CN204391602U - Charged the continuing of suspended insulated guide wire uses operation tool - Google Patents

Charged the continuing of suspended insulated guide wire uses operation tool Download PDF

Info

Publication number
CN204391602U
CN204391602U CN201420779560.7U CN201420779560U CN204391602U CN 204391602 U CN204391602 U CN 204391602U CN 201420779560 U CN201420779560 U CN 201420779560U CN 204391602 U CN204391602 U CN 204391602U
Authority
CN
China
Prior art keywords
action bars
pedestal
guide wire
ratchet spanner
operation tool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420779560.7U
Other languages
Chinese (zh)
Inventor
沈一平
余虹云
周宙龙
潘伟建
蔡国民
薛迪龙
崔利兵
王昕�
任凯
丁宇海
应明春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG ZUOYI POWER EQUIPMENT CO Ltd
Zhejiang Huadian Equipment Inspection Institute
Taizhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
ZHEJIANG ZUOYI POWER EQUIPMENT CO Ltd
Zhejiang Huadian Equipment Inspection Institute
Taizhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG ZUOYI POWER EQUIPMENT CO Ltd, Zhejiang Huadian Equipment Inspection Institute, Taizhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical ZHEJIANG ZUOYI POWER EQUIPMENT CO Ltd
Priority to CN201420779560.7U priority Critical patent/CN204391602U/en
Application granted granted Critical
Publication of CN204391602U publication Critical patent/CN204391602U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The utility model relates to charged the continuing of suspended insulated guide wire and uses operation tool, comprise insulating support rod, insulation control lever, insulating support rod comprises the first action bars, pedestal, clamp assembly that gap is adjustable, insulation control lever comprises the second action bars, ratchet spanner, second action bars is provided with control assembly, and ratchet spanner is provided with the adjusting rod controlling ratchet spanner rotation direction, advantage of the present utility model: wire clamp is fixedly connected on the pedestal on insulating support rod by clamp assembly, and the nut controlled by the ratchet spanner on insulation control lever on wire clamp, only need make ratchet spanner work that nut is pulled off by control assembly, only need two people's operations just can complete whole installation steps during operation, decrease the waste of working strength and manpower, be easy to carry, clamp assembly is arranged to gap adjustable, the wire clamp that can adapt to different model is installed, improve Practical Performance, installation to wire clamp when the bad environments such as the existing remote mountain areas of energy adaptation.

Description

Charged the continuing of suspended insulated guide wire uses operation tool
Technical field
The utility model relates to charged the continuing of suspended insulated guide wire and uses operation tool.
Background technology
In electric power, communication line, aerial condutor adopts wire clamp to carry out continuing and branch usually, at the charged technical elements that continues of overhead transmission line, generally at present carries out charged subsequent duty by aerial lift device with insulated arm.It is convenient that aerial lift device with insulated arm has lift-off, mobility strong, and job area is large, and mechanical strength is high, electrical insulation properties advantages of higher.In recent years, aerial lift device with insulated arm obtains applying more and more widely.But when the place that some aerial lift device with insulating arm for live workings cannot put in place and insulated platform cannot use, the live line working how carrying out insulation puncture line clamping has become in a difficult point.
Utility model content
The technical problems to be solved in the utility model is just to provide charged the continuing of suspended insulated guide wire and uses operation tool, solve the installation to wire clamp when existing servicing unit can not adapt to the bad environments such as remote mountain areas, servicing unit is that required workload is large in carrying, working strength is large, be unfavorable for operation, the defect that security performance is low.
In order to solve the problems of the technologies described above, the utility model is achieved through the following technical solutions: suspended insulated guide wire is charged to continue with operation tool, comprise an insulating support rod for fixture and one for by insulation control lever fastening for wire clamp, described insulating support rod comprises the first action bars, be movably connected in the first action bars top base, be arranged on the clamp assembly that gap on pedestal is adjustable, described insulation control lever comprises the second action bars, be arranged on the ratchet spanner on the second action bars, described second action bars is provided with the control assembly controlling ratchet spanner work, described ratchet spanner is provided with the adjusting rod controlling ratchet spanner rotation direction.
Preferably, described control assembly comprises the connecting rod be movably connected on the second action bars, control connection bar is movably connected in the pull bar on the second action bars, the top of described connecting rod is rotatably connected on ratchet spanner by bearing pin, the bottom of described connecting rod is movably connected on the second action bars by movable component, described pull bar is fixedly connected with movable component, it is movable on the second action bars that pull bar controls movable component, thus make ratchet spanner work, structure is simple, animation effect is good, simple to operate, working strength required during operation is little, can ensure that operating personnel control ratchet spanner under minimum active force, control effects is good.
Preferably, described movable component comprises the first stator, the second stator, at least one is connected to castor between the first stator and the second stator by axis of rotation, described pull bar is fixedly connected with the first stator, animation effect is good, and be convenient to castor and install, the first stator and the second stator are convenient to castor installing/dismounting, it is convenient to change, Practical Performance is good, also pull bar can be fixedly connected on the second stator, is convenient to castor and is movably connected on the second action bars.
Preferably, described second action bars is provided with lower position block and the upper limit position block of restraint wheel active strokes, the outside of described lower position block is coated with one deck by the insulating case of draw lever locking in lower position block, described insulating case is provided with at least one fixing hole matched with pull bar, described insulating case is provided with the locking belt of draw lever locking in fixing hole, the madial wall of described locking belt is provided with protective pad, by the setting of upper limit position block, ensure that the normal rotation of ratchet spanner, decrease between movable component and ratchet spanner and clamp, decrease the working strength of operating personnel, by draw lever locking in the insulating case of lower position block, and locked by locking belt, decrease damage and the disengaging of pull bar, security performance is high, the setting of protective pad, protection effect is good.
Preferably, also comprise one and be arranged on dismountable first handle on the second action bars, the bottom of described second action bars is provided with the first fixed cover installed for first handle, described first handle is fixedly connected with by screw thread with the first fixed cover, the bottom of described first handle is provided with first-hand sleeve, the middle part of described first handle is provided with the spacing sheath of work, adjustment can be carried out according to different operating environments to the height of the second action bars to install, the setting of sheath, the contact of pull bar and first handle can be reduced, decrease pull bar and the damage lower than handle, first-hand sleeve convenient operation personnel take, decrease friction, first fixed cover connects reliable, easy installation and removal, unfailing performance is good.
Preferably, described clamp assembly comprises at least one piece of lower plate be fixedly connected on pedestal, at least one piece is movably connected in the train wheel bridge on pedestal, an adjustable gap is formed between described lower plate and train wheel bridge, lower plate described in every block is equipped with a lug boss for preventing wire clamp from coming off raised up, described first action bars is provided with and controls train wheel bridge and be movably arranged on screw rod on pedestal, the top of described first action bars is provided with the screwed hole for screw rod activity, train wheel bridge movable gap making the formation one between train wheel bridge and lower plate adjustable on pedestal is regulated by screw rod, different wire clamps can be adapted to install, Practical Performance is good, the setting of lug boss, when avoiding installation, wire clamp comes off angle assembly, decrease wire clamp from falling from high altitude, security performance is high, screw action is simple, easy for installation.
Preferably, the portable plate that one piece controls train wheel bridge activity is provided with in described pedestal, described screw tip is provided with the push pedal promoting portable plate activity, described screw rod between pedestal and the first action bars is provided with at least one adjusting nut, controlling portable plate by push pedal makes train wheel bridge movable, animation effect is good, relative to the contact-making surface that screw rod contacts with train wheel bridge, improve the active force of promotion, improve balance during train wheel bridge activity, decrease loss, be conducive to the clamping of angle, the setting of adjusting nut, regulating effect is good, decrease pedestal and the first action bars Contact, decrease damage.
Preferably, described pedestal is provided with and controls the movable gathering sill at pedestal of train wheel bridge, described gathering sill is dovetail groove, and the top of described gathering sill is provided with a latch preventing train wheel bridge from departing from gathering sill, avoids the inclination after train wheel bridge activity, improve angle effect, oat tail groove structure is simple, easy installation and removal, the setting of latch, decrease train wheel bridge in active procedure and depart from gathering sill, decrease damage.
Preferably, described first action bars comprises the second mobile jib, detachable second handle on the second mobile jib, the bottom of described second mobile jib is provided with the second fixed cover installed for second handle, the bottom of described second handle is provided with second-hand's sleeve, height can be carried out according to different different areas of activity to regulate, improve Practical Performance, structure is simple, installs easy accessibility.
Preferably, the top of described first action bars and the top of the second action bars are equipped with an insulating hanger, by the setting of insulating hanger, when working long hours, can say that the first action bars and the second action bars are suspended on operation electric wire, convenient operation personnel have a rest, the working strength of the first action bars and the second action bars entirety when decreasing operation, result of use is good, and structure is simple.
In sum, advantage of the present utility model: wire clamp is fixedly connected on the pedestal on insulating support rod by clamp assembly, and the nut controlled by the ratchet spanner on insulation control lever on wire clamp, only need make ratchet spanner work that nut is pulled off by control assembly, only need two people's operations just can complete whole installation steps during operation, decrease the waste of working strength and manpower, improve security performance, be easy to carry, the rotation direction of ratchet spanner is controlled by adjusting rod, different operating personnel and installment state can be adapted to, clamp assembly is arranged to gap adjustable, the wire clamp that can adapt to different model is installed, improve Practical Performance, installation to wire clamp when the bad environments such as the existing remote mountain areas of energy adaptation, save cost.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the utility model is described in further detail:
Fig. 1 is the structural representation of the utility model insulation control lever;
Fig. 2 is the structural representation of the utility model movable component;
Fig. 3 is the structural representation of the utility model lower position block;
Fig. 4 is the structural representation of the utility model insulating support rod;
Fig. 5 is the structural representation of the utility model clamp assembly.
Embodiment
As Fig. 1, Fig. 2, Fig. 3, Fig. 4, shown in Fig. 5, suspended insulated guide wire is charged to continue with operation tool, comprise an insulating support rod 1 for fixture and one for by insulation control lever 2 fastening for wire clamp, described insulating support rod 1 comprises the first action bars 11, be movably connected in the first action bars 11 top base 12, be arranged on the clamp assembly 3 that on pedestal 12, gap is adjustable, described insulation control lever 2 comprises the second action bars 21, be arranged on the ratchet spanner 22 on the second action bars 21, described second action bars 21 is provided with the control assembly 4 controlling ratchet spanner 22 and work, described ratchet spanner 22 is provided with the adjusting rod 221 controlling ratchet spanner 22 rotation direction, described control assembly 4 comprises the connecting rod 41 be movably connected on the second action bars 21, control connection bar 41 is movably connected in the pull bar 42 on the second action bars 21, the top of described connecting rod 41 is rotatably connected on ratchet spanner 22 by bearing pin 40, the bottom of described connecting rod 41 is movably connected on the second action bars 21 by movable component 5, described pull bar 42 is fixedly connected with movable component 5, it is movable on the second action bars that pull bar controls movable component, thus make ratchet spanner work, structure is simple, animation effect is good, simple to operate, working strength required during operation is little, can ensure that operating personnel control ratchet spanner under minimum active force, control effects is good, described movable component 5 comprises the first stator 51, second stator 52, two are rotatably connected on the castor 54 between the first stator 51 and the second stator 52 by rotating shaft 53, described pull bar 42 is fixedly connected with the first stator 52, animation effect is good, be convenient to castor install, first stator and the second stator are convenient to castor installing/dismounting, it is convenient to change, Practical Performance is good, also pull bar can be fixedly connected on the second stator, being convenient to castor is movably connected on the second action bars, described second action bars 21 is provided with lower position block 7 and the upper limit position block 6 that restraint takes turns 54 active strokes, the outside of described lower position block 7 is coated with one deck and pull bar 42 is locked at insulating case 71 in lower position block 7, described insulating case 71 is provided with a fixing hole 711 matched with pull bar 42, described insulating case 71 is provided with the locking belt 712 of draw lever locking in fixing hole, the madial wall of described locking belt 712 is provided with protective pad 713, by the setting of upper limit position block, ensure that the normal rotation of ratchet spanner, decrease between movable component and ratchet spanner and clamp, decrease the working strength of operating personnel, by draw lever locking in the insulating case of lower position block, and locked by locking belt, decrease damage and the disengaging of pull bar, security performance is high, the setting of protective pad, protection effect is good, also comprise one and be arranged on dismountable first handle 20 on the second action bars 21, the bottom of described second action bars 21 is provided with the first fixed cover 210 installed for first handle 20, described first handle 20 is fixedly connected with by screw thread with the first fixed cover 210, the bottom of described first handle 20 is provided with first-hand sleeve 200, the middle part of described first handle 20 is provided with the spacing sheath 201 of work, adjustment can be carried out according to different operating environments to the height of the second action bars to install, the setting of sheath, the contact of pull bar and first handle can be reduced, decrease pull bar and the damage lower than handle, first-hand sleeve convenient operation personnel take, decrease friction, first fixed cover connects reliable, easy installation and removal, unfailing performance is good, described clamp assembly 3 comprises two pieces of lower plates 31 be fixedly connected on pedestal 12, two pieces are movably connected in the train wheel bridge 32 on pedestal 12, an adjustable gap 30 is formed between described lower plate 31 and train wheel bridge 32, lower plate 31 described in every block is equipped with a lug boss 311 for preventing wire clamp from coming off raised up, described first action bars 11 is provided with and controls train wheel bridge 32 and be movably arranged on screw rod 8 on pedestal 12, the top of described first action bars 11 is provided with the screwed hole for screw rod 8 activity, train wheel bridge movable gap making the formation one between train wheel bridge and lower plate adjustable on pedestal is regulated by screw rod, different wire clamps can be adapted to install, Practical Performance is good, the setting of lug boss, when avoiding installation, wire clamp comes off angle assembly, decrease wire clamp from falling from high altitude, security performance is high, screw action is simple, easy for installation, the portable plate 9 that one piece controls train wheel bridge 31 activity is provided with in described pedestal 12, described screw rod 8 top is provided with the push pedal 81 promoting portable plate 9 activity, described screw rod 8 between pedestal 12 and the first action bars 11 is provided with at least one adjusting nut 80, controlling portable plate by push pedal makes train wheel bridge movable, animation effect is good, relative to the contact-making surface that screw rod contacts with train wheel bridge, improve the active force of promotion, improve balance during train wheel bridge activity, decrease loss, be conducive to the clamping of angle, the setting of adjusting nut, regulating effect is good, decrease pedestal and the first action bars Contact, decrease damage, described pedestal 12 is provided with and controls the gathering sill 121 of train wheel bridge 31 activity at pedestal 12, described gathering sill 121 is dovetail groove, the top of described gathering sill 121 is provided with a latch 122 preventing train wheel bridge from departing from gathering sill, avoid the inclination after train wheel bridge activity, improve angle effect, oat tail groove structure is simple, easy installation and removal, the setting of latch, decrease train wheel bridge in active procedure and depart from gathering sill, decrease damage, also comprise a detachable second handle 13 on the first action bars 11, the bottom of described first action bars 11 is provided with the second fixed cover 110 installed for second handle 13, the bottom of described second handle 13 is provided with second-hand's sleeve 130, height can be carried out according to different different areas of activity to regulate, improve Practical Performance, structure is simple, easy accessibility is installed, the top of described first action bars 11 and the top of the second action bars 21 are equipped with an insulating hanger 10, when working long hours, can say that the first action bars and the second action bars are suspended on operation electric wire, convenient operation personnel have a rest, the working strength of the first action bars and the second action bars entirety when decreasing operation, result of use is good, structure is simple, also comprise for placing insulation control lever, insulating support rod, first handle, the putting bag of second handle, described putting bag is provided with at least one braces and at least one bandage, be respectively equipped with the control lever that insulate in described putting bag, insulating support rod, first handle, second handle is locked at the control cincture in putting bag.
During operation, the rotation direction of ratchet spanner 22 is regulated by adjusting rod 221, all be adjusted to clockwise direction during general operation to rotate, according to the model of wire clamp, wire clamp is made to be locked on pedestal 12 by regulating the gap between train wheel bridge 31 and lower plate 32, during adjustment, only need control push pedal 81 by bolt drives portable plate 9 to make train wheel bridge 31 movable, and regulate the height of the first action bars 11 and the height of the second action bars 21 according to the height of operating environment, only need fix a second handle 13 on the first action bars 11, second action bars 21 is fixed a first handle 20, during use, ratchet spanner 22 is inserted in the nut of wire clamp, pull movable component 5 movable on the second action bars 21 by pull bar 43, thus ratchet spanner 22 pairs of nuts are twisted, until the torque nut of wire clamp is pulled off, operate successively, just can fast and safely install it.
Wire clamp is fixedly connected on the pedestal on insulating support rod by clamp assembly, and the nut controlled by the ratchet spanner on insulation control lever on wire clamp, only need make ratchet spanner work that nut is pulled off by control assembly, only need two people's operations just can complete whole installation steps during operation, decrease the waste of working strength and manpower, improve security performance, be easy to carry, the rotation direction of ratchet spanner is controlled by adjusting rod, different operating personnel and installment state can be adapted to, clamp assembly is arranged to gap adjustable, the wire clamp that can adapt to different model is installed, improve Practical Performance, installation to wire clamp when the bad environments such as the existing remote mountain areas of energy adaptation, save cost.

Claims (10)

1. suspended insulated guide wire is charged continues with operation tool, it is characterized in that: comprise an insulating support rod for fixture (1) and one for by insulation control lever (2) fastening for wire clamp, described insulating support rod (1) comprises the first action bars (11), be movably connected in the first action bars (11) top base (12), be arranged on the clamp assembly (3) that the upper gap of pedestal (12) is adjustable, described insulation control lever (2) comprises the second action bars (21), be arranged on the ratchet spanner (22) on the second action bars (21), described second action bars (21) is provided with the control assembly (4) controlling ratchet spanner (22) and work, described ratchet spanner (22) is provided with the adjusting rod (221) controlling ratchet spanner (22) rotation direction.
2. suspended insulated guide wire according to claim 1 is charged continues with operation tool, it is characterized in that: described control assembly (4) comprises the connecting rod (41) be movably connected on the second action bars (21), control connection bar (41) is movably connected in the pull bar (42) on the second action bars (21), the top of described connecting rod (41) is rotatably connected on ratchet spanner (22) by bearing pin (40), the bottom of described connecting rod (41) is movably connected on the second action bars (21) by movable component (5), described pull bar (42) is fixedly connected with movable component (5).
3. suspended insulated guide wire according to claim 2 is charged continues with operation tool, it is characterized in that: described movable component (5) comprises the first stator (51), the second stator (52), at least one is rotatably connected on castor (54) between the first stator (51) and the second stator (52) by rotating shaft (53), and described pull bar (42) is fixedly connected with the first stator (52).
4. suspended insulated guide wire according to claim 3 is charged continues with operation tool, it is characterized in that: described second action bars (21) is provided with lower position block (7) and the upper limit position block (6) of restraint wheel (54) active strokes, the outside of described lower position block (7) is coated with one deck and pull bar (42) is locked at insulating case (71) in lower position block (7), described insulating case (71) is provided with at least one fixing hole (711) matched with pull bar (42), described insulating case (71) is provided with the locking belt of draw lever locking in fixing hole (712), the madial wall of described locking belt (712) is provided with protective pad (713).
5. the suspended insulated guide wire according to any one of Claims 1-4 is charged to continue with operation tool, it is characterized in that: also comprise one and be arranged on the upper dismountable first handle (20) of the second action bars (21), the bottom of described second action bars (21) is provided with the first fixed cover (210) installed for first handle (20), described first handle (20) is fixedly connected with by screw thread with the first fixed cover (210), the bottom of described first handle (20) is provided with first-hand sleeve (200), the middle part of described first handle (20) is provided with the spacing sheath of work (201).
6. suspended insulated guide wire according to claim 1 is charged continues with operation tool, it is characterized in that: described clamp assembly (3) comprises at least one piece of lower plate (31) be fixedly connected on pedestal (12), at least one piece is movably connected in the train wheel bridge (32) on pedestal (12), an adjustable gap (30) is formed between described lower plate (31) and train wheel bridge (32), lower plate (31) described in every block is equipped with a lug boss (311) for preventing wire clamp from coming off raised up, described first action bars (11) is provided with and controls train wheel bridge (31) and be movably arranged on screw rod (8) on pedestal (12), the top of described first action bars (11) is provided with for the movable screwed hole of screw rod (8).
7. suspended insulated guide wire according to claim 6 is charged continues with operation tool, it is characterized in that: be provided with one piece in described pedestal (12) and control the movable portable plate (9) of train wheel bridge (31), described screw rod (8) top is provided with and promotes the movable push pedal (81) of portable plate (9), and the described screw rod (8) between pedestal (12) and the first action bars (11) is provided with at least one adjusting nut (80).
8. suspended insulated guide wire according to claim 6 is charged continues with operation tool, it is characterized in that: described pedestal (12) is provided with and controls the movable gathering sill (121) in pedestal (12) of train wheel bridge (31), described gathering sill (121) is dovetail groove, and the top of described gathering sill (121) is provided with a latch (122) preventing train wheel bridge from departing from gathering sill.
9. the suspended insulated guide wire according to any one of claim 6 to 8 is charged to continue with operation tool, it is characterized in that: also comprise a detachable second handle (13) on the first action bars (11), the bottom of described first action bars (11) is provided with the second fixed cover (110) installed for second handle (13), and the bottom of described second handle (13) is provided with second-hand's sleeve (130).
10. suspended insulated guide wire according to claim 1 is charged continues with operation tool, it is characterized in that: the top of described first action bars (11) and the top of the second action bars (21) are equipped with an insulating hanger (10).
CN201420779560.7U 2014-12-10 2014-12-10 Charged the continuing of suspended insulated guide wire uses operation tool Expired - Fee Related CN204391602U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420779560.7U CN204391602U (en) 2014-12-10 2014-12-10 Charged the continuing of suspended insulated guide wire uses operation tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420779560.7U CN204391602U (en) 2014-12-10 2014-12-10 Charged the continuing of suspended insulated guide wire uses operation tool

Publications (1)

Publication Number Publication Date
CN204391602U true CN204391602U (en) 2015-06-10

Family

ID=53364290

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420779560.7U Expired - Fee Related CN204391602U (en) 2014-12-10 2014-12-10 Charged the continuing of suspended insulated guide wire uses operation tool

Country Status (1)

Country Link
CN (1) CN204391602U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104505767A (en) * 2014-12-10 2015-04-08 国网浙江省电力公司台州供电公司 Operating tool for electrified connection of insulated overhead conductor
CN109861128A (en) * 2018-12-20 2019-06-07 国网北京市电力公司 Operating stick

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104505767A (en) * 2014-12-10 2015-04-08 国网浙江省电力公司台州供电公司 Operating tool for electrified connection of insulated overhead conductor
CN104505767B (en) * 2014-12-10 2017-01-04 国网浙江省电力公司台州供电公司 Charged the continuing of suspended insulated guide wire uses operation instrument
CN109861128A (en) * 2018-12-20 2019-06-07 国网北京市电力公司 Operating stick
CN109861128B (en) * 2018-12-20 2022-02-08 国网北京市电力公司 Operating rod

Similar Documents

Publication Publication Date Title
CN104505767A (en) Operating tool for electrified connection of insulated overhead conductor
CN202384510U (en) Grounding device for overhauling overhead line
WO2012088987A1 (en) Maintenance tool for insulator of direct current transmission line
CN102969673A (en) Mounting device of insulation piercing line clip
CN204835359U (en) Drive electrified installation device of bird ware
CN204391602U (en) Charged the continuing of suspended insulated guide wire uses operation tool
CN102611035B (en) Special tool and method for charged replacement of middle-phase tension insulator
CN204885990U (en) Transmission line yoke plate hoisting device
CN209762607U (en) Electrical equipment mounting and fixing device
CN205489271U (en) Transmission line aerial earth wire lifter
CN203481707U (en) Upper pile head drainage wire fixing rod
CN102761077B (en) Insulating hoisting bracket for strain insulator string of 1000kV extra-high alternating current line
CN104078881B (en) Phase strain insulator specific purpose tool in charged for replacement
CN205148170U (en) Electrified fastening bolt instrument of transmission line
CN210536203U (en) Cable support
CN203191410U (en) Zinc oxide arrester live testing junction device
CN204809744U (en) Wire end broadsword type load support fixture and insulator chain change device
CN202039638U (en) Lead screw lifting type insulating cross arm
CN203367861U (en) Simple ground-wire lifter
CN205489269U (en) Overhead earth wire hoisting device for high tension transmission line
CN202534979U (en) Stay wire-free insulating pole holding apparatus
CN102191874A (en) Insulating cross arm with movable arc grooves
CN202840363U (en) Insulated lifting bracket for tension insulator chain of 1000-kV extra-high voltage alternating current circuit
CN202423997U (en) Combined ground wire lifting mechanism
CN202513517U (en) Bracket arm hoop

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 317000 Taizhou Central Road, Zhejiang, No. 809

Co-patentee after: Zhejiang Huadian inspection and Research Institute Co., Ltd.

Patentee after: Taizhou Power Supply Company of State Grid Zhejiang Electric Power Company

Co-patentee after: Zhejiang Zuoyi Power Equipment Co., Ltd.

Address before: 317000 Taizhou Central Road, Zhejiang, No. 809

Co-patentee before: Zhejiang Huadian Equipment Inspection Institute

Patentee before: Taizhou Power Supply Company of State Grid Zhejiang Electric Power Company

Co-patentee before: Zhejiang Zuoyi Power Equipment Co., Ltd.