CN204645639U - A kind of building operations formwork tie - Google Patents

A kind of building operations formwork tie Download PDF

Info

Publication number
CN204645639U
CN204645639U CN201520332362.0U CN201520332362U CN204645639U CN 204645639 U CN204645639 U CN 204645639U CN 201520332362 U CN201520332362 U CN 201520332362U CN 204645639 U CN204645639 U CN 204645639U
Authority
CN
China
Prior art keywords
tie
bar
thin bar
thick
snap close
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520332362.0U
Other languages
Chinese (zh)
Inventor
曹光明
宋功业
冯郁馨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Institute of Architectural Technology
Jiangsu Jianzhu Institute
Original Assignee
Jiangsu Institute of Architectural Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Institute of Architectural Technology filed Critical Jiangsu Institute of Architectural Technology
Priority to CN201520332362.0U priority Critical patent/CN204645639U/en
Application granted granted Critical
Publication of CN204645639U publication Critical patent/CN204645639U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

A kind of building operations formwork tie, is reinforced concrete post formwork and designing, belongs to the realm of building construction; Tie (1) is cut with scissors (13) formed with tie snap close (14) by tie thick bar (11), tie thin bar (12), tie; Tie thick bar (11) and tie thin bar (12) by tie cut with scissors (13) hinged, tie snap close (14) is arranged on the end of tie thin bar (12), with tie thin bar (12) consolidation; During use, lie in a horizontal plane in the corner of reinforced concrete post with 4 ties (1), the tie thin bar (12) of a tie (1) be placed in another tie thick bar (11), fastening rear tie snap close (14) is locked.The beneficial effects of the utility model are that tie can be installed quickly and easily, and do not have fragmentary annex and accessory, can not produce annex Loss during construction.

Description

A kind of building operations formwork tie
Technical field
A kind of building operations formwork tie, is reinforced concrete post formwork and designing, belongs to the realm of building construction.
Background technology
When tie is reinforced concrete post formwork in building engineering construction must the instrument of fixed leg template, be that column template is stupefiedly connected into overall cross binding with perpendicular.Existing tie has a variety of, but mostly generally is three, have even with multiple unconnected part, due to the easy landing of some finding, all make troubles with installing to carrying.A kind of building operations formwork tie disclosed in the utility model is adopted to solve the problem.
Utility model content
In order to solve the problem, the utility model provides a kind of building operations formwork tie, is cut with scissors 13 formed with tie snap close 14 by tie thick bar 11, tie thin bar 12, tie; Feature is, tie thick bar 11 and tie thin bar 12 are cut with scissors 13 hinged by tie, tie snap close 14 is arranged on the end of tie thin bar 12, with tie thin bar 12 consolidation; During use, lie in a horizontal plane in the outside of perpendicular stupefied 2 of reinforced concrete post with 4 ties 1, the tie thin bar 12 of a tie 1 be placed in another tie thick bar 11, fastening rear tie snap close 14 is locked, and tie 1 is fixed by perpendicular stupefied 2 pairs of templates 3.
Described tie thick bar 11 is made up of the leverage component with intensity, rigidity and toughness, preferential recommendation adopts channel-section steel to make, when adopting channel-section steel to make, the outward opening of tie thick bar 11, one end of tie thick bar 11 and one end tie of tie thin bar 12 cut with scissors 13 hinged, rotate for axle produces with tie hinge 13, relative rotation can be produced between tie thick bar 11 with tie thin bar 12, to change the angle between tie thick bar 11 and tie thin bar 12, but can not arbitrarily separate between tie thick bar 11 with tie thin bar 12.
Described tie thin bar 12 is made up of the leverage component with intensity, rigidity and toughness, preferential recommendation adopts square steel on an empty stomach to make, also channel-section steel or other materials can be adopted to make, when adopting channel-section steel to make, little than tie thick bar 11 of the sectional dimension of tie thin bar 12, and the opening of channel-section steel should be inside, if required, tie thin bar 12 can be placed in the empty stomach of tie thick bar 11.
Described tie hinge 13 be by having intensity, rigidity becomes with the articulation of toughness, tie hinge 13 is the parts connecting tie thick bar 11 and tie thin bar 12, is worked by tie thick bar 11 and the 12 pairs of formwork work of tie thin bar.
Described tie snap close 14 is made up of the fastener with intensity, rigidity and toughness, tie snap close 14 is placed in the both sides of the other end of tie thin bar 12, and can rotate, during formwork, pressed by snap close, namely tie thin bar 12 and the tie thick bar 11 of two adjacent ties 1 are locked; Rotated by snap close during form removal and lift, tie thin bar 12 is that is released with tie thick bar 11.
Described reinforced concrete post formwork is, four pieces of steel concrete column templates 3 are placed in reinforced concrete post four directions, be arranged in outside steel concrete column template 3 by perpendicular stupefied 2,4 ties 1 are lain in a horizontal plane in the perpendicular stupefied outside of reinforced concrete post corner, by the tie thin bar 12 of adjacent tie 1 and tie thick bar 11 one_to_one corresponding, the tie thin bar 12 of correspondence is placed in the empty stomach of tie thick bar 11, after adjustment, fastening tie snap close 14.
The beneficial effects of the utility model are that tie can be installed quickly and easily, and do not have fragmentary annex and accessory, can not produce annex Loss during construction.
Accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
Fig. 1 tie operating diagram;
Fig. 2 tie schematic diagram;
Fig. 3 1-1 sectional drawing;
Fig. 4 tie operating diagram.
in figure: 1-tie; 11-tie thick bar; 12-tie thin bar; 13-tie cuts with scissors; 14-tie snap close; 2-erects stupefied; 3-column template.
Detailed description of the invention
The frame column formwork of certain framework house adopts the utility model to provide a kind of building operations formwork tie, is cut with scissors 13 formed with tie snap close 14 by tie thick bar 11, tie thin bar 12, tie; Feature is, tie thick bar 11 and tie thin bar 12 are cut with scissors 13 hinged by tie, tie snap close 14 is arranged on the end of tie thin bar 12, with tie thin bar 12 consolidation; During use, lie in a horizontal plane in the outside of perpendicular stupefied 2 of reinforced concrete post with 4 ties 1, the tie thin bar 12 of a tie 1 be placed in another tie thick bar 11, fastening rear tie snap close 14 is locked, and tie 1 is fixed by perpendicular stupefied 2 pairs of templates 3.
Tie thick bar 11 is made up of the leverage component with some strength, rigidity and toughness, actual employing No. 6 channel-section steels make, during making, the outward opening of tie thick bar 11, one end of tie thick bar 11 and one end tie of tie thin bar 12 cut with scissors 13 hinged, produce rotation, can produce relative rotation between tie thick bar 11 with tie thin bar 12 with tie hinge 13 for axle, to change the angle between tie thick bar 11 and tie thin bar 12, but can not arbitrarily separate between tie thick bar 11 with tie thin bar 12.
Tie thin bar 12 is made up of the leverage component with some strength, rigidity and toughness, actual employing No. 4 channel-section steels make, during making, little than tie thick bar 11 of the sectional dimension of tie thin bar 12, and the opening of channel-section steel should be inside, if required, tie thin bar 12 can be placed in the empty stomach of tie thick bar 11.
Tie hinge 13 be by having some strength, rigidity becomes with the articulation of toughness, the actual hinge that adopts makes, by one end shutoff of No. 6 channel-section steels and No. 4 channel-section steels, and be welded on the blade of hinge, tie hinge 13 connects tie thick bar 11 and the part of tie thin bar 12, worked by tie thick bar 11 and the 12 pairs of formwork work of tie thin bar.
The tie snap close 14 that tie snap close 14 is made up of the fastener with some strength, rigidity and toughness is commercially available, tie snap close 14 is placed in the both sides of the other end of tie thin bar 12, and can rotate, during formwork, pressed by snap close, namely tie thin bar 12 and the tie thick bar 11 of two adjacent ties 1 are locked; Rotated by snap close during form removal and lift, tie thin bar 12 is that is released with tie thick bar 11.
Reinforced concrete post formwork is, four pieces of steel concrete column templates 3 are placed in reinforced concrete post four directions, be arranged in outside steel concrete column template 3 by perpendicular stupefied 2,4 ties 1 are lain in a horizontal plane in the perpendicular stupefied outside of reinforced concrete post corner, by the tie thin bar 12 of adjacent tie 1 and tie thick bar 11 one_to_one corresponding, the tie thin bar 12 of correspondence is placed in the empty stomach of tie thick bar 11, after adjustment, fastening tie snap close 14.

Claims (6)

1. a building operations formwork tie, is characterized in that, described tie (1) is cut with scissors (13) formed with tie snap close (14) by tie thick bar (11), tie thin bar (12), tie; Tie thick bar (11) and tie thin bar (12) by tie cut with scissors (13) hinged, tie snap close (14) is arranged on the end of tie thin bar (12), with tie thin bar (12) consolidation; During use, the outside of perpendicular stupefied (2) of reinforced concrete post is lain in a horizontal plane in 4 ties (1), the tie thin bar (12) of a tie (1) is placed in another tie thick bar (11), fastening rear tie snap close (14) locking, tie (1) is fixed template (3) by perpendicular stupefied (2).
2. a kind of building operations formwork tie (1) according to claim 1, it is characterized in that, tie thick bar (11) is made up of leverage component, and the belly of tie thick bar (11) is hollow, tie thin bar (12) can be made to be placed in one on an empty stomach; (13) can be cut with scissors between tie thick bar (11) and tie thin bar (12) rotate for axle produces with tie, to change the angle between tie thick bar (11) and tie thin bar (12), but can not arbitrarily separate between tie thick bar (11) with tie thin bar (12).
3. a kind of building operations formwork tie (1) according to claim 1, it is characterized in that, tie thin bar (12) is made up of leverage component, tie thin bar (12) can be placed in the empty stomach of tie thick bar (11) by little than tie thick bar (11) of the sectional dimension of tie thin bar (12).
4. a kind of building operations formwork tie (1) according to claim 1, it is characterized in that, tie hinge (13) be by having intensity, rigidity becomes with the articulation of toughness, tie hinge (13) is the part of connection tie thick bar (11) and tie thin bar (12).
5. a kind of building operations formwork tie (1) according to claim 1, it is characterized in that, tie snap close (14) is made up of fastener, and tie snap close (14) is placed in the both sides of the end of tie thin bar (12), and can rotate.
6. a kind of building operations formwork tie (1) according to claim 1, it is characterized in that, during reinforced concrete post formwork, four pieces of steel concrete column templates (3) are placed in reinforced concrete post four directions, stupefied (2) will be erected and be arranged in steel concrete column template (3) outside, 4 ties (1) are lain in a horizontal plane in the perpendicular stupefied outside of reinforced concrete post corner, by the tie thin bar (12) of adjacent tie (1) and tie thick bar (11) one_to_one corresponding, the tie thin bar (12) of correspondence is placed in the empty stomach of tie thick bar (11), after adjustment, fastening tie snap close (14).
CN201520332362.0U 2015-05-22 2015-05-22 A kind of building operations formwork tie Expired - Fee Related CN204645639U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520332362.0U CN204645639U (en) 2015-05-22 2015-05-22 A kind of building operations formwork tie

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520332362.0U CN204645639U (en) 2015-05-22 2015-05-22 A kind of building operations formwork tie

Publications (1)

Publication Number Publication Date
CN204645639U true CN204645639U (en) 2015-09-16

Family

ID=54098397

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520332362.0U Expired - Fee Related CN204645639U (en) 2015-05-22 2015-05-22 A kind of building operations formwork tie

Country Status (1)

Country Link
CN (1) CN204645639U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104818846A (en) * 2015-05-22 2015-08-05 江苏建筑职业技术学院 Pillar hoop for horizontally supporting pillar formwork

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104818846A (en) * 2015-05-22 2015-08-05 江苏建筑职业技术学院 Pillar hoop for horizontally supporting pillar formwork

Similar Documents

Publication Publication Date Title
CN102704672A (en) Installation construction method for large all-steel formwork at internal corner of shear wall
CN106150087B (en) A kind of combined frame column template and its construction method
CN204059957U (en) A kind of formwork reinforcement structure
CN103967268A (en) Building template for aluminum frame wood-plastic plate
CN201671331U (en) Internal angle die and steel frame template structure with the same
CN201460198U (en) Concrete poured template
CN204645639U (en) A kind of building operations formwork tie
CN202990421U (en) Reinforcing clamp special for construction beam bottom beam side template
CN204001678U (en) A kind of building multi-purpose type Combined formwork
CN102061806B (en) Building template
CN104818846A (en) Pillar hoop for horizontally supporting pillar formwork
CN103132691A (en) Large steel formwork corner reinforcing device
CN204112735U (en) A kind of template fixator
CN206128624U (en) Complete wooden structural grouping instrument formula wall form system
CN204023955U (en) A kind of NEW TYPE OF COMPOSITE keel structure
CN206477581U (en) Formwork reinforcement corner key
CN204475847U (en) concrete column template
CN205063326U (en) Big template of steel wood combination that subway open cut station structure was used
CN203626232U (en) Construction device for splicing small steel dies with multi-layer board
CN103334582A (en) Method for installing and constructing short-leg shear wall formwork supporting system
CN205224600U (en) Shear force wall outside template screw rod fastener
CN207553595U (en) The Angle formwork of turning out cloudy of straight internal corner formwork and the application straight internal corner formwork
CN206034905U (en) Board combination design mould falls in bathroom
CN205421918U (en) Instrument is consolidated to concrete beam side form
CN204876534U (en) Building shuttering

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150916

Termination date: 20160522

CF01 Termination of patent right due to non-payment of annual fee