CN204532122U - Double lifting derrick and base - Google Patents

Double lifting derrick and base Download PDF

Info

Publication number
CN204532122U
CN204532122U CN201520169769.6U CN201520169769U CN204532122U CN 204532122 U CN204532122 U CN 204532122U CN 201520169769 U CN201520169769 U CN 201520169769U CN 204532122 U CN204532122 U CN 204532122U
Authority
CN
China
Prior art keywords
derrick
base
pulleys
sides
upper seat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520169769.6U
Other languages
Chinese (zh)
Inventor
李全星
程鹏
张志伟
卫虹
高啸天
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
Baoji Oilfield Machinery Co Ltd
CNPC National Oil and Gas Drilling Equipment Engineering Technology Research Center Co Ltd
Original Assignee
Baoji Oilfield Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baoji Oilfield Machinery Co Ltd filed Critical Baoji Oilfield Machinery Co Ltd
Priority to CN201520169769.6U priority Critical patent/CN204532122U/en
Application granted granted Critical
Publication of CN204532122U publication Critical patent/CN204532122U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

本实用新型公开了一种双升式井架与底座,包括井架、底座及人字架,底座包括基座和上座,所述的井架及人字架的下端均铰接在基座上,在井架的中下段两侧对称设置有滑轮一组,在人字架顶端的两侧对称设置有滑轮二组,在上座的两侧对称设置有滑轮;在井架及底座的两侧对称设置两条井架起升大绳,同时,在井架及底座的两侧对称设置两条上座起升大绳。本实用新型的装置,将井架和底座分别采用两套起升滑轮和起升大绳起升,增加了井架和上座起升时大绳绳系数量,并对井架中部提供钢丝绳拉力支撑,以大幅减小井架起升时悬臂长度,降低井架和上座起升载荷,改善滑轮附件结构受力状态,满足了大幅提高井架作业高度及安全空间。

The utility model discloses a double-lift derrick and a base, comprising a derrick, a base and a gable frame, the base comprises a base and an upper seat, the lower ends of the derrick and the gable frame are hinged on the base, and the A set of pulleys is symmetrically arranged on both sides of the middle and lower section, two sets of pulleys are arranged symmetrically on both sides of the top of the gable frame, pulleys are arranged symmetrically on both sides of the upper seat; two sets of derrick lifting are arranged symmetrically on both sides of the derrick and base Large ropes, meanwhile, two upper seat hoisting large ropes are arranged symmetrically on both sides of the derrick and the base. The device of the utility model adopts two sets of hoisting pulleys and large hoisting ropes to lift the derrick and the base respectively, increases the number of large ropes and ropes when the derrick and the upper seat are lifted, and provides steel wire rope tension support for the middle part of the derrick to greatly The length of the cantilever when the derrick is lifted is reduced, the lifting load of the derrick and the upper seat is reduced, and the stress state of the pulley attachment structure is improved, which meets the requirements of greatly increasing the operating height and safety space of the derrick.

Description

双升式井架与底座Double rise derrick and base

技术领域technical field

本实用新型属于石油机械设备技术领域,涉及一种双升式井架与底座。The utility model belongs to the technical field of petroleum machinery and relates to a double-lifting derrick and a base.

背景技术Background technique

目前生产的一次穿绳,连续起升石油钻机井架、底座,采用一根大绳一次穿绳,连续将井架和底座依次起升至工作位置。采用该结构钻机具有:井架和人字架下端铰接在底部基座上,整体结构稳定性好;起升简便,安装工作强度低;井架开档尺寸大、钻台开阔,便于设备布置;井架校正在钻台面进行,操作方便等优点被广泛使用。缺点是采用该结构钻机井架起升时,起升载荷由大绳集中作用在井架下部滑轮及滑轮盒附件结构上,井架滑轮以上部位整体悬臂,致使井架滑轮附近部件受力恶劣,结构臃肿,重量很大。At present, the one-time rope threading and continuous lifting of the oil drilling rig derrick and base adopt a large rope for one-time rope threading, and continuously lift the derrick and the base to the working position successively. The drilling rig with this structure has the following advantages: the lower end of the derrick and the gable frame are hinged on the bottom base, the overall structural stability is good; the lifting is simple and the installation work intensity is low; It is carried out on the drill floor, and the advantages of convenient operation are widely used. The disadvantage is that when the drilling derrick is lifted with this structure, the lifting load is concentrated on the lower pulley of the derrick and the attachment structure of the pulley box by the large rope, and the part above the derrick pulley is integrally cantilevered, resulting in bad stress on the parts near the derrick pulley, bloated structure, and heavy weight. very big.

随着钻井工艺的发展、行业标准对钻井安全要求的提高以及钻井市场竞争的激烈化,客户对钻机的搬迁、安装及作业安全性提出了更高的要求:在保留原有一次穿绳连续起升井架底座结构优点的同时,大幅提高井架的作业高度及安全空间,并携带顶驱及顶驱导轨等设备随井架起升和下放。现有的一次穿绳连续起升井架底座因起升方式所限,无法满足市场要求。With the development of drilling technology, the improvement of industry standards for drilling safety requirements and the intensification of competition in the drilling market, customers have put forward higher requirements for the relocation, installation and operation safety of drilling rigs: While improving the structural advantages of the derrick base, the operating height and safety space of the derrick are greatly improved, and equipment such as top drive and top drive guide rails are lifted and lowered with the derrick. The existing continuous hoisting derrick pedestal with a single threading rope cannot meet the market requirements due to the limitation of the hoisting method.

实用新型内容Utility model content

本实用新型的目的是提供一种双升式井架与底座,解决了现有技术中存在的起升载荷由大绳集中作用在井架下部滑轮及滑轮盒附件结构上,井架滑轮以上部位整体悬臂,致使井架滑轮附近部件受力恶劣,结构臃肿的问题。The purpose of this utility model is to provide a double-lift derrick and base, which solves the problem in the prior art that the hoisting load is concentrated on the pulley at the lower part of the derrick and the accessory structure of the pulley box by the large rope, and the part above the derrick pulley is integrally cantilevered. As a result, the components near the derrick pulley are badly stressed and the structure is bloated.

本实用新型所采用的技术方案是,一种双升式井架与底座,包括井架、底座及人字架,底座包括基座和上座,所述的井架及人字架的下端均铰接在基座上,在井架的中下段两侧对称设置有滑轮一组,在人字架顶端的两侧对称设置有滑轮二组,在上座的两侧对称设置有滑轮;The technical solution adopted in the utility model is a double-lift derrick and base, including a derrick, a base and a gable frame, the base includes a base and an upper seat, and the lower ends of the derrick and the gable frame are hinged on the base On the top, one set of pulleys is symmetrically arranged on both sides of the middle and lower section of the derrick, two sets of pulleys are symmetrically arranged on both sides of the top of the gable frame, and two sets of pulleys are symmetrically arranged on both sides of the upper seat;

在井架及底座的两侧对称设置两条井架起升大绳,同时,在井架及底座的两侧对称设置两条上座起升大绳。Two derrick hoisting ropes are symmetrically arranged on both sides of the derrick and the base, and two upper seat lifting ropes are symmetrically arranged on both sides of the derrick and the base.

本实用新型的双升式井架与底座,其特征还在于:The double-lift derrick and the base of the utility model are also characterized in that:

滑轮一组由四个滑轮组合而成。A set of pulleys is composed of four pulleys.

滑轮二组由两个滑轮组合而成。The second set of pulleys is composed of two pulleys.

井架起升大绳的一端固定在井架中部后立柱耳板上,另一端依次绕过滑轮二组及滑轮一组后挂在与游吊连接的起升三角架上。One end of the derrick hoisting rope is fixed on the ear plate of the rear column in the middle of the derrick, and the other end goes around the second set of pulleys and the first set of pulleys in turn and hangs on the lifting tripod connected with the traveling crane.

上座起升大绳的一端固定在井人字架侧面的固定耳板上,另一端依次绕过滑轮及滑轮一组后挂在与游吊连接的起升三角架上。One end of the lifting rope of the upper seat is fixed on the fixed ear plate on the side of the herringbone frame, and the other end goes around the pulley and a set of pulleys in turn and hangs on the lifting tripod connected with the traveling crane.

本实用新型的有益效果是,该双升式井架与底座,保留原一次穿绳连续起升井架、底座结构型式,在井架、人字架、底座上增加大绳连接耳板、导向滑轮,将井架和底座分别采用两套起升滑轮和起升大绳起升,增加了井架和上座起升时大绳绳系数量,并对井架中部提供钢丝绳拉力支撑,以大幅减小井架起升时悬臂长度,降低井架和上座起升载荷,改善滑轮附件结构受力状态,满足了大幅提高井架作业高度及安全空间,携带顶驱及顶驱导轨进行起升与下放的结构性要求。The beneficial effect of the utility model is that the double-lifting derrick and the base retain the original one-time stringing continuous hoisting derrick and the structure of the base, and a large rope is added to the derrick, the herringbone frame, and the base to connect the lug plate and the guide pulley. The derrick and base are hoisted with two sets of hoisting pulleys and large hoisting ropes respectively, which increases the number of large ropes and ropes when the derrick and the upper base are hoisted, and provides steel wire rope tension support for the middle of the derrick to greatly reduce the cantilever when the derrick is hoisted. length, reduce the hoisting load of the derrick and the upper block, improve the stress state of the pulley attachment structure, and meet the structural requirements of greatly increasing the operating height and safety space of the derrick, and carrying the top drive and top drive guide rail for lifting and lowering.

附图说明Description of drawings

图1为本实用新型井架结构在地面起升初始状态示意图;Fig. 1 is the schematic diagram of the initial state of the derrick structure of the utility model when it is lifted on the ground;

图2为图1中的俯视图;Fig. 2 is the top view in Fig. 1;

图3为图1中的A处局部放大示意图;Fig. 3 is a partially enlarged schematic diagram of A in Fig. 1;

图4为图2中的B处局部放大示意图;Fig. 4 is a partially enlarged schematic diagram of B in Fig. 2;

图5为本实用新型井架起升过程示意图,Fig. 5 is a schematic diagram of the lifting process of the derrick of the utility model,

图6为本实用新型底座结构起升初始状态示意图,Fig. 6 is a schematic diagram of the initial lifting state of the base structure of the utility model,

图7为本实用新型上座起升过程示意图,Figure 7 is a schematic diagram of the lifting process of the upper seat of the utility model,

图8为本实用新型上座起升完成后结构示意图。Fig. 8 is a structural schematic diagram of the utility model after the upper seat is lifted.

图中,1.井架,2.底座,3.人字架,4.基座,5.上座,6.滑轮一组,7.滑轮二组,8.井架起升大绳,9.上座起升大绳,10.滑轮,11.起升三角架。In the figure, 1. Derrick, 2. Base, 3. Herringbone frame, 4. Base, 5. Upper seat, 6. One set of pulleys, 7. Two sets of pulleys, 8. Derrick hoisting rope, 9. Upper seat Raise big rope, 10. pulley, 11. lifting tripod.

具体实施方式Detailed ways

下面结合附图和具体实施方式对本实用新型进行详细说明。The utility model will be described in detail below in conjunction with the accompanying drawings and specific embodiments.

参照图1、图2,本实用新型双升式井架与底座的结构是,包括井架1、底座2及人字架3,底座2包括基座4和上座5,井架1及人字架3的下端均铰接在基座4上,在井架1的中下段两侧对称设置有滑轮一组6(即图1中的A处位置,图3实施例中的滑轮一组6由四个滑轮61/62/63/64组合而成),在人字架3顶端的两侧对称设置有滑轮二组7(即图2中的B处位置,图4实施例中的滑轮二组7由两个滑轮71/72组合而成),在上座5的两侧对称设置有滑轮10;With reference to Fig. 1, Fig. 2, the structure of the utility model double lifting type derrick and base is, comprises derrick 1, base 2 and herringbone frame 3, base 2 comprises base 4 and upper seat 5, derrick 1 and herringbone frame 3 The lower ends are all hinged on the base 4, and a group of pulleys 6 are symmetrically arranged on both sides of the middle and lower section of the derrick 1 (i.e. the position at A in Fig. 1, the group of pulleys 6 in the embodiment of Fig. 3 consists of four pulleys 61/ 62/63/64), two sets of pulleys 7 are symmetrically arranged on both sides of the top of the herringbone frame 3 (that is, the position at B in Fig. 2, and the two sets of pulleys 7 in the embodiment of Fig. 4 are composed of two pulleys 71/72 combination), the both sides of upper seat 5 are symmetrically provided with pulley 10;

在井架1及底座2的两侧对称设置两条井架起升大绳8,同时,在井架1及底座2的两侧对称设置两条上座起升大绳9;井架起升大绳8用于井架1的起升,井架起升大绳8的一端固定在井架1中部后立柱耳板上,另一端依次绕过滑轮滑轮二组7及滑轮一组6(即滑轮71/72、61、62)后挂在与游吊连接的起升三角架11上;上座起升大绳9用于上座5的起升,上座起升大绳9的一端固定在井人字架3侧面的固定耳板上,另一端依次绕过滑轮10及滑轮一组6(其中的滑轮64、63)后挂在与游吊连接的起升三角架11上。Two derrick lifting ropes 8 are symmetrically arranged on both sides of the derrick 1 and the base 2, and at the same time, two upper seat lifting ropes 9 are symmetrically arranged on both sides of the derrick 1 and the base 2; the derrick lifting ropes 8 are used for For the hoisting of the derrick 1, one end of the hoisting rope 8 of the derrick is fixed on the ear plate of the rear column in the middle of the derrick 1, and the other end goes around the pulleys, the second group of pulleys 7 and the first group of pulleys 6 (that is, the pulleys 71/72, 61, 62 ) after being hung on the lifting tripod 11 connected with the swimming crane; the upper seat hoisting rope 9 is used for the lifting of the upper seat 5, and one end of the upper seat hoisting rope 9 is fixed on the fixed ear plate of the well herringbone frame 3 sides On, the other end walks around pulley 10 and pulley group 6 (pulley 64,63 wherein) successively and hangs on the hoisting tripod 11 that is connected with traveling crane.

本实用新型的工作原理是:The working principle of the utility model is:

参照图5,井架起升时,钻机主绞车提升游吊和起升三角架11牵引井架起升大绳8将井架1从水平状态起升到垂直工作状态,将井架1与人字架3连接固定牢靠后,拆开井架起升大绳8与起升三角架11的连接,并将该井架起升大绳8端头固定在井架挂绳器中,下放游吊至低位,井架1起升完成,见图6。Referring to Fig. 5, when the derrick is hoisted, the main drawworks of the drilling rig lifts the traveling crane and the tripod 11 pulls the derrick hoisting rope 8 to lift the derrick 1 from the horizontal state to the vertical working state, and connects the derrick 1 to the gable frame 3 After being fixed securely, disassemble the connection between the derrick hoisting rope 8 and the hoisting tripod 11, and fix the end of the derrick hoisting rope 8 in the derrick rope hanger, lower and hang it to a low position, and the derrick 1 is lifted. Complete, see Figure 6.

参照图7,起升上座5时,将上座起升大绳9一端与人字架3上固定耳板连接,另一端与钻机主绞车提升游吊和起升三角架11连接,上座起升大绳9穿过上座5上的滑轮10,启动钻机主绞车提升游吊,将上座5从低位起升到高位工作状态,将底座2和人字架3连接固定牢靠后,拆开上座起升大绳9与起升三角架11的连接,并将该上座起升大绳9端头固定在井架挂绳器中,下放游吊至低位,底座2起升完成,见图8。Referring to Fig. 7, when lifting the upper stand 5, one end of the upper stand hoisting rope 9 is connected with the fixed lug plate on the herringbone frame 3, and the other end is connected with the main drawworks hoisting crane of the drilling rig and the lifting tripod 11, and the upper stand is lifted large The rope 9 passes through the pulley 10 on the upper base 5, starts the main drawworks of the drilling rig to lift the traveling crane, lifts the upper base 5 from a low position to a high position, connects the base 2 and the gable 3 firmly, and disassembles the upper base for lifting. Rope 9 is connected with hoisting tripod 11, and the end of the upper seat hoisting rope 9 is fixed in the derrick rope hanger, lowered and swung to a low position, and the base 2 is hoisted, as shown in Figure 8.

本实用新型的双升式井架与底座,保留原一次穿绳连续起升井架、底座结构型式,在井架、人字架、底座上增加大绳连接耳板、导向滑轮,将井架和底座分别采用两套起升滑轮和起升大绳起升,增加了井架和上座起升时大绳绳系数量目,并对井架中部提供钢丝绳拉力支撑,以大幅减小井架起升时悬臂长度,降低井架和上座起升载荷,改善滑轮附件结构受力状态,满足了大幅提高井架作业高度及安全空间,携带顶驱及顶驱导轨进行起升与下放的结构性要求。The double-lifting derrick and base of the utility model retains the original one-time continuous hoisting derrick and base structure, and adds large rope connecting ear plates and guide pulleys to the derrick, herringbone frame and base, and uses the derrick and base respectively Two sets of hoisting pulleys and hoisting ropes increase the number of ropes and ropes when the derrick and the upper stand are lifted, and provide steel wire rope tension support for the middle of the derrick to greatly reduce the cantilever length when the derrick is hoisted and lower the derrick. And the lifting load of the top seat, improving the stress state of the pulley attachment structure, meeting the structural requirements of greatly increasing the operating height and safety space of the derrick, and carrying the top drive and top drive guide rail for lifting and lowering.

Claims (5)

1.一种双升式井架与底座,包括井架(1)、底座(2)及人字架(3),底座(2)包括基座(4)和上座(5),其特征在于:1. A double-lifting derrick and base, comprising a derrick (1), a base (2) and a gable (3), the base (2) comprising a base (4) and an upper seat (5), characterized in that: 所述的井架(1)及人字架(3)的下端均铰接在基座(4)上,在井架(1)的中下段两侧对称设置有滑轮一组(6),在人字架(3)顶端的两侧对称设置有滑轮二组(7),在上座(5)的两侧对称设置有滑轮(10);The lower ends of the derrick (1) and the derrick (3) are all hinged on the base (4), and a group of pulleys (6) are symmetrically arranged on both sides of the middle and lower section of the derrick (1). (3) two sets of pulleys (7) are symmetrically arranged on both sides of the top, and pulleys (10) are symmetrically arranged on both sides of the upper seat (5); 在井架(1)及底座(2)的两侧对称设置两条井架起升大绳(8),同时,在井架(1)及底座(2)的两侧对称设置两条上座起升大绳(9)。Two derrick hoisting ropes (8) are symmetrically arranged on both sides of the derrick (1) and the base (2), and at the same time, two upper seat lifting ropes are symmetrically arranged on both sides of the derrick (1) and the base (2) (9). 2.根据权利要求1所述的双升式井架与底座,其特征在于:所述的滑轮一组(6)由四个滑轮组合而成。2. The double-lift derrick and base according to claim 1, characterized in that: the set of pulleys (6) is composed of four pulleys. 3.根据权利要求1所述的双升式井架与底座,其特征在于:所述的滑轮二组(7)由两个滑轮组合而成。3. The double-lift derrick and base according to claim 1, characterized in that: the two sets of pulleys (7) are composed of two pulleys. 4.根据权利要求1所述的双升式井架与底座,其特征在于:所述的井架起升大绳(8)的一端固定在井架(1)中部后立柱耳板上,另一端依次绕过滑轮二组(7)及滑轮一组(6)后挂在与游吊连接的起升三角架(11)上。4. The double-lift derrick and base according to claim 1, characterized in that: one end of the derrick hoisting rope (8) is fixed on the ear plate of the rear column in the middle of the derrick (1), and the other end is wound around After two groups of pulleys (7) and one group of pulleys (6), hang on the hoisting tripod (11) that is connected with the swimming crane. 5.根据权利要求1所述的双升式井架与底座,其特征在于:所述的上座起升大绳(9)的一端固定在井人字架(3)侧面的固定耳板上,另一端依次绕过滑轮(10)及滑轮一组(6)后挂在与游吊连接的起升三角架(11)上。5. The double-lift derrick and base according to claim 1, characterized in that: one end of the upper seat hoisting rope (9) is fixed on the fixed ear plate on the side of the well frame (3), and the other One end walks around the pulley (10) and one group of pulleys (6) successively and hangs on the lifting tripod (11) connected with the traveling crane.
CN201520169769.6U 2015-03-25 2015-03-25 Double lifting derrick and base Expired - Fee Related CN204532122U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520169769.6U CN204532122U (en) 2015-03-25 2015-03-25 Double lifting derrick and base

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520169769.6U CN204532122U (en) 2015-03-25 2015-03-25 Double lifting derrick and base

Publications (1)

Publication Number Publication Date
CN204532122U true CN204532122U (en) 2015-08-05

Family

ID=53746145

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520169769.6U Expired - Fee Related CN204532122U (en) 2015-03-25 2015-03-25 Double lifting derrick and base

Country Status (1)

Country Link
CN (1) CN204532122U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112065289A (en) * 2020-09-29 2020-12-11 中油国家油气钻井装备工程技术研究中心有限公司 Novel rotary lifting type derrick base
CN112627741A (en) * 2020-12-29 2021-04-09 中油国家油气钻井装备工程技术研究中心有限公司 Same-lifting derrick base
US11851953B2 (en) 2020-05-05 2023-12-26 Saudi Arabian Oil Company Mast safety system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11851953B2 (en) 2020-05-05 2023-12-26 Saudi Arabian Oil Company Mast safety system
CN112065289A (en) * 2020-09-29 2020-12-11 中油国家油气钻井装备工程技术研究中心有限公司 Novel rotary lifting type derrick base
CN112065289B (en) * 2020-09-29 2022-08-05 中油国家油气钻井装备工程技术研究中心有限公司 Rotary lifting type derrick base
CN112627741A (en) * 2020-12-29 2021-04-09 中油国家油气钻井装备工程技术研究中心有限公司 Same-lifting derrick base

Similar Documents

Publication Publication Date Title
CN201778661U (en) Hydraulic-cylinder-lifted slingshot derrick substructure
CN103545751B (en) Overhead transmission line ground wire optical cable fittings replacement bracket
CN202785364U (en) Movable dual-door-type mast hoisting device
CN204532122U (en) Double lifting derrick and base
CN202108420U (en) Land headframe for duplex rig
CN202064840U (en) Four-drill column drill derrick
CN204827251U (en) Novel suit derrick upright
CN205297356U (en) Two pneumatic cylinders play to rise rig
CN207552941U (en) Tooth block tensioning equipment mobile formwork on roof box in a kind of cast-in-situ continuous beam
CN204677119U (en) The telescopic derrick of the upright movement height of a kind of adjustable
CN206014344U (en) Oil-well rig preventer hangs shifting and safeguards integrated apparatus
CN204958320U (en) A construction heavy lifting machine
CN201003378Y (en) New type rotary derrick and base
CN203321336U (en) Device for adopting drilling line to realize lifting of oil rig self-elevating derrick
CN204552615U (en) Truck-mounted drilling rig and mast mechanism thereof
CN109236211A (en) A kind of production rig
CN209835518U (en) Oil cylinder lifting type lifting system for drilling
CN202754777U (en) Slide-resistant pile lifting construction platform
CN212356345U (en) A hoisting device for maintenance of large-scale fluid machinery
CN204508629U (en) A kind of light type agricultural lifting appliance
CN206857980U (en) A kind of dovetail groove profile hoisting mechanism
CN202596680U (en) Fixed type oil fishing machine
CN209908424U (en) A simple hydraulic workover rig for offshore platforms
CN205294680U (en) lifting device
CN201043443Y (en) Derrick and base for continuous hoisting by one-shot rope

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210104

Address after: 721002 No.2 Dongfeng Road, Jintai District, Baoji City, Shaanxi Province

Patentee after: BAOJI OILFIELD MACHINERY Co.,Ltd.

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Patentee after: CNPC national oil and gas drilling equipment Engineering Technology Research Center Co.,Ltd.

Address before: 721002 No. 2 Dongfeng Road, Shaanxi, Baoji

Patentee before: Baoji Oilfield Machinery Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150805

CF01 Termination of patent right due to non-payment of annual fee