CN204551269U - A kind of high pier safe operating table - Google Patents

A kind of high pier safe operating table Download PDF

Info

Publication number
CN204551269U
CN204551269U CN201520090425.6U CN201520090425U CN204551269U CN 204551269 U CN204551269 U CN 204551269U CN 201520090425 U CN201520090425 U CN 201520090425U CN 204551269 U CN204551269 U CN 204551269U
Authority
CN
China
Prior art keywords
track bolt
buried track
buried
handling frame
pier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520090425.6U
Other languages
Chinese (zh)
Inventor
张原军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG YONGFENG MOULD MANUFACTURING Co Ltd
Original Assignee
ZHEJIANG YONGFENG MOULD MANUFACTURING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG YONGFENG MOULD MANUFACTURING Co Ltd filed Critical ZHEJIANG YONGFENG MOULD MANUFACTURING Co Ltd
Priority to CN201520090425.6U priority Critical patent/CN204551269U/en
Application granted granted Critical
Publication of CN204551269U publication Critical patent/CN204551269U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a kind of high pier safe operating table, comprise pier shaft, described pier shaft is provided with the first pre-buried track bolt and the second pre-buried track bolt, between described first pre-buried track bolt and the second pre-buried track bolt, the 3rd pre-buried track bolt is installed, described first pre-buried track bolt, the second pre-buried track bolt and the 3rd pre-buried track bolt are provided with bracing frame, support frame as described above is provided with handling frame, described handling frame comprises base, described base is provided with guardrail, and described base is connected with pier shaft.The high pier safe operating table of one described in the utility model, by the bracing frame that the pre-buried track bolt of first on pier shaft, the second pre-buried track bolt and the 3rd pre-buried track bolt are formed, coordinate guardrail thus the safety of guarantee handling frame, personnel safety factor improves greatly, operating speed is accelerated greatly, engineering is guaranteed both quality and quantity, brings benefit to the next generation.

Description

A kind of high pier safe operating table
Technical field
The utility model relates to bridge railway construction field, especially a kind of high pier safe operating table.
Background technology
Speedway, the operation of railway bridge deck-molding pier reinforcing bar binding are all large problems for safety all the time, safety is the repugnance in building forever, general way is that the high pier concrete surface of having built takes a temporary platform, the safety factor of operating personnel is not high, the operating speed of reinforcement installation is unhappy, affects programming.
Utility model content
The purpose of this utility model is to provide a kind of high pier safe operating table, by the bracing frame that the pre-buried track bolt of first on pier shaft, the second pre-buried track bolt and the 3rd pre-buried track bolt are formed, coordinate guardrail thus the safety of guarantee handling frame, personnel safety factor improves greatly, operating speed is accelerated greatly, engineering is guaranteed both quality and quantity, brings benefit to the next generation.
In order to achieve the above object, the technical solution of the utility model is:
A kind of high pier safe operating table, comprise pier shaft, described pier shaft is provided with the first pre-buried track bolt and the second pre-buried track bolt, between described first pre-buried track bolt and the second pre-buried track bolt, the 3rd pre-buried track bolt is installed, described first pre-buried track bolt, the second pre-buried track bolt and the 3rd pre-buried track bolt are provided with bracing frame, support frame as described above is provided with handling frame, described handling frame comprises base, described base is provided with guardrail, and described base is connected with pier shaft.
Support frame as described above 5 comprises the needling be arranged on the first pre-buried track bolt, be arranged on outer hound between needling and the second pre-buried track bolt, be arranged on inner oblique stay bars between needling and the 3rd pre-buried track bolt.
Described needling is provided with handling frame connector, described handling frame connector is provided with handling frame, described handling frame comprises the base be connected with handling frame connector, described base is provided with vertical rod, described vertical rod is connected with the cross bar intersected vertically with vertical rod, the intersection of described vertical rod and cross bar is connected with brace.
The beneficial effects of the utility model are: the high pier safe operating table of one of the present utility model, by the bracing frame that the pre-buried track bolt of first on pier shaft, the second pre-buried track bolt and the 3rd pre-buried track bolt are formed, coordinate guardrail thus the safety of guarantee handling frame, personnel safety factor improves greatly, operating speed is accelerated greatly, engineering is guaranteed both quality and quantity, brings benefit to the next generation.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention
Embodiment 1
A kind of high pier safe operating table as shown in Figure 1, comprise pier shaft 1, described pier shaft 1 is provided with the first pre-buried track bolt 2 and the second pre-buried track bolt 3, between described first pre-buried track bolt 2 and the second pre-buried track bolt 3, the 3rd pre-buried track bolt 4 is installed, the described first pre-buried track bolt 3 of pre-buried track bolt 2, second and the 3rd pre-buried track bolt 4 are provided with bracing frame 5, support frame as described above 5 is provided with handling frame 6, described handling frame 6 comprises base 7, described base 7 is provided with guardrail 8, and described base 7 is connected with pier shaft 1.
Support frame as described above 5 comprises the needling 9 be arranged on the first pre-buried track bolt 2, be arranged on outer hound 10 between needling 9 and the second pre-buried track bolt 3, be arranged on inner oblique stay bars 11 between needling 9 and the 3rd pre-buried track bolt 4.
Described needling 9 is provided with handling frame connector 12, described handling frame connector 12 is provided with handling frame 6, described handling frame 6 comprises the base 7 be connected with handling frame connector 12, described base 7 is provided with vertical rod 13, described vertical rod 13 is connected with the cross bar 14 intersected vertically with vertical rod 13, described vertical rod 13 is connected with brace 15 with the intersection of cross bar 14.
The high pier safe operating table of one of the present embodiment, by the bracing frame that the pre-buried track bolt of first on pier shaft, the second pre-buried track bolt and the 3rd pre-buried track bolt are formed, coordinate guardrail thus the safety of guarantee handling frame, personnel safety factor improves greatly, operating speed is accelerated greatly, engineering is guaranteed both quality and quantity, brings benefit to the next generation.

Claims (3)

1. one kind high pier safe operating table, it is characterized in that: comprise pier shaft (1), described pier shaft (1) is provided with the first pre-buried track bolt (2) and the second pre-buried track bolt (3), between described first pre-buried track bolt (2) and the second pre-buried track bolt (3), the 3rd pre-buried track bolt (4) is installed, described first pre-buried track bolt (2), second pre-buried track bolt (3) and the 3rd pre-buried track bolt (4) are provided with bracing frame (5), support frame as described above (5) is provided with handling frame (6), described handling frame (6) comprises base (7), described base (7) is provided with guardrail (8), described base (7) is connected with pier shaft (1).
2. the high pier safe operating table of one according to claim 1, is characterized in that: support frame as described above (5) comprises the needling (9) be arranged on the first pre-buried track bolt (2), be arranged on outer hound (10) between needling (9) and the second pre-buried track bolt (3), be arranged on inner oblique stay bars (11) between needling (9) and the 3rd pre-buried track bolt (4).
3. the high pier safe operating table of one according to claim 2, it is characterized in that: described needling (9) is provided with handling frame connector (12), described handling frame connector (12) is provided with handling frame (6), described handling frame (6) comprises the base (7) be connected with handling frame connector (12), described base (7) is provided with vertical rod (13), described vertical rod (13) is connected with the cross bar (14) intersected vertically with vertical rod (13), described vertical rod (13) is connected with brace (15) with the intersection of cross bar (14).
CN201520090425.6U 2015-02-10 2015-02-10 A kind of high pier safe operating table Expired - Fee Related CN204551269U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520090425.6U CN204551269U (en) 2015-02-10 2015-02-10 A kind of high pier safe operating table

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520090425.6U CN204551269U (en) 2015-02-10 2015-02-10 A kind of high pier safe operating table

Publications (1)

Publication Number Publication Date
CN204551269U true CN204551269U (en) 2015-08-12

Family

ID=53826402

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520090425.6U Expired - Fee Related CN204551269U (en) 2015-02-10 2015-02-10 A kind of high pier safe operating table

Country Status (1)

Country Link
CN (1) CN204551269U (en)

Similar Documents

Publication Publication Date Title
CN104097253B (en) Cross-saddle single-track traffic environment protection movable formula pre-track beam forms system
CN204552050U (en) A kind of anchor ear bearing frame and scaffolding platform assembly
CN204139459U (en) Regeneration concrete hetermorphiscal column
CN203383221U (en) Foundation pit support structure formed by armoured concrete and steel structure
CN204491828U (en) Can restore funcitons frame structure system
CN204491831U (en) Novel can restore funcitons frame-brace structure system
CN204040515U (en) Cat ladder
CN204551269U (en) A kind of high pier safe operating table
CN201598751U (en) Vertical-load borne thin steel plate shearing wall
CN204510215U (en) For the steel platform of foundation pit construction
CN202672484U (en) Steel pipe single-post structure
CN104453199A (en) Elevator shaft construction operation platform
CN204919363U (en) High mound pin -connected panel strength nature skeleton of anti high wind
CN207228626U (en) A kind of template for being exclusively used in built with ribbed bricks shear wall lintel collar tie beam
CN204326490U (en) A kind of construction of lift well operating platform
CN204983157U (en) Connection structure of reinforced concrete column and bracket
CN204754242U (en) Shear force wall horizontal ladder muscle three-dimensional positioner
CN101761153A (en) Thin steel-plate shear wall capable of bearing vertical load
CN204728477U (en) A kind of steel concrete girder connection applying shaped steel anchoring piece
CN204626964U (en) Concreting leak-proof device
CN204873614U (en) A cross beam supports for tower crane
CN204728478U (en) A kind of for the angle steel anchor combination embedded part in reinforced concrete frame
CN204728476U (en) A kind of for the angle steel anchor combination embedded part in reinforced concrete frame
CN203603509U (en) Pillar steel bar binding four-ring stool
CN203923912U (en) Crash barrier template stand

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150812

Termination date: 20160210