CN204199302U - The dark cushion cap of cast-in-place sprayed mortar and secretly beam loose tool - Google Patents

The dark cushion cap of cast-in-place sprayed mortar and secretly beam loose tool Download PDF

Info

Publication number
CN204199302U
CN204199302U CN201420674601.6U CN201420674601U CN204199302U CN 204199302 U CN204199302 U CN 204199302U CN 201420674601 U CN201420674601 U CN 201420674601U CN 204199302 U CN204199302 U CN 204199302U
Authority
CN
China
Prior art keywords
cushion cap
concrete
foundation trench
cast
holdfasts
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420674601.6U
Other languages
Chinese (zh)
Inventor
郭建东
钟成新
王丽梅
吴茂军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
China Construction Sixth Engineering Bureau Civil Engineering Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
China Construction Sixth Engineering Bureau Civil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd, China Construction Sixth Engineering Bureau Civil Engineering Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201420674601.6U priority Critical patent/CN204199302U/en
Application granted granted Critical
Publication of CN204199302U publication Critical patent/CN204199302U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses the dark cushion cap of cast-in-place sprayed mortar and secretly beam loose tool, it comprises the foundation trench of excavation in predetermined dark cushion cap and secretly beam position, wire gauze or reinforced mesh is welded with until concrete floor bed course position along foundation trench wall, in the soil body of foundation trench wall, interval has set many L shape holdfasts, many described L shape holdfasts adopt drawknot iron wire to be connected with wire gauze or reinforced mesh, foundation trench wall is coated with layer of concrete, and described wire gauze or reinforced mesh and many L shape holdfasts are arranged in layer of concrete.Employing the utility model dark cushion cap of loose tool concreting and secretly beam, easy to operate, speed is fast, applicability by force, does not need the complete 24h of formwork supporting plate, construction of shotcrete to carry out next procedure construction, the operation intermittent time is short, does not need to plaster directly to carry out construction of waterproof layer.Be applicable to the template construction of the dark cushion cap of cast-in-situ steel reinforced concrete and secretly beam.

Description

The dark cushion cap of cast-in-place sprayed mortar and secretly beam loose tool
Technical field
The utility model relates to the dark cushion cap of a kind of cast-in-place sprayed mortar and secretly beam loose tool, belongs to cast in situ concrete foundation and ground beam template construction technology.
Background technology
The template of the dark cushion cap of existing cast-in-situ concrete and secretly beam, because concreting rear pattern plate imbeds underground with cushion cap and grade beam, can not remove, simultaneously template system can not affect the bearing capacity of ground, and adopt builds the brick loose tool of plastering by laying bricks or stones more, after develop the assembled loose tool of precast plate, there is inefficiency in above-mentioned 2 kinds of methods, the shortcomings such as corner and special-shaped socket form moulding difficulty weak effect, especially when needs carry out waterproof coiled material construction on loose tool, also need to carry out specially treated.
The patent of having authorized is learnt by retrieval:
1, publication number is the Chinese patent " making of a kind of building pile foundation cushion cap and grade beam loose tool " of CN101725247, adopt according to pile foundation pile cap shape, physical dimension and quantity, be prefabricated into the polygon cylindrical shell loose tool of concrete in advance, it is concrete moulding bed that grade beam is then prefabricated into grooved according to sectional dimension.
2, publication number is the Chinese patent " a kind of foundation forms applying GRC cement board " of CN 203229962 U, GRC cement board is adopted to be template plate body, template plate body is enclosed in plan and waters around underpin, stand on and be connected to foundation pad upper surface, timber wedge of top tape steel nail is embedded with in the earthwork of basis surrounding, the steel nail that steel nail and the sub-top of timber wedge are imbedded in interval, template top draws wire rope to fix, have inner support between two pieces of relative GRC templates, the space between template and ground adopts dirt to fill.
3, publication number is the Chinese patent " concrete-formwork-precast foundation construction method " of CN 102505709 A, concrete foundation template is assembled in foundation ditch according to the shape of institute's foundation ditch by its way: excavation pit---make concrete foundation template---, composition basis integral mold plate---the backfilling of earthwork outside foundation ditch is also tamped.Concrete foundation template is assembled in foundation ditch according to the shape of institute's foundation ditch by its way of Concrete Beam Reinforced: excavation pit---make concrete foundation template---, composition basis integral mold plate---the backfilling of earthwork outside foundation ditch is also tamped.
4, the Chinese patent " concrete-formwork-precast foundation construction method " of publication number CN202214982U, its way: template comprises glass magnesium plate, tension iron wire, timber and support flitch; Main template body is the channel-shaped structure of two blocks of glass magnesium criterion plates and one piece of glass magnesium base plate composition, tension iron wire is all arranged in the outside of two blocks of glass magnesium side plates, tension iron wire one end penetrates Baume side plate and is fixed on glass magnesium side plate interior sides through iron plate, and the other end is strained and fixed with the described timber imbedding earth's surface; Base plate timber is fixedly connected with below Baume base plate; Laterally evenly face supporting square timber is divided in described two blocks of glass magnesium side plates.
The template of above-mentioned four top patents is prefab form, there is following problem: 1, prefab form installation procedure is many; 2, there is gap between prefab form and ground, the bearing capacity of ground can not be ensured.
5, the Chinese patent being disclosed as CN 102535846 A discloses " the integrated poured once-molding construction process of building construction ", this patent way is: according to construction drawing requirement, formulate construction requirement and the planning book of integrated poured one-shaping technique, prefab form module, the ground beam template then fluid concrete of the good reinforced frame of supporting colligation, solidify after reaching intensity and lay thereon, formwork module supporting is carried out after assembling reinforcement and steel mesh reinforcement, lay by construction technical requirement, configuration concrete embedded part, power supply facilities illuminating line, water-feeding & drainaging pipeline, ventilation passage, heating facility etc., then monobloc cast is carried out.This patent template is cast-in-place module, but needs scene to tie up reinforcing bar, formwork supporting plate, pouring concrete due to the formwork module of this patent, exists: template itself needs formwork; Operation is many, long in time limit; The shortcoming that concrete set time is long.
Summary of the invention
The purpose of this utility model is to overcome the deficiencies in the prior art, there is provided a kind of speed fast, easy to operate, do not affect bearing capacity of foundation soil, do not need formwork supporting plate, site operation, be applicable to various sizes, the dark cushion cap of cast-in-place sprayed mortar of shape and secretly beam loose tool.
The dark cushion cap of cast-in-place sprayed mortar of the present utility model and secretly beam loose tool, it comprises the foundation trench of excavation in predetermined dark cushion cap and secretly beam position, wire gauze or reinforced mesh is welded with until concrete floor bed course position along foundation trench wall, in the soil body of foundation trench wall, interval has set many L shape holdfasts, many described L shape holdfasts adopt drawknot iron wire to be connected with wire gauze or reinforced mesh, foundation trench wall is coated with layer of concrete, and described wire gauze or reinforced mesh and many L shape holdfasts are arranged in layer of concrete.
Employing the utility model dark cushion cap of loose tool concreting and secretly beam, easy to operate, speed is fast, applicability by force, does not need the complete 24h of formwork supporting plate, construction of shotcrete to carry out next procedure construction, the operation intermittent time is short, does not need to plaster directly to carry out construction of waterproof layer.Be applicable to the template construction of the dark cushion cap of cast-in-situ steel reinforced concrete and secretly beam.
Accompanying drawing explanation
Accompanying drawing is the structural representation of the dark cushion cap of cast-in-place sprayed mortar of the present utility model and secretly beam loose tool.
Detailed description of the invention
Below in conjunction with specific embodiment, and with reference to accompanying drawing, the utility model is described further:
The dark cushion cap of cast-in-place sprayed mortar of the present utility model as shown in drawings and secretly beam tire, it comprises the foundation trench 1 of excavation in predetermined dark cushion cap and secretly beam position, wire gauze or reinforced mesh 3 is welded with until concrete floor bed course 2 position along foundation trench wall, in the soil body of foundation trench wall, interval has set many L shape holdfasts 4, many described L shape holdfasts 4 adopt drawknot iron wire 5 to be connected firmly with wire gauze or reinforced mesh 3, foundation trench wall is coated with layer of concrete 6, and described wire gauze or reinforced mesh 3 and many L shape holdfasts 4 are arranged in layer of concrete.
The negative and positive angular position of preferred layer of concrete 6 adopts cloudy outside-corner trowel to make fillet to facilitate waterproof construction.
The construction method of this structure is as follows: the foundation trench 1 digging dark cushion cap or secretly beam according to figure paper size, at foundation trench surface soldered wire gauze or reinforced mesh 3, on foundation trench 1, reinforcing bar holdfast 4 is squeezed at interval, then use drawknot iron wire 5 by reinforcing bar holdfast 4 and wire gauze or reinforced mesh 3 colligation firm, on described wire gauze or reinforced mesh 3, adopt spraying machinery to spray early strength concrete 6 again, floating with plasterer's trowel, angle received by cloudy outside-corner trowel, after maintenance is shaping, the construction of cushion cap or grade beam can be carried out.

Claims (1)

1. the dark cushion cap of cast-in-place sprayed mortar and secretly beam loose tool, it is characterized in that: it comprises the foundation trench of excavation in predetermined dark cushion cap and secretly beam position, wire gauze or reinforced mesh is welded with until concrete floor bed course position along foundation trench wall, in the soil body of foundation trench wall, interval has set many L shape holdfasts, many described L shape holdfasts adopt drawknot iron wire to be connected with wire gauze or reinforced mesh, foundation trench wall is coated with layer of concrete, and described wire gauze or reinforced mesh and many L shape holdfasts are arranged in layer of concrete.
CN201420674601.6U 2014-11-12 2014-11-12 The dark cushion cap of cast-in-place sprayed mortar and secretly beam loose tool Active CN204199302U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420674601.6U CN204199302U (en) 2014-11-12 2014-11-12 The dark cushion cap of cast-in-place sprayed mortar and secretly beam loose tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420674601.6U CN204199302U (en) 2014-11-12 2014-11-12 The dark cushion cap of cast-in-place sprayed mortar and secretly beam loose tool

Publications (1)

Publication Number Publication Date
CN204199302U true CN204199302U (en) 2015-03-11

Family

ID=52657277

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420674601.6U Active CN204199302U (en) 2014-11-12 2014-11-12 The dark cushion cap of cast-in-place sprayed mortar and secretly beam loose tool

Country Status (1)

Country Link
CN (1) CN204199302U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104328790A (en) * 2014-11-12 2015-02-04 中建六局土木工程有限公司 Cast-in-situ sprayed concrete hidden bearing platform and hidden ground beam molding bed

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104328790A (en) * 2014-11-12 2015-02-04 中建六局土木工程有限公司 Cast-in-situ sprayed concrete hidden bearing platform and hidden ground beam molding bed

Similar Documents

Publication Publication Date Title
CN101787710B (en) Integrally-assembled buttressed retaining wall and construction method thereof
CN203755334U (en) Single-pipe tower prefabricated spiral steel pipe pile foundation
CN104805866A (en) Prefabricated comprehensive pipe gallery and construction method
CN104328790B (en) Cast-in-situ sprayed concrete hidden bearing platform and hidden ground beam molding bed
CN104213565A (en) Die supporting system for large deep pit steep slope surface cushion layer and supporting die casting construction method thereof
CN102071698B (en) Construction method of beddings of foundation downward overturn beam and pile cap
CN204898715U (en) Assembled precast concrete child mould of basis cushion cap
CN103774687A (en) Single-pipe tower prefabricated spiral steel pipe pile foundation
CN103334359B (en) Prefabricated reinforced concrete pavement plate and pavement construction method
CN101787701B (en) Construction method for supporting pine pile in elevator shaft foundation pit
CN105369826A (en) Basement bearing platform side mold construction method
CN104358275B (en) Darker elevator shaft or collecting well construction method
CN103161176A (en) Tower crane foundation construction method in main building connected garage
CN106968692B (en) Tunnel excavation supporting structure and construction method thereof
CN103215950B (en) Pile foundation extension construction method in backfilling area
CN202466623U (en) Basement attached lane structure
CN101929245A (en) Thin webbed girder vertical construction method
CN204199302U (en) The dark cushion cap of cast-in-place sprayed mortar and secretly beam loose tool
CN110820756A (en) Shield well and vertical shaft deep foundation pit excavation safety construction method
CN109137986A (en) Urban road inspection shaft walling crib green promotes reinforced construction method
CN211421139U (en) Shield constructs well crown beam bearing structure
CN204645093U (en) Poured band of outer wall of basement advanced processing constructs
CN103821149A (en) Large-scale deep foundation pit slope remaining soil digging and pit-in-pit concrete post casting construction method
CN106930307A (en) The foundation beam prefabricated board and its assembly construction method of a kind of replacement brick fetal membrane
CN203034790U (en) Basic prefabricated concrete formwork for basement

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant