CN204663404U - A kind of driving chassis forward beam Finial device - Google Patents

A kind of driving chassis forward beam Finial device Download PDF

Info

Publication number
CN204663404U
CN204663404U CN201520298675.9U CN201520298675U CN204663404U CN 204663404 U CN204663404 U CN 204663404U CN 201520298675 U CN201520298675 U CN 201520298675U CN 204663404 U CN204663404 U CN 204663404U
Authority
CN
China
Prior art keywords
forward beam
top skin
dead head
installation portion
beam installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520298675.9U
Other languages
Chinese (zh)
Inventor
朱炜
程海军
吴荣高
罗剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Baodi Meishan Industrial City Development Co ltd
Shanghai Meishan Iron and Steel Co Ltd
Original Assignee
Shanghai Meishan Iron and Steel Co Ltd
Nanjing Meishan Metallurgy Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Meishan Iron and Steel Co Ltd, Nanjing Meishan Metallurgy Development Co Ltd filed Critical Shanghai Meishan Iron and Steel Co Ltd
Priority to CN201520298675.9U priority Critical patent/CN204663404U/en
Application granted granted Critical
Publication of CN204663404U publication Critical patent/CN204663404U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

A kind of driving chassis forward beam Finial device, comprise dead head and top skin, there is drilling tool to stretch out in upper dead head and use U-shaped hole, top skin mount pad is had on front side of lower dead head, 1 top skin installing hole and 4 top skin locating holes are had in top skin mount pad, top skin is column, top skin is arranged in the top skin mount pad of lower dead head side, upper forward beam installation portion and lower forward beam installation portion is had on rear side of lower dead head, 2 installing holes are respectively had in upper forward beam installation portion and lower forward beam installation portion, the end winding support of the forward beam of driving chassis hammer drill main body side is arranged in forward beam installation portion and lower forward beam installation portion.The utility model provides a kind of driving chassis forward beam Finial device, it is installed and used, forward beam front end and dead head fixed bolt hole can be avoided to damage, reduce the consumption of overhaul of the equipments that chassis causes due to forward beam fault and spare parts cost, raising chassis operating efficiency.

Description

A kind of driving chassis forward beam Finial device
Technical field
The utility model relates to driving chassis forward beam corollary equipment field, particularly relates to a kind of driving chassis forward beam Finial device.
Background technology
All-hydraulic driving chassis is that underground mine uses relatively universal tunnelling equipment, have turn to flexibly, mobility strong, the motion control feature such as accurate, easy and simple to handle rapidly.But in the excavation operation of long-term down-hole, find that this equipment forward beam front end and dead head set bolt often occur that fracture pulled by bolt, occurring time serious that forward beam leading portion fixing hole thread damage is scrapped needs to change forward beam.
Pass through observation analysis, when the reason that discovery causes forward beam front end installation bottom outlet thread damage and dead head set bolt to pull fracture is excavation operation normal due to chassis, be 200bar during hydraulic system propelling pressure normal operating conditions, when hammer drill advances drill steel to push ahead rock drilling operation, the top wall that withstands on tightly is helped and with fixing forward beam, rock drilling eye position is not offset.Now to receive both direction contrary the top of dead head and below, sizable power.Because top stress point and bolt installation site exist certain distance, when top stressed time effect in moment under erection bolt will be subject to a reverse pulling force, the screw thread that long working easily causes set bolt to pull to rupture even forward beam to install bottom outlet damages and causes whole forward beam repair and replacement or scrap.
Utility model content
For above problem, the utility model provides a kind of driving chassis forward beam Finial device, it is installed and used, forward beam front end and dead head fixed bolt hole can be avoided to damage, reduce the consumption of overhaul of the equipments that chassis causes due to forward beam fault and spare parts cost, improve chassis operating efficiency, for reaching this object, the utility model provides a kind of driving chassis forward beam Finial device, comprise dead head and top skin, described dead head comprises lower dead head, upper dead head, top skin mount pad, upper forward beam installation portion and lower forward beam installation portion, described upper dead head is on lower dead head, there is drilling tool to stretch out in described upper dead head and use U-shaped hole, the drilling tool that the end winding support of drilling tool of driving chassis hammer drill main body side is arranged on dead head stretches out with in U-shaped hole, top skin mount pad is had on front side of described lower dead head, 1 top skin installing hole and 4 top skin locating holes are had in described top skin mount pad, described top skin locating hole angularly around top skin installing hole center one week, described top skin is column, described top skin is arranged in the top skin mount pad of lower dead head side, upper forward beam installation portion and lower forward beam installation portion is had on rear side of described lower dead head, 2 installing holes are respectively had in described upper forward beam installation portion and lower forward beam installation portion, the end winding support of the forward beam of driving chassis hammer drill main body side is arranged in forward beam installation portion and lower forward beam installation portion.
Further improvement of the utility model, there is drilling tool upper limit installing hole both sides, described upper dead head upper end, and the utility model carries out spacing by arranging drilling tool upper limit installing hole to drilling tool.
The utility model provides a kind of driving chassis forward beam Finial device, the application redesigns dead head profile: by top skin position design with forward beam horizontal level, make propulsive force direction become with two power in reaction force direction sized by the power of the contrary same level position of relative direction, eliminate when top stressed time effect in moment under the reversal interlocking relay that affords of erection bolt, thus avoid set bolt, damage that forward beam installs bottom outlet screw thread.In addition the application redesigns top skin profile: changed in shape by original cheese by top skin and be designed to cylindrical, material is still rubber quality.By redesigning, top skin is adapted to the roadway construction of down-hole complexity more.Chassis is when the operation of rough tunnel wall side, and the cylinder design of lengthening can help operating personnel better to require to carry out rock drilling construction according to construction drawing.Meanwhile, newly-designed top skin is due to the lengthening of appearance and size, more wear-resisting, avoids and changes frequently.
Accompanying drawing explanation
Fig. 1 is a kind of schematic diagram of the utility model dead head;
Fig. 2 is the another kind of schematic diagram of the utility model dead head;
Fig. 3 is the utility model scheme of installation;
Illustrate:
1, lower dead head; 2, upper dead head; 3, drilling tool stretches out and uses U-shaped hole;
4, drilling tool upper limit installing hole; 5, top skin mount pad; 6, top skin installing hole;
7, top skin locating hole; 8, upper forward beam installation portion; 9, lower forward beam installation portion;
10, chassis hammer drill main body is tunneled; 11, forward beam; 12, top skin;
13, drilling tool.
Detailed description of the invention
Below in conjunction with drawings and Examples, utility model is described in detail:
The utility model provides a kind of driving chassis forward beam Finial device, it is installed and used, forward beam front end and dead head fixed bolt hole can be avoided to damage, reduce the consumption of overhaul of the equipments that chassis causes due to forward beam fault and spare parts cost, raising chassis operating efficiency.
As a kind of embodiment of the utility model, the utility model provides a kind of driving chassis forward beam Finial device, comprise dead head and top skin 12, described dead head comprises lower dead head 1, upper dead head 2, top skin mount pad 5, upper forward beam installation portion 8 and lower forward beam installation portion 9, described upper dead head 2 is on lower dead head 1, drilling tool is had to stretch out with U-shaped hole 3 in described upper dead head 2, the drilling tool that the end winding support of drilling tool 13 of driving chassis hammer drill main body 10 side is arranged on dead head stretches out with in U-shaped hole 3, top skin mount pad 5 is had on front side of described lower dead head 1, 1 top skin installing hole 6 and 4 top skin locating holes 7 are had in described top skin mount pad 5, described top skin locating hole 7 angularly around top skin installing hole 6 center one week, described top skin 12 is column, described top skin 12 is arranged in the top skin mount pad 5 of lower dead head 1 side, upper forward beam installation portion 8 and lower forward beam installation portion 9 is had on rear side of described lower dead head 1, 2 installing holes are respectively had in described upper forward beam installation portion 8 and lower forward beam installation portion 9, the end winding support of the forward beam 11 of driving chassis hammer drill main body 10 side is arranged in forward beam installation portion 8 and lower forward beam installation portion 9.
As a kind of best specific embodiment of the utility model, the utility model provides the Finial device of one driving chassis forward beam as shown in Figure 3, comprise dead head and top skin 12, described dead head comprises lower dead head 1 as illustrated in fig. 1 and 2, upper dead head 2, top skin mount pad 5, upper forward beam installation portion 8 and lower forward beam installation portion 9, described upper dead head 2 is on lower dead head 1, drilling tool is had to stretch out with U-shaped hole 3 in described upper dead head 2, the drilling tool that the end winding support of drilling tool 13 of driving chassis hammer drill main body 10 side is arranged on dead head stretches out with in U-shaped hole 3, there is drilling tool upper limit installing hole 4 both sides, described upper dead head 1 upper end, the utility model carries out spacing by arranging drilling tool upper limit installing hole to drilling tool, top skin mount pad 5 is had on front side of described lower dead head 1, 1 top skin installing hole 6 and 4 top skin locating holes 7 are had in described top skin mount pad 5, described top skin locating hole 7 angularly around top skin installing hole 6 center one week, described top skin 12 is column, described top skin 12 is arranged in the top skin mount pad 5 of lower dead head 1 side, upper forward beam installation portion 8 and lower forward beam installation portion 9 is had on rear side of described lower dead head 1, 2 installing holes are respectively had in described upper forward beam installation portion 8 and lower forward beam installation portion 9, the end winding support of the forward beam 11 of driving chassis hammer drill main body 10 side is arranged in forward beam installation portion 8 and lower forward beam installation portion 9.
The above; it is only preferred embodiment of the present utility model; not restriction the utility model being made to any other form, and any amendment done according to technical spirit of the present utility model or equivalent variations, still belong to the utility model scope required for protection.

Claims (2)

1. a driving chassis forward beam Finial device, comprise dead head and top skin (12), it is characterized in that: described dead head comprises lower dead head (1), upper dead head (2), top skin mount pad (5), upper forward beam installation portion (8) and lower forward beam installation portion (9), described upper dead head (2) is on lower dead head (1), drilling tool is had to stretch out with U-shaped hole (3) in described upper dead head (2), the drilling tool that the end winding support of drilling tool (13) of driving chassis hammer drill main body (10) side is arranged on dead head stretches out with in U-shaped hole (3), there is top skin mount pad (5) described lower dead head (1) front side, 1 top skin installing hole (6) and 4 top skin locating holes (7) are had in described top skin mount pad (5), described top skin locating hole (7) angularly around top skin installing hole (6) center one week, described top skin (12) is column, described top skin (12) is arranged in the top skin mount pad (5) of lower dead head (1) side, described lower dead head (1) rear side has upper forward beam installation portion (8) and lower forward beam installation portion (9), 2 installing holes are respectively had in described upper forward beam installation portion (8) and lower forward beam installation portion (9), the end winding support of the forward beam (11) of driving chassis hammer drill main body (10) side is arranged in forward beam installation portion (8) and lower forward beam installation portion (9).
2. one driving chassis forward beam Finial device according to claim 1, is characterized in that: there is drilling tool upper limit installing hole (4) described upper dead head (2) both sides, upper end.
CN201520298675.9U 2015-05-11 2015-05-11 A kind of driving chassis forward beam Finial device Expired - Fee Related CN204663404U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520298675.9U CN204663404U (en) 2015-05-11 2015-05-11 A kind of driving chassis forward beam Finial device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520298675.9U CN204663404U (en) 2015-05-11 2015-05-11 A kind of driving chassis forward beam Finial device

Publications (1)

Publication Number Publication Date
CN204663404U true CN204663404U (en) 2015-09-23

Family

ID=54133796

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520298675.9U Expired - Fee Related CN204663404U (en) 2015-05-11 2015-05-11 A kind of driving chassis forward beam Finial device

Country Status (1)

Country Link
CN (1) CN204663404U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110242213A (en) * 2019-07-02 2019-09-17 中国铁建重工集团股份有限公司 Track beam and drill jumbo

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110242213A (en) * 2019-07-02 2019-09-17 中国铁建重工集团股份有限公司 Track beam and drill jumbo

Similar Documents

Publication Publication Date Title
CN103485717B (en) The all-hydraulic anchor shaft anchor cable drill carriage of a kind of four arm
CN201771421U (en) Frame pillar type hydraulic drilling machine
CN102606152A (en) Novel quick digging and anchoring integrated machine for rectangular coal roadway
CN201215012Y (en) Hydraulic rock development machine
CN108035742B (en) Active and passive harmonious support method for extremely soft coal seam roadway
CN108035730B (en) Long-distance coal mine roadway pipe jacking tunneling method
CN104989413A (en) Single-shield TBM plane sliding stepping device and method
CN103244131A (en) Annular beam rock drilling device of tunnel boring machine
CN203783453U (en) Multipurpose hydraulic drilling rig for coal mine
CN106065765A (en) Angular bit machine
CN105332700A (en) Coal mine roadway grooving machine
CN205654299U (en) Multi -functional tunnelling drill carriage
CN204663404U (en) A kind of driving chassis forward beam Finial device
CN101737008A (en) Large-aperture split arm type downhole drill
CN104948109A (en) Suspension type omni-directional anchor rod drill carriage
CN203035204U (en) Large-section tunnel second lining grouping formwork trolley
CN204283211U (en) Advanced support pipe shed pore-forming system for extremely-broken water-rich weak surrounding rock tunnel
CN103557018B (en) Multifunctional rock tunnel borer jumbolter rotation rack
CN204711530U (en) A kind of hydraulic pressure pulls formula tooth and buys or get by illegal means cover machine
CN203175586U (en) Anchor rod recycling device
CN109779650A (en) A kind of tunnel piercing device
CN104533493B (en) It is a kind of to be used to tunnel the shield support with back production
CN203594358U (en) Full-hydraulic anchor rod drill carriage
CN204591122U (en) A kind of rock drilling boring bar tool
CN209228376U (en) A kind of constructing tunnel integration apparatus

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 210039 new building, Zhonghua Gate, Yuhuatai District, Jiangsu, Nanjing

Patentee after: Nanjing Baodi Meishan Industrial City Development Co.,Ltd.

Patentee after: SHANGHAI MEISHAN IRON & STEEL Co.,Ltd.

Address before: 210039 new building, Zhonghua Gate, Yuhuatai District, Jiangsu, Nanjing

Patentee before: NANJING MEISHAN METALLURGY DEVELOPMENT Co.,Ltd.

Patentee before: SHANGHAI MEISHAN IRON & STEEL Co.,Ltd.

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20211027

Address after: 210039 new building, Zhonghua Gate, Yuhuatai District, Jiangsu, Nanjing

Patentee after: Nanjing Baodi Meishan Industrial City Development Co.,Ltd.

Address before: 210039 new building, Zhonghua Gate, Yuhuatai District, Jiangsu, Nanjing

Patentee before: Nanjing Baodi Meishan Industrial City Development Co.,Ltd.

Patentee before: SHANGHAI MEISHAN IRON & STEEL Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150923

CF01 Termination of patent right due to non-payment of annual fee