Foundation ditch concreting pipeline buffering structure Download PDF

Info

Publication number
CN204298824U
CN204298824U CN201420740100.3U CN201420740100U CN204298824U CN 204298824 U CN204298824 U CN 204298824U CN 201420740100 U CN201420740100 U CN 201420740100U CN 204298824 U CN204298824 U CN 204298824U
Authority
CN
China
Prior art keywords
material receiving
buffering structure
receiving port
foundation ditch
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420740100.3U
Other languages
Chinese (zh)
Inventor
裴鸿斌
苏亚武
陈学光
刘鹏
王凯峰
杨红岩
周洪涛
唐祖锡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201420740100.3U priority Critical patent/CN204298824U/en
Application granted granted Critical
Publication of CN204298824U publication Critical patent/CN204298824U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Sewage (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The utility model provides a kind of foundation ditch concreting pipeline buffering structure, and be provided with vertical elephant trunk in foundation ditch, pipeline buffering structure comprises: receiving hopper, and conducting is connected to the bottom of elephant trunk; Screen cloth, is arranged in receiving hopper.The utility model efficiently solve concreting to cross long pipeline particularly vertically super-long pipeline institute produce the problem of excess impact, and improve the quality and security of constructing further.

Description

Foundation ditch concreting pipeline buffering structure
Technical field
The utility model relates to a kind of buffer structure, is specifically related to a kind of pipeline buffering structure being applicable to foundation ditch concreting.
Background technology
At present, in foundation ditch concrete pouring construction, often can apply to the elephant trunk of connection segment as building pipeline.Because design needs, the pipeline total length be formed by connecting just may be long, when running into the situation of total length overlength of particularly vertical duct, just need the problem fully taking into account the impulsive force that concreting produces, can not let alone concrete unimpededly by flinging in vertical tube under, to avoid potential safety hazard.
Utility model content
For overcoming the defect existing for prior art, a kind of foundation ditch concreting pipeline buffering structure is now provided, with effectively solve concreting to cross long pipeline particularly vertically super-long pipeline institute produce the problem of excess impact, and improve the quality and security of constructing further.
For achieving the above object, provide a kind of foundation ditch concreting pipeline buffering structure, be provided with vertical elephant trunk in foundation ditch, pipeline buffering structure comprises:
Receiving hopper, conducting is connected to the bottom of elephant trunk;
Screen cloth, is arranged in receiving hopper.
The beneficial effect of the utility model foundation ditch concreting pipeline buffering structure is,
By arranging receiving hopper and coordinate screen cloth further, to play the effect of buffering to the concrete of building in elephant trunk.
Preferably, pipeline buffering structure also comprises: switching bend pipe, conducting is in the bottom of receiving hopper.
Preferably, receiving hopper comprises the first material receiving port, the second material receiving port and connects the changeover portion of the first material receiving port and the second material receiving port, first material receiving port is greater than the second material receiving port, and the first material receiving port is connected with the bottom conducting of elephant trunk, and the second material receiving port is connected with the conducting of switching bend pipe.
Accompanying drawing explanation
Fig. 1 is the overall schematic of the utility model foundation ditch concreting pipeline buffering structure;
Fig. 2 is the structure for amplifying schematic diagram corresponding to a-quadrant in Fig. 1.
Detailed description of the invention
For the benefit of to the understanding of structure of the present utility model, be described below in conjunction with drawings and Examples.
With reference to Fig. 1, it is the overall schematic of the utility model foundation ditch concreting pipeline buffering structure.With reference to Fig. 2, for corresponding to the structure for amplifying schematic diagram of a-quadrant in Fig. 1.
Shown in composition graphs 1 and Fig. 2, the utility model provides a kind of foundation ditch concreting pipeline buffering structure, and be provided with vertical elephant trunk 2 in foundation ditch 1, pipeline buffering structure 3 comprises: receiving hopper 30, and conducting is connected to the bottom of elephant trunk 2; Screen cloth 32, is arranged in receiving hopper 30.
Particularly, in the bottom of receiving hopper 30, also conducting has switching bend pipe 34.Receiving hopper 30 comprises the first material receiving port 300, second material receiving port 302 and connects the changeover portion 304 of the first material receiving port 300 and the second material receiving port 302, and this first material receiving port 300 is greater than this second material receiving port 302.This first material receiving port 300 is connected with the bottom conducting of above-mentioned elephant trunk 2, and this second material receiving port 302 is connected with above-mentioned switching bend pipe 34 conducting.
After being provided with said structure feature, the utility model can by following implementation Process:
Shown in composition graphs 1 and Fig. 2, along on the sidewall of foundation ditch 1, vertical elephant trunk 2 is installed, above-mentioned pipeline buffering structure 3 is installed on the bottom of this elephant trunk 2.Particularly, first screen cloth 32 is fixed in receiving hopper 30, and the conducting of switching bend pipe 34 is socketed on the second material receiving port 302 of receiving hopper 30, then the first material receiving port 300 conducting of receiving hopper 30 is socketed on the bottom of elephant trunk 2.Further, bend pipe 34 of transferring can be used for conducting and to transfer the elephant trunk (such as oblique elephant trunk) arranged along other directions.Substantially to complete the installation of pipeline buffering structure 3.
After concrete is vertically poured into by elephant trunk 2, pipeline buffer structure 3 can be flowed through.Due to the setting reducing (i.e. the effect of changeover portion 304) and screen cloth 32 of receiving hopper 30 internal diameter, coordinate the inhibition formed concreting.With this, decrease concreting to the impact of building pipeline and its switching place.
Below embodiment has been described in detail the utility model by reference to the accompanying drawings, and those skilled in the art can make many variations example to the utility model according to the above description.Thus, some details in embodiment should not formed restriction of the present utility model, the utility model by the scope that defines using appended claims as protection domain.

Claims (3)

1. a foundation ditch concreting pipeline buffering structure, is provided with vertical elephant trunk in described foundation ditch, it is characterized in that, described pipeline buffering structure comprises:
Receiving hopper, conducting is connected to the bottom of described elephant trunk;
Screen cloth, is arranged in described receiving hopper.
2. pipeline buffering structure according to claim 1, is characterized in that, also comprise:
Switching bend pipe, conducting is in the bottom of described receiving hopper.
3. pipeline buffering structure according to claim 2, is characterized in that,
Described receiving hopper comprises the first material receiving port, the second material receiving port and connects the changeover portion of described first material receiving port and described second material receiving port, described first material receiving port is greater than described second material receiving port, described first material receiving port is connected with the bottom conducting of described elephant trunk, and described second material receiving port is connected with the conducting of described switching bend pipe.
CN201420740100.3U 2014-11-18 2014-12-01 Foundation ditch concreting pipeline buffering structure Expired - Fee Related CN204298824U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420740100.3U CN204298824U (en) 2014-11-18 2014-12-01 Foundation ditch concreting pipeline buffering structure

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201410659409 2014-11-18
CN201420740100.3U CN204298824U (en) 2014-11-18 2014-12-01 Foundation ditch concreting pipeline buffering structure

Publications (1)

Publication Number Publication Date
CN204298824U true CN204298824U (en) 2015-04-29

Family

ID=52848453

Family Applications (8)

Application Number Title Priority Date Filing Date
CN201420742538.5U Expired - Fee Related CN204298828U (en) 2014-11-18 2014-12-01 Foundation ditch concreting elephant trunk cushioning control structure
CN201420740119.8U Expired - Fee Related CN204298826U (en) 2014-11-18 2014-12-01 Deep foundation ditch concrete bottom slab concreting branch elephant trunk structure
CN201420740133.8U Expired - Fee Related CN204298831U (en) 2014-11-18 2014-12-01 Foundation ditch concreting switching buffer structure
CN201420740116.4U Expired - Fee Related CN204298825U (en) 2014-11-18 2014-12-01 Foundation ditch builds elephant trunk supporting and regulating device
CN201420740120.0U Expired - Fee Related CN204298827U (en) 2014-11-18 2014-12-01 Foundation ditch concreting combination string tubular structure
CN201420740100.3U Expired - Fee Related CN204298824U (en) 2014-11-18 2014-12-01 Foundation ditch concreting pipeline buffering structure
CN201410717256.4A Active CN104532845B (en) 2014-11-18 2014-12-01 Deep basal pit super thick concrete floor casting system and construction method
CN201420740118.3U Expired - Fee Related CN204299185U (en) 2014-11-18 2014-12-01 Build pipeline reinforcing steel bar buffering structure

Family Applications Before (5)

Application Number Title Priority Date Filing Date
CN201420742538.5U Expired - Fee Related CN204298828U (en) 2014-11-18 2014-12-01 Foundation ditch concreting elephant trunk cushioning control structure
CN201420740119.8U Expired - Fee Related CN204298826U (en) 2014-11-18 2014-12-01 Deep foundation ditch concrete bottom slab concreting branch elephant trunk structure
CN201420740133.8U Expired - Fee Related CN204298831U (en) 2014-11-18 2014-12-01 Foundation ditch concreting switching buffer structure
CN201420740116.4U Expired - Fee Related CN204298825U (en) 2014-11-18 2014-12-01 Foundation ditch builds elephant trunk supporting and regulating device
CN201420740120.0U Expired - Fee Related CN204298827U (en) 2014-11-18 2014-12-01 Foundation ditch concreting combination string tubular structure

Family Applications After (2)

Application Number Title Priority Date Filing Date
CN201410717256.4A Active CN104532845B (en) 2014-11-18 2014-12-01 Deep basal pit super thick concrete floor casting system and construction method
CN201420740118.3U Expired - Fee Related CN204299185U (en) 2014-11-18 2014-12-01 Build pipeline reinforcing steel bar buffering structure

Country Status (1)

Country Link
CN (8) CN204298828U (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105003077B (en) * 2015-07-17 2017-07-18 中国建筑第二工程局有限公司 Closed space concrete pouring device and construction method
CN105442609B (en) * 2015-11-20 2017-06-23 山东送变电工程公司 Base concrete pours self-supporting chute device
CN108894231A (en) * 2018-09-19 2018-11-27 北京城建集团有限责任公司 A kind of concrete chute structural system and its construction method
CN110904852A (en) * 2019-12-18 2020-03-24 诚通凯胜生态建设有限公司 Bridge construction method
CN111456011A (en) * 2020-03-24 2020-07-28 中国五冶集团有限公司 Underground chamber bottom plate concrete assembled steel chute
CN112376567A (en) * 2020-11-05 2021-02-19 中国建筑土木建设有限公司 Large-volume concrete chute pouring system and construction method thereof
CN112982467A (en) * 2021-02-08 2021-06-18 中铁二十局集团第六工程有限公司 Concrete pouring device and raft foundation pouring method
CN113653060A (en) * 2021-07-28 2021-11-16 中国建筑第八工程局有限公司 Deep foundation pit bottom plate concrete pouring system with multiple supporting beams and construction method thereof
CN113638420B (en) * 2021-09-26 2022-05-24 中铁十八局集团第五工程有限公司 Deep foundation pit self-flowing energy dissipation concrete pouring method and concrete self-flowing energy dissipation structure

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6098014A (en) * 1983-11-04 1985-06-01 Ohbayashigumi Ltd Apparatus for measuring front end position of tremie tube for placing underwater concrete
CN101294387B (en) * 2008-06-17 2011-09-07 中国葛洲坝集团股份有限公司 Transportation method for roller compacted concrete at glacis landform
CN102936896B (en) * 2012-12-04 2015-07-08 中铁二十三局集团有限公司 Device for downward conveying concrete
CN103089015B (en) * 2013-02-01 2015-07-22 河南省水利第二工程局 Descend control device

Also Published As

Publication number Publication date
CN204298828U (en) 2015-04-29
CN104532845A (en) 2015-04-22
CN204299185U (en) 2015-04-29
CN204298831U (en) 2015-04-29
CN204298826U (en) 2015-04-29
CN204298825U (en) 2015-04-29
CN204298827U (en) 2015-04-29
CN104532845B (en) 2016-06-29

Similar Documents

Publication Publication Date Title
CN204298824U (en) Foundation ditch concreting pipeline buffering structure
CN201738463U (en) Vertical connection structure between main body structure and filled wall body
CN204126263U (en) A kind of beam, the pre-buried horizontal case fastening devices of wall
CN204000838U (en) The anti-Flow Structure Around of diaphragm wall capsule-type
CN103614998A (en) Lining wall concrete placement top-down method based on underground diaphragm wall
CN204012542U (en) Wall bushing
CN203320952U (en) Constructional column template drawing device
CN203654760U (en) Device for treating seam between vertical structure and horizontal structure
CN204059207U (en) Bridge construction steel cylinder temporary support
CN202689567U (en) Pump pipe handrail for concrete pouring
CN104453017A (en) Module wall for house building
CN202866532U (en) Door frame mounting structure
CN204512665U (en) A kind of concrete pump pipe fixed block and pump line fixed structure
CN204326307U (en) The module wall that a kind of building construction uses
CN205313960U (en) Easy operation platform of shake, make level, quick travel is integrated
CN204475355U (en) Plugging structure
CN204252294U (en) Composite wallboard two ends Antileaking connecting apparatus
CN203716496U (en) Side formwork fixing frame for concrete floor construction
CN204604573U (en) PVC embedded box in a kind of fixed concrete
CN203977814U (en) The plugging structure at hole, a kind of lift door frame bottom
CN203097241U (en) Feeding component of pulp shooting machine
CN102720288A (en) Method for connecting solderless curtain wall dry pendant
CN209211752U (en) A kind of glass fibre mortar blockwork
CN105332720A (en) Waterproof closed construction method of I-shaped steel framework
CN203113739U (en) Fixing support for fixing cylinder sleeve of pulp shooting machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150429

Termination date: 20201201