CN204615321U - A kind of volcanic rock inorganic mineral pours into a mould bus A-frame hoisting structure entirely - Google Patents
A kind of volcanic rock inorganic mineral pours into a mould bus A-frame hoisting structure entirely Download PDFInfo
- Publication number
- CN204615321U CN204615321U CN201520241138.0U CN201520241138U CN204615321U CN 204615321 U CN204615321 U CN 204615321U CN 201520241138 U CN201520241138 U CN 201520241138U CN 204615321 U CN204615321 U CN 204615321U
- Authority
- CN
- China
- Prior art keywords
- frame
- suspension bracket
- bus
- utility
- inorganic mineral
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model discloses a kind of volcanic rock inorganic mineral and entirely pour into a mould bus A-frame hoisting structure, it comprises at least two trapezoidal suspension bracket points and at least two A-frames, described trapezoidal suspension bracket point and bus bulk are cast for one and stretch out from bus bulk both sides, described A-frame is fixedly connected with the installation fixing point be embedded in advance in advance in metope before installation, and after installing, described trapezoidal suspension bracket point and described A-frame are connected and fixed.The utility model improves accuracy and the fail safe of installation dimension, improves the convenience of construction operation personnel, makes construction operation accuracy, safe, summary.
Description
Technical field
The utility model relates to power source diverter conveying technology field, particularly relates to a kind of volcanic rock inorganic mineral and entirely pours into a mould bus A-frame hoisting structure.
Background technology
At present, domestic bus vertical direction lifting mode, main employing bolt lifting mode, the shortcoming of bolt lifting mode cannot meet to keep steadiness, fail safe under extraneous emersion wave emotionally condition, easily waves and distortion.Because the characteristic easily swinging distortion is installed to work progress make troubles, workmen accurately cannot determine screw rod suspension bracket point position, causes the phenomenon of installing rear element appearance left and right height; Bolt lifting mode must be fixed by in-site installation, cannot be fixed by construction bolt in advance, brings greatly inconvenience to construction and installation.
Utility model content
The utility model, for the above problem existed in above prior art, proposes a kind of volcanic rock inorganic mineral and entirely pours into a mould bus A-frame hoisting structure, improves accuracy and the fail safe of installation dimension.
The utility model solves the technical scheme that its technical problem adopts: a kind of volcanic rock inorganic mineral pours into a mould bus A-frame hoisting structure entirely, it comprises at least two trapezoidal suspension bracket points and at least two A-frames, described trapezoidal suspension bracket point and bus bulk are cast for one and stretch out from bus bulk both sides, described A-frame is fixedly connected with the installation fixing point be embedded in advance in advance in metope before installation, and after installing, described trapezoidal suspension bracket point and described A-frame are connected and fixed.
Improve as to the one of technical scheme described in the utility model, described trapezoidal suspension bracket point and described A-frame quantity are four, in two to the both sides being arranged in described bus bulk.
Improve as to the one of technical scheme described in the utility model, it is integral that described trapezoidal suspension bracket point and described A-frame utilize M12 screw firmly to lock.
Improve as to the one of technical scheme described in the utility model, the design size of described trapezoidal suspension bracket point is 90mm for going to the bottom long, and upper base is long is 60mm, and height is 80mm.
Therefore, the volcanic rock inorganic mineral that the utility model provides pours into a mould bus A-frame hoisting structure entirely, improves accuracy and the fail safe of installation dimension, improves the convenience of construction operation personnel, make construction operation accuracy, safe, summary.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is described in further detail, in accompanying drawing:
Fig. 1 is the front view of trapezoidal suspension bracket point in the utility model specific embodiment;
Fig. 2 is the vertical view of trapezoidal suspension bracket point in the utility model specific embodiment;
Fig. 3 is the front view of the utility model specific embodiment intermediate cam support;
Fig. 4 is the vertical view of the utility model specific embodiment intermediate cam support;
Fig. 5 is the overall structure schematic diagram that the volcanic rock inorganic mineral of the utility model specific embodiment pours into a mould bus A-frame hoisting structure entirely.
Embodiment
In order to make the purpose of this utility model, technical scheme and advantage clearly understand, below in conjunction with drawings and Examples, the utility model is further elaborated.Should be appreciated that specific embodiment described herein only in order to explain the utility model, and be not used in restriction the utility model.
Fig. 1 is the front view of trapezoidal suspension bracket point in the utility model specific embodiment, Fig. 2 is the vertical view of trapezoidal suspension bracket point in the utility model specific embodiment, Fig. 3 is the front view of the utility model specific embodiment intermediate cam support, Fig. 4 is the vertical view of the utility model specific embodiment intermediate cam support, and Fig. 5 is the overall structure schematic diagram that the volcanic rock inorganic mineral of the utility model specific embodiment pours into a mould bus A-frame hoisting structure entirely.
Shown in composition graphs 1 to Fig. 5, volcanic rock inorganic mineral of the present utility model pours into a mould bus A-frame hoisting structure entirely, it comprises at least two trapezoidal suspension bracket points 10 and at least two A-frames 20, trapezoidal suspension bracket point 10 is cast for one with bus bulk 30 and stretches out from the both sides of bus bulk 30, A-frame 20 is fixedly connected with the installation fixing point be embedded in advance in advance in metope before installation, there is in metope pre-buried iron plate 21, be provided with installation fixing point, after installing, trapezoidal suspension bracket point 10 and A-frame 20 are connected and fixed.
In the utility model specific embodiment, trapezoidal suspension bracket point 10 and A-frame 20 quantity are four, in two to the both sides being arranged in bus bulk 30.In the utility model specific embodiment, shown in composition graphs 2, Fig. 3 and Fig. 5, trapezoidal suspension bracket point 10 is connected and fixed at screw 11 place with A-frame 20, such as, adopt M12 screw firmly to lock integral.
In the utility model, the strip of trapezoidal suspension bracket to be cross section be isosceles trapezoid, its both sides are stretched out from the both sides of bus bulk 30, extension is trapezoidal suspension bracket point 10, the design size of trapezoidal suspension bracket point 10 is such as shown in Fig. 1, and cross section is isosceles trapezoid, and it is of a size of the long L2 that goes to the bottom is 90mm, the long L1 of upper base is 60mm, and high h is 80mm.But the utility model is not limited to above size design, the adjustment of various shape and size can be done according to concrete actual service condition.
In the utility model, A-frame 20 comprises the pre-buried iron plate 21 being positioned at body of wall, vertical beam 22, crossbeam 23 and the cant beam 24 that are connected and fixed with it, in the utility model, vertical beam 22, crossbeam 23 and cant beam 24 all adopt 12# channel be bolted to connection or be welded.
In the utility model, volcanic rock inorganic mineral pours into a mould bus A-frame lifting mode entirely when bus bulk 30 pours into a mould production, first waters and outpours and bus trapezoidal suspension bracket 10 integrally; In installation process, the trapezoidal suspension bracket 10 on bus bulk 30 is firmly locked together with the A-frame 20 being embedded in metope, with A-frame 20 and metope compact siro spinning technology when ensureing that bus can extraneously occur fluctuating, ensure that the phenomenon of distortion does not occur when running into extraneous fluctuation to swing bus.A-frame lifting, for choosing fixing point in advance and A-frame 20 being fixed in advance the mode on metope, ensure that the accuracy of installation dimension and the convenience of construction operation personnel, construction operation accuracy, safe, summary.
The height of trapezoidal suspension bracket point of the present utility model will ensure safe distance, and the length H of trapezoidal suspension bracket point changes with element bus height change, and during on-the-spot actual installation, it is integral that trapezoidal suspension bracket point and A-frame firmly utilize M12 screw firmly to lock.
Therefore, the volcanic rock inorganic mineral that the utility model provides pours into a mould bus A-frame hoisting structure entirely, improves accuracy and the fail safe of installation dimension, improves the convenience of construction operation personnel, make construction operation accuracy, safe, summary.
Should be understood that, for those of ordinary skills, can be improved according to the above description or convert, and all these improve and convert the protection range that all should belong to the utility model claims.
Claims (4)
1. a volcanic rock inorganic mineral pours into a mould bus A-frame hoisting structure entirely, it is characterized in that, comprise at least two trapezoidal suspension bracket points and at least two A-frames, described trapezoidal suspension bracket point and bus bulk are cast for one and stretch out from bus bulk both sides, described A-frame is fixedly connected with the installation fixing point be embedded in advance in advance in metope before installation, and after installing, described trapezoidal suspension bracket point and described A-frame are connected and fixed.
2. volcanic rock inorganic mineral according to claim 1 pours into a mould bus A-frame hoisting structure entirely, it is characterized in that, described trapezoidal suspension bracket point and described A-frame quantity are four, in two to the both sides being arranged in described bus bulk.
3. volcanic rock inorganic mineral according to claim 1 pours into a mould bus A-frame hoisting structure entirely, it is characterized in that, it is integral that described trapezoidal suspension bracket point and described A-frame utilize M12 screw firmly to lock.
4. volcanic rock inorganic mineral according to claim 1 pours into a mould bus A-frame hoisting structure entirely, it is characterized in that, the design size of described trapezoidal suspension bracket point is 90mm for going to the bottom long, and upper base is long is 60mm, and height is 80mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520241138.0U CN204615321U (en) | 2015-04-20 | 2015-04-20 | A kind of volcanic rock inorganic mineral pours into a mould bus A-frame hoisting structure entirely |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520241138.0U CN204615321U (en) | 2015-04-20 | 2015-04-20 | A kind of volcanic rock inorganic mineral pours into a mould bus A-frame hoisting structure entirely |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204615321U true CN204615321U (en) | 2015-09-02 |
Family
ID=53967845
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520241138.0U Active CN204615321U (en) | 2015-04-20 | 2015-04-20 | A kind of volcanic rock inorganic mineral pours into a mould bus A-frame hoisting structure entirely |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204615321U (en) |
-
2015
- 2015-04-20 CN CN201520241138.0U patent/CN204615321U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204298824U (en) | Foundation ditch concreting pipeline buffering structure | |
CN206786135U (en) | A kind of pipeline waterborne and π type compensator hoisting bracket | |
CN201843345U (en) | Concrete belt conveyer | |
CN208995861U (en) | A kind of concrete road surface rod piece installation stationary steel bushing tube stent device | |
CN204615321U (en) | A kind of volcanic rock inorganic mineral pours into a mould bus A-frame hoisting structure entirely | |
CN204633261U (en) | A kind of volcanic rock inorganic mineral pours into a mould bus constructional element with spring entirely | |
CN202323727U (en) | Device for adjusting horizontal position of steel box girder | |
CN204825656U (en) | Cast -in -place formwork support structure in bridge sound barrier basis | |
CN206457167U (en) | A kind of reinforced concrete sewer pipe universality suspender | |
CN204615323U (en) | A kind of volcanic rock inorganic mineral pours into a mould bus horizontal O type suspension bracket entirely | |
CN204059207U (en) | Bridge construction steel cylinder temporary support | |
CN203742625U (en) | Full-automatic pipe piece overturning machine | |
CN202500351U (en) | Novel shock absorption support | |
CN206669120U (en) | A kind of flexible iron drain-pipe road suspension bracket | |
CN204174071U (en) | A kind of arch top iron construction of kiln | |
CN209742912U (en) | Template support is pour to tunnel medial side escape canal | |
CN202767215U (en) | Spray gun device | |
CN204000921U (en) | The pre-buried ground connection copper billet of a kind of ultra-high voltage transformer station GIS fastening devices | |
CN204826220U (en) | Location built -in fitting with U type groove | |
CN204111166U (en) | Bi-directional adjustable vehicle body special hanger | |
CN204689349U (en) | Swing pipe structure | |
CN203394060U (en) | Concrete transporting device for bridge construction | |
CN204643596U (en) | Be provided with the swing pipe structure of spring installation | |
CN204643591U (en) | Be provided with the simple and easy swing pipe structure of clamp | |
CN204643557U (en) | Be provided with the simple and easy swing pipe structure of reinforced rib |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |