CN204578035U - Cable trench prefabricating module - Google Patents

Cable trench prefabricating module Download PDF

Info

Publication number
CN204578035U
CN204578035U CN201420859304.9U CN201420859304U CN204578035U CN 204578035 U CN204578035 U CN 204578035U CN 201420859304 U CN201420859304 U CN 201420859304U CN 204578035 U CN204578035 U CN 204578035U
Authority
CN
China
Prior art keywords
cable
cable trench
prefabricating module
module
trench prefabricating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420859304.9U
Other languages
Chinese (zh)
Inventor
孙仁春
袁黎明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Ren Chun Cable Fireproof Plugging Engineering Co Ltd
Original Assignee
Hubei Ren Chun Cable Fireproof Plugging Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Ren Chun Cable Fireproof Plugging Engineering Co Ltd filed Critical Hubei Ren Chun Cable Fireproof Plugging Engineering Co Ltd
Priority to CN201420859304.9U priority Critical patent/CN204578035U/en
Application granted granted Critical
Publication of CN204578035U publication Critical patent/CN204578035U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)
  • Sewage (AREA)

Abstract

Cable trench prefabricating module, according to the requirement of cable trough design size, the cable trench prefabricating module of different model specification is selected to carry out installation, it is characterized in that: cable trough base plate Prefabricated block (1) is connected with gutter channel (2), cable trough base plate Prefabricated block (1) is connected with the first cable trench prefabricating module (3) or the second cable trench prefabricating module (4), first cable trench prefabricating module (3) second cable trench prefabricating module (4) is connected with expansion joint (5), expansion joint (5) and band iron (6), first cable trench prefabricating module (3) second cable trench prefabricating module (4) is connected, band iron (6) and building sealant (7), first cable trench prefabricating module (3) second cable trench prefabricating module (4) is connected, building sealant (7) and the first cable trench prefabricating module (3) second cable trench prefabricating module (4), expansion joint (5) is connected, expansion joint (5), first cable trench prefabricating module (3) second cable trench prefabricating module (4) is connected with cable trough ditch rock Prefabricated block (8), cable trough ditch rock Prefabricated block (8) is connected with ditch rock rubber cushion (9).

Description

Cable trench prefabricating module
Technical field
The utility model cable trench prefabricating module is applicable to the indoor and outdoor cable trough such as market, hotel, office building, factory building of power plant, hydroelectric plant, current conversion station, transformer station, communication and heavy construction.
Background technology
According to national grid, south electric network is economized on water, save land, material-saving, energy-conservation and environmental protection green idea, improve construction criteria and construction object.Cable trench prefabricating module changes the construction Difficulties in the construction of brick thorough and concrete cast-in-situ, processing disadvantages, multiple traditional phenomenons such as danger point, stop body of wall shelling, crack, not bright and clean, the phenomenons such as the out of plumb at negative and positive angle, more effective solve cable trough rain draining difficulty and cable channel cover plate out-of-flatness, walk when tour personnel make an inspection tour and send the drawbacks such as sound on cable channel cover plate.
Summary of the invention
The purpose of this utility model is: improve construction criteria and construction object, shorten cable trough construction period, in construction, ensure that cable trough base plate is smooth, gutter channel arc standard, cable trough ditch body is vertically smooth, and expansion joint lattice is neat, and cable trough ditch rock Prefabricated block connects firmly with ditch rock rubber cushion, appearance color is clearly demarcated, exquisite attractive in appearance.
The technical solution of the utility model is: according to the requirement of cable trough design size, selects different model specification cable trench prefabricating module to carry out installation, it is characterized in that, cable trough base plate Prefabricated block (1) is connected with gutter channel (2), cable trough base plate Prefabricated block (1) is connected with the first cable trench prefabricating module (3) or the second cable trench prefabricating module (4), first cable trench prefabricating module (3) second cable trench prefabricating module (4) is connected with expansion joint (5), expansion joint (5) and band iron (6), first cable trench prefabricating module (3) second cable trench prefabricating module (4) is connected, band iron (6) and building sealant (7), first cable trench prefabricating module (3) second cable trench prefabricating module (4) is connected, building sealant (7) and the first cable trench prefabricating module (3) second cable trench prefabricating module (4), expansion joint (5) is connected, expansion joint (5), first cable trench prefabricating module (3) second cable trench prefabricating module (4) is connected with cable trough ditch rock Prefabricated block (8), cable trough ditch rock Prefabricated block (8) is connected with ditch rock rubber cushion (9).
The beneficial effects of the utility model are: after adopting cable trench prefabricating module, effectively shorten construction period, change traditional handicraft pattern, improve the many-sided drawback of cable trough.Cable trough gutter channel raining is fast, without ponding, ensure that the cable sanitation and hygiene of cable trough.Cable trough ditch body is vertically smooth, and expansion joint lattice standard is neat, and color is clearly demarcated, firm, exquisite attractive in appearance.
Accompanying drawing explanation
Fig. 1: adopt cable trench prefabricating module cutaway view.
In figure: 1, cable trough base plate Prefabricated block 2, gutter channel 3, (600mm*300mm*180mm) cable trench prefabricating module 4, (600mm*300mm*180mm) cable trench prefabricating module 5, expansion joint 6, band iron 7, building sealant 8, cable trough ditch rock module 9, ditch rock rubber cushion
Embodiment
1. clear up punching block: with instrument by end punching block, the foreign material on the internal molds such as side punching block, end punching block and residue clean up, and side punching block, end punching block are connected the fastening of Luo bolt with end punching block, ensure that joint close is tight.
2. concrete pouring vibrates: adopt mechanical agitation even by C35 concrete proportioning, draw in builder's temporary shed, manually enter mould, after filling concrete completes, start vibration machine switch and vibrate with skip car.
3. concrete coating: after having vibrated, wipes one's face with trowel, superelevation and any excess concrete is rooted out, and wipes one's face and puts down to punching block end face, and wiping one's face should be smooth closely knit smooth, and many traces phenomenon does not appear in surface layer.
4. the finished product demoulding: after concrete reaches design strength, can deviate from punching block, after removing side steel punching block, in dismounting cable trench prefabricating module, is transported to storage area stacking and carries out maintenance.
5. finished product maintenance: the cable trench prefabricating module through being up to the standards carries out gentle maintenance at storage space, surface adopts burlap etc. to carry out sunshade moisturizing, and 28 days curing periods can transport.
6. line setting: require line setting according to cable trough construction drawing, reduces the impact that accidental error is brought measurement result as far as possible, controls 3 ‰ slopes than degree, after line setting, repeatedly should check, and examine through authorities.
7. cubic metre of earth stone excavation: cable trough adopts mechanical equivalent of light excavation, and the construction method manually evened out, during mechanical equivalent of light excavation, should strictly control bottom of trench absolute altitude, at any time by bottom of trench flattening-out, compacting.Before hand excavation, carry out the long 2000mm of bottom of trench by workmen and fill essence fixed point, piling absolute altitude, guarantees that 3 ‰ slopes are more error free than degree.The transport cubic metre of earth and stone will stop the backfill soil cubic meter of stone, treats that cable trough lays and backfills.
8. ditch foot mat: wide by cable trough, long fixed point band line, adopts concrete mortar or coarse sand shop fixtures, the strict evenness controlling bottom of trench Prefabricated block, verticality, positive and negative can not more than 2mm.
9. cable trench prefabricating module install: when building cable trench prefabricating module by laying bricks or stones, by the size Selection of cable trough designing requirement, the fissure of displacement builds cable trench prefabricating module by laying bricks or stones, evenness, verticality, positive and negative can not more than 2mm.Cable trench prefabricating module reinforce adopt band iron or epoxy resin daub is even can.
10. expansion joint is filled: when filling building sealant, and adopt a point ruled paper to be pasted onto edge, cable trough concrete prefabricated module expansion joint, point accurate specification of ruled paper label adhering, building sealant is filled smooth bright and clean.
11. ditch rock rubber cushions: the long 5000mm of ditch rock rubber cushion, wide 30mm, thick 20mm, by cable trough length successively mounting groove rock rubber cushion, its Main Function ensures that cable channel cover plate is smooth when walking about without sound.

Claims (1)

1. a cable trench prefabricating module, it is combined by the Prefabricated block of several different model specification to be mounted to cable trough, it is characterized in that: cable trough base plate Prefabricated block (1) is connected with gutter channel (2), cable trough base plate Prefabricated block (1) is connected with the first cable trench prefabricating module (3) or the second cable trench prefabricating module (4), first cable trench prefabricating module (3), second cable trench prefabricating module (4) is connected with expansion joint (5), expansion joint (5) and band iron (6), first cable trench prefabricating module (3), second cable trench prefabricating module (4) is connected, band iron (6) and building sealant (7), first cable trench prefabricating module (3), second cable trench prefabricating module (4) is connected, building sealant (7) and the first cable trench prefabricating module (3), second cable trench prefabricating module (4), expansion joint (5) is connected, expansion joint (5), first cable trench prefabricating module (3), second cable trench prefabricating module (4) is connected with cable trough ditch rock Prefabricated block (8), cable trough ditch rock Prefabricated block (8) is connected with ditch rock rubber cushion (9).
CN201420859304.9U 2014-12-18 2014-12-18 Cable trench prefabricating module Expired - Fee Related CN204578035U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420859304.9U CN204578035U (en) 2014-12-18 2014-12-18 Cable trench prefabricating module

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420859304.9U CN204578035U (en) 2014-12-18 2014-12-18 Cable trench prefabricating module

Publications (1)

Publication Number Publication Date
CN204578035U true CN204578035U (en) 2015-08-19

Family

ID=53870630

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420859304.9U Expired - Fee Related CN204578035U (en) 2014-12-18 2014-12-18 Cable trench prefabricating module

Country Status (1)

Country Link
CN (1) CN204578035U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112878283A (en) * 2021-01-15 2021-06-01 中国电建集团成都勘测设计研究院有限公司 Cable and drainage system for riverbed type workshop dam crest of hydropower station

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112878283A (en) * 2021-01-15 2021-06-01 中国电建集团成都勘测设计研究院有限公司 Cable and drainage system for riverbed type workshop dam crest of hydropower station
CN112878283B (en) * 2021-01-15 2022-10-04 中国电建集团成都勘测设计研究院有限公司 Cable and drainage system for riverbed type workshop dam crest of hydropower station

Similar Documents

Publication Publication Date Title
CN106182359B (en) The horizontal molding die of concrete list storehouse pipe gallery, system and piping lane molding methods
CN106150001B (en) A kind of fabricated assembly overall stair construction method
CN101906768B (en) Panel construction method of concrete faced rock-fill dam
CN107059920B (en) Loess formation piping lane construction technology
CN104594387A (en) Improved post-pouring strip advanced water-stopping construction method
CN109853832A (en) A kind of construction method of filling wall masonry and electrical pre-embedded pipe synchronous construction
CN104213565B (en) A kind of formwork system that is applicable to large-scale deep trouth hole sty bed course and formwork thereof water smashes construction method
CN107059917B (en) Split component prefabricated comprehensive pipe gallery and construction method thereof
CN102937027A (en) Construction method of edge top arch and bottom arch of concrete pouring tunnel
CN106381980B (en) A kind of ground tile paving technique
CN105064579B (en) A kind of construction method ensureing toilet water stopping thresholds platform pouring molding
CN106013509A (en) Dry-method construction method for high-performance autolaved aerated concrete block wall
CN102518216A (en) Cantilever type cover plate deformation joint structure of accessible roof and construction method for structure
CN110424226A (en) Kerbstone precast assembly side form and its construction technology
CN202347544U (en) Advance water stop construction structure for post-cast strip of basement outer wall
CN104328790B (en) Cast-in-situ sprayed concrete hidden bearing platform and hidden ground beam molding bed
CN203839870U (en) Wall-mounted concealed distribution box
CN204578035U (en) Cable trench prefabricating module
CN108867822A (en) A kind of constructing device and its construction method of anti-water Double-layer floor drain
CN103572786A (en) Pile head joint waterproof processing device and construction method thereof
CN206623199U (en) The horizontal mould of concrete list storehouse pipe gallery and system
CN114837038A (en) Construction method of barrier pedestrian path permeable base layer by adopting paver
CN105649222A (en) Treatment and construction method for connecting part of roof waterproof structure deformation joint and external wall
CN203924139U (en) concrete component
CN204199302U (en) The dark cushion cap of cast-in-place sprayed mortar and secretly beam loose tool

Legal Events

Date Code Title Description
DD01 Delivery of document by public notice

Addressee: Sun Renchun

Document name: Notification of Acceptance of Patent Application

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150819

Termination date: 20171218

CF01 Termination of patent right due to non-payment of annual fee