CN204633261U - A kind of volcanic rock inorganic mineral pours into a mould bus constructional element with spring entirely - Google Patents

A kind of volcanic rock inorganic mineral pours into a mould bus constructional element with spring entirely Download PDF

Info

Publication number
CN204633261U
CN204633261U CN201520239800.9U CN201520239800U CN204633261U CN 204633261 U CN204633261 U CN 204633261U CN 201520239800 U CN201520239800 U CN 201520239800U CN 204633261 U CN204633261 U CN 204633261U
Authority
CN
China
Prior art keywords
suspension bracket
bus
spring
pours
inorganic mineral
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520239800.9U
Other languages
Chinese (zh)
Inventor
陈明光
陈成国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Basiwei Energy Saving Technology Co Ltd
Original Assignee
Jiangsu Basiwei Energy Saving Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Basiwei Energy Saving Technology Co Ltd filed Critical Jiangsu Basiwei Energy Saving Technology Co Ltd
Priority to CN201520239800.9U priority Critical patent/CN204633261U/en
Application granted granted Critical
Publication of CN204633261U publication Critical patent/CN204633261U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Vibration Prevention Devices (AREA)

Abstract

The utility model discloses a kind of volcanic rock inorganic mineral and entirely pour into a mould bus constructional element with spring, it comprises at least two trapezoidal suspension bracket points and at least two elastic installation frames, described trapezoidal suspension bracket point and bus bulk are cast for one and stretch out from bus bulk both sides, described elastic installation frame is fixedly connected with the installation fixing point be embedded in advance in advance in metope before installation, after installing, described trapezoidal suspension bracket point and described elastic installation frame are connected and fixed, side and the floor plates of described elastic installation frame are connected and fixed, and opposite side is fixedly connected with described trapezoidal suspension bracket point.The utility model improves accuracy and the fail safe of installation dimension, improves the convenience of construction operation personnel, makes construction operation accuracy, safe, summary.

Description

A kind of volcanic rock inorganic mineral pours into a mould bus constructional element with spring entirely
Technical field
The utility model relates to power source diverter conveying technology field, particularly relates to a kind of volcanic rock inorganic mineral and entirely pours into a mould bus constructional element with spring.
Background technology
At present, domestic bus is worn floor plates and is propped up dress mode, and the main bolt that adopts lifts and support diagonal brace mode, and the shortcoming of bolt lifting mode cannot meet to keep steadiness, fail safe under extraneous emersion wave emotionally condition, easily waves and distortion; Bolt lifting mode, bus bulk is only subject to the effect of angle iron side tensile force upwards, bus is not firmly locked on support, the phenomenon with distortion is waved when powerful seismic wave, cause other equipment around bus shock and damage, suspension rod distortion fractures, and bus bulk does not have suspension and support device and breaks; Because the characteristic easily swinging distortion is installed to work progress make troubles, workmen accurately cannot determine screw rod suspension bracket point position; Bolt lifting mode must be fixed by in-site installation, cannot be fixed by construction bolt in advance, brings greatly inconvenience to construction and installation.Support diagonal brace mode is get from metope to install fixing diagonal support supporting bus body, during Practical Project planning, can not ensure that every bar bus is all pass through floor along metope trend, namely cannot ensure the mounting means of bus under difference moves towards situation of change.Support diagonal brace mode cannot ensure the mounting means of bus under difference moves towards situation of change.
Utility model content
The utility model, for the above problem existed in above prior art, proposes a kind of volcanic rock inorganic mineral and entirely pours into a mould bus constructional element with spring, improves accuracy and the fail safe of installation dimension.
The utility model solves the technical scheme that its technical problem adopts: a kind of volcanic rock inorganic mineral pours into a mould bus constructional element with spring entirely, it comprises at least two trapezoidal suspension bracket points and at least two elastic installation frames, described trapezoidal suspension bracket point and bus bulk are cast for one and stretch out from bus bulk both sides, described elastic installation frame is fixedly connected with the installation fixing point be embedded in advance in advance in metope before installation, after installing, described trapezoidal suspension bracket point and described elastic installation frame are connected and fixed, side and the floor plates of described elastic installation frame are connected and fixed, opposite side is fixedly connected with described trapezoidal suspension bracket point.
Improve as to the one of technical scheme described in the utility model, described elastic installation frame comprises channel, lower channel, spring, screw rod, nut and steel pipe, described upper channel and described trapezoidal suspension bracket point and described screw rod link together, described lower channel is connected with described screw rod with described floor plates, described spring and described steel pipe all through described screw rod on described channel and described lower channel, described upper channel is fixedly connected with by bolt nut with described lower channel.
Improve as to the one of technical scheme described in the utility model, between described upper channel and described lower channel, there is multiple described spring, described screw rod and described steel pipe.
Improve as to the one of technical scheme described in the utility model, there is between described upper channel and described lower channel 3 described springs, described screw rod and described steel pipe.
Improve as to the one of technical scheme described in the utility model, described trapezoidal suspension bracket point and described elastic installation frame quantity are two, are arranged in the both sides of described bus bulk.
Improve as to the one of technical scheme described in the utility model, it is integral that described trapezoidal suspension bracket point and described elastic installation frame utilize M12 screw firmly to lock.
Improve as to the one of technical scheme described in the utility model, the design size of described trapezoidal suspension bracket point is 90mm for going to the bottom long, and upper base is long is 60mm, and height is 80mm.
The volcanic rock inorganic mineral that the utility model provides pours into a mould bus constructional element with spring entirely, improves accuracy and the fail safe of installation dimension, improves the convenience of construction operation personnel, make construction operation accuracy, safe, summary.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is described in further detail, in accompanying drawing:
Fig. 1 is the front view of trapezoidal suspension bracket point in the utility model specific embodiment;
Fig. 2 is the vertical view of trapezoidal suspension bracket point in the utility model specific embodiment;
Fig. 3 is the front view of the utility model specific embodiment Elastic installing rack;
Fig. 4 is the stereogram of the utility model specific embodiment Elastic installing rack;
Fig. 5 is the integral installation structural representation that the volcanic rock inorganic mineral of the utility model specific embodiment pours into a mould bus constructional element with spring entirely.
Embodiment
In order to make the purpose of this utility model, technical scheme and advantage clearly understand, below in conjunction with drawings and Examples, the utility model is further elaborated.Should be appreciated that specific embodiment described herein only in order to explain the utility model, and be not used in restriction the utility model.
Fig. 1 is the front view of trapezoidal suspension bracket point in the utility model specific embodiment, Fig. 2 is the vertical view of trapezoidal suspension bracket point in the utility model specific embodiment, Fig. 3 is the front view of the utility model specific embodiment Elastic installing rack, Fig. 4 is the stereogram of the utility model specific embodiment Elastic installing rack, and Fig. 5 is the integral installation structural representation that the volcanic rock inorganic mineral of the utility model specific embodiment pours into a mould bus constructional element with spring entirely.
Shown in composition graphs 1 to Fig. 5, volcanic rock inorganic mineral of the present utility model pours into a mould bus constructional element with spring entirely, it comprises at least two trapezoidal suspension bracket points 10 and at least two elastic installation frames 20, trapezoidal suspension bracket point 10 is cast for one with bus bulk 40 and stretches out from bus bulk 40 both sides, elastic installation frame 20 is fixedly connected with the installation fixing point be embedded in advance in advance in metope before installation, after installing, trapezoidal suspension bracket point 10 and elastic installation frame 20 are connected and fixed, side and the floor plates 30 of elastic installation frame 20 are connected and fixed, opposite side is fixedly connected with trapezoidal suspension bracket point 10
In the utility model specific embodiment, elastic installation frame 20 comprises channel 21, lower channel 22, spring 23, screw rod 24, nut 25 and steel pipe 26, upper channel 21 links together with trapezoidal suspension bracket point 10 and screw rod 24, lower channel 22 is connected with screw rod 24 with floor plates 30, spring 23 and steel pipe 26 all through screw rod 24 upper channel 21 and lower channel 22, upper channel 21 is fixedly connected with by bolt nut with lower channel 22.
In the utility model, multiple spring 23, screw rod 24 and steel pipe 25 can be had between upper channel 21 and lower channel 22, the layout of quantity can be done according to actual needs, in the utility model specific embodiment, there is between upper channel 21 and lower channel 22 3 springs 23, screw rod 24 and steel pipe 26.In the utility model specific embodiment, trapezoidal suspension bracket point 10 and elastic installation frame 20 quantity are two, are arranged in the both sides of bus bulk 40.It is integral that trapezoidal suspension bracket point 10 and elastic installation frame 20 utilize M12 screw firmly to lock.In the utility model specific embodiment, the design size of trapezoidal suspension bracket point 10 for the long L2 that goes to the bottom be 90mm, the long L1 of upper base is 60mm, and high h is 80mm, but the utility model is not limited to above size design, the adjustment of various shape and size can be done according to concrete actual service condition.
Trapezoidal suspension bracket point 10 is cast for one with bus bulk 40, the height of trapezoidal suspension bracket point 10 will ensure safe distance, length changes with element bus height change, that spring 23 plays cushion effect and permit receipts error effect, steel pipe 26 plays the effect in restriction cushion effect effect degree and guarantee power buffering direction, during in-site installation, with setscrew, elastic installation frame 20 is locked in floor plates 30, elastic installation frame 20 and trapezoidal suspension bracket point 20 are locked together, combine closely between bus bulk 40 and elastic installation frame 20, ensure bus bulk 40 can when the external world occur fluctuation with elastic installation frame 20 and floor plates 30 compact siro spinning technology, there will not be the phenomenon swinging distortion.
Volcanic rock inorganic mineral of the present utility model pours into a mould the vertical spring installing rack mode of bus entirely when bus bulk 40 pours into a mould production, first waters and outpours and bus bulk 40 trapezoidal suspension bracket point 20 integrally; With setscrew, elastic installation frame 20 is locked in floor plates 30, when mounted, elastic installation frame 20 and trapezoidal suspension bracket point 10 are locked together, combine closely between bus bulk and elastic installation frame, ensure bus can when there is fluctuation in the external world with elastic installation frame and floor plates compact siro spinning technology, there will not be and swing the phenomenon of distortion.Bus and floor plates lock by elastic installation frame mode, therefore, overcome the limitation of support diagonal brace mode installation site.Elastic installation frame utilizes telescopic spring ability, ensures the fair receipts of the buffering that the bus situation that fluctuates in the external world is exerted oneself and vertical direction bus installation dimension deviation.Be conducive to the accuracy of installation dimension and the convenience of construction operation personnel, construction operation accuracy, safe, summary.
The volcanic rock inorganic mineral that the utility model provides pours into a mould bus constructional element with spring entirely, improves accuracy and the fail safe of installation dimension, improves the convenience of construction operation personnel, make construction operation accuracy, safe, summary.
Should be understood that, for those of ordinary skills, can be improved according to the above description or convert, and all these improve and convert the protection range that all should belong to the utility model claims.

Claims (7)

1. a volcanic rock inorganic mineral pours into a mould bus constructional element with spring entirely, it is characterized in that, comprise at least two trapezoidal suspension bracket points and at least two elastic installation frames, described trapezoidal suspension bracket point and bus bulk are cast for one and stretch out from bus bulk both sides, described elastic installation frame is fixedly connected with the installation fixing point be embedded in advance in advance in metope before installation, after installing, described trapezoidal suspension bracket point and described elastic installation frame are connected and fixed, side and the floor plates of described elastic installation frame are connected and fixed, and opposite side is fixedly connected with described trapezoidal suspension bracket point.
2. volcanic rock inorganic mineral according to claim 1 pours into a mould bus constructional element with spring entirely, it is characterized in that, described elastic installation frame comprises channel, lower channel, spring, screw rod, nut and steel pipe, described upper channel and described trapezoidal suspension bracket point and described screw rod link together, described lower channel is connected with described screw rod with described floor plates, described spring and described steel pipe all through described screw rod on described channel and described lower channel, described upper channel is fixedly connected with by bolt nut with described lower channel.
3. volcanic rock inorganic mineral according to claim 1 pours into a mould bus constructional element with spring entirely, it is characterized in that, has multiple described spring, described screw rod and described steel pipe between described upper channel and described lower channel.
4. volcanic rock inorganic mineral according to claim 3 pours into a mould bus constructional element with spring entirely, it is characterized in that, has 3 described springs, described screw rod and described steel pipe between described upper channel and described lower channel.
5. volcanic rock inorganic mineral according to claim 1 pours into a mould bus constructional element with spring entirely, it is characterized in that, described trapezoidal suspension bracket point and described elastic installation frame quantity are two, are arranged in the both sides of described bus bulk.
6. volcanic rock inorganic mineral according to claim 1 pours into a mould bus constructional element with spring entirely, it is characterized in that, it is integral that described trapezoidal suspension bracket point and described elastic installation frame utilize M12 screw firmly to lock.
7. volcanic rock inorganic mineral according to claim 1 pours into a mould bus constructional element with spring entirely, it is characterized in that, the design size of described trapezoidal suspension bracket point is 90mm for going to the bottom long, and upper base is long is 60mm, and height is 80mm.
CN201520239800.9U 2015-04-20 2015-04-20 A kind of volcanic rock inorganic mineral pours into a mould bus constructional element with spring entirely Active CN204633261U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520239800.9U CN204633261U (en) 2015-04-20 2015-04-20 A kind of volcanic rock inorganic mineral pours into a mould bus constructional element with spring entirely

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520239800.9U CN204633261U (en) 2015-04-20 2015-04-20 A kind of volcanic rock inorganic mineral pours into a mould bus constructional element with spring entirely

Publications (1)

Publication Number Publication Date
CN204633261U true CN204633261U (en) 2015-09-09

Family

ID=54052254

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520239800.9U Active CN204633261U (en) 2015-04-20 2015-04-20 A kind of volcanic rock inorganic mineral pours into a mould bus constructional element with spring entirely

Country Status (1)

Country Link
CN (1) CN204633261U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104836174A (en) * 2015-04-20 2015-08-12 江苏巴斯威节能科技有限公司 Elastic installation structure of volcanic rock inorganic mineral matter fully-poured bus
CN109036648A (en) * 2018-07-30 2018-12-18 江苏新坝电气集团有限公司 A kind of totally-enclosed minerals bus

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104836174A (en) * 2015-04-20 2015-08-12 江苏巴斯威节能科技有限公司 Elastic installation structure of volcanic rock inorganic mineral matter fully-poured bus
CN109036648A (en) * 2018-07-30 2018-12-18 江苏新坝电气集团有限公司 A kind of totally-enclosed minerals bus

Similar Documents

Publication Publication Date Title
CN209557797U (en) A kind of architectural engineering pipeline fixed structure
CN205191146U (en) An antidetonation gallows of anti horizontal earthquake power
CN204633261U (en) A kind of volcanic rock inorganic mineral pours into a mould bus constructional element with spring entirely
CN102899971A (en) Precast slab assembled floating road bed
CN203850795U (en) Windage yaw prevention flexible control device used for power transmission lines
CN204136802U (en) On trough girder, contact net anchorage rectangle plummet is cut or polish jade with an emery wheel windproof anticreep and is stolen limit frame device
CN202559241U (en) Universal displacement telescopic device
CN208982781U (en) Air hose mounting bracket in truss
CN208844459U (en) A kind of highway high rigidity height-limiting frame
CN104836174A (en) Elastic installation structure of volcanic rock inorganic mineral matter fully-poured bus
CN203766764U (en) Subway platform reinforcing device
CN204023319U (en) For the triangular tower of cableway of constructing
CN204571013U (en) Node installed by a kind of Flexible connection system, side fascia and side fascia
CN205417233U (en) Turn to fixed bolster with adjustable inner ratchet compensation in tunnel is casted anchor
CN205506890U (en) Adjustable ammeter case mounting bracket
CN204615321U (en) A kind of volcanic rock inorganic mineral pours into a mould bus A-frame hoisting structure entirely
CN108071744A (en) A kind of good utility pipes suspension and support of stability
CN203925532U (en) A kind of tunnel i-beam frame
CN208763678U (en) A kind of protective device suitable for flat anchorage
CN204199185U (en) A kind of prestressed stretch-draw support
CN103364064B (en) A kind of top suspension axle weight scale weighing platform
CN206513391U (en) A kind of Novel down-hole gib support frame
CN202500351U (en) Novel shock absorption support
CN204615323U (en) A kind of volcanic rock inorganic mineral pours into a mould bus horizontal O type suspension bracket entirely
CN204258492U (en) A kind of sand machine sliding motor seat processed

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant