CN204551267U - Arch bridge needle beam, stringer and bridge deck cast-in-place construction travelling bridge - Google Patents

Arch bridge needle beam, stringer and bridge deck cast-in-place construction travelling bridge Download PDF

Info

Publication number
CN204551267U
CN204551267U CN201520064423.XU CN201520064423U CN204551267U CN 204551267 U CN204551267 U CN 204551267U CN 201520064423 U CN201520064423 U CN 201520064423U CN 204551267 U CN204551267 U CN 204551267U
Authority
CN
China
Prior art keywords
bridge
stringer
freely
distribution beam
suspension bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520064423.XU
Other languages
Chinese (zh)
Inventor
周文
冯朝军
王远锋
朱志钢
郭俊雅
邱肇京
李海泉
范伟
龚虹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Port and Channel Engineering Group Co Ltd
Bridge Branch of China Railway Port and Channel Engineering Group Co Ltd
Original Assignee
China Railway Port and Channel Engineering Group Co Ltd
Bridge Branch of China Railway Port and Channel Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Port and Channel Engineering Group Co Ltd, Bridge Branch of China Railway Port and Channel Engineering Group Co Ltd filed Critical China Railway Port and Channel Engineering Group Co Ltd
Priority to CN201520064423.XU priority Critical patent/CN204551267U/en
Application granted granted Critical
Publication of CN204551267U publication Critical patent/CN204551267U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of arch bridge needle beam, stringer and bridge deck cast-in-place construction travelling bridge, the edge-beam comprising slideway on the edge-beam that is contained in and watered both sides and watered across both sides and two ends are contained in the freely-supported suspension bracket on slideway, the some upper distribution beam of top distribution of freely-supported suspension bracket, each upper distribution beam all connects suspension rod, each boom foot is distribution beam under the below of freely-supported suspension bracket all connects, crossbeam is laid at lower distribution beam top, crossbeam is arranged the template system of building needle beam, stringer and bridge deck.It is less that this structure consumes auxiliary material; During construction, freely-supported suspension bracket can along slideway forward slip, complete one across after be movable to next across, easy to use; Non-floor-bracket, all work progresss all complete on moveable operation platform, and security risk is lower, and do not need Large-scale Hoisting equipment coordinative construction after installation, also do not limit by geographical environment.

Description

Arch bridge needle beam, stringer and bridge deck cast-in-place construction travelling bridge
Technical field
The utility model is used for technical field of bridge construction, particularly relates to a kind of arch bridge needle beam, stringer and bridge deck cast-in-place construction travelling bridge.
Background technology
Along with development, the growth in the living standard of China's economic strength, arch bridge is applied in town road more and more as a kind of bridge type attractive in appearance.For half-through steel box tied arch bridge, " Y type " triangle frame structure and upper steel case is often had to encircle above main pier even in aggregates.This structure construction order is generally: 2 " Y type " triangle frame concrete on main pier bearing platform of first constructing, then 2 edge-beams above constructing, " Y type " structure is made to become triangular structure, the large-scale transverse beam (before, during and after point) of constructing again between two triangular structures, finally construction 2 edge-beams and 3 large-scale transverse beams surround needle beam, stringer and the bridge deck in the middle of profile, form complete spanning load-carrying members.Be positioned at edge-beam and three large-scale before, during and after monolithic reinforced concrete structure between crossbeam be called needle beam, stringer and bridge deck.For needle beam, stringer and bridge deck cast-in-place construction in half-through steel box tied arch bridge triangle frame structure, according to design feature and on-site actual situations, the construction method of economical rationality can be selected.
Under normal circumstances, needle beam, stringer and bridge deck cast-in-place construction conventional method are: beam-column holder method is cast-in-place, raft support method is cast-in-place.
1. beam-column holder method: inserted to play steel pipe pile or prefabricated tubular pile basis below cast-in-place concrete structure, to construct little cushion cap, steel pipe post and connection structure are installed, pile cover and capital distribution beam, arrange that Bailey beam and bracing frame are formed as leap beam type braced structures and build support, Bailey beam end face arranges little distribution beam and steel pipe scaffold, its end face is adjusted to various pouring structure shape as required, last formwork erection, assembling reinforcement concreting, is beam-column holder method cast-in-place.
2. raft support method: the ground below cast-in-place concrete structure is carried out changing fill out, cure process, set up bowl fastening type or fastener type steel pipe scaffold, its end face is adjusted to various pouring structure shape as required, jacking and Tuo Nei distribution beam are installed, then formwork erection, assembling reinforcement concreting, is raft support method cast-in-place.
The shortcoming of prior art:
1. cast-in-place for beam-column holder method, can in land or use waterborne, need at each across inserted to play steel pipe pile below concrete structure or prefabricated tubular pile basis, make little cushion cap, need the steel pipe pile or prefabricated tubular pile, reinforcing bar and the concrete that consume some, this portion of material reclaims difficult or value is low, and particularly in-water foundation recovery difficult is very large.Need more heavy mechanical equipment: land piling needs pile driver, and marine piling needs pile driving barge, the peaces processed such as the steel pipe post in beam-column holder method and support need loop wheel machine, and waterborne needs hangs ship.Steel pipe support is heavier, and dismounting falls to use not easily.
2. cast-in-place for raft support method, use on land only, dismounting is fallen with more convenient than steel pipe support method, and main equipment uses less, but requires that bearing capacity of foundation soil is higher.Often need to change ground and fill out, build place hardened concrete, if at weak fault place or use raft support method waterborne, basement process cost is very high.
3. beam-column holder method and raft support method all need repeatedly to fall to use, the mounting or dismounting such as steel pipe and support need to use loop wheel machine, hang the crane gears such as ship, and full framing mounting or dismounting need more artificial unloading, also need loop wheel machine with the use of, two kinds of method convenience for construction are limited.
4. beam-column holder and full framing all need hole-specifically to install, and hole-specifically carry out load precompressed, and workload is large, and labour cost is large, dangerous, uneconomical.
5. the mounting or dismounting of beam-column holder and full framing all belong to work high above the ground, and security risk is large, and because support needs repeatedly to pacify to tear open, security risk is long, terminate from support installing construction to support removing construction always.
Utility model content
For solving the problem, the utility model provides a kind of arch bridge needle beam, stringer and bridge deck cast-in-place construction travelling bridge, save hole-specifically mounting or dismounting and the precompressed of beam-column holder or full framing, reduce auxiliary steel member use amount and improve steel utilization ratio, reduce working measure expense, accomplish disposable input, repeatedly income, convenient construction, reduces construction safety risk.
The utility model solves the technical scheme that its technical problem adopts: a kind of arch bridge needle beam, stringer and bridge deck cast-in-place construction travelling bridge, the edge-beam comprising slideway on the edge-beam that is contained in and watered both sides and watered across both sides and two ends are contained in the freely-supported suspension bracket on described slideway end face, the some upper distribution beam of top distribution of described freely-supported suspension bracket, each described upper distribution beam all connects suspension rod, each described boom foot distribution beam under the below of freely-supported suspension bracket all connects, crossbeam is laid at described lower distribution beam top, described crossbeam is arranged and builds needle beam, the template system of stringer and bridge deck.
Be further used as the improvement of technical solutions of the utility model, described freely-supported suspension bracket is assembled by some beret truss, is provided with the bearing be slidably connected between the two ends of described freely-supported suspension bracket and described slideway.
Be further used as the improvement of technical solutions of the utility model, described suspension rod comprises the front suspension rod and rear suspension bar that are contained in both sides before and after described template system respectively, described front suspension rod and rear suspension bar are provided with elevator above distribution beam on described, between described elevator and upper distribution beam, lifting jack are housed.
Be further used as the improvement of technical solutions of the utility model, also comprise the walking suspender belt be contained on the rear side sections concrete of having built, the lower end of described walking suspender belt connects hanging roller, and the rear end of described lower distribution beam arranges the long joining section be inserted in described hanging roller.
Be further used as the improvement of technical solutions of the utility model, described freely-supported suspension bracket top is connected with upper distribution beam and lower distribution beam bolt respectively with bottom.
The beneficial effects of the utility model: the edge-beam that this arch bridge needle beam, stringer and bridge deck cast-in-place construction travelling bridge utilize dual-side to water is fulcrum, between the edge-beam that both sides have been watered, freely-supported suspension bracket is set, the edge-beam watered arranges slideway, slideway can either bear working load, again can as the slide of slippage.Arrange above freely-supported suspension bracket some on distribution beam, each upper distribution beam hangs and arranges load-bearing suspension rod.Suspension rod lower end connects lower distribution beam, lower distribution beam is laid crossbeam, upper distribution beam and lower distribution beam one_to_one corresponding, penetrates suspension rod anchoring, crossbeam is provided with template system.During construction, put in place by the suspension rod template system that hoists, build needle beam, stringer and bridge deck, after concrete strength and the length of time reach designing requirement, carry out stretch-draw prestressing force steel strand and the vacuum grouting of needle beam inside, transfer template system by each suspension rod again, then move to next and build sections.Continuous reciprocation cycle, until the construction completing whole needle beam, stringer and bridge deck.
This hanger system is once assembled, Long-Time Service, and to the last one do not need mounting or dismounting across completing, do not need precompressed again, construction period does not need big machinery to lift yet, and material saving less manpower can accelerate the duration.It is less that this structure consumes auxiliary material; Constructed one across after be movable to next across, easy to use; Non-floor-bracket, all work progresss all complete on moveable operation platform, reduce the work high above the ground time, security risk is lower, and after installation, do not need Large-scale Hoisting equipment coordinative construction, without console mode support system, do not affect by the unfavorable terrain such as weak fault, river, can enforcement under complex environment, do not limit by geographical environment.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the utility model is described in further detail:
Fig. 1 is this structural representation arch bridge cross-sectional structure schematic diagram;
Fig. 2 is the utility model embodiment arch bridge needle beam, stringer and bridge deck cast-in-place construction travelling bridge structural front view;
Fig. 3 is the utility model embodiment arch bridge needle beam, stringer and bridge deck cast-in-place construction travelling bridge structure side view;
Fig. 4 is that the utility model embodiment arch bridge needle beam, stringer and bridge deck cast-in-place construction travelling bridge move forward structure side view.
Detailed description of the invention
With reference to Fig. 1 ~ Fig. 4, the utility model provides a kind of arch bridge needle beam, stringer and bridge deck cast-in-place construction travelling bridge, the edge-beam 1 comprising slideway 2 on the edge-beam 1 that is contained in and watered both sides and watered across both sides and two ends are contained in the freely-supported suspension bracket 3 on described slideway 2 end face, described freely-supported suspension bracket 3 is assembled by some beret truss, is provided with the bearing 31 be slidably connected between the two ends of described freely-supported suspension bracket 3 and described slideway 2.The some upper distribution beam 4 of top distribution of described freely-supported suspension bracket 3, each described upper distribution beam 4 all connects suspension rod 5, bottom each described suspension rod 5 under the below of freely-supported suspension bracket 3 all connects distribution beam 6, crossbeam 61 is laid at described lower distribution beam 6 top, described crossbeam 61 is arranged the template system 62 of building needle beam, stringer and bridge deck.Described freely-supported suspension bracket 3 top and bottom are connected with upper distribution beam 4 and lower distribution beam 6 bolt respectively.
Described suspension rod 5 is finish rolling deformed bar, described suspension rod 5 comprises the front suspension rod 51 and rear suspension bar 52 that are contained in both sides before and after described template system respectively, described front suspension rod 51 and rear suspension bar 52 are provided with elevator 53 above distribution beam 4 on described, between described elevator 53 and upper distribution beam 4, lifting jack 54 are housed.
Also comprise the walking suspender belt 7 be contained on the rear side sections concrete of having built, the lower end of described walking suspender belt 7 connects hanging roller 71, and the rear end of described lower distribution beam 6 arranges the long joining section 63 be inserted in described hanging roller 71.
A kind of arch bridge needle beam, stringer and bridge deck cast-in-situ construction method, comprise the following steps:
S10. prefabricated upper distribution beam 4, lower distribution beam 6, crossbeam 61 and template system 62, the edge-beam 1 that both sides have been watered installs slideway 2, the freely-supported suspension bracket 3 of the assembled edge-beam 1 watered across both sides on described slideway 2 end face, described freely-supported suspension bracket 3 adopts the assembled beret truss of tower crane to form, the two ends of described freely-supported suspension bracket 3 are provided with the bearing 31 be slidably connected with described slideway 2, top along described freely-supported suspension bracket 3 arranges 7 upper distribution beam 4, each described upper distribution beam 4 all connects suspension rod 5, bottom each described suspension rod 5 under the below of freely-supported suspension bracket 3 all connects distribution beam 6, crossbeam 61 is laid at described lower distribution beam 6 top, described crossbeam 61 is arranged and builds needle beam, the template system 62 of stringer and bridge deck, described suspension rod 5 comprises the front suspension rod 51 and rear suspension bar 52 that are contained in both sides before and after described template system 62 respectively, described front suspension rod 51 and rear suspension bar 52 are provided with elevator 53 above distribution beam 4 on described, 28t spiral lifting jack 54 is housed between described elevator 53 and upper distribution beam 4,
S11. arrange on described crossbeam 61 load with carry out load precompressed inspection freely-supported suspension bracket 3, on the intensity of hanger system of distribution beam 4, suspension rod 5, lower distribution beam 6 and crossbeam 61 composition, rigidity and stability, described crossbeam 61 is arranged load adopt lay oil skin in sand pocket embankment and the low groove among sand pocket embankment after carry out to the mode of water filling in oilcloth;
S20. promote suspension rod 5 by 28t spiral lifting jack 54 pushing tow elevator 53, promote lower distribution beam 6 by each described suspension rod 5, described template system 62 rises to lower distribution beam 6 and builds position;
S30. assembling reinforcement, prestressed pipeline and penetrate steel strand, adjustment template system 62 absolute altitude, concreting, after concrete strength and the length of time reach designing requirement, prestress wire in sections and vacuum grouting are originally built in stretch-draw;
S40. by transferring suspension rod 5 after 28t spiral lifting jack 54 pushing tow elevator 53, put down distribution beam 65 times by each described suspension rod, described template system 62 drops to the needle beam, stringer and the bridge deck concrete that leave built completely with lower distribution beam 6;
The sections concrete of S50. having built at rear side is installed walking suspender belt 7, the lower end of described walking suspender belt 7 connects hanging roller 71,5 lower distribution beam 6 rear end spreadings in 7 described lower distribution beam 6 are inserted in hanging roller 71, make it Free-rolling to move, rack winch, tackle pulley and wire rope are installed in bearing 31 front end below freely-supported suspension bracket 3 both ends, strengthen ground way 2, slideway 2 end face smears lithium saponify, with hoist engine traction bearing 31, traction freely-supported suspension bracket 3 moves forward to next along described slideway 2 end face and builds sections;
S60. repeat step S20 ~ S50, complete the pouring construction of whole sections.
S70. after last has been built across needle beam, stringer and bridge deck, lower distribution beam 6, crossbeam 61 and bed die system 62 are transferred spreading suspension rod 5 by the jacking of 28t spiral lifting jack 54 makes it put to ground dismounting, and the freely-supported suspension bracket 3 in beam face and slideway 2 system etc. adopt tower crane or beam face automobile loop wheel machine to remove.
The edge-beam 1 that this arch bridge needle beam, stringer and bridge deck cast-in-place construction travelling bridge utilize dual-side to water is fulcrum, between the edge-beam 1 that both sides have been watered, freely-supported suspension bracket 3 is set, the edge-beam 1 watered arranges slideway 2, slideway 2 can either bear working load, again can as the slipping base of slippage.Arrange above freely-supported suspension bracket 3 some on distribution beam 4, each upper distribution beam 4 arranges load-bearing suspension rod 5.Suspension rod 5 lower end connects lower distribution beam 6, lower distribution beam 6 is laid crossbeam 61, and upper distribution beam 4 and lower distribution beam 6 one_to_one corresponding, penetrate suspension rod 5 anchoring, crossbeam 61 is provided with template system 62.During construction, put in place by suspension rod 5 template system 62 that hoists, build needle beam, stringer and bridge deck, after concrete strength and the length of time reach designing requirement, after prestress wire in sections in needle beam and true mud jacking are originally built in stretch-draw, transfer template system 62 by each suspension rod 5, then by trailer system traction move it to next build sections.Continuous reciprocation cycle, until the construction completing whole needle beam, stringer and bridge deck.
This hanger system is once assembled, Long-Time Service, and to the last one do not need mounting or dismounting across completing, do not need precompressed again, construction period does not need big machinery to lift yet, and material saving less manpower can accelerate the duration.It is less that this structure consumes auxiliary material; Constructed one across after be movable to next across, easy to use; Non-floor-bracket, all work progresss all complete on moveable operation platform, reduce the work high above the ground time, security risk is lower, and after installation, do not need Large-scale Hoisting equipment coordinative construction, without console mode support system, do not affect by the unfavorable terrain such as weak fault, river, can enforcement under complex environment, do not limit by geographical environment.
Certainly, the invention is not limited to above-mentioned embodiment, those of ordinary skill in the art also can make equivalent variations or replacement under the prerequisite without prejudice to the utility model spirit, and these equivalent modification or replacement are all included in the application's claim limited range.

Claims (5)

1. an arch bridge needle beam, stringer and bridge deck cast-in-place construction travelling bridge, it is characterized in that: comprise slideway on the edge-beam end face that is contained in and watered both sides and the edge-beam that watered across both sides and two ends are contained in the freely-supported suspension bracket on described slideway end face, the some upper distribution beam of top distribution of described freely-supported suspension bracket, each described upper distribution beam all connects suspension rod, each described boom foot distribution beam under the below of freely-supported suspension bracket all connects, crossbeam is laid at described lower distribution beam top, described crossbeam is arranged the template system of building needle beam, stringer and bridge deck.
2. arch bridge needle beam according to claim 1, stringer and bridge deck cast-in-place construction travelling bridge, it is characterized in that: described freely-supported suspension bracket is assembled by some beret truss, between the two ends of described freely-supported suspension bracket and described slideway, be provided with the bearing be slidably connected.
3. arch bridge needle beam according to claim 1, stringer and bridge deck cast-in-place construction travelling bridge, it is characterized in that: described suspension rod comprises the front suspension rod and rear suspension bar that are contained in both sides before and after described template system respectively, described front suspension rod and rear suspension bar are provided with elevator above distribution beam on described, between described elevator and upper distribution beam, lifting jack are housed.
4. arch bridge needle beam according to claim 1, stringer and bridge deck cast-in-place construction travelling bridge, it is characterized in that: also comprise the walking suspender belt be contained on the rear side sections concrete of having built, the lower end of described walking suspender belt connects hanging roller, and the rear end of described lower distribution beam arranges the long joining section be inserted in described hanging roller.
5. arch bridge needle beam according to claim 1, stringer and bridge deck cast-in-place construction travelling bridge, is characterized in that: described freely-supported suspension bracket top is connected with upper distribution beam and lower distribution beam bolt respectively with bottom.
CN201520064423.XU 2015-01-29 2015-01-29 Arch bridge needle beam, stringer and bridge deck cast-in-place construction travelling bridge Expired - Fee Related CN204551267U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520064423.XU CN204551267U (en) 2015-01-29 2015-01-29 Arch bridge needle beam, stringer and bridge deck cast-in-place construction travelling bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520064423.XU CN204551267U (en) 2015-01-29 2015-01-29 Arch bridge needle beam, stringer and bridge deck cast-in-place construction travelling bridge

Publications (1)

Publication Number Publication Date
CN204551267U true CN204551267U (en) 2015-08-12

Family

ID=53826400

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520064423.XU Expired - Fee Related CN204551267U (en) 2015-01-29 2015-01-29 Arch bridge needle beam, stringer and bridge deck cast-in-place construction travelling bridge

Country Status (1)

Country Link
CN (1) CN204551267U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104631333A (en) * 2015-01-29 2015-05-20 中铁港航局集团有限公司 Moving hanger frame and method for small cross beam, small longitudinal beam and bridge deck slab cast-in-situ construction of arch bridge
CN109811657A (en) * 2019-01-23 2019-05-28 南昌大学 A kind of precast concrete is wet to connect a section prestressed pipe pipeline construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104631333A (en) * 2015-01-29 2015-05-20 中铁港航局集团有限公司 Moving hanger frame and method for small cross beam, small longitudinal beam and bridge deck slab cast-in-situ construction of arch bridge
CN104631333B (en) * 2015-01-29 2017-01-04 中铁港航局集团有限公司 Arch bridge needle beam, stringer and floorings cast-in-place construction travelling bridge and method
CN109811657A (en) * 2019-01-23 2019-05-28 南昌大学 A kind of precast concrete is wet to connect a section prestressed pipe pipeline construction method

Similar Documents

Publication Publication Date Title
CN104631333B (en) Arch bridge needle beam, stringer and floorings cast-in-place construction travelling bridge and method
CN100543235C (en) The method and system of erecting steel trusses by stay cable auxiliary complete cantilever
CN106978784B (en) A kind of Long span highway suspension bridge Demolition Construction method
CN205205635U (en) Stride footpath bailey frame steel suspension bridge structure greatly
CN204690605U (en) The self-propelled triangular truss hanging basket of large span beam bridge
CN102797227A (en) Construction method adopting inverted triangular obliquely-crawling hanging basket
CN106522112A (en) Cable-stayed bridge side span beam section erecting system and method thereof
CN203049466U (en) Downward bracket self-moving formwork bridge fabrication machine
CN106522101A (en) Construction method of superlong cable beam-free sections of cable-stayed bridge
CN102505636A (en) Construction method of No.0 block of continuous rigid frame bridge of double-thin-wall pier
WO2023016573A1 (en) Construction method for steel-concrete main girder of cable-stayed bridge
CN112854008A (en) Prefabricated bridge pier and beam integrated bridge girder erection machine and construction method thereof
CN110700119B (en) Design construction method of walking system on assembled bailey beam hanging basket
CN204551267U (en) Arch bridge needle beam, stringer and bridge deck cast-in-place construction travelling bridge
CN110904969A (en) High steep slope slab corridor structure concrete placement slipform system
CN106480826B (en) The cast-in-place traversing construction engineering method of single line box beam pier top
CN206538687U (en) Cable-stayed bridge end bay beam section construction system
CN102493363B (en) Quick construction method for segment No.0 of continuous beam
CN102926388A (en) Earth moving device and method for deep foundation pit excavation
CN106758827B (en) Chevron shaped prestressed concrete pre-tensioned method Bridge Erector and application method
CN102225580B (en) Method for longitudinally moving box girder internal mold
CN101122115B (en) Construction method for tower crane shift
CN105019357A (en) Method for mounting specially-shaped precast bridge decks on open lattice steel beams of arched bridge
CN210737607U (en) A hang braced system for reverse construction method beam slab construction
CN201972095U (en) Chain block lifting platform for thin-walled hollow piers of bridges

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150812

Termination date: 20200129