the pressure data of multiple pressure transducers 3 that described pressure logging 4 collects all collects with the last time, variable quantity is less than 0.01pa ~ 0.1pa, namely the data that described pressure logging 4 collects no longer produce obvious change, illustrate that the expanded foamed material of perfusion solidifies completely.
In the present embodiment, T in step 3 2value be 3min.
After step 3, leave standstill the expanded foamed material 0.5h ~ 2h be filled in chamber 1, then adopt chamber deformation measurement support to measure transversely deforming amount and the longitudinal deformation amount of chamber 1, concrete process is:
Step 401, the first fixed support 6 and the second fixed support 7 are placed on respectively the both sides of chamber 1, and regulate the link position of horizontal wire rope 10 and the first abutment ring 8 and the second abutment ring 9, make horizontal wire rope 10 mutually concordant with the horizontal edge of chamber 1, and make pedal line 11 be close to chamber 1 with the tie point of horizontal wire rope 10;
Step 402, regulate the link position of pedal line 11 on horizontal wire rope 10, make pedal line 11 be close to the most salient point of lateral wall of chamber 1;
Step 403, the translation distance of measurement pedal line 11 on horizontal wire rope 10, namely measure the transversely deforming amount obtaining chamber 1;
Step 404, regulate the link position of horizontal wire rope 10 and the first abutment ring 8 and the second abutment ring 9, make horizontal wire rope 10 be close to the peak of solidification expanded foamed material afterwards;
Step 405, the upper and lower translation height of measurement horizontal wire rope 10 on the first abutment ring 8 or the second abutment ring 9, namely measure the longitudinal deformation amount obtaining chamber 1.
After off-test, by checking the data that pressure logging 4 described in step 2 and step 3 records, just can know not in the same time expanded foamed material to the lateral pressure of chamber 1 sidewall, the longitudinal deformation amount of chamber 1 after the expanded foamed material cured obtained in the transversely deforming amount of chamber 1 after the expanded foamed material cured obtained in integrating step 403 again and step 405, just can study the destructiveness of grouting filling material to underground airtight space template.
By the test of above method, the grouting filling material of different ratio and different position height economical, high efficiencyly can be measured on the impact of template lateral pressure.
The above; it is only preferred embodiment of the present utility model; not the utility model is imposed any restrictions; every above embodiment is done according to the utility model technical spirit any simple modification, change and equivalent structure change, all still belong in the protection domain of technical solutions of the utility model.

Claims (7)

1. the form lateral pressure proving installation of a grouting filling material, it is characterized in that: comprise be made up of tempered glass chamber (1), lateral pressure data acquisition system (DAS) and chamber deformation measurement support, described chamber (1) is the cube structure of sidewall sealing, upper and lower opening, and the lower opening of described chamber (1) is sealedly connected with lower cover (2), described lateral pressure data acquisition system (DAS) comprises multiple being evenly arranged on chamber (1) sidewall and the pressure logging (4) stretching into the inner pressure transducer (3) of chamber (1) and be all connected with the output terminal of multiple pressure transducer (3), and the power supply (5) for powering for multiple pressure transducer (3) and pressure logging (4), the surface that described pressure transducer (3) stretches into chamber (1) interior section is mutually concordant with the inner wall surface of chamber (1), described chamber deformation measurement support comprises the first fixed support (6) and the second fixed support (7), described first fixed support (6) is fixedly connected with the first abutment ring (8), described second fixed support (7) is fixedly connected with the second abutment ring (9), described first abutment ring (8) and the second abutment ring (9) are positioned at sustained height place, the minimum point of described first abutment ring (8) and the minimum point of the second abutment ring (9) are all higher than the height of chamber (1), horizontal wire rope (10) is connected with between described first abutment ring (8) and the second abutment ring (9), described horizontal wire rope (10) is connected with pedal line (11), described pedal line (11) bottom is connected with mass (12).
2. according to the form lateral pressure proving installation of a kind of grouting filling material according to claim 1, it is characterized in that: the quantity making the tempered glass of chamber (1) is four pieces, the thickness of four blocks of described tempered glass is 6mm ~ 10mm, two blocks of adjacent tempered glass are fixedly connected with by clip, and the seam of two blocks of adjacent tempered glass is sealed by glass cement.
3. according to the form lateral pressure proving installation of a kind of grouting filling material according to claim 1, it is characterized in that: described lower cover (2) is fixedly connected with chamber (1) by bolt, described lower cover (2) is sealed by glass cement with the seam of chamber (1).
4. according to the form lateral pressure proving installation of a kind of grouting filling material according to claim 1, it is characterized in that: the thickness of described lower cover (2) is 5mm ~ 20mm.
5. according to the form lateral pressure proving installation of a kind of grouting filling material according to claim 1, it is characterized in that: the minimum point of described first abutment ring (8) and the minimum point of the second abutment ring (9) are all than the height height 3cm ~ 10cm of chamber (1).
6. according to the form lateral pressure proving installation of a kind of grouting filling material according to claim 1, it is characterized in that: described first abutment ring (8) and the second abutment ring (9) are the iron annulus that diameter is 1cm ~ 3cm.
7. according to the form lateral pressure proving installation of a kind of grouting filling material according to claim 1, it is characterized in that: the quantity of described pressure transducer (3) is six, six described pressure transducers (3) are flat-die pressure transducer.
CN201520416586.XU 2015-06-17 2015-06-17 A kind of form lateral pressure proving installation of grouting filling material Expired - Fee Related CN204679497U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520416586.XU CN204679497U (en) 2015-06-17 2015-06-17 A kind of form lateral pressure proving installation of grouting filling material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520416586.XU CN204679497U (en) 2015-06-17 2015-06-17 A kind of form lateral pressure proving installation of grouting filling material

Publications (1)

Publication Number Publication Date
CN204679497U true CN204679497U (en) 2015-09-30

Family

ID=54179180

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520416586.XU Expired - Fee Related CN204679497U (en) 2015-06-17 2015-06-17 A kind of form lateral pressure proving installation of grouting filling material

Country Status (1)

Country Link
CN (1) CN204679497U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104897884A (en) * 2015-06-17 2015-09-09 西安科技大学 Formwork side pressure testing device and method for grouting filling material under self-weight load
CN105628465A (en) * 2015-12-25 2016-06-01 龙岩学院 Pressurized grouting material forming square sample mold and grouting forming method
CN105937407A (en) * 2016-06-22 2016-09-14 西安科技大学 Gob-side entry retaining concrete filled wall annular air bag construction method
CN106052921A (en) * 2016-05-23 2016-10-26 山东理工大学 Filling retaining wall stress change rule simulation test device and test method
CN111928983A (en) * 2020-09-22 2020-11-13 上海建工集团股份有限公司 Concrete formwork lateral pressure monitoring device and method
CN113804092A (en) * 2021-09-17 2021-12-17 北京科技大学 Experimental device and method for measuring deformation of filled retaining wall geotextile

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104897884A (en) * 2015-06-17 2015-09-09 西安科技大学 Formwork side pressure testing device and method for grouting filling material under self-weight load
CN104897884B (en) * 2015-06-17 2016-06-29 西安科技大学 Form lateral pressure method of testing from heavy load bet slurry filler
CN105628465A (en) * 2015-12-25 2016-06-01 龙岩学院 Pressurized grouting material forming square sample mold and grouting forming method
CN106052921A (en) * 2016-05-23 2016-10-26 山东理工大学 Filling retaining wall stress change rule simulation test device and test method
CN106052921B (en) * 2016-05-23 2019-02-26 山东理工大学 A kind of filling counterfort stress changing rule simulating test device and test method
CN105937407A (en) * 2016-06-22 2016-09-14 西安科技大学 Gob-side entry retaining concrete filled wall annular air bag construction method
CN105937407B (en) * 2016-06-22 2017-11-10 西安科技大学 A kind of construction method of gob-side entry retaining concrete filling wall annular air-pocket
CN111928983A (en) * 2020-09-22 2020-11-13 上海建工集团股份有限公司 Concrete formwork lateral pressure monitoring device and method
CN111928983B (en) * 2020-09-22 2021-01-05 上海建工集团股份有限公司 Concrete formwork lateral pressure monitoring device and method
CN113804092A (en) * 2021-09-17 2021-12-17 北京科技大学 Experimental device and method for measuring deformation of filled retaining wall geotextile

Similar Documents

Publication Publication Date Title
CN204679497U (en) A kind of form lateral pressure proving installation of grouting filling material
CN203008160U (en) Wall body for top filling of filling wall under beam slab
CN203498799U (en) Prefabricated hollow pipe pile water-facing envelop enclosure
CN203626767U (en) Experimental device and system for SAGD super heavy oil exploitation
CN202706233U (en) Waterproof structure for expansion joint of basement
CN203022210U (en) Thermal-insulation concrete hollow corner building block
CN202946188U (en) Gas extraction drilling hole multiphase medium plugging device
CN114002411B (en) Dynamic monitoring system and method for water inflow of coal seam taking coal seam as main aquifer
CN201620509U (en) Heat insulating block for building
CN103290827B (en) Mounting, burying and grouting method for multi-point displacement meter
CN110321623A (en) A kind of duct pieces of shield tunnel faulting of slab ends deformation acquisition methods
CN207033472U (en) A kind of novel hydraulic resistance increasing type tunnel is by pressure device
CN203175569U (en) Steel tube piece tunnel portal water-proof sealing structure in shield-driven tunnel breakthrough
CN104897884A (en) Formwork side pressure testing device and method for grouting filling material under self-weight load
CN203684515U (en) Novel self-insulation chain block
CN203977451U (en) Electric power overhaul well
CN203238671U (en) Self-healing construction seam structure of underground building side wall
CN202512020U (en) Counter force device for earth surface rock body in situ deformation test
CN207032320U (en) For subway station main body and the waterproof construction of accessory structure seam crossing
CN203546733U (en) Mass hollow concrete structure used for large-scale cavity backfilling
CN207194285U (en) A kind of building energy-saving building block
CN202417567U (en) Hole packing device of coal seam water injection slot hole
CN208803726U (en) A kind of wall block grouting machine
CN207727784U (en) A kind of building block for space between padding girder bottom and wall top
CN201459740U (en) Railway existing retaining wall wide-side structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150930

Termination date: 20160617