CN204626257U - A kind of bridge column construction operation platform - Google Patents
A kind of bridge column construction operation platform Download PDFInfo
- Publication number
- CN204626257U CN204626257U CN201520260733.9U CN201520260733U CN204626257U CN 204626257 U CN204626257 U CN 204626257U CN 201520260733 U CN201520260733 U CN 201520260733U CN 204626257 U CN204626257 U CN 204626257U
- Authority
- CN
- China
- Prior art keywords
- base plate
- column
- shaped base
- bridge
- awning
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model provides a kind of bridge column construction operation platform, mainly comprise operating desk, mobile device, rain insensitive device, operating desk comprises symmetrically arranged first U-shaped base plate, second U-shaped base plate, plate outer side one circle arranges reinforcing rib, first base plate, second base plate both sides arrange the first fixed head, second fixed head, mobile device comprises liftable column, diagonal member, cross bar and be arranged on the roller of column bottom, rain insensitive device comprises awning Peng Ding, awning skeleton column, bridge formwork and bridge formwork bracket upright post, fastener for connection is passed through between rain insensitive device and operating desk, the utility model structure is simple, safe and convenient to use, be convenient to dismounting and movement, lifting operating platform can be carried out according to different bridge depth of beam, the problem in rainy day construction can be solved simultaneously, practical.
Description
Technical field:
The utility model relates to field of bridge construction, particularly relates to a kind of bridge column construction operation platform.
Background technology:
The construction of bridge column belongs to work high above the ground, for ensureing construction safety, special scaffold construction operating platform must be set up before column concrete placings, because this operating platform life cycle is short, turnaround speed is fast, but set up platform and need the manpower and materials that cost is larger, cost is higher, so general unit in charge of construction does not set up special operating platform when column concrete placings is constructed, constructor directly to straddle in template or uses that the simple and easy Hanging Basket of reinforcing bar is plug-in in template, carry out the construction of column concrete placings, there is larger potential safety hazard, run counter to safe construction requirement.When constructing to zones of different, constructor climbs up and climbs down movable operating platform, time-consumingly requires great effort again, affects operating efficiency, in addition, when run into rain heavily suddenly time, being forced to interrupt construction and then can having a strong impact on efficiency of construction.
Utility model content:
In order to solve the problem, it is simple that the utility model provides a kind of structure, safe and convenient to use, be convenient to dismounting and movement, lifting operating platform can be carried out according to different bridge depth of beam, the problem in rainy day construction can be solved, practical technical scheme simultaneously:
A kind of bridge column construction operation platform, mainly comprise operating desk, mobile device, rain insensitive device, operating desk comprises symmetrically arranged first U-shaped base plate, second U-shaped base plate, first U-shaped base plate, second U-shaped plate outer side one encloses and all arranges reinforcing rib, first U-shaped base plate, second U-shaped base plate both sides arrange the first fixed head, second fixed head, mobile device comprises liftable column, diagonal member, cross bar and be arranged on the roller of column bottom, rain insensitive device comprises awning Peng Ding, awning skeleton column, bridge formwork and bridge formwork bracket upright post, fastener for connection is passed through between rain insensitive device and operating desk.
As preferably, the first U-shaped sole periphery is fixedly installed the first protective guard, and the second U-shaped sole periphery is fixedly installed the second protective guard, the first protective guard, the second protective guard all arranges safety net, is bolted between the first fixed head and the second fixed head.
As preferably, column arranges four, and four root posts are arranged on bottom the first U-shaped base plate, the second U-shaped base plate, and cross bar is arranged between two between column, and arrange described diagonal member between symmetrical two root posts, roller is with brake block.
As preferably, steel pipe arranges four, awning skeleton column lower end is connected on bridge formwork, awning skeleton column top arranges awning Peng Ding, the mono-slope of awning Peng Ding is arranged, corresponding bridge formwork from-inner-to-outer tilts, and awning Peng Ding chooses template in two ends, and awning skeleton column is arranged on bridge formwork bracket upright post upper end.
The beneficial effects of the utility model are:
(1) the utility model arranges mobile device below operating desk, and the arbitrary region be convenient in work progress moves, and adopts liftable column simultaneously, is convenient to the construction operation of the bridge column to differing heights, improves operating efficiency.
(2) the utility model adopts and arrange rain insensitive device above operating desk, convenient in raining working, interrupts construction, affect efficiency of construction when preventing from raining suddenly.
Accompanying drawing explanation
Fig. 1 is Integral connection structure elevation of the present utility model;
Fig. 2 is operating desk top view of the present utility model;
Fig. 3 is the utility model mobile device stereogram.
Detailed description of the invention:
For making goal of the invention of the present utility model, technical scheme and advantage clearly, below in conjunction with accompanying drawing, embodiment of the present utility model is described in further detail.
As Figure 1-3, a kind of bridge column construction operation platform, mainly comprise operating desk, mobile device, rain insensitive device, operating desk comprises symmetrically arranged first U-shaped base plate 1, second U-shaped base plate 2, first U-shaped base plate 1, outside second U-shaped base plate 2, a circle all arranges reinforcing rib 3, first U-shaped base plate 1, second U-shaped base plate 2 both sides arrange the first fixed head 4, second fixed head 5, first U-shaped base plate 1 periphery is fixedly installed the first protective guard 15, second U-shaped base plate 2 periphery is fixedly installed the second protective guard 16, first protective guard 15, second protective guard 16 all arranges safety net 17, be connected by bolt 18 between first fixed head 4 with the second fixed head 5.
Mobile device comprises liftable column 6, diagonal member 7, cross bar 8 and the roller 9 be arranged on bottom column 6, rain insensitive device comprises awning paulin top 10, awning skeleton column 11, bridge formwork 12 and bridge formwork bracket upright post 13, be connected by steel pipe 14 between rain insensitive device with operating desk, column 6 arranges four, four root posts 6 are arranged on the first U-shaped base plate 1, bottom second U-shaped base plate 2, cross bar 8 is arranged between two between column 6, between symmetrical two root posts 6, diagonal member 7 is set, roller 9 is with brake block 19, steel pipe 14 arranges four, awning skeleton column 11 lower end is connected on bridge formwork 12, awning skeleton column 11 top arranges awning paulin top 10, single slope, awning paulin top 10 is arranged, corresponding bridge formwork 12 from-inner-to-outer tilts, template is chosen at two ends, awning paulin top 10, awning skeleton column 11 is arranged on bridge formwork bracket upright post 13 upper end.
Before construction, only the brake block 19 on four rolling 9 need be depressed, after being fixed by four rolling 9, constructor safely and conveniently can stand on operating platform and construct, just can be constructed at arbitrary region by shifting roller 9, lifting operating platform can be carried out according to the bridge of differing heights simultaneously, after construction, only bolt or fastener need be unclamped, all component can be dismantled, so that after moving to another building site, then use again after assembling combination, improve operating efficiency.The utility model adopts and arrange rain insensitive device above operating desk simultaneously, convenient in raining working, interrupts construction, affect efficiency of construction when preventing from raining suddenly.
Above-described embodiment is preferred embodiment of the present utility model; it is not the restriction to technical solutions of the utility model; as long as without the technical scheme that creative work can realize on the basis of above-described embodiment, all should be considered as falling within the scope of the rights protection of the utility model patent.
Claims (4)
1. a bridge column construction operation platform, mainly comprise operating desk, mobile device, rain insensitive device, it is characterized in that: described operating desk comprises symmetrically arranged first U-shaped base plate (1), second U-shaped base plate (2), described first U-shaped base plate (1), described second U-shaped base plate (2) outside one circle all arranges reinforcing rib (3), described first U-shaped base plate (1), described second U-shaped base plate (2) both sides arrange the first fixed head (4), second fixed head (5), described mobile device comprises liftable column (6), diagonal member (7), cross bar (8) and the roller (9) be arranged on bottom described column (6), described rain insensitive device comprises awning Peng Ding (10), awning skeleton column (11), bridge formwork (12) and bridge formwork bracket upright post (13), be connected by steel pipe (14) between described rain insensitive device with described operating desk.
2. a kind of bridge column construction operation platform according to claim 1, it is characterized in that: described first U-shaped base plate (1) periphery is fixedly installed the first protective guard (15), described second U-shaped base plate (2) periphery is fixedly installed the second protective guard (16), described first protective guard (15), described second protective guard (16) all arrange safety net (17), is connected by bolt (18) between described first fixed head (4) with described second fixed head (5).
3. a kind of bridge column construction operation platform according to claim 1, it is characterized in that: described column (6) arranges four, four described columns (6) are arranged on described first U-shaped base plate (1), described second U-shaped base plate (2) bottom, described cross bar (8) is arranged between two between described column (6), arrange described diagonal member (7) between symmetrical two described columns (6), described roller (9) is with brake block (19).
4. a kind of bridge column construction operation platform according to claim 1, it is characterized in that: described steel pipe (14) arranges four, described awning skeleton column (11) lower end is connected on described bridge formwork (12), described awning skeleton column (11) top arranges described awning Peng Ding (10), the single slope of described awning Peng Ding (10) is arranged, corresponding described bridge formwork (12) from-inner-to-outer tilts, template is chosen at described awning Peng Ding (10) two ends, described awning skeleton column (11) is arranged on described bridge formwork bracket upright post (13) upper end.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520260733.9U CN204626257U (en) | 2015-04-23 | 2015-04-23 | A kind of bridge column construction operation platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520260733.9U CN204626257U (en) | 2015-04-23 | 2015-04-23 | A kind of bridge column construction operation platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204626257U true CN204626257U (en) | 2015-09-09 |
Family
ID=54045302
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520260733.9U Expired - Fee Related CN204626257U (en) | 2015-04-23 | 2015-04-23 | A kind of bridge column construction operation platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204626257U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108331338A (en) * | 2018-04-04 | 2018-07-27 | 中交第三公路工程局有限公司 | A kind of hydraulic climbing formwork device and construction method |
CN108330826A (en) * | 2018-01-22 | 2018-07-27 | 徐晓山 | bridge column construction operation platform |
-
2015
- 2015-04-23 CN CN201520260733.9U patent/CN204626257U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108330826A (en) * | 2018-01-22 | 2018-07-27 | 徐晓山 | bridge column construction operation platform |
WO2019140899A1 (en) * | 2018-01-22 | 2019-07-25 | 徐晓山 | Bridge pillar construction operation platform |
CN108331338A (en) * | 2018-04-04 | 2018-07-27 | 中交第三公路工程局有限公司 | A kind of hydraulic climbing formwork device and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110616885A (en) | Movable overhanging working frame | |
CN205036063U (en) | A operation platform that encorbelments for building inside is encorbelmented position and is under construction | |
CN203097316U (en) | Foldable hydraulic lifting support secure channel for high altitude construction | |
CN204626257U (en) | A kind of bridge column construction operation platform | |
CN206873307U (en) | Movable type bridge justifies pier stud work high above the ground operating platform | |
CN203021928U (en) | Movable temporary buttress for dismantling bridge | |
CN204126240U (en) | Moving lift type is encorbelmented operating platform | |
CN201883693U (en) | Steel-structure roof brace mounting rack tool | |
CN204000932U (en) | Lower channel in safety in a kind of deep foundation pit construction operation | |
CN209703984U (en) | A kind of high-altitude mobile security platform for structure for steel structure roof inner slab installation | |
CN107696005B (en) | lifting operation platform for building construction | |
CN203222995U (en) | Construction hoist feeding and discharging operation platform | |
CN102733586A (en) | Scaffold cart | |
CN112853991A (en) | Anti-toppling scaffold for bridge road and building construction and construction method | |
CN208235587U (en) | A kind of large-span deep foundation pit underground power house rack assembling construction platform | |
CN202831591U (en) | Special-shaped truss operation platform capable of hoisting to super high space | |
CN202718373U (en) | Movable operating workbench | |
CN202953755U (en) | Novel anti-climbing safety device for tower crane | |
CN201212250Y (en) | Mobile wheel track installation platform for large-sized network frame engineering | |
CN203392657U (en) | Machine maintenance platform | |
CN206091253U (en) | Be suitable for irregular space's simple and easy steel bracket platform | |
CN204418634U (en) | A kind of safety device of scaffold | |
CN203669322U (en) | Decoration aerial work platform in industrial factory building | |
CN104947925A (en) | Elevator shaft protection operation platform | |
CN204826588U (en) | Elevator shaft protection operation platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150909 Termination date: 20160423 |