CN204590318U - The perpendicular dress syndeton of house and side fascia thereof - Google Patents

The perpendicular dress syndeton of house and side fascia thereof Download PDF

Info

Publication number
CN204590318U
CN204590318U CN201520116757.7U CN201520116757U CN204590318U CN 204590318 U CN204590318 U CN 204590318U CN 201520116757 U CN201520116757 U CN 201520116757U CN 204590318 U CN204590318 U CN 204590318U
Authority
CN
China
Prior art keywords
floor
alc plate
connector
upper strata
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520116757.7U
Other languages
Chinese (zh)
Inventor
方德杰
秦海琴
李岩
王坤腾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HENAN YAYING STEEL CURTAIN WALL ENGINEERING Co Ltd
Original Assignee
HENAN YAYING STEEL CURTAIN WALL ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HENAN YAYING STEEL CURTAIN WALL ENGINEERING Co Ltd filed Critical HENAN YAYING STEEL CURTAIN WALL ENGINEERING Co Ltd
Priority to CN201520116757.7U priority Critical patent/CN204590318U/en
Application granted granted Critical
Publication of CN204590318U publication Critical patent/CN204590318U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses the perpendicular dress syndeton of a kind of house and side fascia thereof.The top of ALC plate is connected to below the upper strata girder steel of bracketing below the floor of upper strata by upper connector, the bottom of ALC plate to be connected on lower floor's floor by lower connector or the top of lower floor's girder steel of bracketing below lower floor's floor.When carrying out building operations, the top of ALC plate can directly be connected to below the girder steel of upper strata by upper connector, by lower connector, the bottom of ALC plate is connected on lower floor's floor again, therefore the top of this ALC plate will be connected on the girder steel of upper strata by upper connector, to remove the structure preparing top concrete beam below the edge of upper strata floor, so not only make the installation save trouble and labor of ALC plate between upper and lower floor plate, and upper strata girder steel is to the stability of the bracketing of upper strata floor by the whole house of raising, makes the overall structure in house more firm.

Description

The perpendicular dress syndeton of house and side fascia thereof
Technical field
The utility model relates to the perpendicular dress syndeton of a kind of house and side fascia thereof.
Background technology
At present, along with Chinese national economy development and urbanization quickening, the continuing of China's dwelling construction develops on an unprecedented scale, and the habitat condition of people progressively improve, also more and more higher to the requirement of living quality.Simultaneously China has become the first Chan Gang big country, and steel house is suitable for factory mass and produces, and industrialization, commercialized degree are high, can design, produce, construction, integration be installed, improve housing industrialization level.National more and more higher to building products consumption standard, the material base of reality and technical condition, steel are superfluous and price falls after rise present situation is develop steel house to improve sound assurance and good opportunity, build the dwelling construction direction that housing and public buildings that use less energy and land are China's futures, on April 27th, 2012, the Ministry of Finance, house town and country construction portion combines the notice having issued " implementation guideline about accelerating to promote China's Green Architectural Development ", clearly will by setting up financial incentives mechanism, perfect standard criterion and evaluate Indicator system, advance the multiple means such as relevant technical progress and industry development, strive the year two thousand twenty, green building accounts for new building proportion more than 30%.Development housing building of steel-structure is then solve green building material and energy-conservation facility, utilizes the footholds such as the usefull space effective approach to greatest extent.Carry out factorial praluction, promote the industrialization of steel structure of housing building, have wide market development prospect.
By the steel house market survey situation to a Chinese line, tier 2 cities at present, carry out technical economic analysis comparison, think that external wall protection body cost is building the large percentage in construction cost per square meter, belong to the key, the sensible factor that affect steel work house cost, energy-conservation (by energy-conservation 50% to 65% further in conjunction with country subsequently, Beijing brings up to 75%) policy that reduces discharging, establish the research to peripheral structure.In 1 year, in succession investigate Liuzhou, Shenzhen, Wuhan, Beijing, packet header, Xi'an, parts of Shanghai steel work external wall protection body form and corresponding mounting process, several city is due to residing geographical position relation above, adopt materials for wall not identical, city on the south the Changjiang river, because its climate characteristic belongs to Xia Redong cold (or the winter is warm) area, material itself to heat-insulating property require relative North City low many when just can meet the energy conservation standard of national requirements, moreover, the wind-force crushing by snow in these areas is less, its impact on building in the north is less than on the effect of nigh-level synthesis, these features comprehensive, the heat-insulating property of the exterior wall material in these areas, the indexs such as intensity are lower than the similar building in the north, main use granular polystyrene (or other heat-insulating granules material) foam concrete plate is as external wall protection body, cost is low, quality is light, easy for installation, but this kind of plate in the north due to its intensity, the index present stages such as heat-insulating property still can not meet the minimum use feature of building in the north, be not used, in the north, steel house mainly adopts three class materials for walls, one be " sandwich " Sandwich biscuit type two-layer fiber cement board pressure in the middle of add heat insulating material or charge the concrete combined wall of low density foam, two is that the form adopting autoclaved lightweight concrete board (i.e. ALC plate) or ALC plate+warming plate to combine does exterior wall, three is that materials for wall is made in traditional building block, be aided with heat-insulation plate for external and form external heat preserving structure for exterior wall, by comparing three kinds of plates in production (generality), transport (popularity), install (convenience), the technical economic analysis of the aspects such as composite price (generalization), we unanimously feel, in Shangqiu Area and even Henan, Southern Hebei, the ground such as Shandong, ALC plate is adopted to have huge realistic meaning as exterior wall.
Chinese patent literature 201320307559.X discloses a kind of wall structure of vertical inclination, this wall structure comprises lower concrete substrate, top concrete beam, middle part ALC plate, junction steel plate, fluid sealant, T-shaped bolt, expansion bolt, ALC plate is between lower concrete substrate and top concrete beam, be fixedly connected with the connection of expansion bolt, T-shaped bolt by junction steel plate inside ALC plate with between lower concrete substrate, top concrete beam, seam crossing is provided with fluid sealant.But the top of ALC plate needs to be connected with top concrete beam upper strata floor watering concrete in this wall structure, and top concrete beam water concrete can increase upper strata floor water concrete construction workload, make the time-consuming effort of the building operations in house, the angle bar be simultaneously connected on top concrete beam by expansion bolt is limited by concrete strength, in long use procedure, easily there is situation about getting loose, the structural reliability of whole body of wall is reduced.
Utility model content
The purpose of this utility model is to provide a kind of perpendicular dress syndeton using the side fascia of reliable, easy construction, and another object of the present utility model is to provide a kind of house using the perpendicular dress syndeton of this side fascia simultaneously.
In order to realize above object, in the utility model, the technical scheme of the perpendicular dress syndeton of side fascia is as follows:
The perpendicular dress syndeton of side fascia, comprise, lower floor's floor and ALC plate between the two, the edge of upper strata floor is encorbelmented in the outside of the upper strata girder steel of below bracketing, the edge of lower floor's floor is encorbelmented in the outside of lower floor's girder steel of below bracketing, the top of ALC plate is connected to the outside of upper strata girder steel by upper connector, the outer panel face of ALC plate is from upper, the lateral surface of lower floor's floor exposes outside and forms the seam that caves in be in outside respective side floor in the both sides up and down of ALC plate, cave in and be filled with the compensation block of spray furnace in seam, and the bottom of ALC plate be connected to lower floor's floor by lower connector encorbelment in part, upper connector and/or lower connector connect the pre-buried built-in fitting be fixed in ALC plate by T-shaped bolt, built-in fitting offering notch is on the surface of ALC plate, and to lead adaptive T-slot with the head of T-shaped bolt.
The lateral surface of compensation block and the outer panel face of ALC plate flush.
The lateral surface of upper strata floor and/or the lateral surface of lower floor's floor be provided with that dabbing processes in conjunction with indenture.
Upper connector connects built-in fitting by T-shaped bolt, lower connector is the lower angle bar be connected between the interior plate face of ALC plate and the epipleural face of lower floor's floor, and a sidewall paneling of lower angle bar is connected on lower floor's floor by expansion bolt, opposite side wallboard is connected on ALC plate by lower fastening bolt.
The interior plate face of ALC plate offers accommodation seam or the groove of the contact portion for holding upper connector and/or lower connector.
In the utility model, the technical scheme in house is as follows:
House, comprise the roof of exterior wall and upper bracketing thereof, exterior wall has the perpendicular dress syndeton of the side fascia being in interlayer, the perpendicular dress syndeton of side fascia comprises, lower floor's floor and ALC plate between the two, the edge of upper strata floor is encorbelmented in the outside of the upper strata girder steel of below bracketing, the edge of lower floor's floor is encorbelmented in the outside of lower floor's girder steel of below bracketing, the top of ALC plate is connected to the outside of upper strata girder steel by upper connector, the outer panel face of ALC plate is from upper, the lateral surface of lower floor's floor exposes outside and forms the seam that caves in be in outside respective side floor in the both sides up and down of ALC plate, cave in and be filled with the compensation block of spray furnace in seam, and the bottom of ALC plate be connected to lower floor's floor by lower connector encorbelment in part, upper connector and/or lower connector connect the pre-buried built-in fitting be fixed in ALC plate by T-shaped bolt, built-in fitting offering notch is on the interior plate face of ALC plate, and to lead adaptive T-slot with the head of T-shaped bolt.
The lateral surface of compensation block and the outer panel face of ALC plate flush.
The lateral surface of upper strata floor and/or the lateral surface of lower floor's floor be provided with that dabbing processes in conjunction with indenture.
Upper connector connects built-in fitting by T-shaped bolt, lower connector is the lower angle bar be connected between the interior plate face of ALC plate and the epipleural face of lower floor's floor, and a sidewall paneling of lower angle bar is connected on lower floor's floor by expansion bolt, opposite side wallboard is connected on ALC plate by lower fastening bolt.
The interior plate face of ALC plate offers accommodation seam or the groove of the contact portion for holding upper connector and/or lower connector.
In the utility model, the top of ALC plate is connected to below the upper strata girder steel of bracketing below the floor of upper strata by upper connector, the bottom of ALC plate is connected on lower floor's floor by lower connector, and upper connector and/or lower connector connect the pre-buried built-in fitting be fixed in ALC plate by T-shaped bolt, built-in fitting to offer on surface that notch is in ALC plate and to lead adaptive T-slot with the head of T-shaped bolt, cave in and be filled with the compensation block of spray furnace in seam, therefore in the utility model, the perpendicular dress syndeton of side fascia has the following advantages:
1, when carrying out building operations, the top of ALC plate can directly be connected to below the girder steel of upper strata by upper connector, by lower connector, the bottom of ALC plate is connected on lower floor's floor again, the structure of concrete beam need be prepared below the edge of upper strata floor compared to existing technology, in the utility model, the top of ALC plate will be connected on the girder steel of upper strata by upper connector, to remove the structure preparing top concrete beam below the edge of upper strata floor, so not only make ALC plate upper, installation save trouble and labor between lower floor's floor, and upper strata girder steel will improve the stability in whole house to the bracketing of upper strata floor, make the overall structure in house more firm,
2, when ALC plate is along the T-slot length direction fine motion of built-in fitting, relative movement between built-in fitting and T-shaped bolt, thus make fastening bolt realize the fine motion of plate body by its head, decrease the impact that T-shaped screw bolt abrasion brings Integral connection structure, further ensure the connection reliability between ALC plate of the present utility model and corresponding connector;
3, edge because of upper strata floor is encorbelmented in the outside of the upper strata girder steel of below bracketing, the edge of lower floor's floor is encorbelmented in the outside of lower floor's girder steel of below bracketing, ALC plate is in the outside of room, upper strata beam, so whole exterior wall will adopt cantilevered structure, so not only can increase the interior space inside ALC plate, and ALC plate will form externally-packed structure outward at girder steel and corresponding column, to make ALC plate resistance be interposed between the exterior space and girder steel, play fireproofing function;
4, the lateral surface of ALC plate exposes at the lateral surface of floor and forms the seam that caves in, the compensation block of filling spray mortar again in this seam, this compensation block can play the effect of outsourcing to the outside of floor, embedded bar in floor so not only can be avoided to expose caused corrosion, and make the outside in the gap, junction between floor and ALC plate also by shutoff, improve sealing.
Accompanying drawing explanation
Fig. 1 is the structural representation of exterior wall in the embodiment in house of the present utility model.
Detailed description of the invention
The embodiment in house in the utility model: as shown in Figure 1, this house comprises the roof of exterior wall and upper bracketing thereof, exterior wall has the perpendicular dress syndeton of the side fascia being in interlayer, the perpendicular dress syndeton of this side fascia is vertically comprising the upper strata floor 421 arranged successively from the top down, upper strata girder steel 422, upper connector 423, ALC plate 424, lower connector 425, lower floor's floor 426 and lower floor's girder steel 427, girder steel 422 and lower floor's girder steel 427 are the i beam of H type at the middle and upper levels for they, upper strata girder steel 422 bracketing is below upper strata floor 421, lower floor's girder steel 427 bracketing is below lower floor's floor 426, to be fixed on bearing column by the two ends of upper strata girder steel 422 and lower floor's girder steel 427, upper strata girder steel 422 and lower floor's girder steel 427 is made to be supporting part in whole exterior wall syndeton.The edge of upper strata floor 421 is encorbelmented in the outside of upper strata girder steel 422, the edge of lower floor's floor 426 is also encorbelmented in the outside of lower floor's girder steel 427, and ALC plate 424 be in upper strata floor 421 and lower floor's floor 426 encorbelment between part, namely ALC plate 424 is in outside upper strata girder steel 422 and lower floor's girder steel 427, to make the exterior wall in whole house encorbelment outside girder steel and bearing column by upper strata floor 421 and encorbelmenting of lower floor's floor 426, so not only can increase the interior space in ALC plate 424, the alien invasion of bearing column can also be wrapped up by ALC plate 424, play fireproof effect.The top of ALC plate 424 is fixed on the bottom flange of upper strata girder steel 422 by upper connector 423, and the bottom of ALC plate 424 is fixed on encorbelmenting in part of lower floor's floor 426 by lower connector 425.The outer panel face of ALC plate 424 is exposed from the lateral surface of upper strata floor 421 and the lateral surface of lower floor's floor 426, to surround by the lateral surface of the end face of ALC plate 424 and upper strata floor 421 seam 4291 that to cave on depressed indoors above ALC plate 424, surround by the bottom surface of ALC plate 424 and the lateral surface of lower floor's floor 426 seam 4292 that to cave under depressed indoors in the below of ALC plate 424, and on the cave in upper opening of seam 4291 formed by upper strata ALC plate 424 shutoff the groove that caves in, under the cave in lower openings of seam 4292 formed down by the shutoff of lower floor ALC plate 424 groove that caves in again.Upper cave in groove and under to cave in spray furnace in groove and form filling correspondence and to cave in the compensation block 428 of groove (also or the corresponding seam that caves in), the lateral surface of this compensation block 428 and the outer panel face of ALC plate 424 flush, and for ensureing that compensation block 428 is caving in the bond strength in groove, on the lateral surface of upper strata floor 421 and the lateral surface of lower floor's floor 426, equal dabbing is processed with in conjunction with indenture.
Upper connector 423 is upper angle bar, the horizontal wallboard of upper angle bar is close to fixing (can weld or bolt connection) on the bottom flange of upper strata girder steel 422, the vertical wallboard of upper angle bar is close on the interior plate face of ALC plate 424, the T-shaped bolt 4231 installed inside and outside vertical wallboard and ALC plate 424 pass through is connected, the inner, bar portion of T-shaped bolt 4231 is stretched out from the inner side of vertical wallboard, extension is installed with the clamp nut of limit block inside vertical wallboard, the head of T-shaped bolt 4231 to be connected in ALC plate 424 on pre-buried fixing built-in fitting 4241, this built-in fitting 4241 is RX type pre-buried steel frid, the inner side of built-in fitting 4241 is provided with to lead adaptive T-slot along wall length direction with the head of T-shaped bolt 4231, be assemblied in the T-slot of built-in fitting 4241 to make the head of T-shaped bolt 4231 along wall length direction guiding movement, (can be welded by T-shaped bolt 4231 and the upper angle bar be assemblied on the bottom flange of upper strata girder steel 422 to make ALC plate 424, can bolt connect) link together, realize the hinged fixing of the top of ALC plate, this flexibly connects and can discharge due to wind load, the part stress that geological process causes.
Lower connector 425 is lower angle bar, what the horizontal wallboard of lower angle bar was fixed on lower floor's floor 426 by expansion bolt encorbelments in part, vertical wallboard is in accommodation seam that the interior plate face bottom ALC plate 424 is offered, and vertical wallboard is connected by fastening bolt 4251 and ALC plate 424, the outer end, bar portion of fastening bolt 4251 is in the counterbore that the outer panel face of ALC plate 424 is offered, and is also equipped with the lower outside side chain jack panel of spinning on the bar portion external end head of fastening bolt 4251 in this counterbore; The head of fastening bolt 4251 stretches out from the inner side of the vertical wallboard of lower angle bar, extension is still in and holds in seam, and extension is installed with lower inside lock jack panel, to make the bottom of ALC plate 424 link together by fastening bolt 4251 with the lower angle bar spiral that expansion bolt is fixed on lower floor's floor 426, the bottom of ALC plate 424 is made to be fixed on encorbelmenting in part of lower floor's floor 426.
In the present embodiment, the top of ALC plate 424 is fixed together with the upper angle bar (can weld, can bolt be connected) on the bottom flange being assemblied in upper strata girder steel 422 by T-shaped bolt 4231, realizes fixing the top of ALC plate 424; The bottom of ALC plate 424 is bolted together by plain bolt with the lower angle bar that expansion bolt is fixed on lower floor's floor 426; The external surface of floor and ALC plate 424 is not at same plane, and the later stage, spray furnace compensated by the banded plate dabbing process of floor (i.e. steel bar truss floor support plate).Because floor is encorbelmented, the interior space is fully used, and ALC plate 424 has wrapped up girder steel alien invasion simultaneously, plays fireproofing function.
In the above-described embodiments, only upper connector adopts T-shaped bolt to be connected in the inner side of ALC plate, and lower connector connects ALC plate by plain bolt, and in other embodiments, lower connector also can realize being connected with ALC plate by T-shaped bolt and corresponding built-in fitting.
In other embodiments, upper connector also can adopt plain bolt to be connected with ALC plate, and corresponding lower connector also can adopt T-shaped bolt to connect ALC plate.In addition, upper and lower connector also can adopt channel-section steel, steel plate etc., and to realize top to ALC plate, bottom fixes.
In the above-described embodiments, compensation block flushes with ALC plate, and in other embodiments, this compensation block also relative to ALC plate evagination or can cave in.
The embodiment of external structure in the utility model: in the present embodiment, the perpendicular dress syndeton of side fascia is identical with the structure of the perpendicular dress syndeton of side fascia in above-described embodiment, therefore repeats no more.

Claims (10)

1. the perpendicular dress syndeton of side fascia, comprise, lower floor's floor and ALC plate between the two, it is characterized in that, the edge of upper strata floor is encorbelmented in the outside of the upper strata girder steel of below bracketing, the edge of lower floor's floor is encorbelmented in the outside of lower floor's girder steel of below bracketing, the top of ALC plate is connected to the outside of upper strata girder steel by upper connector, the outer panel face of ALC plate is from upper, the lateral surface of lower floor's floor exposes outside, thus the seam that caves in be in outside respective side floor is formed in the both sides up and down of ALC plate, cave in and be filled with the compensation block of spray furnace in seam, and the bottom of ALC plate be connected to lower floor's floor by lower connector encorbelment in part, upper connector and/or lower connector connect the pre-buried built-in fitting be fixed in ALC plate by T-shaped bolt or fastening bolt, built-in fitting offering notch is on the surface of ALC plate, and to lead adaptive T-slot with the head of T-shaped bolt.
2. the perpendicular dress syndeton of side fascia according to claim 1, is characterized in that, the lateral surface of compensation block and the outer panel face of ALC plate flush.
3. the perpendicular dress syndeton of side fascia according to claim 1, is characterized in that, the lateral surface of upper strata floor and/or the lateral surface of lower floor's floor be provided with that dabbing processes in conjunction with indenture.
4. the perpendicular dress syndeton of the side fascia according to claim 1 or 2 or 3, it is characterized in that, upper connector connects built-in fitting by T-shaped bolt, lower connector is the lower angle bar be connected between the interior plate face of ALC plate and the epipleural face of lower floor's floor, and a sidewall paneling of lower angle bar is connected on lower floor's floor by expansion bolt, opposite side wallboard is connected on ALC plate by lower fastening bolt.
5. the perpendicular dress syndeton of the side fascia according to claim 1 or 2 or 3, is characterized in that, the interior plate face of ALC plate offers accommodation seam or the groove of the contact portion for holding upper connector and/or lower connector.
6. house, comprise the roof of exterior wall and upper bracketing thereof, exterior wall has the perpendicular dress syndeton of the side fascia being in interlayer, the perpendicular dress syndeton of side fascia comprises, lower floor's floor and ALC plate between the two, it is characterized in that, the edge of upper strata floor is encorbelmented in the outside of the upper strata girder steel of below bracketing, the edge of lower floor's floor is encorbelmented in the outside of lower floor's girder steel of below bracketing, the top of ALC plate is connected to the outside of upper strata girder steel by upper connector, the outer panel face of ALC plate is from upper, the lateral surface of lower floor's floor exposes outside and forms the seam that caves in be in outside respective side floor in the both sides up and down of ALC plate, cave in and be filled with the compensation block of spray furnace in seam, and the bottom of ALC plate be connected to lower floor's floor by lower connector encorbelment in part, upper connector and/or lower connector connect the pre-buried built-in fitting be fixed in ALC plate by T-shaped bolt, built-in fitting offering notch is on the interior plate face of ALC plate, and to lead adaptive T-slot with the head of T-shaped bolt.
7. house according to claim 6, is characterized in that, the lateral surface of compensation block and the outer panel face of ALC plate flush.
8. house according to claim 6, is characterized in that, the lateral surface of upper strata floor and/or the lateral surface of lower floor's floor be provided with that dabbing processes in conjunction with indenture.
9. the house according to claim 6 or 7 or 8, it is characterized in that, upper connector connects built-in fitting by T-shaped bolt, lower connector is the lower angle bar be connected between the interior plate face of ALC plate and the epipleural face of lower floor's floor, and a sidewall paneling of lower angle bar is connected on lower floor's floor by expansion bolt, opposite side wallboard is connected on ALC plate by lower fastening bolt.
10. the house according to claim 6 or 7 or 8, is characterized in that, the interior plate face of ALC plate offers accommodation seam or the groove of the contact portion for holding upper connector and/or lower connector.
CN201520116757.7U 2015-02-26 2015-02-26 The perpendicular dress syndeton of house and side fascia thereof Expired - Fee Related CN204590318U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520116757.7U CN204590318U (en) 2015-02-26 2015-02-26 The perpendicular dress syndeton of house and side fascia thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520116757.7U CN204590318U (en) 2015-02-26 2015-02-26 The perpendicular dress syndeton of house and side fascia thereof

Publications (1)

Publication Number Publication Date
CN204590318U true CN204590318U (en) 2015-08-26

Family

ID=53926484

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520116757.7U Expired - Fee Related CN204590318U (en) 2015-02-26 2015-02-26 The perpendicular dress syndeton of house and side fascia thereof

Country Status (1)

Country Link
CN (1) CN204590318U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421818A (en) * 2015-12-08 2016-03-23 徐州中煤百甲重钢科技股份有限公司 Embedded steel structure assembling residence
CN106320513A (en) * 2016-08-31 2017-01-11 四川汉驭空间钢结构有限公司 Makeshift house made of prefabricated wall plates
CN109057091A (en) * 2018-08-22 2018-12-21 江苏华大装配式房屋有限公司 A kind of assembled hollow exterior wall body and its assembly method suitable for steel construction
CN111502292A (en) * 2020-05-06 2020-08-07 河南远大可持续建筑科技有限公司 Sinking type process method for expansion bolt of wall through hole of autoclaved aerated concrete wallboard

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421818A (en) * 2015-12-08 2016-03-23 徐州中煤百甲重钢科技股份有限公司 Embedded steel structure assembling residence
CN106320513A (en) * 2016-08-31 2017-01-11 四川汉驭空间钢结构有限公司 Makeshift house made of prefabricated wall plates
CN109057091A (en) * 2018-08-22 2018-12-21 江苏华大装配式房屋有限公司 A kind of assembled hollow exterior wall body and its assembly method suitable for steel construction
CN111502292A (en) * 2020-05-06 2020-08-07 河南远大可持续建筑科技有限公司 Sinking type process method for expansion bolt of wall through hole of autoclaved aerated concrete wallboard

Similar Documents

Publication Publication Date Title
CN105525702B (en) A kind of steel construction assembling type outer wall system
CN204590318U (en) The perpendicular dress syndeton of house and side fascia thereof
CN108035433A (en) Prefabricated house is built and its method of construction
CN204781446U (en) Side fascia connection structure and use house of this structure
CN103821276A (en) Novel assembly-type modular building system
CN204590340U (en) A kind of house and side fascia thereof erect assembling structure
CN103046755A (en) Construction method for assembly type light-steel integrated house in pasturing area
CN108301532B (en) Desert sand lightweight aggregate concrete fabricated shear wall structure
CN106609562A (en) Double-pitch-roof mobile house with base
CN204590327U (en) A kind of exterior wall erects assembling structure and uses the house of this structure
CN204590316U (en) The perpendicular dress syndeton of a kind of house and side fascia thereof
CN201620465U (en) New light steel-weed tile energy saving residential structure for villages
CN103061533A (en) Environment-friendly anti-seismic eco-house system suitable for mountainous areas
CN204590326U (en) A kind of wallboard erects dress syndeton and uses the house of this structure
CN203270856U (en) Building wall
CN103362235B (en) Integrally-poured building house with wallboards integrating thermal insulating and templates
CN103362307B (en) Construction method for modularizing insulation wall boards and pouring integrated house building
CN204919808U (en) Side direction facade system in aluminum alloy house
CN204919802U (en) Preceding facade system in aluminum alloy house
CN204919800U (en) Back facade system in aluminum alloy house
CN204919968U (en) Ceramsite concrete metal rack light weight wallboard
CN207988131U (en) A kind of integrated house
CN203412312U (en) Thermal-insulating integrated template wallboard construction building
CN102251581B (en) Steel beam-reinforced concrete floor structure and construction method thereof
CN201202175Y (en) House with non-blockwork, steel, concrete, beam frame and net structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150826

Termination date: 20170226

CF01 Termination of patent right due to non-payment of annual fee