CN204511452U - 一种地下矿井斜坡道的路径布置结构 - Google Patents
一种地下矿井斜坡道的路径布置结构 Download PDFInfo
- Publication number
- CN204511452U CN204511452U CN201520203069.4U CN201520203069U CN204511452U CN 204511452 U CN204511452 U CN 204511452U CN 201520203069 U CN201520203069 U CN 201520203069U CN 204511452 U CN204511452 U CN 204511452U
- Authority
- CN
- China
- Prior art keywords
- ramp
- entry
- mine
- entrance
- arrangement structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
一种地下矿径井斜坡道的路径布置结构,属于矿井工程技术领域,用于提供采矿的经济性。其技术方案是:它包括多个不同深度的水平巷道,多个水平巷道之间有竖井连接和连接斜坡道相连接,地表的斜坡道入口与第二个水平巷道有进入斜坡道直接连接,在满足运输及设计规范的条件下斜坡道平均坡度尽可能大,同时综合考虑第1个水平日后与斜坡道的连接距离。本实用新型突破了斜坡道路径设计的传统思维,特别针对回采顺序由下而上、且斜坡道入口距矿体远的地下矿井斜坡道的路径设计,本实用新型的布置结构经济合理,能够大幅度地减少矿山工程前期投资,缩短建设工期,提前达到设计产量,提高生产效率。
Description
技术领域
本实用新型涉及一种地下矿斜坡道的路径布置结构,属于矿井工程技术领域。
背景技术
在地下矿井中有多层水平巷道,与水平巷道相连接的有斜坡道系统。传统的斜坡道的路径布置往往是按折返的形式由上到下依次到达各水平巷道,这种设计方案对于回采顺序由上而下的矿山而言是经济合理的,但对于回采顺序由下而上,斜坡道入口距矿体远的矿山是很不经济的,因此有必要寻求一种新的斜坡道路径布置结构,以缩短矿山建设工期,节省工程投资。
实用新型内容
本实用新型所要解决的技术问题是提供一种地下矿井斜坡道的路径布置结构,这种路径布置结构适合于回采顺序由下而上、且斜坡道入口距矿体远的地下矿山。
解决上述技术问题的技术方案是:
一种地下矿井斜坡道的路径布置结构,它包括多个不同深度的水平巷道,多个水平巷道之间有竖井连接和连接斜坡道相连接,其改进之处是,地表的斜坡道入口与第二个水平巷道有进入斜坡道直接连接。
上述地下矿井斜坡道的路径布置结构,所述地表的斜坡道入口与第二个水平巷道连接的进入斜坡道的坡度为6.5度~8.5度。
本实用新型的有益效果是:
本实用新型突破了斜坡道路径设计的传统思维,特别针对回采顺序由下而上、且斜坡道入口距矿体远的地下矿井斜坡道的路径设计,本实用新型的布置结构经济合理,能够大幅度地减少矿山工程前期投资,缩短建设工期,提前达到设计产量,提高生产效率。
附图说明
图1是本实用新型的结构示意图。
图中标记如下:第一个水平巷道1、第二个水平巷道2、进入斜坡道3、斜坡道入口4、竖井5、连接斜坡道6。
具体实施方式
图中显示,本实用新型包括多个不同深度的水平巷道,多个水平巷道之间有竖井5连接和连接斜坡道6相连接。
图中显示,本实用新型的地表的斜坡道入口4跳过第一个水平巷道1直接与第二个水平巷道2用进入斜坡道3相连接。斜坡道入口4与第二个水平巷道2连接的进入斜坡道3的坡度为6.5度~8.5度。
在具体实施过程中,当回采顺序由下而上的地下矿山的第一个水平巷道1(中段)确定后,在地表选取最佳斜坡道入口4,先将进入斜坡道3引入第二个水平巷道2,在满足运输及设计规范的条件下进入斜坡道3平均坡度尽可能大,同时综合考虑第一个水平巷道1日后与进入斜坡道3的连接距离。
具体过程如下:
1.结合矿区地质地形条件,因地制宜选好斜坡道入口4。
2.根据进入斜坡道3跳过第一个水平巷道1后直接到达第二个水平巷道2确定进入斜坡道3的平均坡度。
3.综合考虑矿体赋存情况、进入斜坡道3所穿越地段的水文地质条件以及第一个水平巷道1位置情况,对斜坡道入口4到第二个水平巷道2的进入斜坡道3进行合理的布置,在满足运输及设计规范的条件下进入斜坡道3平均坡度尽可能大。
4.进入斜坡道3穿过第二水平巷道2后,再按照折返式布置通达第一个水平巷道1及以下各水平巷道的连接斜坡道6。
Claims (2)
1.一种地下矿井斜坡道的路径布置结构,它包括多个不同深度的水平巷道,多个水平巷道之间有竖井(5)连接和连接斜坡道(6)相连接,其特征在于:地表的斜坡道入口(4)与第二个水平巷道(2)有进入斜坡道(3)直接连接。
2.根据权利要求1所述的地下矿井斜坡道的路径布置结构,其特征在于:所述地表的斜坡道入口(4)与第二个水平巷道(2)连接的进入斜坡道(3)的坡度为6.5度~8.5度。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520203069.4U CN204511452U (zh) | 2015-04-07 | 2015-04-07 | 一种地下矿井斜坡道的路径布置结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520203069.4U CN204511452U (zh) | 2015-04-07 | 2015-04-07 | 一种地下矿井斜坡道的路径布置结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204511452U true CN204511452U (zh) | 2015-07-29 |
Family
ID=53709442
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520203069.4U Expired - Fee Related CN204511452U (zh) | 2015-04-07 | 2015-04-07 | 一种地下矿井斜坡道的路径布置结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204511452U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114033490A (zh) * | 2021-11-23 | 2022-02-11 | 清华四川能源互联网研究院 | 矿洞储气型压缩空气储能系统及其控制方法 |
-
2015
- 2015-04-07 CN CN201520203069.4U patent/CN204511452U/zh not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114033490A (zh) * | 2021-11-23 | 2022-02-11 | 清华四川能源互联网研究院 | 矿洞储气型压缩空气储能系统及其控制方法 |
CN114033490B (zh) * | 2021-11-23 | 2023-09-05 | 清华四川能源互联网研究院 | 矿洞储气型压缩空气储能系统及其控制方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102493838B (zh) | 一种急倾斜煤层综采连续充填采煤方法 | |
CN104074521B (zh) | 一种端帮煤层远程控制掘进开采方法 | |
CN106321103A (zh) | 一种固体充填协同人工矿柱回收房式煤柱方法 | |
CN105275471A (zh) | 一种确定露天矿山开采境界的方法 | |
CN102155260A (zh) | 一种急倾斜煤层采空区充填方法 | |
CN102606161A (zh) | 倾斜、厚大矿床的露天地下三阶段开采方法 | |
CN102926804B (zh) | 分布式地下水库群及地下水库群内矿井水的转移方法 | |
CN103590830A (zh) | 多矿体露天地下时空同步开采方法 | |
CN103758560A (zh) | 一种多重递进保护层分组区域瓦斯治理方法 | |
CN113027459B (zh) | 煤与煤系共生铝土矿协调开采系统及其上行开拓延伸方法 | |
CN201568069U (zh) | 煤矿井下大面积盘区的三进三回集中巷道 | |
CN204511452U (zh) | 一种地下矿井斜坡道的路径布置结构 | |
CN103603673B (zh) | 回采工作面并列双u型巷道 | |
CN103557029B (zh) | 一种由无底柱分段崩落法向上向水平分层充填法过渡的方法 | |
CN102979532B (zh) | 一种辅助斜坡道配合胶带斜井运输的开拓方法 | |
CN111577382A (zh) | 一种河北邯邢地区岩溶大水铁矿山水害防治及水资源综合利用方法 | |
CN204608810U (zh) | 用于高陡边坡开挖工程中的出渣竖井结构 | |
CN203978442U (zh) | 一种公铁合建水下隧道 | |
CN105525921A (zh) | 共轭式采准方法 | |
CN102296962A (zh) | 一种大断面隧洞在富水洞段开挖逆坡施工方法 | |
CN205154250U (zh) | 一种适用于进路充填多点下料的输送管道 | |
CN103726849B (zh) | 一种露天煤矿坑底境界外薄煤层回采技术 | |
CN104088664B (zh) | 一种向上填充采矿的矿井废水处理方法及系统 | |
CN204567664U (zh) | 站台开敞式半地下车站 | |
CN204327189U (zh) | 低渗透性粉细砂地层隧道内降水系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150729 Termination date: 20190407 |