CN204475580U - Wall panel assembly and full prefabricated building - Google Patents
Wall panel assembly and full prefabricated building Download PDFInfo
- Publication number
- CN204475580U CN204475580U CN201520025381.9U CN201520025381U CN204475580U CN 204475580 U CN204475580 U CN 204475580U CN 201520025381 U CN201520025381 U CN 201520025381U CN 204475580 U CN204475580 U CN 204475580U
- Authority
- CN
- China
- Prior art keywords
- wallboard
- wall panel
- panel assembly
- wall
- prestressing force
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 229910000831 Steel Inorganic materials 0.000 claims description 22
- 239000010959 steel Substances 0.000 claims description 22
- 239000004567 concrete Substances 0.000 claims description 8
- 239000007787 solid Substances 0.000 claims description 2
- 229910001294 Reinforcing steel Inorganic materials 0.000 claims 2
- 238000011066 ex-situ storage Methods 0.000 abstract 1
- 238000010276 construction Methods 0.000 description 10
- 238000010586 diagram Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 239000011150 reinforced concrete Substances 0.000 description 3
- 210000002435 tendon Anatomy 0.000 description 3
- 238000000034 method Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005336 cracking Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 238000009417 prefabrication Methods 0.000 description 1
- 239000011090 solid board Substances 0.000 description 1
Landscapes
- Load-Bearing And Curtain Walls (AREA)
Abstract
Description
技术领域 technical field
本实用新型属于工程技术领域,涉及一种以钢筋混凝土构件为主的全预制装配化房屋,主要适用于低层和多层房屋。 The utility model belongs to the technical field of engineering and relates to a fully prefabricated assembled house mainly composed of reinforced concrete components, which is mainly suitable for low-rise and multi-storey houses.
背景技术 Background technique
随着劳动力成本的提高,建筑工业化是中国建筑业发展的趋势。现阶段,建造成本是制约建筑工业化发展的主要因素。装配式房屋主体结构的成本主要由墙板、梁、柱构件的成本组成,其中外墙板的成本比例最高。传统的低多层房屋主要以砖混结构、钢筋混凝土框架结构、轻钢龙骨结构为主。其中,砖混结构存在抗震性能差,节能性能差等诸多缺点使用得越来越少。钢筋混凝土框架结构力学性能较好,但不利于装配式施工。轻钢龙骨结构房屋为目前最为常用的低层装配式房屋,但由于其制造成本远高于传统的低层房屋结构,影响其推广应用。 With the increase of labor costs, the industrialization of construction is the development trend of China's construction industry. At this stage, construction cost is the main factor restricting the development of construction industrialization. The cost of the main structure of the prefabricated house is mainly composed of the cost of wall panels, beams, and column components, of which the cost ratio of exterior wall panels is the highest. Traditional low-rise buildings are mainly brick-concrete structures, reinforced concrete frame structures, and light steel keel structures. Among them, the brick-concrete structure has many shortcomings such as poor seismic performance and poor energy-saving performance, and is used less and less. The mechanical properties of reinforced concrete frame structure are better, but it is not conducive to prefabricated construction. Light steel keel structure houses are currently the most commonly used low-rise prefabricated houses, but because their manufacturing costs are much higher than traditional low-rise house structures, their popularization and application are affected.
为降低房屋结构造价,提高房屋的装配化率和施工速度,新型的预制装配式结构体系有待提出。 In order to reduce the cost of housing structure and improve the assembly rate and construction speed of housing, a new prefabricated assembly structure system needs to be proposed.
实用新型内容 Utility model content
针对以上问题,本实用新型的目的在于提出一种墙板组件及采用该墙板组件的全装配式房屋,其各片墙板沿楼高为整板,并采用有别于传统墙板方案的预应力索张紧墙板的技术,达到安全、实用、经济、工期短的目的。本实用新型主要适用于低层和多层的房屋,尤其适用于别墅或普通民宅,以解决现有技术中的不足。 In view of the above problems, the purpose of this utility model is to propose a wall panel assembly and a fully assembled house using the wall panel assembly. Each piece of wall panel is a whole panel along the height of the building, and it adopts a structure different from the traditional wall panel scheme. The technique of tensioning the wall panels with prestressed cables achieves the goals of safety, practicality, economy and short construction period. The utility model is mainly suitable for low-rise and multi-storey houses, especially for villas or ordinary houses, so as to solve the deficiencies in the prior art.
本实用新型提供一种墙板组件,包括至少两片单片墙板和预应力组件;其中,每片单片墙板的相应位置具有贯穿墙板的两侧的通孔;预应力组件依次穿过通孔,在最外侧的墙板固定。 The utility model provides a wallboard assembly, which comprises at least two single-piece wallboards and prestressed components; wherein, the corresponding position of each single-piece wallboard has through holes penetrating through both sides of the wallboard; the prestressed components pass through Through the through hole, the outermost wall plate is fixed.
本实用新型提供一种墙板组件,还可以具有这样的特征:预应力组件包括预应力索和预应力锚件;预应力索穿过通孔,预应力锚件在最外侧的墙板固定。 The utility model provides a wallboard assembly, which can also have the following features: the prestressed assembly includes a prestressed cable and a prestressed anchor; the prestressed cable passes through the through hole, and the prestressed anchor is fixed on the outermost wallboard.
本实用新型提供一种墙板组件,还可以具有这样的特征:预应力组件包括预应力筋和预应力锚件;预应力筋穿过通孔,预应力锚件在最外侧的墙板固定。 The utility model provides a wall board assembly, which can also have the following features: the prestressed assembly includes prestressed tendons and prestressed anchors; the prestressed tendons pass through the through hole, and the prestressed anchors are fixed on the outermost wallboard.
本实用新型提供一种墙板组件,还可以具有这样的特征:单片墙板为混凝土实心板或空心板或现浇叠合板。 The utility model provides a wall board assembly, which can also have the following feature: a single wall board is a concrete solid board or a hollow board or a cast-in-place laminated board.
本实用新型提供一种墙板组件,还可以具有这样的特征:单片墙板高度范围为1-4层房屋高度。 The utility model provides a wall panel assembly, which can also have the following feature: the height range of a single wall panel is the height of a 1-4 storey building.
另外,本实用新型提供一种全装配式房屋,包括:外墙板件、楼板、基础;其中,外墙板件包括至少两片单片墙板和预应力组件;其中,每片单片墙板的相应位置具有贯穿墙板的两侧的通孔;预应力组件依次穿过通孔,在最外侧的墙板固定;外墙板件、楼板、基础之间通过螺栓连接。 In addition, the utility model provides a fully assembled house, including: exterior wall panels, floor slabs, and foundations; wherein, the exterior wall panels include at least two single-piece wall panels and prestressed components; wherein, each single-piece wall Corresponding positions of the boards have through holes through both sides of the wall boards; prestressed components pass through the through holes in turn and are fixed on the outermost wall boards; the outer wall boards, floor slabs and foundations are connected by bolts.
本实用新型提供一种全装配式房屋,还包括钢柱、钢梁和内墙板件,将全装配式房屋进行空间分割;外墙板件、楼板、基础、钢柱、钢梁和内墙板件之间采用螺栓连接。 The utility model provides a fully assembled house, which also includes steel columns, steel beams and inner wall panels to divide the space of the fully assembled house; outer wall panels, floor slabs, foundations, steel columns, steel beams and inner walls The plates are connected by bolts.
本实用新型提供一种全装配式房屋,还可以具有这样的特征:外墙 板件具有预埋件,预埋件与楼板通过螺栓连接。 The utility model provides a fully assembled house, which can also have the following characteristics: the outer wall panels have embedded parts, and the embedded parts are connected to the floor slab by bolts.
实用新型的有益效果 Beneficial Effects of Utility Models
本实用新型提供的一种全装配式房屋,可实现较传统预制混凝土房屋更高水平的建筑工业化,能降低建造成本,缩短工期。 The fully assembled house provided by the utility model can achieve a higher level of construction industrialization than traditional prefabricated concrete houses, can reduce construction costs and shorten construction periods.
本实用新型提供的一种全装配式房屋,首次采用与传统墙板方案不同的预应力拉索将墙板张紧的技术,可使组成墙体的各片墙板之间整体协作,成为抗侧刚度很大的剪力墙构件,达到抵抗结构水平力的作用;且在墙体中免设现浇带或现场灌浆带,进一步提高房屋结构装配化程度。 A fully assembled house provided by the utility model adopts the technology of tensioning the wall panels with prestressed cables different from the traditional wall panel scheme for the first time, which can make the wall panels that make up the wall cooperate as a whole to become an anti- The shear wall components with high lateral stiffness can resist the horizontal force of the structure; and the cast-in-place or grouting belts are not required in the walls to further improve the degree of assembly of the building structure.
本实用新型提供的一种全装配式房屋,由于预应力的存在,使得墙板开裂的可能性大大降低,且使墙板与墙板之间的板缝外观可做无缝处理。 In the fully assembled house provided by the utility model, due to the existence of prestress, the possibility of cracking of the wall panels is greatly reduced, and the appearance of the seams between the wall panels can be treated seamlessly.
本实用新型提供的一种全装配式房屋,不仅适用于1层层高,尤其适用于2~4层高,沿房屋结构高度竖向连续的墙板,能提高结构装配化水平,在充分利用结构抵抗水平力的优势下,不必像传统利用墙板抵抗水平力的房屋那样在各层墙板间现浇混凝土(传统预制墙板为1层高,一般需要现浇或者采用在梁上挂板的方式,在梁上挂板的方式,则不能充分利用墙板的抵抗水平力的性能)。 The fully assembled house provided by the utility model is not only suitable for 1 storey, but especially suitable for 2 to 4 storeys, and vertically continuous wall panels along the height of the house structure, which can improve the level of structural assembly and make full use of With the advantages of structural resistance to horizontal forces, it is not necessary to cast concrete between the wall panels of each layer like traditional houses that use wall panels to resist horizontal forces (traditional prefabricated wall panels are 1 storey high, and generally need to be cast in-situ or hang panels on beams The way of hanging the board on the beam can not make full use of the performance of the wall board to resist the horizontal force).
附图说明 Description of drawings
图1为全装配式房屋结构平面布置图。 Figure 1 is a layout plan of the fully assembled house structure.
图2为图1的A轴结构立面布置图。 Fig. 2 is the elevation layout of the A-axis structure in Fig. 1 .
图3为实施例一中墙板组件的俯视图。 Fig. 3 is a top view of the wall panel assembly in the first embodiment.
图4为图1的E轴结构立面布置图。 Fig. 4 is the elevation layout diagram of the E-axis structure in Fig. 1 .
图5为图1的C轴结构立面布置图。 Fig. 5 is a vertical layout diagram of the C-axis structure in Fig. 1 .
图6为图1的d轴结构立面布置图。 Fig. 6 is a vertical layout diagram of the d-axis structure in Fig. 1 .
图7为图6的I部放大图。 FIG. 7 is an enlarged view of part I of FIG. 6 .
图8为图6的II部放大图。 FIG. 8 is an enlarged view of part II of FIG. 6 .
图9为变形例一中墙板组件的俯视图。 Fig. 9 is a top view of the wall panel assembly in Modification 1.
图10为图9的III部放大图。 Fig. 10 is an enlarged view of part III of Fig. 9 .
具体实施方式 Detailed ways
下面结合附图和具体实施例对本实用新型做进一步的描述。 Below in conjunction with accompanying drawing and specific embodiment the utility model is described further.
实施例一 Embodiment one
一种采用预应力索张紧墙板的全装配式房屋,包括:预制装配式的外墙板件1、楼板2、基础3;侧向力全部由外墙板件承担,内部钢柱仅承受竖向力。外墙板件1采用墙体组件。楼板也可以采用墙体组件。 A fully assembled house using prestressed cable tensioned wall panels, including: prefabricated exterior wall panels 1, floor slabs 2, and foundations 3; all lateral forces are borne by the exterior wall panels, and the internal steel columns only bear vertical force. The exterior wall panel 1 adopts a wall assembly. Floor slabs can also use wall components.
全装配式房屋,还包括有预制装配式的少量钢柱4、少量钢梁5和内墙板件8,并可根据建筑使用功能灵活布设分隔空间。内墙板件8也可以采用墙体组件。 The fully-fabricated house also includes a small amount of prefabricated steel columns 4, a small amount of steel beams 5, and interior wall panels 8, and can be flexibly arranged to separate spaces according to building functions. The inner wall panel 8 can also be a wall assembly.
墙体组件由若干片模数化的预制的单片墙板6采用预应力组件7张紧而成一整块墙板。 The wall assembly consists of several modularized prefabricated single-piece wall panels 6 that are tensioned by prestressed components 7 to form a whole wall panel.
每片单片墙板6的相应位置具有贯穿墙板的两侧的通孔6-1。 Corresponding positions of each single piece of wallboard 6 have through holes 6-1 running through both sides of the wallboard.
预应力组件包括预应力索7-1和预应力锚件7-2。预应力索7-1穿过通孔6-1,预应力锚件7-2在最外侧的墙板6固定。 The prestressed assembly includes a prestressed cable 7-1 and a prestressed anchor 7-2. The prestressed cable 7-1 passes through the through hole 6-1, and the prestressed anchor 7-2 is fixed on the outermost wallboard 6.
如图3所示,4片单片墙板6平铺,有预应力组件7将连接成一整块墙板。外墙板件之间免设现浇带,各肢墙板可形成整体受力。 As shown in Figure 3, four single-piece wallboards 6 are tiled, and prestressed components 7 are connected to form a whole wallboard. The cast-in-place belt is not required between the exterior wall panels, and the wall panels of each limb can form an overall force.
当然,预应力索也可以为预应力筋。 Of course, the prestressed cables can also be prestressed tendons.
外墙板件1的高度可以根据实际楼层需要,制备成不同楼层高度。 The height of the exterior wall panels 1 can be prepared into different floor heights according to actual floor requirements.
预制单片墙板6为混凝土实心楼板或空心楼板或现浇叠合板等,在板平面内设预应力拉索7将预制墙板6张紧。单片墙板6的高度可以根据实际楼层需要,制备成不同楼层高度;即外墙板件1的高度可以根据实际楼层需要制备。 The prefabricated single-piece wall panel 6 is a concrete solid floor slab or a hollow floor slab or a cast-in-place laminated slab, etc., and a prestressed cable 7 is set in the board plane to tension the prefabricated wall panel 6 . The height of the single wall panel 6 can be prepared into different floor heights according to the actual floor requirements; that is, the height of the exterior wall panels 1 can be prepared according to the actual floor requirements.
各片外墙板件1沿楼高为连续的整板。当楼层数小于或等于4时,可采用一整块外墙板件1。当楼层数大于4时,可采用分段外墙板件1。如当楼层数为5时,在1~3层采用一块外墙板件1,4~5层采用一块外墙板件1。墙板属于剪力墙。墙板1可在预制时布设门窗洞口。 Each piece of exterior wall panels 1 is a continuous whole panel along the height of the building. When the number of floors is less than or equal to 4, a whole piece of exterior wall panel 1 can be used. When the number of floors is greater than 4, segmented exterior wall panels 1 may be used. For example, when the number of floors is 5, one exterior wall panel 1 is used on the 1st to 3rd floors, and one exterior wall panel 1 is used on the 4th to 5th floors. Wall panels are shear walls. The wall panel 1 can be provided with door and window openings during prefabrication.
房屋的基础3和楼板2为工厂预制。楼板2可采用混凝土空心板或叠合楼板,如考虑到提高结构的整体性能,也可采用预应力索张紧。另外,基础也可以创新性采用预制基础。预制基础也可以通过预应力索将多块预制基础现场拼接成整板基础。 The foundation 3 and floor slab 2 of the house are factory prefabricated. The floor 2 can be a concrete hollow slab or a laminated floor slab, and if it is considered to improve the overall performance of the structure, it can also be tensioned by prestressed cables. In addition, the foundation can also innovatively adopt prefabricated foundation. The prefabricated foundation can also be spliced into a whole slab foundation by splicing multiple prefabricated foundations on site through prestressed cables.
外墙板件1与外墙板件之间,外墙板件与楼板2之间,外墙板件与基础3之间,钢柱4和钢柱4之间,钢柱4和钢梁5之间,各个部件之间皆通过螺栓10连接。 Between exterior wall panel 1 and exterior wall panel, between exterior wall panel and floor 2, between exterior wall panel and foundation 3, between steel column 4 and steel column 4, steel column 4 and steel beam 5 All parts are connected by bolts 10 between them.
如图7所示,钢柱4和钢梁5之间采用通过螺栓10-1实现连接。 As shown in FIG. 7 , the steel column 4 and the steel beam 5 are connected by bolts 10 - 1 . the
如图8所示,外墙面1和钢梁5之间采用通过螺栓10-2实现连接。预埋件11预制在该外墙面1内,通过预埋件11,将外墙面1和钢梁5固定在一起。预埋件11一般采用角钢或L形截面作为主材。各个部件之间皆通过实现螺栓10连接。 As shown in FIG. 8 , the connection between the outer wall surface 1 and the steel beam 5 is realized through bolts 10 - 2 . The embedded part 11 is prefabricated in the outer wall surface 1, and the outer wall surface 1 and the steel beam 5 are fixed together through the embedded part 11. The embedded part 11 generally adopts angle steel or L-shaped section as the main material. All parts are connected by bolts 10 .
变相例一 Disguised example one
墙体组件1中的单片墙板6的排列方式不同。其他部件的结构与实施例一中相同,就不再详细描述。 The individual wall panels 6 in the wall assembly 1 are arranged in different ways. The structures of other components are the same as those in the first embodiment, and will not be described in detail.
如图9和图10所示,墙体组件1包括六片单片墙板6;其中4片单片墙板,最外侧的2片单片墙体与相邻墙体垂直,呈90度角。 As shown in Figures 9 and 10, the wall assembly 1 includes six single-piece wall panels 6; among them, there are four single-piece wall panels, and the outermost two single-piece walls are perpendicular to the adjacent walls at an angle of 90 degrees. .
预应力索7-1穿过垂直的单片墙体,在穿过4片平铺的单片墙体,最后穿过另一片垂直的单片墙体,预应力锚件7-2在两端进行固定。 The prestressed cable 7-1 passes through a vertical monolithic wall, passes through 4 tiled monolithic walls, and finally passes through another vertical monolithic wall, and the prestressed anchor 7-2 is carried out at both ends. fixed.
上述对实施例的描述是为便于该技术领域的普通技术人员能理解和应用本实用新型。熟悉本领域技术的人员显然可以容易地对这些实施例做出各种修改,并把在此说明的一般原理应用到其他实施例中而不必经过创造性的劳动。因此,本实用新型不限于这里的实施例,本领域技术人员根据本实用新型的揭示,不脱离本实用新型范畴所做出的改进和修改都应该在本实用新型的保护范围之内。 The above description of the embodiments is for those of ordinary skill in the technical field to understand and apply the utility model. It is obvious that those skilled in the art can easily make various modifications to these embodiments, and apply the general principles described here to other embodiments without creative effort. Therefore, the utility model is not limited to the embodiments here, and improvements and modifications made by those skilled in the art according to the disclosure of the utility model without departing from the scope of the utility model should be within the protection scope of the utility model.
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520025381.9U CN204475580U (en) | 2015-01-14 | 2015-01-14 | Wall panel assembly and full prefabricated building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520025381.9U CN204475580U (en) | 2015-01-14 | 2015-01-14 | Wall panel assembly and full prefabricated building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204475580U true CN204475580U (en) | 2015-07-15 |
Family
ID=53631382
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520025381.9U Expired - Lifetime CN204475580U (en) | 2015-01-14 | 2015-01-14 | Wall panel assembly and full prefabricated building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204475580U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105756369A (en) * | 2016-05-03 | 2016-07-13 | 三新房屋制造股份有限公司 | Heat insulation and decoration integrated fabricated building with built-in structural framework and construction method thereof |
CN107514093A (en) * | 2017-08-09 | 2017-12-26 | 上海仝筑建筑科技有限公司 | Building systems are built in a kind of assembled 3D sprays |
CN109057524A (en) * | 2018-08-10 | 2018-12-21 | 杭州泽通建筑节能新材料有限公司 | The detachable whole fence structure of one kind and construction method |
CN109183978A (en) * | 2018-09-15 | 2019-01-11 | 吕小龙 | A kind of module assembled energy conservation environment protection architecture |
-
2015
- 2015-01-14 CN CN201520025381.9U patent/CN204475580U/en not_active Expired - Lifetime
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105756369A (en) * | 2016-05-03 | 2016-07-13 | 三新房屋制造股份有限公司 | Heat insulation and decoration integrated fabricated building with built-in structural framework and construction method thereof |
CN107514093A (en) * | 2017-08-09 | 2017-12-26 | 上海仝筑建筑科技有限公司 | Building systems are built in a kind of assembled 3D sprays |
CN109057524A (en) * | 2018-08-10 | 2018-12-21 | 杭州泽通建筑节能新材料有限公司 | The detachable whole fence structure of one kind and construction method |
CN109183978A (en) * | 2018-09-15 | 2019-01-11 | 吕小龙 | A kind of module assembled energy conservation environment protection architecture |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108086693B (en) | Construction method of a low-story prefabricated reinforced concrete frame structure system | |
JP5969141B2 (en) | Fully assembled, overall placement complex type housing and its construction method | |
CN105756235B (en) | A kind of assembled steel concrete frame shear wall building system | |
CN104674989B (en) | The gently light wall assembled compound shear wall of steel occlusal pattern complex heat-preservation and the practice | |
CN111155681B (en) | Steel concrete composite connection multilayer prefabricated section steel concrete shear wall structure and preparation and construction method thereof | |
CN105275089B (en) | A kind of complete prefabricated cold formed steel house modular unit and assembly connection method | |
CN114232843B (en) | A fully assembled building and construction method thereof | |
CN207063269U (en) | The beam-column node structure of assembled floor | |
CN109083272A (en) | A kind of assembled architecture frame structure and its construction method | |
CN204475580U (en) | Wall panel assembly and full prefabricated building | |
CN114232844B (en) | Shear wall system of a fully assembled building and its wall panel module prefabrication method | |
CN107060104B (en) | A prefabricated steel frame concrete box unit structure system and its construction method | |
CN111155680A (en) | All-bolt connection multilayer prefabricated section steel concrete shear wall structure and preparation and construction method thereof | |
CN204551821U (en) | Light steel occlusal pattern complex heat-preservation light wall assembling compound shear wall | |
CN107355027B (en) | Section steel concrete shear wall assembly type space modularized structural system and construction method | |
CN106988452A (en) | A kind of and supporting industrialization EPS modular wall panel systems of assembled steel framework | |
CN115162533A (en) | Multi-storey prefabricated steel frame-cold-formed thin-walled steel composite structure building system | |
CN207376945U (en) | A kind of concrete prefabricated wallboard of steel bar girder and structural system | |
CN206467828U (en) | A kind of fabricated construction insulation and decoration integrated plate wall | |
CN110670758B (en) | Fabricated steel structure building based on fiber reinforced clad wood substrate and construction method | |
EP2672038A2 (en) | A building seismic strengthening system | |
CN205329970U (en) | Precast concrete wallboard and wall panel structure system of dark frame in area of structure thereof | |
CN217517797U (en) | Fully-assembled multi-layer bent frame building | |
CN105649259A (en) | Prefabricated concrete wallboard and wallboard structural system constructed through prefabricated concrete wallboards and provided with hidden frame | |
CN211229117U (en) | Assembled composite floor and node structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20230819 Address after: No. 110 Wenchang East Road, High tech Industrial Development Zone, Taixing City, Taizhou City, Jiangsu Province, 225400 Patentee after: Jiangsu Tonghui Lvjian Technology Co.,Ltd. Address before: Room 312D, No. 1121 Zhongshan North Second Road, Yangpu District, Shanghai, 200092 Patentee before: SHANGHAI T&D ARCHITECTURAL SCIENCE AND TECHNOLOGY CO.,LTD. |
|
TR01 | Transfer of patent right | ||
CX01 | Expiry of patent term |
Granted publication date: 20150715 |
|
CX01 | Expiry of patent term |