CN204588471U - Open slope shaft excavation simple gantry crane device - Google Patents
Open slope shaft excavation simple gantry crane device Download PDFInfo
- Publication number
- CN204588471U CN204588471U CN201520278611.2U CN201520278611U CN204588471U CN 204588471 U CN204588471 U CN 204588471U CN 201520278611 U CN201520278611 U CN 201520278611U CN 204588471 U CN204588471 U CN 204588471U
- Authority
- CN
- China
- Prior art keywords
- crossbeam
- column
- suspension ring
- safety hanging
- gantry crane
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Earth Drilling (AREA)
Abstract
A kind of open slope shaft excavation simple gantry crane device, comprise column, crossbeam, suspension ring, fixed pulley, steel rope, earth anchor, suspension ring have two, be separately positioned on the position that crossbeam is different, safety hanging cradle A and safety hanging cradle B is connected to by fixed pulley and steel rope under two suspension ring, under safety hanging cradle A and safety hanging cradle B, corresponding first time digs face and digs face for the second time respectively, and two steel rope one end connect earth anchors, and the other end is connected to winch A and winch B.Reliably to be connected with steel cable clamp by twin cable between suspension ring with fixed pulley.This device is simple to operate, safe and reliable, convenient to use, construction cost drops into little.
Description
Technical field
The utility model relates to a kind of open slope shaft excavation simple gantry crane device.
Background technology
When side slope vertical shaft adopts " raise boring machine method " to excavate, work progress is generally divided into 2 stages.1st stage carried out A216mm sprocket hole and A1.4m construction of pilot shaft for utilizing raise boring machine, and the 2nd stage digs A1.4m pilot shaft to design profile face.Divide according to vertical shaft diameter and dig for 1 time or 2 times.
After side slope vertical shaft completes the 1st staged construction task, manually need enter in pilot shaft and carry out the 2nd staged construction, namely pilot shaft digs.Because of construction time personnel, construction material traffic requirements, need dig in process arrange vertical lifting operation platform at pilot shaft above pilot shaft well head, conventional construction method is by arranging wheel crane or crane in bridge type.Though wheel crane can meet material vertical transport, operating personnel enters the safety hanging cradle in A1.4m pilot shaft, considers that construction safety cannot carry out vertical transport with wheel crane; Though crane in bridge type better can meet the traffic requirements of material, personnel, its construction preparation cycle is long, input cost is large.For solving this problem, we work out a kind of open slope shaft excavation simple gantry crane device.
Summary of the invention
Technical problem to be solved in the utility model is to provide a kind of open slope shaft excavation simple gantry crane device.
The object of utility model is achieved in that a kind of open slope shaft excavation simple gantry crane device, it comprises column, crossbeam, suspension ring, fixed pulley, steel rope, earth anchor, suspension ring have two, be separately positioned on the position that crossbeam is different, safety hanging cradle A and safety hanging cradle B is connected to by fixed pulley and steel rope under two suspension ring, under safety hanging cradle A and safety hanging cradle B, corresponding first time digs face and digs face for the second time respectively, two steel rope one end connect earth anchor, and the other end is connected to winch A and winch B.
Above-mentioned crossbeam and column junction are provided with billet, are provided with skewed horizontal load between column and crossbeam, and column bottom is provided with balance in roll diagonal ligament.
Above-mentioned balance in roll diagonal ligament is fixed on the ground by oblique joint bar, and balance in roll diagonal ligament and oblique joint bar are welded to connect.
Above-mentioned skewed horizontal load two ends are all cut into inclined-plane and are welded into integral structure with column, crossbeam flange plate with 45 ° of angles respectively; Balance diagonal ligament one end is cut into inclined-plane and column flange plate is welded into integral structure with 30 ° of-45 ° of angles.
The utility model achieves following technique effect: be reliably connected with steel cable clamp by twin cable between suspension ring with fixed pulley.Oblique joint bar is set at bedrock surface, by dowel exposed parts and balance diagonal ligament firm welding, whole portal frame and basement rock is combined together; Draw in advance at crossbeam span centre position and establish steel rope, and land used is anchored on the opposite side of crossbeam, utilize positive and negative silk to regulate the tightness of steel rope, thus prevent that self steel rope in winch lifting process is stressed to be caused crossbeam span centre point horizontal displacement or be out of shape excessive to greatest extent; Hoisting system steel rope walks around fixed pulley, promotes or transfers safety hanging cradle and carry out vertical shaft Enlargement excavation.This device is simple to operate, safe and reliable, convenient to use, construction cost drops into little.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is described in further detail:
Fig. 1 is front view of the present utility model;
Fig. 2 is lateral plan of the present utility model.
Detailed description of the invention
As shown in Figure 1-2, a kind of open slope shaft excavation simple gantry crane device, comprise column 1, crossbeam 2, suspension ring 6, fixed pulley 7, steel rope 9, earth anchor 10, suspension ring have two, be separately positioned on the position that crossbeam is different, safety hanging cradle A11 and safety hanging cradle B12 is connected to by fixed pulley 7 and steel rope under two suspension ring, under safety hanging cradle A and safety hanging cradle B, corresponding first time digs face and digs face for the second time respectively, two steel rope one end connect earth anchor, and the other end is connected to winch A13 and winch B14.
Described crossbeam and column junction are provided with billet 3, are provided with skewed horizontal load 4 between column and crossbeam, and column bottom is provided with balance in roll diagonal ligament 5.Described balance in roll diagonal ligament is fixed on the ground by oblique joint bar 8, and balance in roll diagonal ligament and oblique joint bar are welded to connect.Described skewed horizontal load two ends are all cut into inclined-plane and are welded into integral structure with column, crossbeam flange plate with 45 ° of angles respectively; Balance diagonal ligament one end is cut into inclined-plane and column flange plate is welded into integral structure with 30 ° of-45 ° of angles.
The using method of the utility model device: 1, in field, material prepares, and comprises reinforcing bar, I-beam section blanking.
2, column and crossbeam are welded into entirety by billet, skewed horizontal load two ends are all cut into inclined-plane and are welded into integral structure with the flange plate of column, crossbeam with 45 ° of angles respectively, balance diagonal ligament one end is cut into inclined-plane and column flange plate is welded into integral structure with 30 ° of-45 ° of angles, suspension ring and beam welding integrally, are reliably connected with steel cable clamp by twin cable between suspension ring with fixed pulley.
3, to construct oblique joint bar at bedrock surface, dowel exposed parts and column are balanced diagonal ligament firm welding.
4, crossbeam span centre position is drawn in advance and is established 1 steel rope, and land used is anchored on crossbeam opposite side, utilizes positive and negative silk to regulate the tightness of steel rope.
5, hoisting system steel rope walks around fixed pulley, utilizes steel cable clamp to be connected with safety hanging cradle.
6, workmen, material enter in pilot shaft by safety hanging cradle, carry out pilot shaft Enlargement excavation.
Claims (4)
1. an open slope shaft excavation simple gantry crane device, it is characterized in that: it comprises column (1), crossbeam (2), suspension ring (6), fixed pulley (7), steel rope (9) and earth anchor (10), suspension ring have two, be separately positioned on the position that crossbeam is different, safety hanging cradle A(11 is connected to by fixed pulley (7) and steel rope under two suspension ring) and safety hanging cradle B(12), under safety hanging cradle A and safety hanging cradle B, corresponding first time digs face and digs face for the second time respectively, two steel rope one end connect earth anchor, the other end is connected to winch A(13) and winch B(14).
2. open slope shaft excavation simple gantry crane device according to claim 1, it is characterized in that: described crossbeam and column junction are provided with billet (3), be provided with skewed horizontal load (4) between column and crossbeam, column bottom is provided with balance in roll diagonal ligament (5).
3. open slope shaft excavation simple gantry crane device according to claim 2, is characterized in that: described balance in roll diagonal ligament is fixed on the ground by oblique joint bar (8), and balance in roll diagonal ligament and oblique joint bar are welded to connect.
4. open slope shaft excavation simple gantry crane device according to claim 2, is characterized in that: described skewed horizontal load (4) two ends are all cut into inclined-plane and are welded into integral structure with column, crossbeam flange plate with 45 ° of angles respectively; Balance diagonal ligament one end is cut into inclined-plane and column flange plate is welded into integral structure with 30 ° of-45 ° of angles.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520278611.2U CN204588471U (en) | 2015-05-04 | 2015-05-04 | Open slope shaft excavation simple gantry crane device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520278611.2U CN204588471U (en) | 2015-05-04 | 2015-05-04 | Open slope shaft excavation simple gantry crane device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204588471U true CN204588471U (en) | 2015-08-26 |
Family
ID=53924647
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520278611.2U Expired - Fee Related CN204588471U (en) | 2015-05-04 | 2015-05-04 | Open slope shaft excavation simple gantry crane device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204588471U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106401481A (en) * | 2016-08-30 | 2017-02-15 | 贵州铁鳄矿山装备制造有限公司 | Raise boring machine for broaching of inclined holes of mine |
-
2015
- 2015-05-04 CN CN201520278611.2U patent/CN204588471U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106401481A (en) * | 2016-08-30 | 2017-02-15 | 贵州铁鳄矿山装备制造有限公司 | Raise boring machine for broaching of inclined holes of mine |
CN106401481B (en) * | 2016-08-30 | 2018-07-10 | 贵州铁鳄矿山装备制造有限公司 | The anti-well reaming drilling machine of mine inclined hole |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107191676B (en) | Construction method of buried pipeline | |
CN105178968B (en) | Rock tunnel(ling) machine pushing tow support meanss and construction method | |
CN104963301A (en) | Dragging, translating and lowering device and method for dismantling pier top beam section and pier | |
CN106193054B (en) | A kind of support system and its construction method for subway foundation pit | |
CN103132506A (en) | Processing and manufacturing method for bored pile double-layer strengthened hoop steel bar cage | |
CN207294093U (en) | A kind of large span steel truss integral lifting apparatus | |
CN204588471U (en) | Open slope shaft excavation simple gantry crane device | |
CN206736920U (en) | A kind of internal-expansion type pipe drawing device | |
CN110409325A (en) | The method for dismounting of box beam | |
CN103979442A (en) | Method for lifting Fischer-Tropsch reactor by 6400t hydraulic combined crane | |
CN201873949U (en) | Bride prestress stretch-draw trolley | |
CN212101621U (en) | Lifting appliance for underground excavation trolley | |
CN209758880U (en) | self-propelled superelevation super large area steel reinforcement cage lifting equipment | |
CN206667058U (en) | A kind of across cable walking cord clip handling erecting device | |
CN204416961U (en) | Single mast single-sheaved block group lifting derrick | |
CN109306870B (en) | Steel arch frame for whole support of tunnel full-section construction and support method | |
CN209337920U (en) | It is a kind of for drop shaft, the interim lift headframe of ore storage bin | |
CN203188109U (en) | Multi-span ground anchor type suspension bridge | |
CN111794211A (en) | Prefabricated assembly tubular pile convenient to hoist and mount and concatenation | |
CN202245864U (en) | Underground scraper hoisting device | |
CN207419482U (en) | For the Section-steel Piles pile cover of pressing pile construction | |
CN204645039U (en) | The operation pylon of hole-drilling pile-filling machine | |
CN207260143U (en) | A kind of spliced ground pile anchoring | |
CN110410018A (en) | A kind of pile holding device of support drilling machine connection wind-powered electricity generation stake | |
CN211692520U (en) | Fully-mechanized mining face hydraulic support recovery device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20180104 Address after: 830049 No. 918 Xinhua South Road, the Xinjiang Uygur Autonomous Region, Urumqi Patentee after: Gezhouba Xinjiang Engineering Co.,Ltd. Address before: 443002 Hubei province Yichang City Road No. 1 Patentee before: CHINA GEZHOUBA GROUP Co.,Ltd. |
|
TR01 | Transfer of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150826 |
|
CF01 | Termination of patent right due to non-payment of annual fee |