CN204559019U - A kind of mineral matter cabling arrangements - Google Patents

A kind of mineral matter cabling arrangements Download PDF

Info

Publication number
CN204559019U
CN204559019U CN201520244651.5U CN201520244651U CN204559019U CN 204559019 U CN204559019 U CN 204559019U CN 201520244651 U CN201520244651 U CN 201520244651U CN 204559019 U CN204559019 U CN 204559019U
Authority
CN
China
Prior art keywords
vertical
crane span
cable
span structure
floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520244651.5U
Other languages
Chinese (zh)
Inventor
范方
徐家银
陈志斌
薛少松
姚林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SCEGC No 9 Construction Engineering Group Co Ltd
Original Assignee
SCEGC No 9 Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SCEGC No 9 Construction Engineering Group Co Ltd filed Critical SCEGC No 9 Construction Engineering Group Co Ltd
Priority to CN201520244651.5U priority Critical patent/CN204559019U/en
Application granted granted Critical
Publication of CN204559019U publication Critical patent/CN204559019U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of mineral matter cabling arrangements, comprise multicomponent and be not set up in cable testing bridge on each floor of institute's construction building; Often organize cable testing bridge and include three cable testing bridges be set up on same floor, three cable testing bridges comprise a vertical crane span structure, a horizontal crane span structure crane span structure vertical with, and the distribution box that each floor is arranged all is positioned at below vertical crane span structure that this floor sets up; The vertical crane span structure that multiple floor sets up to be laid on same vertical curve and the vertical cable crane span structure that lays for vertical cable of its composition from the bottom to top, the vertical crane span structure that each floor sets up all is provided with a horizontal stand, horizontal stand is provided with the terminal board connected for vertical cable, the distribution box that each floor is arranged all is connected with the terminal board that this floor is installed by branch cable.The utility model structure is simple, reasonable in design and easy construction, result of use are good, can solve the various problems that existing employing T connects existence when case carries out cable laying.

Description

A kind of mineral matter cabling arrangements
Technical field
The utility model belongs to cable laying technical field, especially relates to a kind of mineral matter cabling arrangements.
Background technology
In building construction process, according to the cable laying technique of routine to when carrying out cable laying, usually adopt T to connect case and cable is connected.T connects case and in a case, does five (four) line copper bars exactly, and three fire one zero one ground, main line is connected to T from power supply point and connects in case, and other branch roads connect in case from T and are connected to termination rack (i.e. distribution electric box).At present, the cable laid in construction mostly is mineral matter cable, as mineral insulated cable and mineral matter fireproof cable.
As shown in Figure 1, T is adopted to connect case when carrying out cable laying on each floor of institute's construction building, first on institute's construction floor, set up cable testing bridge, and set up cable testing bridge quantity be three, three described cable testing bridges comprise a vertical crane span structure 2 be supported in institute's construction floor between upper and lower two floors 1, to be arranged on vertical crane span structure 2 and the horizontal crane span structure 3 laid in level and to be connected between horizontal crane span structure 3 with the distribution box 4 that institute construction floor is arranged and with the vertical crane span structure 5 of horizontal crane span structure 3 in vertical runs, the T adopted connects case and is positioned at above horizontal crane span structure 3, and this T connects in case the terminal support 6 being provided with and installing for terminal board, terminal board is provided with T connecting terminal 8.Actual when carrying out cable laying, T connecting terminal 8 is connected to two groups and treats cabling 9, two groups treat cabling 9 comprise one group introduce from bottom to top treat that cabling 9 and one group draws from bottom to top treat cabling 9 and the two is all laid on vertical crane span structure 2, often group treats that cabling 9 includes many and treats cabling 9; Meanwhile, T connecting terminal 8 is connected to the branch cable 10 be connected with distribution box 4, branch cable 10 is laid on vertical crane span structure 5.As shown in the above, adopt above-mentioned T to connect case when carrying out cable laying, not only take up room large, not easily lay, and intersect between cable, the place of bending is more, destructible insulating barrier, affects the normal usage function of cable.Thus, simple, the reasonable in design and mineral matter cabling arrangements that easy construction, result of use are good of a kind of structure need be designed, can solve existing employing T connect taking up room of existence when case carries out cable laying large, lay that difficulty is large, destructible cable insulation, affect the problems such as cable normal usage function.
Utility model content
Technical problem to be solved in the utility model is for above-mentioned deficiency of the prior art, a kind of mineral matter cabling arrangements is provided, its structure is simple, reasonable in design and easy construction, result of use are good, can solve existing employing T connect taking up room of existence when case carries out cable laying large, lay that difficulty is large, destructible cable insulation, affect the problems such as cable normal usage function.
For solving the problems of the technologies described above, the technical solution adopted in the utility model is: a kind of mineral matter cabling arrangements, it is characterized in that: comprise multicomponent and be not set up in cable testing bridge on each floor of institute's construction building, the structure of the described cable testing bridge of many groups all identical and its from top to bottom lay; Institute's construction building is divided into multiple floor from top to bottom, is separated, each floor of institute's construction building is provided with distribution box between neighbouring two described floors by one deck floor; Often organize described cable testing bridge and include three described cable testing bridges be set up on same floor, three described cable testing bridges comprise that one is supported in vertical crane span structure between adjacent two described floors, one to be arranged on the horizontal crane span structure laid on vertical crane span structure and in level with one be the vertical crane span structure of vertical runs with horizontal crane span structure, and vertical crane span structure is positioned at below horizontal crane span structure; The distribution box that each floor of institute's construction building is arranged all is positioned at below vertical crane span structure that this floor sets up;
The vertical crane span structure that multiple described floor sets up is laid on same vertical curve from the bottom to top, and the vertical crane span structure that multiple described floor sets up forms a vertical cable crane span structure laid for vertical cable, described vertical cable crane span structure is laid with from the bottom to top many described vertical cables; The vertical crane span structure that each described floor sets up all is provided with a horizontal stand, described horizontal stand is provided with the terminal board connected for vertical cable; The distribution box that each floor of institute's construction building is arranged all is connected with the terminal board that this floor is installed by branch cable, described drop cable installation at horizontal crane span structure with on vertical crane span structure; Described vertical cable and branch cable are mineral matter cable.
Above-mentioned a kind of mineral matter cabling arrangements, is characterized in that: described vertical crane span structure, horizontal crane span structure are channel-type cable bridge with vertical crane span structure.
Above-mentioned a kind of mineral matter cabling arrangements, is characterized in that: the quantity of the terminal board that described horizontal stand is installed is two, and two described terminal boards lay respectively at the left and right sides of horizontal stand.
Above-mentioned a kind of mineral matter cabling arrangements, is characterized in that: two described terminal boards are respectively left terminal row and the right hand terminal row of the left and right sides being positioned at horizontal stand; Many described vertical cables are divided into two groups, vertical cable described in two groups comprises left-side cable on the left of one group of described vertical cable crane span structure that is laid in and one group of right-side cable be laid on the right side of described vertical cable crane span structure, and the quantity of described left-side cable and right-side cable is many; Many described left-side cable are all connected on described left terminal row, and many described right-side cable are all connected on described right hand terminal row.
Above-mentioned a kind of mineral matter cabling arrangements, it is characterized in that: described horizontal stand comprise be arranged on rectangular frame on vertical crane span structure and two be installed in the terminal board installed on rectangular frame and for terminal board, two described terminal boards lay respectively at the left and right sides of rectangular frame, and two described terminal boards are arranged on two described terminal boards respectively; Described rectangular frame is vertically to laying.
Above-mentioned a kind of mineral matter cabling arrangements, is characterized in that: described horizontal stand is arranged on the middle part of vertical crane span structure.
Above-mentioned a kind of mineral matter cabling arrangements, is characterized in that: described horizontal bridge chord position is in the upper inner of vertical crane span structure, and horizontal stand is positioned at below horizontal crane span structure.
The utility model compared with prior art has the following advantages:
1, structure is simple, reasonable in design and input cost is lower.
2, cable laying is convenient, difficulty of construction is low and result of use good, use value is high, horizontal stand installed by vertical crane span structure, directly the terminal board for connecting vertical cable is arranged on horizontal stand, and adopt terminal board to connect branch cable, case is connect without the need to additionally laying T again, constructability, conserve space, avoid cable intersection, dog leg, the insulating barrier of cable can not be destroyed, thus while guarantee institute cabling using function, can effectively guarantee that cable is injury-free, later period maintenance is easy, and the cable perception of laying is good.
In sum, the utility model structure is simple, reasonable in design and easy construction, result of use are good, can solve existing employing T connect taking up room of existence when case carries out cable laying large, lay that difficulty is large, destructible cable insulation, affect the problems such as cable normal usage function.
Below by drawings and Examples, the technical solution of the utility model is described in further detail.
Accompanying drawing explanation
Fig. 1 is the structural representation that existing employing T connects when case carries out cable laying.
Fig. 2 is structural representation of the present utility model.
Fig. 3 is the installment state schematic diagram of the utility model horizontal stand.
Description of reference numerals:
1-floor; 2-vertical crane span structure; 3-horizontal crane span structure;
4-distribution box; 5-vertical crane span structure; 6-terminal support;
7-terminal board; 8-T connecting terminal; 9-treat cabling;
10-branch cable; 11-vertical cable; 12-horizontal stand;
12-1-rectangular frame; 12-2-terminal board.
Embodiment
As shown in Figure 2 and Figure 3, the utility model comprises multicomponent and is not set up in cable testing bridge on each floor of institute's construction building, the structure of the described cable testing bridge of many groups all identical and its from top to bottom lay; Institute's construction building is divided into multiple floor from top to bottom, is separated, each floor of institute's construction building is provided with distribution box 4 between neighbouring two described floors by one deck floor 1; Often organize described cable testing bridge and include three described cable testing bridges be set up on same floor, three described cable testing bridges comprise a vertical crane span structure 2, be supported between adjacent two described floors 1, and to be arranged on the horizontal crane span structure 3 laid on vertical crane span structure 2 and in level with one be the vertical crane span structure 5 of vertical runs with horizontal crane span structure 3, and vertical crane span structure 5 is positioned at below horizontal crane span structure 3.The distribution box 4 that each floor of institute's construction building is arranged all is positioned at below vertical crane span structure 5 that this floor sets up.
The vertical crane span structure 2 that multiple described floor sets up is laid on same vertical curve from the bottom to top, and the vertical crane span structure 2 that multiple described floor sets up forms a vertical cable crane span structure laid for vertical cable 11, described vertical cable crane span structure is laid with from the bottom to top many described vertical cables 11.The vertical crane span structure 2 that each described floor sets up all is provided with a horizontal stand 12, described horizontal stand 12 is provided with the terminal board 7 connected for vertical cable 11.The distribution box 4 that each floor of institute's construction building is arranged all is connected with the terminal board 7 that this floor is installed by branch cable 10, and described branch cable 10 is laid in horizontal crane span structure 3 with on vertical crane span structure 5.Described vertical cable 11 and branch cable 10 are mineral matter cable.
During actual use, described mineral matter cable is mineral insulated cable or mineral matter fireproof cable.
During physical cabling, vertical cable 11 described in every root is all divided into multiple vertical cable sections from the bottom to top by the terminal board 7 that multiple described floor is installed, and is connected between neighbouring two described vertical cable sections by terminal board 7.
In the present embodiment, described vertical crane span structure 2, horizontal crane span structure 3 are channel-type cable bridge with vertical crane span structure 5.
In actual use procedure, described vertical crane span structure 2, horizontal crane span structure 3 and vertical crane span structure 5 also can adopt the cable testing bridge of other type.
In the present embodiment, the quantity of the terminal board 7 that described horizontal stand 12 is installed is two, and two described terminal boards 7 lay respectively at the left and right sides of horizontal stand 12.
In the present embodiment, two described terminal boards 7 are respectively left terminal row and the right hand terminal row of the left and right sides being positioned at horizontal stand 12.Many described vertical cables 11 are divided into two groups, vertical cable 11 described in two groups comprises left-side cable on the left of one group of described vertical cable crane span structure that is laid in and one group of right-side cable be laid on the right side of described vertical cable crane span structure, and the quantity of described left-side cable and right-side cable is many; Many described left-side cable are all connected on described left terminal row, and many described right-side cable are all connected on described right hand terminal row.
During actual use, described left-side cable is leader cable, and described right-side cable is cable in stock, and the quantity of described left-side cable and described right-side cable is four.Correspondingly, two terminal boards 7 that described horizontal stand 12 is installed are provided with four groups of binding posts, often organize described binding post and include upper and lower two described binding posts.
As shown in Figure 3, described horizontal stand 12 comprises the rectangular frame 12-1 and two be arranged on vertical crane span structure 2 and is installed in the terminal board 12-2 installed on rectangular frame 12-1 and for terminal board 7, two described terminal board 12-2 lay respectively at the left and right sides of rectangular frame 12-1, and two described terminal board 12-2 are arranged on two described terminal board 12-2 respectively.Described rectangular frame 12-1 is vertically to laying.
In the present embodiment, described horizontal stand 12 is arranged on the middle part of vertical crane span structure 2.
During practice of construction, can according to specific needs, the setting height(from bottom) of horizontal stand 12 on vertical crane span structure 2 be adjusted accordingly.
In the present embodiment, described horizontal crane span structure 3 is positioned at the upper inner of vertical crane span structure 2, and horizontal stand 12 is positioned at below horizontal crane span structure 3.
The above; it is only preferred embodiment of the present utility model; not the utility model is imposed any restrictions; every above embodiment is done according to the utility model technical spirit any simple modification, change and equivalent structure change, all still belong in the protection range of technical solutions of the utility model.

Claims (7)

1. a mineral matter cabling arrangements, is characterized in that: comprise multicomponent and be not set up in cable testing bridge on each floor of institute's construction building, the structure of the described cable testing bridge of many groups all identical and its from top to bottom lay; Institute's construction building is divided into multiple floor from top to bottom, is separated, each floor of institute's construction building is provided with distribution box (4) between neighbouring two described floors by one deck floor (1); Often organize described cable testing bridge and include three described cable testing bridges be set up on same floor, three described cable testing bridges comprise one be supported in vertical crane span structure (2) between adjacent two described floors (1), one be arranged on the upper and horizontal crane span structure (3) that is that lay in level of vertical crane span structure (2) and one and the vertical crane span structure (5) of horizontal crane span structure (3) in vertical runs, vertical crane span structure (5) is positioned at below horizontal crane span structure (3); The distribution box (4) that each floor of institute's construction building is arranged all is positioned at vertical crane span structure (5) below that this floor sets up;
The vertical crane span structure (2) that multiple described floor sets up is laid on same vertical curve from the bottom to top, and the vertical crane span structure (2) that multiple described floor sets up composition vertical cable crane span structure laid for vertical cable (11), described vertical cable crane span structure is laid with from the bottom to top many described vertical cables (11); The vertical crane span structure (2) that each described floor sets up all is provided with a horizontal stand (12), described horizontal stand (12) is provided with the terminal board (7) connected for vertical cable (11); The distribution box (4) that each floor of institute's construction building is arranged all is connected with the terminal board (7) that this floor is installed by branch cable (10), and described branch cable (10) is laid in horizontal crane span structure (3) with on vertical crane span structure (5); Described vertical cable (11) and branch cable (10) are mineral matter cable.
2. according to a kind of mineral matter cabling arrangements according to claim 1, it is characterized in that: described vertical crane span structure (2), horizontal crane span structure (3) are channel-type cable bridge with vertical crane span structure (5).
3. according to a kind of mineral matter cabling arrangements described in claim 1 or 2, it is characterized in that: the quantity of the upper terminal board (7) installed of described horizontal stand (12) is two, and two described terminal boards (7) lay respectively at the left and right sides of horizontal stand (12).
4. according to a kind of mineral matter cabling arrangements according to claim 3, it is characterized in that: two described terminal boards (7) are respectively left terminal row and the right hand terminal row of the left and right sides being positioned at horizontal stand (12); Many described vertical cables (11) are divided into two groups, vertical cable (11) described in two groups comprises left-side cable on the left of one group of described vertical cable crane span structure that is laid in and one group of right-side cable be laid on the right side of described vertical cable crane span structure, and the quantity of described left-side cable and right-side cable is many; Many described left-side cable are all connected on described left terminal row, and many described right-side cable are all connected on described right hand terminal row.
5. according to a kind of mineral matter cabling arrangements according to claim 3, it is characterized in that: described horizontal stand (12) comprises and is arranged on rectangular frame (12-1) on vertical crane span structure (2) and two and is installed in the upper and terminal boards (12-2) that are that install for terminal board (7) of rectangular frame (12-1), two described terminal boards (12-2) lay respectively at the left and right sides of rectangular frame (12-1), and two described terminal boards (12-2) are arranged on two described terminal boards (12-2) respectively; Described rectangular frame (12-1) is vertically to laying.
6. according to a kind of mineral matter cabling arrangements described in claim 1 or 2, it is characterized in that: described horizontal stand (12) is arranged on the middle part of vertical crane span structure (2).
7. according to a kind of mineral matter cabling arrangements described in claim 1 or 2, it is characterized in that: described horizontal crane span structure (3) is positioned at the upper inner of vertical crane span structure (2), and horizontal stand (12) is positioned at horizontal crane span structure (3) below.
CN201520244651.5U 2015-04-22 2015-04-22 A kind of mineral matter cabling arrangements Expired - Fee Related CN204559019U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520244651.5U CN204559019U (en) 2015-04-22 2015-04-22 A kind of mineral matter cabling arrangements

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520244651.5U CN204559019U (en) 2015-04-22 2015-04-22 A kind of mineral matter cabling arrangements

Publications (1)

Publication Number Publication Date
CN204559019U true CN204559019U (en) 2015-08-12

Family

ID=53834090

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520244651.5U Expired - Fee Related CN204559019U (en) 2015-04-22 2015-04-22 A kind of mineral matter cabling arrangements

Country Status (1)

Country Link
CN (1) CN204559019U (en)

Similar Documents

Publication Publication Date Title
CN105298201B (en) Transmission line cable termination solid draws lower device
CN103944356A (en) Converter valve assembly and valve tower with converter valve assembly
CN202520040U (en) Bifurcated pole tower for realizing double-T connection of double circuit power transmission line
CN204668863U (en) 2M cell cube activity reason coil holder
CN204858287U (en) 220kVGIS three -layer roof beam outlet structure
CN204559019U (en) A kind of mineral matter cabling arrangements
CN206272192U (en) A kind of new 330kV power distribution equipments in high altitude localities
CN203205717U (en) Compact 220kV outdoor GIS power distribution equipment
CN103354319B (en) A kind of 220 kilovolts of outdoor GIS double-dragonfly-typoutlet outlet wire arrangement structure
CN205724627U (en) A kind of three-dimensional compact outlet structure being applicable to transformer station 330kV GIS
CN206389008U (en) Tank unifies power station cabin
CN204190186U (en) The compact HGIS three-row power distribution equipment of single tube post framework pattern is entirely combined based on 220kV
CN207459403U (en) A kind of vertical wire outlet structure of compact 330kV substations GIS
CN206611094U (en) A kind of outdoor GIS cable terminations fixing device
CN210127694U (en) Cable terminal pole for breaking one cable in double-circuit same-pole parallel power transmission line
CN206575071U (en) A kind of tree-like door frame outlet structure of 330kV open airs GIS power distribution equipments
CN102278532A (en) Two-directional bridge frame connector
CN203674655U (en) Distribution frame for network
CN217741187U (en) Cabling rack for cable laying
CN104141405A (en) Overhead junction pole for two-circuit overhead transmission line and line junction structure of overhead junction pole
CN204156311U (en) Standard wiring formula wire cable fixing clamp
CN203312638U (en) Screw type outgoing line framework arrangement structure of 220 kilovolt outdoor power distribution device
CN215733332U (en) Electric weak current shaft structure of building
CN108756419A (en) A kind of double back cable suitable for built span line draws lower facility
CN205012746U (en) Last style of calligraphy of 35kV cluster tangent tower

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150812