CN206035074U - High -efficient installation device of wire pole for electric power - Google Patents

High -efficient installation device of wire pole for electric power Download PDF

Info

Publication number
CN206035074U
CN206035074U CN201620865827.3U CN201620865827U CN206035074U CN 206035074 U CN206035074 U CN 206035074U CN 201620865827 U CN201620865827 U CN 201620865827U CN 206035074 U CN206035074 U CN 206035074U
Authority
CN
China
Prior art keywords
electric
crane
swing seat
electric power
connecting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620865827.3U
Other languages
Chinese (zh)
Inventor
张继钢
张志彬
牛峰
申敏
秦高原
袁皓
冷祥彪
窦如婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CSG Electric Power Research Institute
Research Institute of Southern Power Grid Co Ltd
Original Assignee
Research Institute of Southern Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Research Institute of Southern Power Grid Co Ltd filed Critical Research Institute of Southern Power Grid Co Ltd
Priority to CN201620865827.3U priority Critical patent/CN206035074U/en
Application granted granted Critical
Publication of CN206035074U publication Critical patent/CN206035074U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model relates to an installation device especially relates to a high -efficient installation device of wire pole for electric power. The to -be -solved technical problem of the utility model is to provide a high -efficient installation device of wire pole for electric power that installation effectiveness high, be convenient for removal, easy operation. In order to solve the technical problem, the utility model provides such high -efficient installation device of wire pole for electric power which comprises there be baffle, crane, guide bar, connecting rod, swinging arms, connecting rod, go up swing seat, shallow, connecting block, cylinder, lower swing seat, solid fixed ring, pulley, stay cord and the ring, the shallow top is equipped with the crane, and open the crane top has the guiding hole, and left wall is equipped with swing seat in the crane, goes up swing seat and goes up the articulated swinging arms that is connected with, and the swinging arms right -hand member is connected with the pulley, and the bottom is equipped with down swing seat and solid fixed ring in the crane. The utility model discloses reached the installation effectiveness high, be convenient for to remove, easy operation's effect, save a large amount of manpower and materials.

Description

A kind of electric power efficient erecting device of electric pole
Technical field
This utility model is related to a kind of erecting device, more particularly to a kind of electric power efficient erecting device of electric pole.
Background technology
Electric power is the energy using electric energy as power.Invention is started in 19 century 70s, the invention and application of electric power Second industrialization climax.Since becoming 18th century of human history, one of three scientific and technological revolutions that the world occurs, from this section's technological transformation The life of people is become.The large-scale electrical power system that 20th century occurred is one of most important achievement in the human engineering history of science, The power generation being made up of links such as generating, transmission of electricity, power transformation, distribution and electricity consumptions and consumption system.
Electric pole is exactly the bar installed electricity lines as its name suggests, is one of early stage Chinese important infrastructure.Early stage it is various Electric pole, is all to start to walk from rod, or even is not too high high-voltage line electric pole including electric pressure.Later due to iron and steel and steel The development of reinforced concrete and technical requirement, both materials instead of most of rod.
Existing electric pole erecting device haves the shortcomings that installation effectiveness is low, is difficult to mobile, complex operation, therefore needs badly and set Count a kind of installation effectiveness height, be easy to mobile, the efficient erecting device of electric power simple to operate electric pole.
Utility model content
(1)Technical problem to be solved
This utility model is in order to overcome that existing electric pole erecting device installation effectiveness is low, be difficult to mobile, complex operation Shortcoming, the technical problems to be solved in the utility model are to provide a kind of installation effectiveness height, are easy to mobile, simple to operate electric power to use The efficient erecting device of electric pole.
(2)Technical scheme
In order to solve above-mentioned technical problem, this utility model efficiently installs dress there is provided such a electric power electric pole Put, include baffle plate, crane, guide post, connecting rod, swing arm, connecting rod, upper swing seat, go-cart, contiguous block, cylinder, the bottom Dynamic seat, retainer ring, pulley, drawstring and annulus;Crane is provided with the top of go-cart, is provided with pilot hole, in crane above crane Left wall is provided with swing seat, is hingedly connected with swing arm in upper swing seat, and swing arm right-hand member is connected with pulley, crane inner bottom part Lower swing seat and retainer ring is provided with, lower swing seat is located at retainer ring left, is hingedly connected with cylinder, cylinder upper end on lower swing seat Contiguous block is provided with, contiguous block is articulated and connected with swing arm, in retainer ring, is fixed with drawstring, drawstring bypasses pulley, drawstring bottom righthand side Annulus is provided with, connecting rod on swing arm, is hingedly connected with, connecting rod upper end is hingedly connected with guide post, and guide post is through guiding Hole, guide post left end are provided with connecting rod, and through in the middle of go-cart bottom, connecting rod right-hand member is provided with baffle plate to connecting rod.
Preferably, L-type top board and spring is also included, is provided with L-type top board on the right side of baffle plate, connects between baffle plate and L-type top board It is connected to spring.
Preferably, fixing device is also included, fixing device includes the first electric pushrod and the second electric pushrod, go-cart Right side is hingedly connected with the first electric pushrod and the second electric pushrod, and the first electric pushrod is located on front side of the second electric pushrod, the One electric pushrod and the second electric pushrod right-hand member are articulated and connected with annulus.
Preferably, the material of drawstring is steel wire rope.
Preferably, the material of baffle plate is Q235 steel.
Preferably, on the right side of baffle plate it is L-type.
Preferably, diameter of pulley is 30cm.
Operation principle:Originally, electric pole is entangled with annulus, pole bottom is leaned against on the right side of baffle plate, manually promote go-cart To the left side in hole.Start cylinder elongation, drive swing arm to rotate counterclockwise, so as to band movable pulley is moved upwards, by drawstring and Annulus pulls electric pole to vertical direction banking motion.As swing arm is rotated counterclockwise, connecting rod motion is driven, so as to drive , to left movement, connecting rod is therewith to left movement for guide post so that electric pole is to left movement.Annulus is coordinated with connecting rod so that electric pole Slide in hole, after electric pole is slid to hole, cylinder continues elongation, and band movable pulley is continued up, pulled by drawstring Annulus is moved upwards so that annulus departs from electric pole top.After annulus departs from electric pole, start cylinder and shorten, drive and swing Bar clockwise oscillation, band movable pulley are moved downward, while driving guide post to move right, connecting rod is moved right therewith, works as pulley When moving to reset with guide post, cylinder quits work.Repeat aforesaid operations, you can next electric pole is installed.
Because also including L-type top board and spring, L-type top board is provided with the right side of baffle plate, is connected between baffle plate and L-type top board Spring, electric pole is fixed on the right side of L-type top board, so when pulley pulls electric pole to slide in hole by drawstring, spring and L-type Top board coordinates so that electric pole easier rapidly can be slid to hole.
Because also including fixing device, fixing device includes the first electric pushrod and the second electric pushrod, and go-cart is right Side is hingedly connected with the first electric pushrod and the second electric pushrod, and the first electric pushrod is located on front side of the second electric pushrod, and first Electric pushrod and the second electric pushrod right-hand member are articulated and connected with annulus, so when drawstring pulls electric pole to slide to the process in hole In, the first electric pushrod and the second electric pushrod can strengthen the stability of electric pole, it is to avoid which is inclined to side.Work as electric pole After sliding to hole, cylinder continues elongation, and band movable pulley is continued up, and pulls annulus to move upwards by drawstring, while Start the first electric pushrod and the elongation of the second electric pushrod, the first electric pushrod and the second electric pushrod coordinate pulley so that circle Ring stably rapidly departs from electric pole.
Because the material of drawstring is steel wire rope, with higher ductility, stability and intensity.
Because the material of baffle plate is Q235 steel, with higher corrosion resistance, increase the service life.
Because on the right side of baffle plate being L-type, it is possible to more stably fix electric pole.
(3)Beneficial effect
This utility model has reached installation effectiveness height, has been easy to mobile, effect simple to operate, saves substantial amounts of manpower thing Power.
Description of the drawings
Fig. 1 is the first main structure diagram of the present utility model.
Fig. 2 is second main structure diagram of the present utility model.
Fig. 3 is the third main structure diagram of the present utility model.
Fig. 4 is the overlooking the structure diagram of fixing device of the present utility model.
Labelling in accompanying drawing for:1- ground, 2- holes, 3- baffle plates, 4- electric poles, 5- pilot holes, 6- cranes, 7- are oriented to Bar, 8- connecting rods, 9- swing arms, 10- connecting rods, the upper swing seats of 11-, 12- go-carts, 13- contiguous blocks, 14- cylinders, 15- lower swings Seat, 16- retainer rings, 17- pulleys, 18- drawstrings, 19- annulus, 20- springs, 21-L type top boards, 22- fixing devices, 221- first Electric pushrod, the second electric pushrods of 222-.
Specific embodiment
With reference to the accompanying drawings and examples this utility model is further described.
Embodiment 1
A kind of electric power efficient erecting device of electric pole, as Figure 1-4, include baffle plate 3, crane 6, guide post 7, Connecting rod 8, swing arm 9, connecting rod 10, upper swing seat 11, go-cart 12, contiguous block 13, cylinder 14, lower swing seat 15, retainer ring 16, Pulley 17, drawstring 18 and annulus 19;Crane 6 is provided with the top of go-cart 12, is provided with pilot hole 5, in crane 6 above crane 6 Left wall is provided with swing seat 11, is hingedly connected with swing arm 9 in upper swing seat 11, and 9 right-hand member of swing arm is connected with pulley 17, lifting 6 inner bottom part of frame is provided with lower swing seat 15 and retainer ring 16, and lower swing seat 15 is located at 16 left of retainer ring, is hinged on lower swing seat 15 Cylinder 14 is connected with, 14 upper end of cylinder is provided with contiguous block 13, and contiguous block 13 is articulated and connected with swing arm 9, it is fixed in retainer ring 16 There is drawstring 18, drawstring 18 bypasses pulley 17, and 18 bottom righthand side of drawstring is provided with annulus 19, is hingedly connected with connecting rod 8 on swing arm 9, 8 upper end of connecting rod is hingedly connected with guide post 7, and guide post 7 passes through pilot hole 5,7 left end of guide post to be provided with connecting rod 10, connecting rod 10 Through in the middle of 12 bottom of go-cart, 10 right-hand member of connecting rod is provided with baffle plate 3.
L-type top board 21 and spring 20 is also included, L-type top board 21 is provided with the right side of baffle plate 3, between baffle plate 3 and L-type top board 21 It is connected with spring 20.
Fixing device 22 is included also, fixing device 22 includes the first electric pushrod 221 and the second electric pushrod 222, The first electric pushrod 221 and the second electric pushrod 222 is hingedly connected with the right side of go-cart 12, and the first electric pushrod 221 is located at second On front side of electric pushrod 222, the first electric pushrod 221 and 222 right-hand member of the second electric pushrod are articulated and connected with annulus 19.
The material of drawstring 18 is steel wire rope.
The material of baffle plate 3 is Q235 steel.
It is L-type on the right side of baffle plate 3.
17 a diameter of 30cm of pulley.
Operation principle:Originally, electric pole 4 is entangled with annulus 19,4 bottom of electric pole is leaned against on the right side of baffle plate 3, it is artificial to promote The left side of go-cart 12 to hole 2.Start cylinder 14 to extend, drive swing arm 9 to rotate counterclockwise, so as to band movable pulley 17 is transported upwards It is dynamic, electric pole 4 is pulled to vertical direction banking motion by drawstring 18 and annulus 19.As swing arm 9 is rotated counterclockwise, drive Connecting rod 8 is moved, and so as to drive guide post 7 to left movement, connecting rod 10 is therewith to left movement so that electric pole 4 is to left movement.Circle Ring 19 is coordinated with connecting rod 10 so that electric pole 4 is slided in hole 2, and after electric pole 4 is slid to hole 2, cylinder 14 continues elongation, Band movable pulley 17 is continued up, and pulls annulus 19 to move upwards by drawstring 18 so that annulus 19 departs from electric pole 4 and pushes up Portion.After annulus 19 departs from electric pole 4, start cylinder 14 and shorten, drive 9 clockwise oscillation of swing arm, band movable pulley 17 is downward Motion, while driving guide post 7 to move right, connecting rod 10 is moved right therewith, when pulley 17 and guide post 7 move to reset When, cylinder 14 quits work.Repeat aforesaid operations, you can next electric pole 4 is installed.
Because also including L-type top board 21 and spring 20, L-type top board 21, baffle plate 3 and L-type top board 21 on the right side of baffle plate 3, is provided with Between be connected with spring 20, electric pole 4 is fixed on the right side of L-type top board 21, thus pulley 17 by drawstring 18 pull electric pole 4 When sliding in hole 2, spring 20 and L-type top board 21 coordinate so that electric pole 4 easier rapidly can be slid to hole 2.
Because also including fixing device 22, fixing device 22 includes the first electric pushrod 221 and the second electric pushrod 222, the first electric pushrod 221 and the second electric pushrod 222 is hingedly connected with the right side of go-cart 12, the first electric pushrod 221 is located at On front side of second electric pushrod 222, the first electric pushrod 221 and 222 right-hand member of the second electric pushrod are articulated and connected with annulus 19, institute During pulling electric pole 4 to slide in hole 2 when drawstring 18, the first electric pushrod 221 and the second electric pushrod 222 can increase The stability of forceful electric power line bar 4, it is to avoid which is inclined to side.After electric pole 4 is slid to hole 2, cylinder 14 continues elongation, drives Pulley 17 is continued up, and pulls annulus 19 to move upwards by drawstring 18, while starting the first electric pushrod 221 and second Electric pushrod 222 extends, and the first electric pushrod 221 and the second electric pushrod 222 coordinate pulley 17 so that annulus 19 is stable quick Ground departs from electric pole 4.
Because the material of drawstring 18 is steel wire rope, with higher ductility, stability and intensity.
Because the material of baffle plate 3 is Q235 steel, with higher corrosion resistance, increase the service life.
Because on the right side of baffle plate 3 being L-type, it is possible to more stably fix electric pole 4.
Embodiment described above only expresses preferred implementation of the present utility model, and its description is more concrete and detailed, But therefore can not be interpreted as the restriction to this utility model the scope of the claims.It should be pointed out that common for this area For technical staff, without departing from the inventive concept of the premise, some deformations, improvement and replacement can also be made, these are all Belong to protection domain of the present utility model.Therefore, the protection domain of this utility model patent should be defined by claims.

Claims (7)

1. a kind of electric power efficient erecting device of electric pole, it is characterised in that include baffle plate(3), crane(6), guide post (7), connecting rod(8), swing arm(9), connecting rod(10), upper swing seat(11), go-cart(12), contiguous block(13), cylinder(14), under Swing seat(15), retainer ring(16), pulley(17), drawstring(18)And annulus(19);Go-cart(12)Top is provided with crane(6), Crane(6)Top is provided with pilot hole(5), crane(6)Inner left wall is provided with swing seat(11), upper swing seat(11)On be hinged It is connected with swing arm(9), swing arm(9)Right-hand member is connected with pulley(17), crane(6)Inner bottom part is provided with lower swing seat(15)With Retainer ring(16), lower swing seat(15)Positioned at retainer ring(16)Left, lower swing seat(15)On be hingedly connected with cylinder(14), gas Cylinder(14)Upper end is provided with contiguous block(13), contiguous block(13)With swing arm(9)It is articulated and connected, retainer ring(16)On be fixed with drawstring (18), drawstring(18)Bypass pulley(17), drawstring(18)Bottom righthand side is provided with annulus(19), swing arm(9)On the company of being hingedly connected with Extension bar(8), connecting rod(8)Upper end is hingedly connected with guide post(7), guide post(7)Through pilot hole(5), guide post(7)Left end It is provided with connecting rod(10), connecting rod(10)Through go-cart(12)In the middle of bottom, connecting rod(10)Right-hand member is provided with baffle plate(3).
2. a kind of electric power according to claim 1 efficient erecting device of electric pole, it is characterised in that also include L-type Top board(21)And spring(20), baffle plate(3)Right side is provided with L-type top board(21), baffle plate(3)With L-type top board(21)Between be connected with Spring(20).
3. a kind of electric power according to claim 2 efficient erecting device of electric pole, it is characterised in that also include fixation Device(22), fixing device(22)Include the first electric pushrod(221)With the second electric pushrod(222), go-cart(12)Right side It is hingedly connected with the first electric pushrod(221)With the second electric pushrod(222), the first electric pushrod(221)It is electronic positioned at second Push rod(222)Front side, the first electric pushrod(221)With the second electric pushrod(222)Right-hand member is and annulus(19)It is articulated and connected.
4. a kind of electric power according to claim 3 efficient erecting device of electric pole, it is characterised in that drawstring(18)Material Matter is steel wire rope.
5. a kind of electric power according to claim 4 efficient erecting device of electric pole, it is characterised in that baffle plate(3)Material Matter is Q235 steel.
6. a kind of electric power according to claim 5 efficient erecting device of electric pole, it is characterised in that baffle plate(3)Right side For L-type.
7. a kind of electric power according to claim 6 efficient erecting device of electric pole, it is characterised in that pulley(17)Diameter For 30cm.
CN201620865827.3U 2016-08-11 2016-08-11 High -efficient installation device of wire pole for electric power Active CN206035074U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620865827.3U CN206035074U (en) 2016-08-11 2016-08-11 High -efficient installation device of wire pole for electric power

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620865827.3U CN206035074U (en) 2016-08-11 2016-08-11 High -efficient installation device of wire pole for electric power

Publications (1)

Publication Number Publication Date
CN206035074U true CN206035074U (en) 2017-03-22

Family

ID=58308868

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620865827.3U Active CN206035074U (en) 2016-08-11 2016-08-11 High -efficient installation device of wire pole for electric power

Country Status (1)

Country Link
CN (1) CN206035074U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106958776A (en) * 2017-03-28 2017-07-18 中国计量大学 A kind of stable type solar street light installation servicing unit
CN107060479A (en) * 2017-05-15 2017-08-18 湖州市澳蓝电力科技有限责任公司 A kind of stable type electric power is with electric pole installation servicing unit
CN107386761A (en) * 2017-07-19 2017-11-24 南昌叁润科技有限公司 A kind of concrete wire pole efficient transportation and installation equipment
CN107476641A (en) * 2017-08-01 2017-12-15 南昌叁润科技有限公司 A kind of pair directly makes real equipment with the vertical of electric pole installation with grooving
CN109160465A (en) * 2018-10-24 2019-01-08 广东电网有限责任公司 A kind of device facilitating plantation electric pole

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106958776A (en) * 2017-03-28 2017-07-18 中国计量大学 A kind of stable type solar street light installation servicing unit
CN107060479A (en) * 2017-05-15 2017-08-18 湖州市澳蓝电力科技有限责任公司 A kind of stable type electric power is with electric pole installation servicing unit
CN107386761A (en) * 2017-07-19 2017-11-24 南昌叁润科技有限公司 A kind of concrete wire pole efficient transportation and installation equipment
CN107476641A (en) * 2017-08-01 2017-12-15 南昌叁润科技有限公司 A kind of pair directly makes real equipment with the vertical of electric pole installation with grooving
CN109160465A (en) * 2018-10-24 2019-01-08 广东电网有限责任公司 A kind of device facilitating plantation electric pole

Similar Documents

Publication Publication Date Title
CN206035074U (en) High -efficient installation device of wire pole for electric power
CN104444909A (en) Trolley type cable well lid opener
CN106838804A (en) A kind of theft-proof type solar energy street lamp
CN206817353U (en) A kind of theft-proof type solar energy street lamp
CN203308113U (en) Portable cement electric pole centering device
CN204324787U (en) A kind of trolley type cable manhole cover opener
CN206052477U (en) Dismantling of track device
CN102330413B (en) Construction method for enabling bridge girder erection machine to independently go up and down girder carrier
CN204897278U (en) Cable well cover opening device
CN204474233U (en) The erecting device of reactor
CN201679005U (en) Steel puller
CN215829968U (en) A safety device for thermal power plant's electrical construction
CN104925687A (en) Electric lifting device and working method thereof
CN108221816A (en) A kind of construction iron nail reclaimer
CN209618802U (en) A kind of handling device
CN203558824U (en) Cable overhauling well lid plate lifting tool
CN202117077U (en) Manhole cover opening device
CN203545559U (en) Electric meter box hoisting tool
CN202353102U (en) Lead lifting device for power line erection
CN203513094U (en) Lifting appliance
CN207596424U (en) Cable pit cover plate boom hoisting
CN202004370U (en) Tool for transferring overhead ground wires in process of modification of pole tower
CN206457725U (en) It is a kind of to be used for the overall device transferred and remove dragging suspension basket
CN203230220U (en) Stand for assembling and disassembling electric pole
CN201478117U (en) Iron core overturning device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant