CN204452881U - The slipway launching ballast for cruising cabin structure of interim frock is supported based on pipe - Google Patents

The slipway launching ballast for cruising cabin structure of interim frock is supported based on pipe Download PDF

Info

Publication number
CN204452881U
CN204452881U CN201420752508.2U CN201420752508U CN204452881U CN 204452881 U CN204452881 U CN 204452881U CN 201420752508 U CN201420752508 U CN 201420752508U CN 204452881 U CN204452881 U CN 204452881U
Authority
CN
China
Prior art keywords
frock
groove
outer bottom
pipe
ballast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420752508.2U
Other languages
Chinese (zh)
Inventor
赵蕾
李嘉换
王志超
隋月
黄志勇
任怀远
沈涛
马延德
田天
王景洋
彭贵胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian Shipbuilding Industry Co Ltd
Original Assignee
Dalian Shipbuilding Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian Shipbuilding Industry Co Ltd filed Critical Dalian Shipbuilding Industry Co Ltd
Priority to CN201420752508.2U priority Critical patent/CN204452881U/en
Application granted granted Critical
Publication of CN204452881U publication Critical patent/CN204452881U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The utility model discloses the slipway launching ballast for cruising cabin structure supporting interim frock based on pipe, in ballast tank, outer bottom is indulged interval between bone and is arranged vertical supporting tool, described frock comprises the round steel pipe main body (4) at middle part, be positioned at the steel structure draw-in groove (5) at the upper and lower two ends of described round steel pipe main body (4), described draw-in groove (5) madial wall and bottom surface pad are provided with Rubber washer (7), and a sidewall horizontal of described draw-in groove (5) is equipped with the bolt (6) for support top stay tube.The utility model is according to outer bottom loading characteristic in slipway launching process, and in slideway place ballast tank, outer bottom is indulged between bone and set up vertical pipe supporting tool.For the paint of protecting tool set-up and hull structure section bar contact position, the bolt position at the upper and lower two ends of frock adds Rubber washer.After launching completion, regain pipe frock, can use in serial ship.This frock is easy for installation, and use flexibly, actv. prevents the distortion of boats and ships hull Outer Bottom Plating and component in lower water process.

Description

The slipway launching ballast for cruising cabin structure of interim frock is supported based on pipe
Technical field
The present invention relates to the interim Fixture Design of slipway launching boats and ships, in particular, relate in slipway launching process, between the double bottom of outer bottom plate hight support reaction region, set up the design of pipe supporting tool.
Background technology
In launching process, before stern is floating, suffered by the hull structure skidding off runner portions, gravity is greater than buoyancy, and hull beam is in hogging condition, and way end becomes large instantaneously to the support reaction of hull structure.When position between strong frame is in way end, by the direct acting vertical bone stress of slideway often beyond yield limit, and cause part bracket unstability, thus cause occurring the situation that bottom of ship is out of shape in lower water process.To this, way is in the past, as illustrated in fig. 1 and 2, the outside plate in slideway 1 region is indulged bone and increases or change vertical bone into stringers 2.But under normal circumstances, when lower water has calculated, scene has completed total combination and has held together, and amendment bottom construction, the difficulty of construction be transported to bottom ballast tank by group's component is large.In addition, boats and ships are in whole service life, and lower water condition can not occur again, increase permanent structure and not only gain in weight, cause structure to waste, and need again to submit to a higher level for approval or revision drawing, delay the duration.
Summary of the invention
The present invention is directed to the problems referred to above, through slipway launching Strength Calculation, in high support reaction region, outer bottom is indulged between bone and is set up vertical steel pipe support frock, as interim frock, thus reaches the effect improving operating efficiency, reduce costs, increase safety.
In order to achieve the above object, a kind of slipway launching ballast for cruising cabin structure supporting interim frock based on pipe of the present invention, in ballast tank, outer bottom is indulged interval between bone and is arranged vertical supporting tool, described frock comprises the round steel pipe main body at middle part, be positioned at the steel structure draw-in groove at the described upper and lower two ends of round steel pipe main body, described draw-in groove madial wall and bottom surface pad are provided with Rubber washer, and a sidewall horizontal of described draw-in groove is equipped with the bolt for support top stay tube.
The present invention can be delivered to tank top plate structure by stressed for outer bottom, actv. reduces the generation of outside plate distortion in launching process, replace the method in the past strengthening permanent hull structure (as stringers), also can install easily in the ship building later stage, reduce the design and construction workload that increase because of structural modification, greatly increase work efficiency.
Accompanying drawing explanation
Fig. 1 slideway region girder work figure.
Fig. 2 be in Fig. 1 A-A to sectional structure schematic diagram.
Fig. 3 is the arrangement plan of pipe supporting tool between ballast tank double bottom.
Fig. 4 be in Fig. 3 A-A to sectional structure schematic diagram.
Fig. 5 is pipe supporting tool erection plan.
Detailed description of the invention
As seen in figures 3-5, the present invention's outer bottom in high support reaction region is indulged between bone 9 and is set up vertical steel pipe support frock 3.Supporting tool comprises round steel pipe main body 4, two ends steel structure draw-in groove 5, and the bolt 6 of fixing tool.For the paint of protecting tool set-up and hull structure section bar contact position, bolt 6 position at the upper and lower two ends of frock adds Rubber washer 7.
For C3900 case box ship, calculate stern floating-point position in lower water process.According to hull structural strength result of calculation, indulge each rib position place between bone in area of high stress double bottom and arrange steel pipe support frock 3, see Fig. 2.Steel pipe 4 rigidity itself is enough strong to ensure can not bend and buckling deformation in pressurized process in lower water process.On vertical bone 9 bulb of going to the bottom to be placed in draw-in groove 5, centre adds Rubber washer 7, and the bulb back side one side bayonet slot is provided with two bolts 6, supporting tool is fixed on double bottom and indulges between bone.After lower water completion, pipe frock is regained, treats that follow-up ship uses.This frock making is simple, is convenient to installing/dismounting and transport.
The present invention can be delivered to tank top plate structure 8 by stressed for outer bottom, actv. reduces the generation of outside plate distortion in launching process, replace the method in the past strengthening permanent hull structure (as stringers 2), also can install easily in the ship building later stage, reduce the design and construction workload that increase because of structural modification, greatly increase work efficiency.
The present invention is according to outer bottom loading characteristic in slipway launching process, and in slideway place ballast tank, outer bottom is indulged between bone and set up vertical pipe supporting tool.For the paint of protecting tool set-up and hull structure section bar contact position, the bolt position at the upper and lower two ends of frock adds Rubber washer.After launching completion, regain pipe frock, can use in serial ship.This frock is easy for installation, and use flexibly, actv. prevents the distortion of boats and ships hull Outer Bottom Plating and component in lower water process.
The above; be only the present invention's preferably detailed description of the invention; but protection scope of the present invention is not limited thereto; anyly be familiar with those skilled in the art in the technical scope that the present invention discloses; be equal to according to technical scheme of the present invention and inventive concept thereof and replace or change, all should be encompassed within protection scope of the present invention.

Claims (1)

1. one kind supports the slipway launching ballast for cruising cabin structure of interim frock based on pipe, it is characterized in that, in ballast tank, outer bottom is indulged interval between bone and is arranged vertical supporting tool, described frock comprises the round steel pipe main body (4) at middle part, be positioned at the steel structure draw-in groove (5) at the upper and lower two ends of described round steel pipe main body (4), described draw-in groove (5) madial wall and bottom surface pad are provided with Rubber washer (7), and a sidewall horizontal of described draw-in groove (5) is equipped with the bolt (6) for support top stay tube.
CN201420752508.2U 2014-12-03 2014-12-03 The slipway launching ballast for cruising cabin structure of interim frock is supported based on pipe Active CN204452881U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420752508.2U CN204452881U (en) 2014-12-03 2014-12-03 The slipway launching ballast for cruising cabin structure of interim frock is supported based on pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420752508.2U CN204452881U (en) 2014-12-03 2014-12-03 The slipway launching ballast for cruising cabin structure of interim frock is supported based on pipe

Publications (1)

Publication Number Publication Date
CN204452881U true CN204452881U (en) 2015-07-08

Family

ID=53659804

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420752508.2U Active CN204452881U (en) 2014-12-03 2014-12-03 The slipway launching ballast for cruising cabin structure of interim frock is supported based on pipe

Country Status (1)

Country Link
CN (1) CN204452881U (en)

Similar Documents

Publication Publication Date Title
KR102030139B1 (en) light buoy for navigational aide
US20140137789A1 (en) Installation vehicle for a tidal power plant and method for the operation thereof
CN211167281U (en) Large-scale L NG ship side and bilge structure under high ice level
CN109747772A (en) The side ejector sleeve support construction and installation method of ocean engineering ship bow part Side Thrusters
CN101108648A (en) Method for manufacturing watercraft commutation tube
CN102535870A (en) Tooling support for assembling and transporting nuclear-power containment-vessel cover head
CN204452881U (en) The slipway launching ballast for cruising cabin structure of interim frock is supported based on pipe
CN105109617B (en) A kind of Ship Structure for the large-scale A cabinet frames of reassembling type
CN204958181U (en) Winch is assisted to boats and ships
CN201778958U (en) Shipborne liftable wind power generator tower
CN201037231Y (en) Yacht dock (bateau bridge)
CN105947108A (en) Portal frame used for shelving and transporting super-large ship body cabin
CN205754131U (en) A kind of floating on water surface photovoltaic plant installing rack
CN204993163U (en) Showy integral photovoltaic power plant on water
CN215860611U (en) Floating type offshore wind turbine foundation
CN102407920B (en) Anti-impact protection structure for box type beams of hull
CN210235267U (en) Offshore wind turbine composite cylinder foundation towing structure
CN109720570B (en) Buoy connecting structure of large amphibious aircraft
CN103723243B (en) Fixing end section location fixture components and the using method thereof of pipe pillar
CN113236502A (en) Floating type offshore wind turbine foundation
CN210027844U (en) Inclined supporting seat structure for dragging and moving ship
CN102769049A (en) Solar photovoltaic component roof installation system
CN102730164B (en) A kind of ship floats the agent structure of mooring system
CN202703846U (en) Fixation compound plate
CN205647363U (en) Photovoltaic board on water supports uses device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant