CN204645039U - The operation pylon of hole-drilling pile-filling machine - Google Patents
The operation pylon of hole-drilling pile-filling machine Download PDFInfo
- Publication number
- CN204645039U CN204645039U CN201520219016.1U CN201520219016U CN204645039U CN 204645039 U CN204645039 U CN 204645039U CN 201520219016 U CN201520219016 U CN 201520219016U CN 204645039 U CN204645039 U CN 204645039U
- Authority
- CN
- China
- Prior art keywords
- truss
- hoist
- suspension hook
- support platform
- support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model provides a kind of operation pylon of hole-drilling pile-filling machine, comprises support platform, support, truss, ballast box, first hoist, second hoist, the first steel cable, the second steel cable, the first suspension hook and the second suspension hook; Support platform, support and truss are connected by bearing and can fold, support platform side is provided with link, one end of truss is provided with the first leading block, the second leading block, traveling sheave, fixed block and directional sliding wheels, first hoist and second hoist are fixed in support platform, ballast box is connected to the other end of truss, wherein, the top and the bottom of truss both sides are welded with angle steel respectively, and in the angle steel groove of bottom on be welded with reinforced pipe respectively.The first suspension hook clasp joint that traveling sheave connects on the link of support platform, thus is slowed down the vibration problems of truss when utilizing drill hammer to drive piles by the utility model; Truss both sides are welded with angle steel, in angle steel groove, are welded with reinforced pipe, greatly increase the lifting strength of truss.
Description
[technical field]
The utility model relates to building machinery technical field, is specifically related to a kind of operation pylon of hole-drilling pile-filling machine.
[background technology]
Pylon is the implement of pile driver.Existing pylon, the vibrations of truss can be caused when hole-drilling pile-filling machine utilizes drill hammer to drive piles, impact piling effect, and the truss inner bracing piece of pylon is designed to triangle, its general lifting capacity is only at one ton to several tons, maximum ability lifting more than ten ton, cannot meet the demand that truss the inner requires to reach the hole-drilling pile-filling machine of more than 20 tons.
Therefore, the operation pylon designing a kind of new hole-drilling pile-filling machine is necessary.
[utility model content]
For the variety of problems faced described in background technology, the purpose of this utility model is the operation pylon providing a kind of hole-drilling pile-filling machine.
For achieving the above object, the technical scheme that the utility model adopts is: a kind of operation pylon of hole-drilling pile-filling machine, comprises support platform, support, truss, ballast box, first hoist, second hoist, the first steel cable, the second steel cable, the first suspension hook and the second suspension hook; Support platform, support and truss are connected by bearing and can fold, support platform side is provided with link, one end of truss is provided with the first leading block, the second leading block, traveling sheave, fixed block and directional sliding wheels, first hoist and second hoist are fixed in support platform, ballast box is connected to the other end of truss, wherein, the top and the bottom of truss both sides are welded with angle steel respectively, and in the angle steel groove of bottom on be welded with reinforced pipe respectively; First steel cable one end in first hoist is successively after the bearing, the first leading block of support and truss connection place, fix with fixed block after walking around traveling sheave again, first suspension hook is connected on traveling sheave, pulls the first steel cable can make the first suspension hook and link phase clasp joint; Second steel cable one end in second hoist is connected with the second suspension hook successively after in the middle part of the 3rd leading block of frame upper setting, the second leading block, directional sliding wheels, and the 3rd leading block is positioned at the top of truss.
Further, angle steel is equilateral.
Further, truss is connected to support by four pull bars and pedestal upper end, and wherein, every two pull bars are connected on the both sides of truss same position.
The first suspension hook clasp joint that the utility model passes through to traveling sheave to connect on the link of support platform, thus can slow down the vibration problems of truss when utilizing drill hammer to drive piles; By the top and the bottom of truss both sides are welded with angle steel respectively, and be welded with reinforced pipe respectively in the angle steel groove of bottom, considerably increase the lifting strength of truss; First suspension hook can be used for the object of lifting gravity below 20 tons, the second suspension hook can lifting more than 20 tons object and carry out piling work for clasp joint hole-drilling pile-filling machine; Hole-drilling pile-filling machine adopts operation pylon of the present utility model, and pylon can be accomplished auto-erecting, certainly fall, thus can reduce other transfer crane of non-activity duration and carry out lifting hole-drilling pile-filling machine, reduces construction cost, improves operating efficiency.
Your juror all can there be further understanding and understanding to the purpose of this utility model, shape, structure, feature and effect thereof for ease of, and elaborate in conjunction with the embodiments.
[accompanying drawing explanation]
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the cut-away view in the direction of A shown in Fig. 1.
Fig. 3 is the background technology schematic diagram of Fig. 2.
Fig. 4 is the enlarged drawing in the region of B shown in Fig. 1.
Fig. 5 is the schematic diagram of the first suspension hook clasp joint of the present utility model on the link of support platform.
The drawing reference numeral of detailed description of the invention illustrates:
Support platform 1 | Support 2 | Truss 3 |
Ballast box 4 | First hoist 5 | Second hoist 6 |
First steel cable 7 | Second steel cable 8 | First suspension hook 9 |
Second suspension hook 10 | Link 11 | First leading block 12 |
Second leading block 13 | Traveling sheave 14 | Fixed block 15 |
Directional sliding wheels 16 | Angle steel 17 | Reinforced pipe 18 |
Pull bar 19 | Bearing 20 |
[detailed description of the invention]
Be described further below in conjunction with the operation pylon of the drawings and specific embodiments to a kind of hole-drilling pile-filling machine of the utility model.
Please refer to Fig. 1, Fig. 2, Fig. 4 and Fig. 5, for the operation pylon of the utility model hole-drilling pile-filling machine, it comprises support platform 1, support 2, truss 3, ballast box 4, first hoist 5, second hoist 6, first steel cable 7, second steel cable 8, first suspension hook 9 and the second suspension hook 10.
Support platform 1, support 2 and truss 3 are connected by bearing 20 and can fold, support platform 1 side is provided with link 11, one end of truss 3 is provided with the first leading block 12, second leading block 13, traveling sheave 14, fixed block 15 and directional sliding wheels 16, first hoist 5 and second hoist 6 are fixed in support platform 1, ballast box 4 is connected to the other end of truss 3, wherein, the top and the bottom of truss 3 both sides are welded with angle steel 17 respectively, angle steel 17 is equilateral, and is welded with reinforced pipe 18 in every bar angle steel 17 groove of bottom.
Truss 3 is connected to support by four pull bars 19 and support 2 upper end, and wherein, every two pull bars 19 are connected on the both sides of truss 3 same position.
First steel cable 7 one end in first hoist 5 is successively after the bearing, the first leading block 12 of support 2 and truss 3 connection place, walk around after traveling sheave 14 fixing with fixed block 15 again, first suspension hook 9 is connected on traveling sheave 14, pulls the first steel cable 7 can make the first suspension hook 9 and link 11 phase clasp joint.
Second steel cable 8 one end in second hoist 6 is connected with the second suspension hook 10 successively after in the middle part of the 3rd leading block of support 2 top setting, the second leading block 13, directional sliding wheels 16, and the 3rd leading block is positioned at the top of truss 3.
In sum, the first suspension hook clasp joint that the utility model passes through to traveling sheave to connect on the link of support platform, thus can slow down the vibration problems of truss when utilizing drill hammer to drive piles; By the top and the bottom of truss both sides are welded with angle steel respectively, and be welded with reinforced pipe respectively in the angle steel groove of bottom, considerably increase the lifting strength of truss; First suspension hook can be used for the object of lifting gravity below 20 tons, the second suspension hook can lifting more than 20 tons object and carry out piling work for clasp joint hole-drilling pile-filling machine; Hole-drilling pile-filling machine adopts operation pylon of the present utility model, and pylon can be accomplished auto-erecting, certainly fall, thus can reduce other transfer crane of non-activity duration and carry out lifting hole-drilling pile-filling machine, has reduced construction cost low, improves operating efficiency.
Above-mentioned explanation is the detailed description for the better possible embodiments of the utility model, but embodiment is also not used to limit patent claim of the present utility model, the equal change completed under technical spirit suggested by all the utility model or modification are changed, and all should belong to the utility model and contain the scope of the claims.
Claims (3)
1. an operation pylon for hole-drilling pile-filling machine, is characterized in that: comprise support platform, support, truss, ballast box, first hoist, second hoist, the first steel cable, the second steel cable, the first suspension hook and the second suspension hook;
Support platform, support and truss are connected by bearing and can fold, support platform side is provided with link, one end of truss is provided with the first leading block, the second leading block, traveling sheave, fixed block and directional sliding wheels, first hoist and second hoist are fixed in support platform, ballast box is connected to the other end of truss, wherein, the top and the bottom of truss both sides are welded with angle steel respectively, and are welded with reinforced pipe in every bar angle steel groove of bottom;
First steel cable one end in first hoist is successively after the bearing, the first leading block of support and truss connection place, fix with fixed block after walking around traveling sheave again, first suspension hook is connected on traveling sheave, pulls the first steel cable can make the first suspension hook and link phase clasp joint;
Second steel cable one end in second hoist is connected with the second suspension hook successively after in the middle part of the 3rd leading block of frame upper setting, the second leading block, directional sliding wheels, and the 3rd leading block is positioned at the top of truss.
2. the operation pylon of hole-drilling pile-filling machine as claimed in claim 1, is characterized in that: angle steel is equilateral.
3. the operation pylon of hole-drilling pile-filling machine as claimed in claim 1, it is characterized in that: truss is connected to support by four pull bars and pedestal upper end, wherein, every two pull bars are connected on the both sides of truss same position.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520219016.1U CN204645039U (en) | 2015-04-13 | 2015-04-13 | The operation pylon of hole-drilling pile-filling machine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520219016.1U CN204645039U (en) | 2015-04-13 | 2015-04-13 | The operation pylon of hole-drilling pile-filling machine |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204645039U true CN204645039U (en) | 2015-09-16 |
Family
ID=54097797
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520219016.1U Active CN204645039U (en) | 2015-04-13 | 2015-04-13 | The operation pylon of hole-drilling pile-filling machine |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204645039U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104762966A (en) * | 2015-04-13 | 2015-07-08 | 广西大学 | Working tower frame of drilling cast-in-place pile machine |
-
2015
- 2015-04-13 CN CN201520219016.1U patent/CN204645039U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104762966A (en) * | 2015-04-13 | 2015-07-08 | 广西大学 | Working tower frame of drilling cast-in-place pile machine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203845689U (en) | Indoor assembled large-type equipment lifting device | |
CN103061521B (en) | Coliseum Steel Cantilever Truss torque type mounting method | |
CN204645039U (en) | The operation pylon of hole-drilling pile-filling machine | |
CN206034479U (en) | Tower crane relay handling supporter device | |
CN204401395U (en) | A kind of subgrade case | |
CN201873949U (en) | Bride prestress stretch-draw trolley | |
CN203855359U (en) | Movable-type double-arm hydraulic gantry crane | |
CN207062949U (en) | A kind of traveling pile driver | |
CN104762966B (en) | The operation pylon of hole-drilling pile-filling machine | |
CN106193102B (en) | A kind of tower crane relay handling Shelf device | |
CN209758880U (en) | self-propelled superelevation super large area steel reinforcement cage lifting equipment | |
CN201144134Y (en) | Double herringbone hoisting derrick mast | |
CN201082850Y (en) | Crawler crane main boom head | |
CN204416961U (en) | Single mast single-sheaved block group lifting derrick | |
CN204212059U (en) | A kind of dilatory with large span heavy duty slipway beam | |
CN206751238U (en) | A kind of hoist base fixing device | |
CN201980843U (en) | Hoisting device for reinforcement cage | |
CN207645633U (en) | A kind of reversal hanger for Rectangular Tunnel combined type section of jurisdiction | |
CN206219084U (en) | The main string standard knot of double angle | |
CN103015323B (en) | Beam body hoisting device | |
CN207436058U (en) | A kind of clump weight of hydraulic static pile pressing machine | |
CN204690594U (en) | A kind of simple and easy door frame of the Slidable for the installation of framing type steel box-girder crossbeam | |
CN201362860Y (en) | Building concrete pile detection device | |
CN206385750U (en) | A kind of mixed structure precast stair | |
CN202830913U (en) | Duplex winch crawler belt walking type dynamic compactor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |