A kind of two-piece type ecological brick Download PDFInfo
- Publication number
- CN206070289U CN206070289U CN201621015324.3U CN201621015324U CN206070289U CN 206070289 U CN206070289 U CN 206070289U CN 201621015324 U CN201621015324 U CN 201621015324U CN 206070289 U CN206070289 U CN 206070289U
- Authority
- CN
- China
- Prior art keywords
- brick
- brick body
- groove
- right triangle
- isosceles right
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/60—Planning or developing urban green infrastructure
Abstract
This utility model provides a kind of two-piece type ecological brick, including two panels brick body, the horizontal cross-section of brick body is in isosceles right triangle, the lower end of brick body offers more than one groove, the length direction of the groove is perpendicular with the hypotenuse of the isosceles right triangle, brick body offers two symmetrical skewed slots and a half slot being located between two skewed slots in the side corresponding with the hypotenuse of the isosceles right triangle, mutually support the two panels brick body side corresponding with the hypotenuse of the isosceles right triangle, and the corresponding skewed slot and the corresponding half slot form the first perforation respectively in two panels brick body.First perforation is formed respectively by corresponding skewed slot in two brick bodies and corresponding half slot, simplifies the structure of brick-making mould, reduce production cost;Simultaneously by arranging groove, by reinforcing bar interspersed groove during laying, during laying and using when be not likely to produce vertical shift and to lay flatness preferable.
Description
Technical field
This utility model is related to a kind of building materials, especially a kind of two-piece type ecological brick.
Background technology
With the development of the city, public building, house and road construction occupies substantial amounts of soil so that ground environment
Hardening, almost changes the ecological environment for building ground completely, and due to the covering of building and road, hardening proportion causes greatly very much green
Meadow is reduced and is even disappeared, and the moisture of earth's surface is difficult to be evaporated, and causes atmospheric evaporation circulation to be affected, air in urban area
Humidity is reduced, and temperature is raised, and is formed " tropical island effect "." tropical island effect " causes city in summer sultryyer, dust in air
Increase, threaten the health of the mankind;Hardened ground causes rainwater that water almost cannot be descended over the ground to be supplemented simultaneously, water resource stream
Lose, groundwater level declines, and easily causes arid;In addition hardened ground prevents rainwater from permeating the ground, and in excess surface water, shadow
Urban health and traffic are rung, under rainstorm weather, the water yield for flowing into sewer increases, the drainage pipeline and sewage disposal to city
Factory increases huge processing load.
In order to alleviate " tropical island effect ", maintaining ecological balance, ecological brick replace traditional solid brick to be widely used, due to
It is usually provided with ecological brick for by the perforation of rainwater introducing underground, ground environment hardening phenomenon can be prevented effectively from.But
Existing ecological brick is usually monoblock type square structure, and when the number of holes is too many, the structure of brick-making mould is also relative complex, raw
Produce cost of a relatively high;Additionally, in order to ensure rainwater can enter underground, two ecological bricks from the gap between two ecological bricks
Between generally can not use concrete binding, during laying, fragment of brick is easily shifted, laying flatness it is relatively poor.
In view of this, the applicant is conducted in-depth research to the structure of ecological brick, has then this case to produce.
Utility model content
The purpose of this utility model is that to provide a kind of production cost relatively low and lay flatness relatively good two
Chip ecological brick.
To achieve these goals, this utility model is adopted the following technical scheme that:
A kind of two-piece type ecological brick, including the brick body that two panels is symmetrically arranged, the horizontal cross-section of brick body is in isosceles
Right angled triangle, the lower end of brick body offer more than one groove, and the length direction of the groove is straight with the isosceles
Angle hypotenuse is perpendicular, and brick body offers two in the side corresponding with the hypotenuse of the isosceles right triangle
Individual symmetrical skewed slot and a half slot being located between two skewed slots, two panels brick body and the isosceles right angle
The corresponding side of hypotenuse is mutually supported, and the corresponding skewed slot and corresponding described in two panels brick body
Half slot forms the first perforation respectively.
As a kind of improvement of the present utility model, the second multiple perforation in brick body, are offered, each described second wears
Hole is vertically arranged respectively.
Used as a kind of improvement of the present utility model, the bottom of the groove is the arc surface matched with reinforcing bar.
As a kind of improvement of the present utility model, the through hole parallel with the groove in brick body, is further opened with, it is described
The first perforation described with one and second perforation are connected through hole respectively.
Used as a kind of improvement of the present utility model, the periphery of brick body is provided with heavy platform.
Using above-mentioned technical proposal, this utility model has the advantages that:
By skewed slot and half slot are opened up on the side of brick body, and two brick bodies are allowed to support in opposite directions so that two brick bodies
Upper corresponding skewed slot and corresponding half slot form the first perforation respectively, simplify the structure of brick-making mould, and reduction is produced into
This;Simultaneously by arranging groove, by reinforcing bar interspersed groove during laying, during laying and using when be not likely to produce vertical shift and paving
If flatness preferably, can also improve the earth-catching property of fragment of brick, fragment of brick is more consolidated with ground, is difficult to come off because rocking.
Additionally, by arranging heavy platform, the third dimension of brick body is improved, while also having guide functions.
Description of the drawings
Structural representations of the Fig. 1 for this utility model two-piece type ecological brick, omits heavy platform in figure;
Brick laying structure schematic diagrams of the Fig. 2 for this utility model two-piece type ecological brick;
Brick body another viewing angle constructions schematic diagrams of the Fig. 3 for this utility model two-piece type ecological brick.
Correspondence is indicated in figure as follows:
10- brick bodies;11- grooves;
12- through holes;13- skewed slots;
14- half slots;15- second bores a hole;
16- sinks platform.
Specific embodiment
This utility model is described further with specific embodiment below in conjunction with the accompanying drawings.
As shown in Figure 1, Figure 2 and Figure 3, the two-piece type ecological brick that the present embodiment is provided, including the symmetrical arrangement of two panels
Brick body 10, the horizontal cross-section of brick body 10 is in isosceles right triangle, it should be noted that horizontal cross-section herein refers to brick body 10
Brick horizontal direction when facing up cross section, similar, hereinafter the upper end of brick body refers to brick body 10 with brick face
End, the corresponding other end are the lower end of brick body 10.
The lower end of brick body 10 offers more than one groove 11, and in the present embodiment, groove 11 has two, two grooves
11 are parallel to each other, and the hypotenuse of the isosceles right triangle that the length direction of each groove 11 is presented with 10 horizontal cross-section of brick body mutually hangs down
Directly.During laying, reinforcing bar can be interspersed in the groove 11, a part for reinforcing bar is located in groove 11, and another part is from groove 11
In pass, such reinforcing bar both can be used for correct brick body 10 position, prevent laying when ecological brick rock or shift, it is also possible to increase
Enter the earth-catching property of ecological brick, be preferably combined together with ground.
Preferably, in the present embodiment, the bottom of groove 11 is the arc surface matched with reinforcing bar, is easy to interspersed reinforcing bar.Together
When brick body on be further opened with the through hole 12 parallel with groove 11, through hole 12 is equally used for interspersed reinforcing bar, due to the steel in through hole 12
From the reinforcing bar in groove 11 on different horizontal levels, both can be collectively forming three-dimensional bar-mat reinforcement to muscle so that each brick body
Connection between 10 is relatively stable, further prevents ecological brick from rocking.
Brick body 10 offers two in the side corresponding with the hypotenuse of the isosceles right triangle that its horizontal cross-section is presented
Symmetrical skewed slot 13 and a half slot 14 being located between two skewed slots 13.Two panels brick body 10 is presented with its horizontal cross-section
The corresponding side of hypotenuse of isosceles right triangle mutually support and form complete ecological brick together, and two panels brick body 10
After mutually supporting, corresponding skewed slot 13 and corresponding half slot 14 form the first perforation respectively, you can form three first and wear
Hole.
Additionally, the second multiple perforation 15 are further opened with brick body 10, each second perforation 15 is vertically arranged respectively, through hole 12
15 connect with one first perforation and one second perforation respectively, so when certain internal water accumulation of boring a hole therein is too many, can be with
Flowed in another perforation by the gap between reinforcing bar and through hole 12, it is ensured that in perforation, be not likely to produce hydrops.
Preferably, in the present embodiment.The periphery of brick body 10 is provided with heavy platform 16, and heavy platform 16 can lift the solid of brick body 10
Sense, while also having guide functions.
This utility model is described in detail above in conjunction with accompanying drawing, but embodiment of the present utility model not only
It is limited to above-mentioned embodiment, those skilled in the art can make various modifications to this utility model according to prior art, it is such as straight
Connect and groove 11 is arranged to into arc groove etc., these belong to protection domain of the present utility model.
Claims (5)
1. a kind of two-piece type ecological brick, it is characterised in that including the brick body of the symmetrical arrangement of two panels, the level of brick body is cut
Face is in isosceles right triangle, and the lower end of brick body offers more than one groove, the length direction of the groove and institute
The hypotenuse for stating isosceles right triangle is perpendicular, and brick body is in the side corresponding with the hypotenuse of the isosceles right triangle
Offer the half slot that two symmetrical skewed slots and are located between two skewed slots, two panels brick body with it is described
The side that the hypotenuse of isosceles right triangle is corresponding is mutually supported, and the corresponding skewed slot and right in two panels brick body
The half slot answered forms the first perforation respectively.
2. two-piece type ecological brick as claimed in claim 1, it is characterised in that multiple second are offered in brick body and is worn
Hole, each second perforation are vertically arranged respectively.
3. two-piece type ecological brick as claimed in claim 2, it is characterised in that the bottom of the groove is the circle matched with reinforcing bar
Cambered surface.
4. two-piece type ecological brick as claimed in claim 2 or claim 3, it is characterised in that be further opened with brick body logical with described
The parallel through hole of groove, the first perforation described with and second perforation are connected the through hole respectively.
5. the two-piece type ecological brick as described in any claim in claim 1-3, it is characterised in that the periphery of brick body
It is provided with heavy platform.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621015324.3U CN206070289U (en) | 2016-08-30 | 2016-08-30 | A kind of two-piece type ecological brick |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621015324.3U CN206070289U (en) | 2016-08-30 | 2016-08-30 | A kind of two-piece type ecological brick |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206070289U true CN206070289U (en) | 2017-04-05 |
Family
ID=58435197
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621015324.3U Expired - Fee Related CN206070289U (en) | 2016-08-30 | 2016-08-30 | A kind of two-piece type ecological brick |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206070289U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107630438A (en) * | 2017-08-21 | 2018-01-26 | 安徽省康宇水电机械成套设备有限公司 | A kind of chain ecological revetment brick of triangle |
-
2016
- 2016-08-30 CN CN201621015324.3U patent/CN206070289U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107630438A (en) * | 2017-08-21 | 2018-01-26 | 安徽省康宇水电机械成套设备有限公司 | A kind of chain ecological revetment brick of triangle |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104313967B (en) | Row's water-seepage type is mated formation combining structure | |
CN206352331U (en) | The concave herbaceous field structure of sponge the idea of the city | |
CN207813108U (en) | A kind of Rain Garden | |
CN106758638A (en) | A kind of city sponge brick and its construction technology | |
CN107059526A (en) | A kind of sponge urban water-through brick | |
CN205347914U (en) | Interlocking formula ecology concrete road surface brick that permeates water with water conservancy diversion hole | |
CN204039856U (en) | Row's water-seepage type is mated formation combining structure | |
CN203904857U (en) | Precast-concrete three-arch culvert pipe | |
CN206070289U (en) | A kind of two-piece type ecological brick | |
CN201502019U (en) | Permeable ground structure | |
CN102561161B (en) | The laying method on permeable tile work ground and permeable locator | |
CN104594155A (en) | Permeable pavement laying method | |
CN204608556U (en) | A kind of water permeable pavement | |
CN206034227U (en) | Ecological brick who is difficult for rocking | |
CN206721596U (en) | A kind of pavement structure of permeable road | |
CN206034228U (en) | Triangle ecological brick | |
CN202787015U (en) | Landscape ecology framework | |
CN206034225U (en) | Concatenation formula ecological brick | |
CN208415025U (en) | A kind of regeneration concrete lawn brick | |
CN107268368A (en) | Latch gap water-permeable brick | |
CN106996063A (en) | A kind of pavement structure of permeable road | |
CN211734905U (en) | Spliced water seepage brick | |
CN206034226U (en) | Interlocking -type ecological brick | |
CN206873225U (en) | A kind of novel garden road pavior brick | |
CN202401380U (en) | Pervious locator for pervious brick paving floor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170405 Termination date: 20210830 |
|
CF01 | Termination of patent right due to non-payment of annual fee |