CN207260143U - A kind of spliced ground pile anchoring - Google Patents

A kind of spliced ground pile anchoring Download PDF

Info

Publication number
CN207260143U
CN207260143U CN201721271388.4U CN201721271388U CN207260143U CN 207260143 U CN207260143 U CN 207260143U CN 201721271388 U CN201721271388 U CN 201721271388U CN 207260143 U CN207260143 U CN 207260143U
Authority
CN
China
Prior art keywords
ground
peg board
joint tongue
utility
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721271388.4U
Other languages
Chinese (zh)
Inventor
柳建新
李文杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LU'AN CHANGCHENG STEEL STRUCTURE CO Ltd
Original Assignee
LU'AN CHANGCHENG STEEL STRUCTURE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LU'AN CHANGCHENG STEEL STRUCTURE CO Ltd filed Critical LU'AN CHANGCHENG STEEL STRUCTURE CO Ltd
Priority to CN201721271388.4U priority Critical patent/CN207260143U/en
Application granted granted Critical
Publication of CN207260143U publication Critical patent/CN207260143U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a kind of spliced ground pile anchoring, including ground peg board and ground anchor, the upper surface of described ground peg board along its length on being fixed with least two groups anchor, the first joint tongue is fixed with the one side of described ground peg board, the first link slot is equipped with the corresponding another side of ground peg board, be respectively equipped with the other two sides of described ground peg board the second joint tongue and with matched second link slot of the second joint tongue;The utility model is simple in structure, easy to use, while pile size is extended, ensures that the quality safety of pile is reliable, splices quick easily progress, highly practical, easy to promote the use of.

Description

A kind of spliced ground pile anchoring
Technical field
The utility model belongs to steel construction building materials technology field, more particularly to a kind of spliced ground pile anchoring.
Background technology
When build high-storey building, piling is an essential operation, if because above ground structure will Build on the ground, ground will bear very big pressure, it is necessary that there is enough renitent intensity on ground, this is often It is difficult to accomplish, so must just be reinforced to the ground for bearing building or improve ground bears mode, so just thinking Drive piles on ground, allow most of weight of building to pass to the very deep position of below ground by stake, because this position Ground it is more much bigger than ground ability to bear, by piling may be such that building it is more firm, due to pile to bear increase pressure Power, so to ensure fastness of the pile in underground, existing ground pilework, specification are once it is determined that can not just change, to change Become the size of pile, with regard to that need to remake, the use in inconvenient later stage, therefore the utility model provides a kind of new technological means and comes Solve this technical problem.
Utility model content
The purpose of this utility model is to provide a kind of spliced ground pile anchoring, to solve what is be previously mentioned in above-mentioned background technology Problem.
To achieve the above object, the utility model provides following technical solution:A kind of spliced ground pile anchoring, including ground peg board With ground anchor, the upper surface of described ground peg board along its length on being fixed with least two groups anchor, described ground peg board The first joint tongue is fixed with one side, the first link slot is equipped with the corresponding another side of ground peg board, it is described Be respectively equipped with the other two sides of ground peg board the second joint tongue and with matched second link slot of the second joint tongue.
As a kind of optimal technical scheme of the utility model, the free end of described ground anchor is fixed with grapple, institute Grapple is stated to be an integral structure with ground anchor.
As a kind of optimal technical scheme of the utility model, first joint tongue and the first link slot are equipped with specification The first consistent bolt hole.
As a kind of optimal technical scheme of the utility model, second joint tongue and the second link slot are equipped with specification The second consistent bolt hole.
As a kind of optimal technical scheme of the utility model, company is fixed by bolt between peg board described in each group Connect.
As a kind of optimal technical scheme of the utility model, the top of described ground anchor can also be fixed with double grapples.
The beneficial effects of the utility model:The utility model is by by the buried underground of ground peg board, with increase ground anchor and ground Active force between face so that pile is more firm, ensures the quality of later stage building, simultaneously the end of anchor is in hook shape Add pile and pour the active force between concrete in it, be further ensured that the stability of building, while each pile By the form of splicing to extend the size of pile between plate so that pile is more flexible and changeable, to adapt to different environment And situation, simple operation, the utility model is simple in structure, easy to use, while pile size is extended, ensures the matter of pile Amount is safe and reliable, splices and quickly easily carries out, highly practical, easy to promote the use of.
Brief description of the drawings
Attached drawing is used to provide a further understanding of the present invention, and a part for constitution instruction, with this practicality New embodiment is used to explain the utility model together, does not form the limitation to the utility model.In the accompanying drawings:
Fig. 1 is the utility model overall structure diagram;
Fig. 2 is the utility model side structure schematic diagram;
Fig. 3 is the utility model entirety splicing construction schematic diagram;
Fig. 4 is another embodiment structure diagram of the utility model.
Embodiment
Lower combination attached drawing illustrates the preferred embodiment of the utility model, it will be appreciated that described herein preferred Embodiment is only used for describing and explaining the present invention, and is not used to limit the utility model.
In the utility model, in the case where not making conversely explanation, the noun of locality that uses as " front, back, left, right, up, Under " it is typically each component for direction shown in the drawings or on vertical, vertical or gravity direction Mutual alignment relationship description word.
Embodiment 1
Referring to Fig. 1, the utility model, which provides, is implemented as follows mode:A kind of spliced ground pile anchoring, including ground peg board 1 and ground Anchor 2, the upper surface of described ground peg board 1 along its length on being fixed with least two groups anchor 2, described ground peg board 1 The first joint tongue 3 is fixed with one side, the first link slot 5, institute are equipped with 1 corresponding another side of ground peg board State ground peg board 1 other two sides on be respectively equipped with the second joint tongue 4 and with 4 matched second link slot 6 of the second joint tongue, By the splicing relation between the first joint tongue 3 and the first link slot 5, peg board 1 extension on length direction can be carried out over the ground, and Extension on width peg board 1 can be carried out by the second joint tongue 4 and the second link slot 6 over the ground so that the size of pile is more Add flexibly, to adapt to more complicated environment and situation.
With reference to Fig. 2, the free end of ground anchor 2 is fixed with grapple 21, and the grapple 21 is integral type knot with ground anchor 2 Structure, the ground anchor 2 with grapple 21 can increase the active force between pile and concrete so that building is more firm, ensures Its quality safety, and the first joint tongue 3 and the first link slot 5 are equipped with the first bolt hole 7 that specification is consistent, to facilitate over the ground The extension of peg board 1 in the longitudinal direction, it is easy to connect, and that the second joint tongue 4 and the second link slot 6 are equipped with that specification is consistent Two bolts hole 8, it is easy to control so that pile size, specification are more to facilitate the extension over the ground on the progress of peg board 1 width It is changeable;With reference to Fig. 3, be fixedly connected by bolt 9 between peg board 1 to each group, and in each group the junction of peg board 1 it Between further consolidated by welding manner, ensure splicing after pile entirety stability.
The utility model is by by the buried underground of ground peg board, with the active force between increase ground anchor and ground so that ground Stake is more firm, ensures the quality of later stage building, and simultaneously the end of anchor adds pile in hook shape and pours in it Concrete between active force, be further ensured that the stability of building, while pass through the form of splicing between the peg board of various regions To extend the size of pile so that pile is more flexible and changeable, to adapt to different environment and situation, simple operation.
The utility model is simple in structure, easy to use, while pile size is extended, ensures that the quality safety of pile can Lean on, splice quick easily progress, it is highly practical, easy to promote the use of.
Embodiment 2
Incorporated by reference to Fig. 4, the utility model provides another embodiment, and the present embodiment and the difference of embodiment 1 are: The top of ground anchor 2 can also be fixed with double grapples 22, further strengthen the active force between pile and concrete, ensure building Security and stability.
Finally it should be noted that:The above descriptions are merely preferred embodiments of the present invention, is not limited to this Utility model, although the utility model is described in detail with reference to the foregoing embodiments, for those skilled in the art For, it can still modify the technical solution described in foregoing embodiments, or to which part technical characteristic Equivalent substitution is carried out, where within the spirit and principles of the present invention, any modification, equivalent replacement, improvement and so on, It should be included within the scope of protection of this utility model.

Claims (6)

1. a kind of spliced ground pile anchoring, including ground peg board (1) and ground anchor (2), it is characterised in that:Described ground peg board (1) it is upper Surface along its length on being fixed with least two groups anchor (2), be fixed with the one side of described ground peg board (1) One joint tongue (3), is equipped with the first link slot (5), described ground peg board (1) on ground peg board (1) corresponding another side Other two sides on be respectively equipped with the second joint tongue (4) and the second link slot matched with the second joint tongue (4) (6).
2. one kind spliced ground pile anchoring according to claim 1, it is characterised in that:The free end of described ground anchor (2) Grapple (21) is fixed with, the grapple (21) is an integral structure with ground anchor (2).
3. one kind spliced ground pile anchoring according to claim 1, it is characterised in that:First joint tongue (3) and first Link slot (5) is equipped with consistent the first bolt hole (7) of specification.
4. one kind spliced ground pile anchoring according to claim 1, it is characterised in that:Second joint tongue (4) and second Link slot (6) is equipped with consistent the second bolt hole (8) of specification.
5. one kind spliced ground pile anchoring according to claim 1, it is characterised in that:Lead to described in each group between peg board (1) Bolt (9) is crossed to be fixedly connected.
6. one kind spliced ground pile anchoring according to claim 1, it is characterised in that:Also may be used on the top of described ground anchor (2) It is fixed with double grapples (22).
CN201721271388.4U 2017-09-29 2017-09-29 A kind of spliced ground pile anchoring Active CN207260143U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721271388.4U CN207260143U (en) 2017-09-29 2017-09-29 A kind of spliced ground pile anchoring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721271388.4U CN207260143U (en) 2017-09-29 2017-09-29 A kind of spliced ground pile anchoring

Publications (1)

Publication Number Publication Date
CN207260143U true CN207260143U (en) 2018-04-20

Family

ID=61919481

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721271388.4U Active CN207260143U (en) 2017-09-29 2017-09-29 A kind of spliced ground pile anchoring

Country Status (1)

Country Link
CN (1) CN207260143U (en)

Similar Documents

Publication Publication Date Title
CN103452147B (en) Self-balancing anchor counterweight broken pile forced-landing tilt correcting method
CN203654295U (en) Single-leg inclined strut reinforced foundation pit supporting structure
CN109208615A (en) A kind of groove notch supporting construction, construction method and groove pouring procedure
CN110023570B (en) Portable mechanical combined ground fixing pile device
CN109537929A (en) Demolishing columns bracing means and reinforcement means
CN102926388B (en) Earth moving method for deep foundation pit excavation
CN207260143U (en) A kind of spliced ground pile anchoring
CN208201658U (en) A kind of steel trestle rapid construction device
CN104652446B (en) Interim shaped steel lattice column fills core apparatus and method thereof
CN207959224U (en) A kind of prefabricated pile extension cast-in-place node anchor structure of foundation pit enclosure structure
CN103790156A (en) Square buckle plate mechanical pile splicing method for precast square piles
CN103790157A (en) Circular buckle plate mechanical pile splicing method for precast square piles
CN105890997A (en) External three-ring integrated type loading frame of shield segment mechanical property testing machine
CN215252409U (en) Be applied to support mound that T constructs bridge and demolishs
CN204588471U (en) Open slope shaft excavation simple gantry crane device
CN204570684U (en) A kind of anchor head of Recyclable anchor rope is fixed and guiding device
CN103790153A (en) Circular buckle plate mechanical pile splicing method for precast square piles
CN103790158A (en) Square buckle plate mechanical pile splicing method for tubular piles
CN208792943U (en) A kind of excavating device of Quick-moving type electric pole foundation pit
CN201865106U (en) Friction ground anchor
CN107023019B (en) Concrete-assembled steel mixed enclosing purlin in foundation pit supporting structure and construction method thereof
CN207419482U (en) For the Section-steel Piles pile cover of pressing pile construction
CN205591219U (en) Tunnel type ground anchor
CN212427066U (en) Steel sheet pile supporting construction
CN205188966U (en) But reuse's assembled earth anchor device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant