CN204474233U - The erecting device of reactor - Google Patents
The erecting device of reactor Download PDFInfo
- Publication number
- CN204474233U CN204474233U CN201520016759.9U CN201520016759U CN204474233U CN 204474233 U CN204474233 U CN 204474233U CN 201520016759 U CN201520016759 U CN 201520016759U CN 204474233 U CN204474233 U CN 204474233U
- Authority
- CN
- China
- Prior art keywords
- reactor
- installation device
- support frame
- lifting
- pair
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000009434 installation Methods 0.000 claims abstract description 49
- 230000005540 biological transmission Effects 0.000 abstract description 7
- 239000000463 material Substances 0.000 abstract description 5
- 238000010586 diagram Methods 0.000 description 5
- 238000000034 method Methods 0.000 description 4
- 238000006073 displacement reaction Methods 0.000 description 2
- 230000001360 synchronised effect Effects 0.000 description 2
- 238000006243 chemical reaction Methods 0.000 description 1
- 230000001934 delay Effects 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000009440 infrastructure construction Methods 0.000 description 1
- 230000007257 malfunction Effects 0.000 description 1
- 238000010248 power generation Methods 0.000 description 1
- 230000000087 stabilizing effect Effects 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
Landscapes
- Jib Cranes (AREA)
Abstract
本实用新型提供了一种电抗器的安装装置,其包括支撑架、丝杠、移动支撑部件以及吊装部件,所述支撑架上竖直安装有所述丝杠,所述丝杠与所述移动支撑部件传动连接,所述移动支撑部件用于承载电抗器进行升降,所述移动支撑部件的上端设置有所述吊装部件,所述吊装部件可以在水平方向上向任意方向移动,用于将所述移动支撑部件上的电抗器吊至安装位置。本实用新型的电抗器的安装装置,通过丝杠和手拉葫芦的配合,实现了电抗器经过平稳地升降以及平移后到达安装位置,防止了电抗器移动时因掉落而损坏部件,并且结构简单,使用方便,适合在小空间内起吊设备,节约了人力、物力,提高了工作效率,降低了安全隐患。
The utility model provides an installation device for a reactor, which includes a support frame, a lead screw, a movable support component and a lifting component. The lead screw is vertically installed on the support frame, and the lead screw is connected to the movable support frame. The support component is connected by transmission, and the movable support component is used to carry the reactor for lifting and lowering. The upper end of the movable support component is provided with the hoisting component. The hoisting component can move in any direction in the horizontal direction and is used to lift the reactor. Lift the reactor on the mobile support component to the installation position. The installation device of the reactor of the present utility model realizes the smooth lifting and translation of the reactor to the installation position through the cooperation of the screw and the hand chain hoist, thereby preventing the components from being damaged due to falling when the reactor is moved, and the structure Simple and easy to use, it is suitable for lifting equipment in small spaces, saving manpower and material resources, improving work efficiency and reducing safety hazards.
Description
技术领域technical field
本实用新型涉及一种安装装置,尤其涉及电抗器的安装装置。The utility model relates to an installation device, in particular to a reactor installation device.
背景技术Background technique
风能发电具有清洁、环境效益好、可再生、永不枯竭、基建周期短、装机规模灵活等优点。随着风电机投运年数的增加,风电机的变频柜、滤波柜内的部件开始发生老化、故障损坏等问题,需要更换电抗器,并且随着时间的变长,更换和检修电抗器的频率也越大。例如10kV户内式变压器、串联电抗器机芯在运行过程中会产生较强的震动,运行一段时间后,会使引出线与连接套管间的螺栓出现松动,造成户内式变压器、电抗器直流电阻超标。在实际操作中,由于电抗器重量达200Kg,不易移动,搬运困难,没有专业的工具来操作,通常靠人力来完成,不仅浪费人力、时间,劳动强度大,工作效率低,而且延误了风电机恢复运行的时间,导致大量的电量损失。另外,在电抗器的安装过程中,部件过重而不易控制,会砸坏其他部件甚至威胁工作人员的人身安全。Wind power generation has the advantages of cleanness, good environmental benefits, renewable, inexhaustible, short infrastructure construction period, and flexible installed capacity. With the increase in the number of years of wind turbine operation, the components in the frequency conversion cabinet and filter cabinet of the wind turbine begin to age, malfunction and damage, and the reactor needs to be replaced. Also bigger. For example, the cores of 10kV indoor transformers and series reactors will generate strong vibration during operation. After running for a period of time, the bolts between the lead wires and the connecting bushings will become loose, causing indoor transformers and reactors to vibrate. The DC resistance exceeds the standard. In actual operation, because the reactor weighs up to 200Kg, it is not easy to move, difficult to carry, and there is no professional tool to operate it. It is usually done by manpower, which not only wastes manpower and time, but also has high labor intensity and low work efficiency, and delays the wind turbine. Time to resume operation, resulting in a large loss of power. In addition, during the installation of the reactor, the components are too heavy to be controlled, which may damage other components and even threaten the personal safety of the staff.
现有技术处理该故障时,因室内无法使用起重车辆,只能通过人力将电抗器整体移至室外,再使用起重车辆进行机芯拆卸,以维修、保养变压器、电抗器,这样不仅需要耗费大量的人力物力,而且在移动过程中容易对变压器、电抗器造成损坏,存在安全隐患,增加企业经济损失。因此有必要对现有技术加以改进。When dealing with this fault in the prior art, because the lifting vehicle cannot be used indoors, the reactor can only be moved outdoors by manpower as a whole, and then the core is disassembled with the lifting vehicle to repair and maintain the transformer and reactor, which not only requires It consumes a lot of manpower and material resources, and it is easy to cause damage to the transformer and reactor during the moving process, which has potential safety hazards and increases the economic loss of the enterprise. Therefore it is necessary to improve the prior art.
实用新型内容Utility model content
本实用新型实施例的目的在于提供一种电抗器的安装装置,防止电抗器移动时因掉落而损坏部件,节约人力、物力,提高工作效率,降低安全隐患。The purpose of the embodiments of the present invention is to provide a reactor installation device, which can prevent components from being damaged due to falling when the reactor moves, save manpower and material resources, improve work efficiency, and reduce potential safety hazards.
为达到上述目的,本实用新型实施例提供了一种电抗器的安装装置,其包括支撑架、丝杠、移动支撑部件以及吊装部件,所述支撑架上竖直安装有所述丝杠,所述丝杠与所述移动支撑部件传动连接,所述移动支撑部件用于承载电抗器进行升降,In order to achieve the above purpose, the embodiment of the utility model provides a reactor installation device, which includes a support frame, a lead screw, a moving support part and a lifting part, and the lead screw is vertically installed on the support frame. The lead screw is in transmission connection with the moving supporting part, and the moving supporting part is used to carry the reactor for lifting,
所述移动支撑部件的上端设置有所述吊装部件,所述吊装部件可以在水平方向上向任意方向移动,用于将所述移动支撑部件上的电抗器吊至安装位置。The upper end of the mobile supporting part is provided with the lifting part, and the lifting part can move in any direction in the horizontal direction, and is used for hoisting the reactor on the moving supporting part to the installation position.
进一步地,所述支撑架上还竖直设置有一对定位杆,所述一对定位杆与所述丝杠平行安装,所述丝杠设置在所述一对定位杆之间,所述移动支撑部件滑动设置在所述一对定位杆上,所述丝杠的转动带动所述移动支撑部件上下移动。Further, a pair of positioning rods are vertically arranged on the support frame, and the pair of positioning rods are installed in parallel with the screw, and the screw is arranged between the pair of positioning rods, and the mobile support The parts are slidably arranged on the pair of positioning rods, and the rotation of the lead screw drives the moving support part to move up and down.
进一步地,所述丝杠一端设置有带轮,所述带轮与皮带的第一端连接,所述皮带的第二端与电机传动连接。Further, one end of the lead screw is provided with a pulley, the pulley is connected to the first end of the belt, and the second end of the belt is connected to the motor for transmission.
进一步地,所述支撑架上端设置有顶架,所述顶架探出支撑架,所述吊装部件设置在所述顶架的下端。Further, a top frame is provided at the upper end of the support frame, and the top frame protrudes from the support frame, and the lifting component is arranged at the lower end of the top frame.
可选地,所述吊装部件为电葫芦,所述电葫芦下端设置有吊钩。Optionally, the hoisting component is an electric hoist, and a hook is provided at the lower end of the electric hoist.
进一步地,所述支撑架下端设置有支撑基座,所述移动支撑部件在所述顶架和所述支撑基座之间上下滑动。Further, a support base is provided at the lower end of the support frame, and the mobile support member slides up and down between the top frame and the support base.
进一步地,所述支撑架底端设置有一对移动轮,所述移动轮位于所述支撑基座的后端,所述支撑架的外侧壁两端设置有一对把手。Further, a pair of moving wheels is provided at the bottom end of the supporting frame, and the moving wheels are located at the rear end of the supporting base, and a pair of handles are provided at both ends of the outer wall of the supporting frame.
本实用新型实施例的电抗器的安装装置,通过丝杠和手拉葫芦的配合,实现了电抗器经过平稳地升降以及平移后到达安装位置,防止了电抗器移动时因掉落而损坏部件,并且结构简单,使用方便,适合在小空间内起吊设备,节约了人力、物力,提高了工作效率,降低了安全隐患。The installation device of the reactor in the embodiment of the utility model, through the cooperation of the lead screw and the chain hoist, realizes the reactor to reach the installation position after the smooth lifting and translation, and prevents the reactor from being damaged due to falling when moving. And the structure is simple, easy to use, suitable for hoisting equipment in a small space, saving manpower and material resources, improving work efficiency, and reducing potential safety hazards.
附图说明Description of drawings
图1为本实用新型实施例的安装装置结构示意图;Fig. 1 is the schematic structural diagram of the installation device of the utility model embodiment;
图2为图1的第一局部结构示意图;Fig. 2 is a schematic diagram of the first partial structure of Fig. 1;
图3为图1的第二局部结构示意图;Fig. 3 is a second partial structural schematic diagram of Fig. 1;
图4为图1的第三局部结构示意图。FIG. 4 is a schematic diagram of a third partial structure of FIG. 1 .
附图标号说明:Explanation of reference numbers:
1-支撑架;11-顶架;12-支撑基座;2-丝杠;3-移动支撑部件;4-吊装部件;41-电葫芦;42-吊钩;5-电抗器;6-定位杆;7-带轮;8-移动轮;9-把手;10-电机。1-support frame; 11-top frame; 12-support base; 2-lead screw; 3-movable support parts; 4-hoisting parts; 41-electric hoist; Rod; 7-belt wheel; 8-moving wheel; 9-handle; 10-motor.
具体实施方式Detailed ways
下面结合附图对本实用新型的实施例进行详细描述。Embodiments of the utility model are described in detail below in conjunction with the accompanying drawings.
本实用新型实施例的技术原理是通过丝杠带动电抗器的升降以及电葫芦带动电抗器的水平位移,完成电抗器的安装。需要说明的是,本实用新型实施例的技术方案不局限于电抗器的安装,也可以应用于其他相关技术领域。The technical principle of the embodiment of the utility model is that the reactor is driven up and down by the lead screw and the horizontal displacement of the reactor is driven by the electric hoist to complete the installation of the reactor. It should be noted that the technical solutions of the embodiments of the utility model are not limited to the installation of reactors, and can also be applied to other related technical fields.
如图1至图4所示,图1为本实用新型实施例的安装装置结构示意图,图2为图1的第一局部结构示意图,图3为图1的第二局部结构示意图,图4为图1的第三局部结构示意图。本实用新型实施例的电抗器的安装装置,包括支撑架1、丝杠2、移动支撑部件3以及吊装部件4,支撑架1上竖直安装有丝杠2,丝杠2与移动支撑部件3传动连接,移动支撑部件3用于承载电抗器5进行升降,移动支撑部件3的上端设置有吊装部件4,吊装部件4可以在水平方向上向任意方向移动,用于将移动支撑部件3上的电抗器5吊至安装位置。其中,通过丝杠2带动电抗器5的升降以及吊装部件4带动电抗器5的水平位移,二者相互配合,调整电抗器5的各个方位,使得电抗器5放入安装位置,完成电抗器5的平稳安装。丝杠2传动有自锁能力,可以防止移动支撑部件3下滑。优选地,电抗器5的升降可以利用丝杠2传动方式完成,也可以采用其他方式,以实现电抗器5的升降。As shown in Figures 1 to 4, Figure 1 is a schematic structural view of the installation device of the embodiment of the present invention, Figure 2 is a schematic view of the first partial structure of Figure 1, Figure 3 is a schematic view of the second partial structure of Figure 1, and Figure 4 is a schematic view of the second partial structure of Figure 1. The schematic diagram of the third partial structure in Fig. 1 . The reactor installation device of the embodiment of the utility model includes a support frame 1, a lead screw 2, a mobile support part 3 and a hoisting part 4, a lead screw 2 is vertically installed on the support frame 1, and the lead screw 2 and the mobile support part 3 Transmission connection, the mobile support part 3 is used to carry the reactor 5 for lifting, the upper end of the mobile support part 3 is provided with a hoisting part 4, the hoisting part 4 can move in any direction in the horizontal direction, and is used to move the reactor 5 on the mobile support part 3 The reactor 5 is hoisted to the installation location. Among them, the lifting of the reactor 5 is driven by the lead screw 2 and the horizontal displacement of the reactor 5 is driven by the hoisting part 4. The two cooperate with each other to adjust the various orientations of the reactor 5, so that the reactor 5 is put into the installation position, and the reactor 5 is completed. smooth installation. The transmission of the leading screw 2 has self-locking ability, which can prevent the mobile supporting part 3 from sliding down. Preferably, the raising and lowering of the reactor 5 can be accomplished by using the transmission method of the lead screw 2 , or other methods can be used to realize the raising and lowering of the reactor 5 .
进一步地,支撑架1上还可以竖直设置有一对定位杆6,一对定位杆6用于对移动支撑部件3进行导正以及定位。其中,定位杆6可以为外表光滑的圆柱体,也可以为其他结构,例如滑动导轨,以实现移动支撑部件3的导正以及定位。一对定位杆6与丝杠2可以平行安装,丝杠2可以设置在一对定位杆6之间,也可以设置在其他位置,以实现移动支撑部件3沿直线升降。移动支撑部件3可以滑动设置在一对定位杆6上,丝杠2的转动可以带动移动支撑部件3上下移动。实现移动支撑部件3的升降。Further, a pair of positioning rods 6 may also be vertically arranged on the support frame 1 , and the pair of positioning rods 6 are used for guiding and positioning the mobile supporting part 3 . Wherein, the positioning rod 6 may be a cylinder with a smooth appearance, or may be other structures, such as sliding guide rails, so as to realize the guiding and positioning of the mobile support member 3 . A pair of positioning rods 6 and the leading screw 2 can be installed in parallel, and the leading screw 2 can be arranged between the pair of positioning rods 6 or at other positions, so as to realize the vertical lifting of the mobile support member 3 . The mobile supporting part 3 can be slidably arranged on a pair of positioning rods 6, and the rotation of the lead screw 2 can drive the mobile supporting part 3 to move up and down. The lifting of the mobile supporting part 3 is realized.
进一步地,丝杠2一端可以设置有带轮7,带轮7可以与皮带的第一端连接,皮带的第二端可以与电机10传动连接。电机10可以为步进电机,采用皮带连接方式,在安装装置过载时可以保护电机10,皮带轮优选为同步带轮,皮带优选为同步皮带。其中,电机10为丝杠2的转动提供动力。Further, one end of the lead screw 2 may be provided with a pulley 7 , the pulley 7 may be connected to the first end of the belt, and the second end of the belt may be connected to the motor 10 in transmission. The motor 10 can be a stepping motor, and the belt connection mode can be used to protect the motor 10 when the installation device is overloaded. The pulley is preferably a synchronous pulley, and the belt is preferably a synchronous belt. Wherein, the motor 10 provides power for the rotation of the lead screw 2 .
进一步地,支撑架1上端可以设置有顶架11,顶架11可以探出支撑架1,用于安装吊装部件4。吊装部件4设置在顶架11的下端。吊装部件4可以在顶架11上沿水平方向任意滑动。可选地,可以在顶架11上设置滑动导轨,进而吊装部件4可以在滑动导轨上滑动,以实现电抗器5的平移。Further, a top frame 11 may be provided at the upper end of the support frame 1 , and the top frame 11 may protrude out of the support frame 1 for installing the hoisting component 4 . The suspension part 4 is arranged on the lower end of the top frame 11 . The hoisting part 4 can slide arbitrarily along the horizontal direction on the top frame 11 . Optionally, a sliding guide rail may be provided on the top frame 11 , and then the hoisting component 4 may slide on the sliding guide rail to realize translation of the reactor 5 .
可选地,吊装部件4可以为电葫芦41,也可以为其他吊装装置,以实现电抗器5的吊装。电葫芦41下端可以设置有吊钩42。便于进行电抗器5的吊装操作。Optionally, the hoisting component 4 may be an electric hoist 41 , or other hoisting devices, so as to realize the hoisting of the reactor 5 . The lower end of the electric hoist 41 may be provided with a hook 42 . It is convenient to carry out the hoisting operation of the reactor 5 .
进一步地,支撑架1下端可以设置有支撑基座12,用于稳定支撑架1,防止安装工作中支撑架1发生倾斜。移动支撑部件3可以在顶架11和支撑基座12之间上下滑动,可以在充分的活动空间中调整电抗器5的位置,方便将电抗器5准确地放置在安装位置。Further, a support base 12 may be provided at the lower end of the support frame 1 for stabilizing the support frame 1 and preventing the support frame 1 from tilting during installation. The movable supporting part 3 can slide up and down between the top frame 11 and the supporting base 12, and the position of the reactor 5 can be adjusted in sufficient movable space, so that the reactor 5 can be accurately placed at the installation position.
进一步地,支撑架1底端可以设置有一对移动轮8,实现安装装置的移动,移动轮8可以位于支撑基座12的后端,具体地,当完成安装或者准备安装时,可以将支撑架1以一对移动轮8为轴心倾斜一定的角度之后,支撑基座12离开地面后,一对移动轮8支撑安装装置整体,可以推动支撑架1远离或者靠近安装位置。便于支撑架1的移动。支撑架1的外侧壁两端可以设置有一对把手9,方便工作人员推拉支撑架1。Further, a pair of moving wheels 8 can be provided at the bottom end of the support frame 1 to realize the movement of the installation device. The moving wheels 8 can be located at the rear end of the support base 12. Specifically, when the installation is completed or ready to be installed, the support frame can be moved 1 After tilting a certain angle with the pair of moving wheels 8 as the axis, after the support base 12 leaves the ground, the pair of moving wheels 8 supports the installation device as a whole, and can push the support frame 1 away from or close to the installation position. It is convenient to move the support frame 1. A pair of handles 9 may be provided at both ends of the outer wall of the support frame 1, so that the staff can push and pull the support frame 1 conveniently.
具体地,将安装装置以移动轮8为轴心倾斜一定角度,支撑基座12离开地面后,通过把手9将安装装置推至安装位置附近,以移动轮8为轴心放正安装装置,支撑基座12接触地面后,将电抗器5放在移动支撑部件3上,开动步进电机使得丝杠2转动,进而移动支撑部件3带着电抗器5上下移动,当电抗器5的底面与安装位置的安装面高度相同时,停止步进电机的转动,将安装装置推入柜体,然后将电抗器5用吊钩42勾住,启动电葫芦41,将电抗器5移动到安装位置,解除吊钩42,将电抗器5安装在安装位置。最后,以移动轮8为轴心将安装装置倾斜,使得支撑基座12离开地面,通过把手9将安装装置拉出柜体,完成电抗器5的安装。Specifically, the installation device is tilted at a certain angle with the moving wheel 8 as the axis. After the support base 12 leaves the ground, the installation device is pushed to the vicinity of the installation position through the handle 9, and the installation device is placed with the moving wheel 8 as the axis. After the base 12 touches the ground, put the reactor 5 on the movable supporting part 3, start the stepping motor to make the lead screw 2 rotate, and then the moving supporting part 3 moves up and down with the reactor 5, when the bottom surface of the reactor 5 and the installation When the height of the installation surface at the same position is the same, stop the rotation of the stepper motor, push the installation device into the cabinet, hook the reactor 5 with the hook 42, start the electric hoist 41, move the reactor 5 to the installation position, and release it. The hook 42 is used to install the reactor 5 at the installation position. Finally, the installation device is tilted with the moving wheel 8 as the axis, so that the support base 12 is off the ground, and the installation device is pulled out of the cabinet through the handle 9 to complete the installation of the reactor 5 .
本实用新型实施例的电抗器的安装装置,通过丝杠和手拉葫芦的配合,实现了电抗器经过平稳地升降以及平移后到达安装位置,防止了电抗器移动时因掉落而损坏部件,并且结构简单,使用方便,适合在小空间内起吊设备,节约了人力、物力,提高了工作效率,降低了安全隐患。The installation device of the reactor in the embodiment of the utility model, through the cooperation of the lead screw and the chain hoist, realizes the reactor to reach the installation position after the smooth lifting and translation, and prevents the reactor from being damaged due to falling when moving. And the structure is simple, easy to use, suitable for hoisting equipment in a small space, saving manpower and material resources, improving work efficiency, and reducing potential safety hazards.
以上所述,仅为本实用新型的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实用新型揭露的技术范围内,可轻易想到变化或替换,都应涵盖在本实用新型的保护范围之内。因此,本实用新型的保护范围应以所述权利要求的保护范围为准。The above is only a specific embodiment of the present utility model, but the scope of protection of the present utility model is not limited thereto. Anyone familiar with the technical field can easily think of changes or changes within the technical scope disclosed by the utility model Replacement should be covered within the protection scope of the present utility model. Therefore, the protection scope of the present utility model should be based on the protection scope of the claims.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520016759.9U CN204474233U (en) | 2015-01-09 | 2015-01-09 | The erecting device of reactor |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520016759.9U CN204474233U (en) | 2015-01-09 | 2015-01-09 | The erecting device of reactor |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204474233U true CN204474233U (en) | 2015-07-15 |
Family
ID=53630036
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201520016759.9U Expired - Lifetime CN204474233U (en) | 2015-01-09 | 2015-01-09 | The erecting device of reactor |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204474233U (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105523505A (en) * | 2015-12-29 | 2016-04-27 | 东莞市青麦田数码科技有限公司 | Logistics box handling device |
| CN105668450A (en) * | 2016-04-16 | 2016-06-15 | 国网福建省电力有限公司 | Breaker mechanism maintenance trolley |
| CN108017006A (en) * | 2016-11-04 | 2018-05-11 | 中冶宝钢技术服务有限公司 | A kind of lifting conveyer |
| CN115565750A (en) * | 2022-11-07 | 2023-01-03 | 中国二十二冶集团有限公司 | Indoor reactor stacking method |
-
2015
- 2015-01-09 CN CN201520016759.9U patent/CN204474233U/en not_active Expired - Lifetime
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105523505A (en) * | 2015-12-29 | 2016-04-27 | 东莞市青麦田数码科技有限公司 | Logistics box handling device |
| CN105668450A (en) * | 2016-04-16 | 2016-06-15 | 国网福建省电力有限公司 | Breaker mechanism maintenance trolley |
| CN108017006A (en) * | 2016-11-04 | 2018-05-11 | 中冶宝钢技术服务有限公司 | A kind of lifting conveyer |
| CN115565750A (en) * | 2022-11-07 | 2023-01-03 | 中国二十二冶集团有限公司 | Indoor reactor stacking method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN204474233U (en) | The erecting device of reactor | |
| CN207259070U (en) | A kind of transformer installation lifting gear | |
| CN105502213B (en) | Transformer equipment jacking apparatus and its adjustment mechanism | |
| CN203903830U (en) | Small framework quickly-assembled jack for equipment | |
| CN205934983U (en) | Cable well cover opening device | |
| CN204897278U (en) | Cable well cover opening device | |
| CN203825047U (en) | Electricity detection platform | |
| CN203434492U (en) | Combination-type electric hoisting apparatus | |
| CN220300280U (en) | Glass curtain wall construction hoist device | |
| CN215626554U (en) | Temporary slideway convenient to hoist and mount | |
| CN117374775A (en) | A modular box-type substation that is convenient for transportation | |
| CN205111191U (en) | Scissors formula liftable roller device | |
| CN111232869A (en) | A electrical construction fixed knot constructs for building engineering | |
| CN212265428U (en) | A kind of generator rotor winding coil cleaning and shaping support device | |
| CN211597882U (en) | A component, device and stage for unilateral lifting and lifting | |
| CN111017792B (en) | A kind of electric power emergency repair tower wire lifting device and using method thereof | |
| CN222082230U (en) | A mobile and adjustable lifting platform for a ditch photovoltaic power generation system | |
| CN217741099U (en) | Auxiliary device is used in installation of 110kv transformer substation | |
| CN107879298B (en) | Accurate and stable replacing device for converter valve assembly | |
| CN217229979U (en) | Auxiliary hoisting assembly for box-type substation | |
| CN202888686U (en) | Conveyer of box-type transformer | |
| CN216235539U (en) | An installation device for a quick splicing structure for elevator lifting | |
| CN217975309U (en) | Construction platform for housing construction engineering | |
| CN219239131U (en) | A lifting device for a reactor | |
| CN223866233U (en) | A lifting tool for mounting brackets of photovoltaic systems in plains areas. |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term |
Granted publication date: 20150715 |
|
| CX01 | Expiry of patent term |