CN204662272U - 桥梁同步顶升施工的应力应变控制装置 - Google Patents

桥梁同步顶升施工的应力应变控制装置 Download PDF

Info

Publication number
CN204662272U
CN204662272U CN201520293642.5U CN201520293642U CN204662272U CN 204662272 U CN204662272 U CN 204662272U CN 201520293642 U CN201520293642 U CN 201520293642U CN 204662272 U CN204662272 U CN 204662272U
Authority
CN
China
Prior art keywords
control
control system
control device
ess
strain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520293642.5U
Other languages
English (en)
Inventor
谭广成
谢世坚
黄志平
陈潮发
陈欢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinzhongtian Group Co ltd
Jinzhongtian Water Conservancy Construction Co ltd
Original Assignee
Jinzhongtian Group Ganghang Co ltd
Jinzhongtian Building Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinzhongtian Group Ganghang Co ltd, Jinzhongtian Building Group Co ltd filed Critical Jinzhongtian Group Ganghang Co ltd
Priority to CN201520293642.5U priority Critical patent/CN204662272U/zh
Application granted granted Critical
Publication of CN204662272U publication Critical patent/CN204662272U/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Fluid-Pressure Circuits (AREA)

Abstract

一种桥梁同步顶升施工的应力应变控制装置,包括液压驱动装置、检测装置及控制系统,所述液压驱动装置包括液压机,液压机的控制装置与所述控制系统电性连接,由控制系统控制液压机启动,所述检测装置包括压力传感器、位移检测装置、电阻应变片及电阻应变仪;本实用新型具有以下优点:①对结构应力的预警反应功能,整体更安全可靠,功能更齐全;②操作控制集中,所有油缸既可同时控制,也可单独控制;③同步控制点数量可根据需要设置,适用于大体积结构物的同步位移;④各控制点同步偏差极小,结构物的移位精确;⑤具有友好Windows用户界面的计算机控制系统。

Description

桥梁同步顶升施工的应力应变控制装置
技术领域
本实用新型涉及建设工程施工,尤其是一种桥梁同步顶升施工的应力应变控制装置。
背景技术
传统桥梁同步顶升施工技术,同步顶升控制系统主要由液压动力系统和计算机监测控制系统(简称监控系统)两大部分组成,对计算机监测控制技术的研究有助于提高该装备的自动化、智能化水平,同时也有利于信息化施工的进行,控制液压同步顶升系统由液压系统(油泵、油缸等)、监测传感器、计算机控制系统等几个部分组成。该系统能全自动完成同步位移,实现力和位移控制、操作闭锁、过程显示、故障报警等多种功能,但该控制液压同步顶升技术虽然在一定的程度或理论上消除了油缸不同步对顶升构件造成的附加应力从而引起构件失效所引起的极大的安全隐患,但在桥梁顶升施工中不能对桥梁结构体的应力进行同步监测及反应,让桥梁顶升施工的可控性和安全性存在不确定性。
发明内容
本实用新型为了解决上述存在的技术问题,提供一种桥梁同步顶升施工的应力应变控制装置。
本实用新型的技术方案是这样实现的:
一种桥梁同步顶升施工的应力应变控制装置,包括液压驱动装置、检测装置及控制系统,所述液压驱动装置包括液压机,液压机的控制装置与所述控制系统电性连接,由控制系统控制液压机启动,所述检测装置包括压力传感器、位移检测装置、电阻应变片及电阻应变仪,利用电阻应变片的电阻应变效应(将测量物体的变形转换为电阻变化),通过电阻应变仪的特定测量电路,测得电压或电流的变量,可得测量物体的变形量,从而知道测量物体的应变应力,再通过控制中心将物体的应力变化同步反馈到工作油泵,保证了桥梁结构在顶升施工中的安全,使桥梁顶升施工的安全性和可控性大大提高。
 本实用新型具有以下优点:①对结构应力的预警反应功能,整体更安全可靠,功能更齐全; ②操作控制集中,所有油缸既可同时控制,也可单独控制; ③同步控制点数量可根据需要设置,适用于大体积结构物的同步位移; ④各控制点同步偏差极小,结构物的移位精确;⑤具有友好Windows 用户界面的计算机控制系统。
附图说明
图1是本实用新型的方框示意图。
具体实施方式
如图1所示,本实用新型通过多点的位移检测装置、压力传感器、电阻应变片及电阻应变仪的信号由信号电缆连接到超高压泵站的电气控制箱内,经信号放大器放大后将顶升位移、负载吨位、结构应力送至控制系统中,控制系统中根据操纵台发出的操作指令,启动多台泵的电机,驱动油泵工作,油泵的动力油源经控制阀组,输出到外接的液压油缸中,使液压千斤顶运动,同时控制系统根据检测的位移信号,不断与指令信号进行比较,将误差值修正后改变变频器的输出频率,以改变电机的转速,达到连续可调的动力油源,供给外接液压油缸,来保持多点液压油缸同步上下运动。控制器还根据检测的应力信号,不断与本实用新型控制系统设定的预警值进行比对,当检测到的应力小于预警值时,系统按正常程序继续工作,当检测到的应力大于或等于预警值时,系统在发出预警信号的同时进行闭锁操作,等待技术人员查明原因,发出新的指令。

Claims (5)

1.一种桥梁同步顶升施工的应力应变控制装置,其特征在于:包括液压驱动装置、检测装置及控制系统,所述液压驱动装置包括液压机,液压机的控制装置与所述控制系统电性连接,由控制系统控制液压机启动,所述检测装置包括压力传感器、位移检测装置、电阻应变片及电阻应变仪。
2.根据权利要求1所述的一种桥梁同步顶升施工的应力应变控制装置,其特征在于:所述控制系统包括主控装置及从控装置。
3.根据权利要求1所述的一种桥梁同步顶升施工的应力应变控制装置,其特征在于:所述液压机上有液压千斤顶。
4.根据权利要求1所述的一种桥梁同步顶升施工的应力应变控制装置,其特征在于:所述控制系统通过应变信号线与应变片电性连接。
5.根据权利要求1所述的一种桥梁同步顶升施工的应力应变控制装置,其特征在于:所述液压液压千斤顶与压力传感器连接。
CN201520293642.5U 2015-05-08 2015-05-08 桥梁同步顶升施工的应力应变控制装置 Expired - Fee Related CN204662272U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520293642.5U CN204662272U (zh) 2015-05-08 2015-05-08 桥梁同步顶升施工的应力应变控制装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520293642.5U CN204662272U (zh) 2015-05-08 2015-05-08 桥梁同步顶升施工的应力应变控制装置

Publications (1)

Publication Number Publication Date
CN204662272U true CN204662272U (zh) 2015-09-23

Family

ID=54132673

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520293642.5U Expired - Fee Related CN204662272U (zh) 2015-05-08 2015-05-08 桥梁同步顶升施工的应力应变控制装置

Country Status (1)

Country Link
CN (1) CN204662272U (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108756292A (zh) * 2018-09-05 2018-11-06 山东建筑大学 一种基于物联网技术的建筑同步顶升控制方法及系统

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108756292A (zh) * 2018-09-05 2018-11-06 山东建筑大学 一种基于物联网技术的建筑同步顶升控制方法及系统

Similar Documents

Publication Publication Date Title
CN102518044B (zh) 一种用于桥梁顶升的plc液压比例同步顶升系统
CN204897229U (zh) 一种起重机运行状态实时监测系统
CN101769709B (zh) 检测位移传感器lvdt断线的模拟电路及其检测方法
CN102849544B (zh) 一种升降架升降控制系统及方法
CN109058333B (zh) 一种实时监测碟簧力的盘式制动器及监测方法
CN202390764U (zh) 一种用于桥梁顶升的plc液压比例同步顶升系统
CN203515972U (zh) 风力发电机组螺栓连接夹紧力监测系统
CN103171588A (zh) 一种机车制动闸瓦与轮箍磨损工况在线监测器
CN203824579U (zh) 用于旋转机械的监测装置
CN204662272U (zh) 桥梁同步顶升施工的应力应变控制装置
CN104485853B (zh) 一种带电机抱闸监控的伺服驱动器及抱闸异常检测方法
CN105034441B (zh) 一种压力机的过载检测方法
CN203499975U (zh) 一种气动隔膜泵故障报警系统
CN206257111U (zh) 液压电控系统的压力感应装置
CN112858822A (zh) 一种比例阀伺服阀电气故障的测试方法
CN203822602U (zh) 一种往复泵泵组效率检测系统
CN110757878A (zh) 一种伺服压力机的压力故障检测系统及方法
CN103309274B (zh) 基于双监控系统的锻造液压控制方法
CN203051308U (zh) 基于plc控制器的液压元件检测系统
CN106185630B (zh) 一种起重机液压泵的监控系统
CN211740604U (zh) 一种脉宽调制数控比例方向阀故障诊断系统
CN207380523U (zh) 一种真空度自动控制装置
CN205003239U (zh) 一种电力变压器绕组松动缺陷诊断系统
CN203519064U (zh) 重型物件精确称重及重心测定系统
CN206988215U (zh) 卸荷压力控制装置

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP03 Change of name, title or address

Address after: 510627 Guangdong, Guangzhou, Haian, No. 13 Tianhe District Road, fortune Century Square, building A1, floor 25

Patentee after: JINZHONGTIAN GROUP CO.,LTD.

Patentee after: JINZHONGTIAN WATER CONSERVANCY CONSTRUCTION CO.,LTD.

Address before: 510623 Yuexiu, Guangdong Pearl River New City, Haian Road, No. 13, Century Square, A-25 fortune

Patentee before: JINZHONGTIAN BUILDING GROUP Co.,Ltd.

Patentee before: Jinzhongtian Group Ganghang Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170407

Address after: 510627 Guangdong, Guangzhou, Haian, No. 13 Tianhe District Road, fortune Century Square, building A1, floor 25

Patentee after: JINZHONGTIAN WATER CONSERVANCY CONSTRUCTION CO.,LTD.

Address before: 510627 Guangdong, Guangzhou, Haian, No. 13 Tianhe District Road, fortune Century Square, building A1, floor 25

Patentee before: JINZHONGTIAN GROUP CO.,LTD.

Patentee before: JINZHONGTIAN WATER CONSERVANCY CONSTRUCTION CO.,LTD.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150923

Termination date: 20190508