CN204645039U - The operation pylon of hole-drilling pile-filling machine - Google Patents

The operation pylon of hole-drilling pile-filling machine Download PDF

Info

Publication number
CN204645039U
CN204645039U CN201520219016.1U CN201520219016U CN204645039U CN 204645039 U CN204645039 U CN 204645039U CN 201520219016 U CN201520219016 U CN 201520219016U CN 204645039 U CN204645039 U CN 204645039U
Authority
CN
China
Prior art keywords
truss
hoist
suspension hook
support platform
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520219016.1U
Other languages
Chinese (zh)
Inventor
林勇传
叶世昌
谢夏琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi University
Original Assignee
Guangxi University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi University filed Critical Guangxi University
Priority to CN201520219016.1U priority Critical patent/CN204645039U/en
Application granted granted Critical
Publication of CN204645039U publication Critical patent/CN204645039U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a kind of operation pylon of hole-drilling pile-filling machine, comprises support platform, support, truss, ballast box, first hoist, second hoist, the first steel cable, the second steel cable, the first suspension hook and the second suspension hook; Support platform, support and truss are connected by bearing and can fold, support platform side is provided with link, one end of truss is provided with the first leading block, the second leading block, traveling sheave, fixed block and directional sliding wheels, first hoist and second hoist are fixed in support platform, ballast box is connected to the other end of truss, wherein, the top and the bottom of truss both sides are welded with angle steel respectively, and in the angle steel groove of bottom on be welded with reinforced pipe respectively.The first suspension hook clasp joint that traveling sheave connects on the link of support platform, thus is slowed down the vibration problems of truss when utilizing drill hammer to drive piles by the utility model; Truss both sides are welded with angle steel, in angle steel groove, are welded with reinforced pipe, greatly increase the lifting strength of truss.

Description

The operation pylon of hole-drilling pile-filling machine
[technical field]
The utility model relates to building machinery technical field, is specifically related to a kind of operation pylon of hole-drilling pile-filling machine.
[background technology]
Pylon is the implement of pile driver.Existing pylon, the vibrations of truss can be caused when hole-drilling pile-filling machine utilizes drill hammer to drive piles, impact piling effect, and the truss inner bracing piece of pylon is designed to triangle, its general lifting capacity is only at one ton to several tons, maximum ability lifting more than ten ton, cannot meet the demand that truss the inner requires to reach the hole-drilling pile-filling machine of more than 20 tons.
Therefore, the operation pylon designing a kind of new hole-drilling pile-filling machine is necessary.
[utility model content]
For the variety of problems faced described in background technology, the purpose of this utility model is the operation pylon providing a kind of hole-drilling pile-filling machine.
For achieving the above object, the technical scheme that the utility model adopts is: a kind of operation pylon of hole-drilling pile-filling machine, comprises support platform, support, truss, ballast box, first hoist, second hoist, the first steel cable, the second steel cable, the first suspension hook and the second suspension hook; Support platform, support and truss are connected by bearing and can fold, support platform side is provided with link, one end of truss is provided with the first leading block, the second leading block, traveling sheave, fixed block and directional sliding wheels, first hoist and second hoist are fixed in support platform, ballast box is connected to the other end of truss, wherein, the top and the bottom of truss both sides are welded with angle steel respectively, and in the angle steel groove of bottom on be welded with reinforced pipe respectively; First steel cable one end in first hoist is successively after the bearing, the first leading block of support and truss connection place, fix with fixed block after walking around traveling sheave again, first suspension hook is connected on traveling sheave, pulls the first steel cable can make the first suspension hook and link phase clasp joint; Second steel cable one end in second hoist is connected with the second suspension hook successively after in the middle part of the 3rd leading block of frame upper setting, the second leading block, directional sliding wheels, and the 3rd leading block is positioned at the top of truss.
Further, angle steel is equilateral.
Further, truss is connected to support by four pull bars and pedestal upper end, and wherein, every two pull bars are connected on the both sides of truss same position.
The first suspension hook clasp joint that the utility model passes through to traveling sheave to connect on the link of support platform, thus can slow down the vibration problems of truss when utilizing drill hammer to drive piles; By the top and the bottom of truss both sides are welded with angle steel respectively, and be welded with reinforced pipe respectively in the angle steel groove of bottom, considerably increase the lifting strength of truss; First suspension hook can be used for the object of lifting gravity below 20 tons, the second suspension hook can lifting more than 20 tons object and carry out piling work for clasp joint hole-drilling pile-filling machine; Hole-drilling pile-filling machine adopts operation pylon of the present utility model, and pylon can be accomplished auto-erecting, certainly fall, thus can reduce other transfer crane of non-activity duration and carry out lifting hole-drilling pile-filling machine, reduces construction cost, improves operating efficiency.
Your juror all can there be further understanding and understanding to the purpose of this utility model, shape, structure, feature and effect thereof for ease of, and elaborate in conjunction with the embodiments.
[accompanying drawing explanation]
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the cut-away view in the direction of A shown in Fig. 1.
Fig. 3 is the background technology schematic diagram of Fig. 2.
Fig. 4 is the enlarged drawing in the region of B shown in Fig. 1.
Fig. 5 is the schematic diagram of the first suspension hook clasp joint of the present utility model on the link of support platform.
The drawing reference numeral of detailed description of the invention illustrates:
Support platform 1 Support 2 Truss 3
Ballast box 4 First hoist 5 Second hoist 6
First steel cable 7 Second steel cable 8 First suspension hook 9
Second suspension hook 10 Link 11 First leading block 12
Second leading block 13 Traveling sheave 14 Fixed block 15
Directional sliding wheels 16 Angle steel 17 Reinforced pipe 18
Pull bar 19 Bearing 20
[detailed description of the invention]
Be described further below in conjunction with the operation pylon of the drawings and specific embodiments to a kind of hole-drilling pile-filling machine of the utility model.
Please refer to Fig. 1, Fig. 2, Fig. 4 and Fig. 5, for the operation pylon of the utility model hole-drilling pile-filling machine, it comprises support platform 1, support 2, truss 3, ballast box 4, first hoist 5, second hoist 6, first steel cable 7, second steel cable 8, first suspension hook 9 and the second suspension hook 10.
Support platform 1, support 2 and truss 3 are connected by bearing 20 and can fold, support platform 1 side is provided with link 11, one end of truss 3 is provided with the first leading block 12, second leading block 13, traveling sheave 14, fixed block 15 and directional sliding wheels 16, first hoist 5 and second hoist 6 are fixed in support platform 1, ballast box 4 is connected to the other end of truss 3, wherein, the top and the bottom of truss 3 both sides are welded with angle steel 17 respectively, angle steel 17 is equilateral, and is welded with reinforced pipe 18 in every bar angle steel 17 groove of bottom.
Truss 3 is connected to support by four pull bars 19 and support 2 upper end, and wherein, every two pull bars 19 are connected on the both sides of truss 3 same position.
First steel cable 7 one end in first hoist 5 is successively after the bearing, the first leading block 12 of support 2 and truss 3 connection place, walk around after traveling sheave 14 fixing with fixed block 15 again, first suspension hook 9 is connected on traveling sheave 14, pulls the first steel cable 7 can make the first suspension hook 9 and link 11 phase clasp joint.
Second steel cable 8 one end in second hoist 6 is connected with the second suspension hook 10 successively after in the middle part of the 3rd leading block of support 2 top setting, the second leading block 13, directional sliding wheels 16, and the 3rd leading block is positioned at the top of truss 3.
In sum, the first suspension hook clasp joint that the utility model passes through to traveling sheave to connect on the link of support platform, thus can slow down the vibration problems of truss when utilizing drill hammer to drive piles; By the top and the bottom of truss both sides are welded with angle steel respectively, and be welded with reinforced pipe respectively in the angle steel groove of bottom, considerably increase the lifting strength of truss; First suspension hook can be used for the object of lifting gravity below 20 tons, the second suspension hook can lifting more than 20 tons object and carry out piling work for clasp joint hole-drilling pile-filling machine; Hole-drilling pile-filling machine adopts operation pylon of the present utility model, and pylon can be accomplished auto-erecting, certainly fall, thus can reduce other transfer crane of non-activity duration and carry out lifting hole-drilling pile-filling machine, has reduced construction cost low, improves operating efficiency.
Above-mentioned explanation is the detailed description for the better possible embodiments of the utility model, but embodiment is also not used to limit patent claim of the present utility model, the equal change completed under technical spirit suggested by all the utility model or modification are changed, and all should belong to the utility model and contain the scope of the claims.

Claims (3)

1. an operation pylon for hole-drilling pile-filling machine, is characterized in that: comprise support platform, support, truss, ballast box, first hoist, second hoist, the first steel cable, the second steel cable, the first suspension hook and the second suspension hook;
Support platform, support and truss are connected by bearing and can fold, support platform side is provided with link, one end of truss is provided with the first leading block, the second leading block, traveling sheave, fixed block and directional sliding wheels, first hoist and second hoist are fixed in support platform, ballast box is connected to the other end of truss, wherein, the top and the bottom of truss both sides are welded with angle steel respectively, and are welded with reinforced pipe in every bar angle steel groove of bottom;
First steel cable one end in first hoist is successively after the bearing, the first leading block of support and truss connection place, fix with fixed block after walking around traveling sheave again, first suspension hook is connected on traveling sheave, pulls the first steel cable can make the first suspension hook and link phase clasp joint;
Second steel cable one end in second hoist is connected with the second suspension hook successively after in the middle part of the 3rd leading block of frame upper setting, the second leading block, directional sliding wheels, and the 3rd leading block is positioned at the top of truss.
2. the operation pylon of hole-drilling pile-filling machine as claimed in claim 1, is characterized in that: angle steel is equilateral.
3. the operation pylon of hole-drilling pile-filling machine as claimed in claim 1, it is characterized in that: truss is connected to support by four pull bars and pedestal upper end, wherein, every two pull bars are connected on the both sides of truss same position.
CN201520219016.1U 2015-04-13 2015-04-13 The operation pylon of hole-drilling pile-filling machine Active CN204645039U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520219016.1U CN204645039U (en) 2015-04-13 2015-04-13 The operation pylon of hole-drilling pile-filling machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520219016.1U CN204645039U (en) 2015-04-13 2015-04-13 The operation pylon of hole-drilling pile-filling machine

Publications (1)

Publication Number Publication Date
CN204645039U true CN204645039U (en) 2015-09-16

Family

ID=54097797

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520219016.1U Active CN204645039U (en) 2015-04-13 2015-04-13 The operation pylon of hole-drilling pile-filling machine

Country Status (1)

Country Link
CN (1) CN204645039U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104762966A (en) * 2015-04-13 2015-07-08 广西大学 Working tower frame of drilling cast-in-place pile machine

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104762966A (en) * 2015-04-13 2015-07-08 广西大学 Working tower frame of drilling cast-in-place pile machine

Similar Documents

Publication Publication Date Title
CN203845689U (en) Indoor assembled large-type equipment lifting device
CN103061521B (en) Coliseum Steel Cantilever Truss torque type mounting method
CN204645039U (en) The operation pylon of hole-drilling pile-filling machine
CN206034479U (en) Tower crane relay handling supporter device
CN204401395U (en) A kind of subgrade case
CN201873949U (en) Bride prestress stretch-draw trolley
CN203855359U (en) Movable-type double-arm hydraulic gantry crane
CN207062949U (en) A kind of traveling pile driver
CN104762966B (en) The operation pylon of hole-drilling pile-filling machine
CN106193102B (en) A kind of tower crane relay handling Shelf device
CN209758880U (en) self-propelled superelevation super large area steel reinforcement cage lifting equipment
CN201144134Y (en) Double herringbone hoisting derrick mast
CN201082850Y (en) Crawler crane main boom head
CN204416961U (en) Single mast single-sheaved block group lifting derrick
CN204212059U (en) A kind of dilatory with large span heavy duty slipway beam
CN206751238U (en) A kind of hoist base fixing device
CN201980843U (en) Hoisting device for reinforcement cage
CN207645633U (en) A kind of reversal hanger for Rectangular Tunnel combined type section of jurisdiction
CN206219084U (en) The main string standard knot of double angle
CN103015323B (en) Beam body hoisting device
CN207436058U (en) A kind of clump weight of hydraulic static pile pressing machine
CN204690594U (en) A kind of simple and easy door frame of the Slidable for the installation of framing type steel box-girder crossbeam
CN201362860Y (en) Building concrete pile detection device
CN206385750U (en) A kind of mixed structure precast stair
CN202830913U (en) Duplex winch crawler belt walking type dynamic compactor

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant