A kind of assembled plastic sports floor
Technical field
The utility model relates to constructional materials, particularly a kind of assembled plastic floor.
Background technology
At present, plastic sports ground is constructed, what basis often adopted is traditional ground, this ground generally adopts rammed earth+macadam gradating stabilized zone+concrete foundation, or rammed earth+macadam gradating stabilized zone+bituminous concrete, there is following defect in this type of traditional ground: one is that difficulty of construction is large, and need to employ multiple stage main equipment, the foundation construction cycle reaches more than 30 days; Two is that energy consumption is large, and work progress need consume mass energy, and produces a large amount of building waste; Three is second-rate, is mainly manifested in the following aspects: 1. drainage performance is poor, can only adopt surface drainage; 2. easily bursting by freezing, a drum, crack; 3. impact compress intensity is low, only 300Kpa; 4. planeness is difficult to control; 5. shock absorption is poor.
Utility model content
The purpose of this utility model is to provide a kind of assembled plastic floor of good performance.
The purpose of this utility model is achieved through the following channels: a kind of assembled plastic sports floor, it comprises substrate, and the side of substrate respectively correspondence is provided with latch and slot, and substrate back is distributed with honeycomb groove, substrate surface is pasted with plastic plate, and substrate and plastic plate plate face are distributed with water seepage hole.
As the further optimization of this programme, in described honeycomb groove, be provided with reinforcing rib.
As the further optimization of this programme, be interconnected between described honeycomb groove and honeycomb groove.
As the further optimization of this programme, described substrate is provided with fixing hole.
As the further optimization of this programme, the latch and the slot that are positioned at substrate homonymy are staggered.
A kind of assembled plastic sports floor material of the utility model, is applicable to the sports field of building high-performance, low-carbon environment-friendly.Its advantage is:
1. compare with traditional 13mm plastic cement race track surface layer with traditional silicon PU synthetic court surface layer, shock absorption is better, for motion provides better safety and comfortableness.
2. foundation slab bearing strength is large, and crack resistance is strong, and be not easy distortion, resistance to foundation settlement, permeability is good.
3. construction is simple, quick.A people can lay 800 square metres in one day.Rapid construction means: the duration is short, reduces to minimum to the impact that owner causes; The various constructional materialss that the manpower dropped into reduces greatly, use also greatly reduce, the management of owner to project construction of being more convenient for; Do not need service time, not by weather effect, there is uncertain factor hardly, quality is really guaranteed; Owner can use new place sooner, more early plays returns of investment
4. are forms of construction work of a kind of low-carbon (LC): foundation material can reclaim easily, cycling and reutilization; Do not need the use of heavy-duty machinery or facility; Do not need high energy consumption material cement and steel; Constructional materials at least reduces 90% from weight, greatly reduces the needs of transport of materials; According to rough calculation, the synthetic materials ground of 500 square metres is compared with traditional concrete foundation, and the electric energy saved is equivalent to the Liang Ge family power consumption of a year, and the carbon discharge amount of minimizing is equivalent to the carbon emission amount that a family-sized car travels 10,000 kilometers.
5. drainage performance is very excellent, vertical drainage ability per hour more than 4 meters, transverse drainage ability more than 2 meters, and thoroughly eliminates all whole worries relevant with concrete foundation, such as bursting by freezing, to play drum, crack, draining bad, smooth not etc.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the utility model is described in further detail:
Fig. 1 is the utility model substrate front side structural representation;
Fig. 2 is the utility model substrate back structural representation;
Fig. 3 is the utility model overall side structural representation;
In figure, substrate 1, latch 2, slot 3, water seepage hole 4, honeycomb groove 6, reinforcing rib 7, fixing hole 8, plastic plate 9.
Detailed description of the invention
As shown in Figure 1, Figure 2, Figure 3 shows, a kind of assembled plastic sports floor of the utility model, it comprises substrate 1, and substrate 1 surface mount has plastic plate 9, and plastic plate 9 is directly amplexiformed at substrate 1 by glue.The material of substrate can be PP material or metal material, the side of substrate 1 respectively correspondence is provided with latch 2 and slot 3, the latch 2 being positioned at substrate 1 homonymy is staggered with slot 3, during installation, latch and the slot of two pieces of adjacent substrates engage each other, on substrate 1 and plastic plate 9 plate face, correspondence is distributed with water seepage hole 4, for draining, substrate 1 back side is distributed with honeycomb groove 6, be interconnected between honeycomb groove 6 and honeycomb groove 6, reinforcing rib 7 is provided with in honeycomb groove 6, honeycomb groove is used for strengthening the anti-pressure ability of substrate, described substrate 1 is provided with fixing hole 8, bolt fixing base better can be passed through.
Its installation process of the utility model is as follows: first place rammed earth flattened with equipment, the place after smooth paves geotextiles, in geotextiles, be directly mounted directly assembled plastic sports floor.
The above; be only detailed description of the invention of the present utility model; but protection domain of the present utility model is not limited thereto; any those of ordinary skill in the art are in the technical scope disclosed by the utility model; the change can expected without creative work or replacement, all should be encompassed within protection domain of the present utility model.Therefore, the protection domain that protection domain of the present utility model should limit with claims is as the criterion.