CN202217965U - Conductor wire location device - Google Patents

Conductor wire location device Download PDF

Info

Publication number
CN202217965U
CN202217965U CN2011202721355U CN201120272135U CN202217965U CN 202217965 U CN202217965 U CN 202217965U CN 2011202721355 U CN2011202721355 U CN 2011202721355U CN 201120272135 U CN201120272135 U CN 201120272135U CN 202217965 U CN202217965 U CN 202217965U
Authority
CN
China
Prior art keywords
hoisting
bearing bar
suspension rod
steel wire
ratchet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011202721355U
Other languages
Chinese (zh)
Inventor
徐强
王晴
宋以新
翟健
李栋
马祥壮
徐宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YIYUAN COUNTY POWER SUPPLY CO Ltd
State Grid Corp of China SGCC
Original Assignee
YIYUAN COUNTY POWER SUPPLY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YIYUAN COUNTY POWER SUPPLY CO Ltd filed Critical YIYUAN COUNTY POWER SUPPLY CO Ltd
Priority to CN2011202721355U priority Critical patent/CN202217965U/en
Application granted granted Critical
Publication of CN202217965U publication Critical patent/CN202217965U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The utility model relates to a conductor wire location device, belonging to the field of a high-voltage overhead line maintenance device. The conductor wire location device comprises a bearing bar, a hoisting rod and a hoisting rope, and is characterized in that: the bearing bar is articulated with the hoisting rod through a power ratchet wheel, a ratchet wheel rocker arm is arranged at one side of the power ratchet wheel, the hoisting rod is provided with a hoisting ring, a pulley is arranged at the top end of the bearing bar, a movable clamping groove and a fixed clamping groove are arranged on the bearing rod, an adjusting steel wire rope is fixedly connected on the hoisting rod, the adjusting steel wire rope is wound on the power ratchet wheel after passing through the pulley, a steel wire rope for hoisting is arranged at the top end of the hoisting rod, and a hoisting hook is arranged at the end of the steel wire rope for hoisting. By utilizing the mechanical principle, the original purely-manual operation for lead wire location is changed into mechanical operation to achieve the labor-saving, time-saving and safety purposes, and improve the working efficiency and reduce the operation cost. The conductor wire location device has a wide application range, a simple structure, convenience in operation and strong pertinence and saves sources.

Description

The lead place device
Technical field
The utility model relates in the 10kV-35kV overhead transmission line, adopts a kind of device of the lead work in place of supporting insulator cement pole bar type, is a kind of lead place device specifically.
Background technology
The Yiyuan County is located in the mountain areas in middle Shandong, and the high ditch in domestic mountain is many, with a varied topography, and relief is indefinite, the discrepancy in elevation is big.Limited by landform, Yiyuan County 35kV overhead transmission line adopts cement pole to set up more, and utilization rounded projections arranged and use post insulator set up the 35kV circuit.
Along with the continuous development of local economy, it is heavy day by day that electrical network newly sets up and transform the work of old circuit in the mountainous region, and quantities is huge.Because receive the influence of topography, need personnel many, especially some discrepancy in elevation is bigger, and extreme terrain that span is big and bar type just need 3,4 people to operate simultaneously on same basic shaft tower, and the mode that generally adopts rope pickaback to draw wastes time and energy and occurs potential safety hazard easily.
The utility model content
According to the deficiency of above prior art, the technical problem that the utility model will solve is: provide a kind of easy to operate, reduce manpower, increase the lead place device of coefficient of safety.
The utility model solves the technical scheme that its technical problem adopted: a kind of lead place device, and comprise bearing bar, play suspension rod and lifting rope, it is characterized in that: bearing bar is hinged through power ratchet with a suspension rod; Power ratchet one side is provided with the ratchet rocking arm; Play suspension rod suspension ring are set, the bearing bar top is provided with pulley, is provided with on the bearing bar to move draw-in groove and fixed card slot; Be fixedly connected on the suspension ring and regulate steel wire rope; Regulate steel wire rope and be wrapped on the power ratchet after through pulley, lifting masthead portion is provided with hoisting wirerope, the terminal hook that connects of hoisting wirerope.
Fixed card slot and mobile draw-in groove are fixed on the anchor ear sheet screw of shaft tower top, have decontroled suspension rod, the hook that hoisting wirerope is terminal hangs on the lead; Twist tight power ratchet through the ratchet rocking arm then; Made suspension rod raise gradually, treat that lead breaks away from original position after, decontrol power ratchet more gradually; Lead is dropped on the insulator gradually, accomplish lead process in place.
Wherein preferred version is:
Described lifting masthead portion is provided with the lifting ratchet device, the lifting ratchet device hoisting wirerope that is fastened.The convenient height of regulating hoisting wirerope is accomplished the vertical up-down to lead.
Described suspension rod is provided with expansion link, and expansion link is provided with mutual corresponding fixing hole with a suspension rod.Completion is to the adjusting that plays length of boom and fixing.
Described suspension rod is provided with corresponding positioner with bearing bar.Can accomplish bearing bar and the folding of a suspension rod are fixed.
The beneficial effect that the utility model lead place device is had is: through a bearing bar and a suspension rod is hinged through power ratchet, power ratchet one side is provided with the ratchet rocking arm, and lifting masthead portion is provided with hoisting wirerope; The terminal hook that connects of hoisting wirerope; Utilize theory of mechanics, convert mechanically actuated operation into original pure manual operation lead is in place, reach laborsaving, save time, purpose of safety; Improve operating efficiency, reduced running cost.
The utility model has wide range of applications, simple in structure, easy and simple to handle, with strong points, economize on resources.
Description of drawings
Fig. 1 is the structural representation of the utility model;
Fig. 2 is the user mode reference diagram of the utility model;
Fig. 3 is the folded state reference diagram of the utility model;
Wherein: 1, move draw-in groove 2, fixed card slot 3, power ratchet 4, ratchet Rocker arm 5, bearing bar 6, a suspension rod 7, hook 8, expansion link 9, hoisting wirerope 10, lifting ratchet device 11, suspension ring 12, adjusting steel wire rope 13, pulley 14, positioner.
Embodiment
Below in conjunction with accompanying drawing the embodiment of the utility model is done and to further describe:
As shown in Figure 1, bearing bar 5 is hinged through power ratchet 3 with a suspension rod 6, and power ratchet 3 one sides are provided with the ratchet Rocker arm 4; Play suspension rod 6 suspension ring 11 are set, bearing bar 5 tops are provided with pulley 13, are provided with on the bearing bar 5 to move draw-in groove 1 and fixed card slot 2; Be fixedly connected on the suspension ring 11 and regulate steel wire rope 12; Regulate steel wire rope 12 and be wrapped on the power ratchet 3 after through pulley 13, play suspension rod 6 tops hoisting wirerope 9 is set, the hoisting wirerope 9 terminal hooks 7 that connect.
Play suspension rod 6 tops lifting ratchet device 10 is set, lifting ratchet device 10 hoisting wirerope 9 that is fastened, the convenient height of regulating hoisting wirerope is accomplished the vertical up-down to lead.Play suspension rod 6 expansion link 8 is set, expansion link 8 is provided with mutual corresponding fixing hole with playing a suspension rod 6, accomplishes the adjusting that plays length of boom and fixes.Play suspension rod 6 and corresponding positioner 14 is set, can accomplish bearing bar 5 and the folding of a suspension rod 6 are fixed with bearing bar 5.
Bearing bar 5 materials adopt the manganese-titanium metal.Steel wire rope adopts the 2T galvanized steel wire rope.Fixing, mobile draw-in groove 1,2 and power ratchet 3 are used manganese steel.Pulley 13 uses the stainless steel pulley.
The course of work:
Shown in Fig. 2-3, fixed card slot 2 and mobile draw-in groove 1 are fixed on the anchor ear sheet screw of shaft tower top.Twine on the power ratchet 3 and regulate steel wire rope 12,, carry out operation ratchet through the ratchet Rocker arm 4 for whole device provides power.Hook 7 is hooked on the lead, regulates steel wire rope 12, through the rotation of power ratchet 3 and the pulley 13 on bearing bar top, has driven suspension rod 6 and has moved up and down, and regulates lead and laterally moves.Play suspension rod 6 tops lifting ratchet device 10, accomplish vertical up-down lead.After the work in place of two phase conductors, will play suspension rod 6 through positioner 14 and be fixed on the bearing bar 5 about completion, the work in place of phase conductor in the completion.Power ratchet 3 is used external rocking bar operation, reduces working strength through strengthening moment, reduces staff's work load.

Claims (4)

1. a lead place device comprises bearing bar, plays suspension rod and lifting rope, it is characterized in that: bearing bar is hinged through power ratchet with a suspension rod; Power ratchet one side is provided with the ratchet rocking arm, plays suspension rod suspension ring are set, and the bearing bar top is provided with pulley; Be provided with on the bearing bar and move draw-in groove and fixed card slot, be fixedly connected on the suspension ring and regulate steel wire rope, regulate steel wire rope and be wrapped on the power ratchet after through pulley; Lifting masthead portion is provided with hoisting wirerope, the terminal hook that connects of hoisting wirerope.
2. lead place device according to claim 1 is characterized in that: described lifting masthead portion is provided with the lifting ratchet device, the lifting ratchet device hoisting wirerope that is fastened.
3. lead place device according to claim 1 and 2 is characterized in that: described suspension rod is provided with expansion link, and expansion link is provided with mutual corresponding fixing hole with a suspension rod.
4. lead place device according to claim 1 and 2 is characterized in that: described suspension rod is provided with corresponding positioner with bearing bar.
CN2011202721355U 2011-07-29 2011-07-29 Conductor wire location device Expired - Fee Related CN202217965U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202721355U CN202217965U (en) 2011-07-29 2011-07-29 Conductor wire location device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202721355U CN202217965U (en) 2011-07-29 2011-07-29 Conductor wire location device

Publications (1)

Publication Number Publication Date
CN202217965U true CN202217965U (en) 2012-05-09

Family

ID=46017196

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202721355U Expired - Fee Related CN202217965U (en) 2011-07-29 2011-07-29 Conductor wire location device

Country Status (1)

Country Link
CN (1) CN202217965U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103825218A (en) * 2014-03-05 2014-05-28 国家电网公司 10KV circuit crossing assisting device
CN104901230A (en) * 2015-07-02 2015-09-09 国家电网公司 Live wire insulated lifter
CN105314560A (en) * 2015-11-09 2016-02-10 国家电网公司 Conducting wire lifter

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103825218A (en) * 2014-03-05 2014-05-28 国家电网公司 10KV circuit crossing assisting device
CN104901230A (en) * 2015-07-02 2015-09-09 国家电网公司 Live wire insulated lifter
CN105314560A (en) * 2015-11-09 2016-02-10 国家电网公司 Conducting wire lifter

Similar Documents

Publication Publication Date Title
CN108002269B (en) A kind of simple pole type transformer lifting device
CN203531496U (en) Falling type double-holding-rod pole erecting device
CN202423978U (en) Overhead wire crossing frame
CN202217965U (en) Conductor wire location device
CN201746168U (en) Rewinding and releasing system for prestressed steel strands
CN202090629U (en) "Inverted-U-shaped" truss structure of main variable ingoing line used for 750 kV transformer station in Riyue Mountain
CN201883750U (en) Cable pole erecting device
CN208015234U (en) A kind of novel line apparatus
CN204474233U (en) The erecting device of reactor
CN203895841U (en) Wire supporter
CN202924668U (en) Hydraulic rod erecting device
CN203774688U (en) Wire supporting construction manual wire lifting device
CN102277999B (en) Large-section portal steel structure holding pole
CN202829361U (en) Small-size hoisting machine
CN203242965U (en) Sag adjuster
CN201802300U (en) Self-tight folded hanging ladder
CN202988631U (en) Power facility hoisting device
CN209276035U (en) A kind of self-supporting superelevation Lift-on/Lift-off System
CN202353102U (en) Lead lifting device for power line erection
CN203553744U (en) An ultra extra high voltage AC-DC overhead transmission line ground wire optical cable armour clamp replacing apparatus
CN112875488A (en) Power equipment hoisting threading operating rod convenient for height adjustment
CN202214170U (en) Extending-retracting and folding mechanism for horizontal single-rope double-lifting-point boom
CN202970094U (en) Guyed tower applied to transmission line project
CN202175522U (en) Device for hoisting concrete pole
CN202633820U (en) Lifting device for moving porcelain insulator

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: YIYUAN POWER SUPPLY CO., LTD.

Effective date: 20130802

Owner name: STATE ELECTRIC NET CROP.

Free format text: FORMER OWNER: YIYUAN POWER SUPPLY CO., LTD.

Effective date: 20130802

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 256100 ZIBO, SHANDONG PROVINCE TO: 100031 XICHENG, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20130802

Address after: 100031 Xicheng District, Chang'an Avenue, No. 86,

Patentee after: State Grid Corporation of China

Patentee after: Yiyuan County Power Supply Co.,Ltd.

Address before: 256100 No. 22 Lishan Road, Yiyuan County, Zibo, Shandong

Patentee before: Yiyuan County Power Supply Co.,Ltd.

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120509

Termination date: 20130729