CN109861128A - Operating stick - Google Patents
Operating stick Download PDFInfo
- Publication number
- CN109861128A CN109861128A CN201811578123.8A CN201811578123A CN109861128A CN 109861128 A CN109861128 A CN 109861128A CN 201811578123 A CN201811578123 A CN 201811578123A CN 109861128 A CN109861128 A CN 109861128A
- Authority
- CN
- China
- Prior art keywords
- hook
- auxiliary rod
- mobile jib
- operating stick
- rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Abstract
The present invention provides a kind of operating sticks, it include: mobile jib, work department and auxiliary rod, work department includes that hook and insulation sleeve, insulation sleeve are fixed on the first end of mobile jib, hook is at least partially disposed in insulation sleeve, the second state linking up with the first state with closure and opening;Auxiliary rod is arranged in parallel with mobile jib, and auxiliary rod is connected with hook, so that hook is moved along the extending direction of mobile jib.Technical solution of the present invention efficiently solves the problems, such as that insulating bar in the prior art cannot achieve reliable lifting, fixed operation.
Description
Technical field
The present invention relates to the technical fields of distribution line, in particular to a kind of operating stick.
Background technique
During distribution line insulating bar working system livewire work, it is often necessary to operation Work tool, masking apparatus, be detected
It repairs equipment etc. and the operation such as is fixed, rotates, clamping, existing operational instrument mainly includes that hook-type operating stick and quincunx connect fastly
Head, hook-type operating stick have hook, can be hooked by operation object, the operation such as are rotated, are pulled down, but can not will be operated
Object lifting can not be reliably fixed.
Summary of the invention
It, can to solve that insulating bar in the prior art cannot achieve the main purpose of the present invention is to provide a kind of operating stick
The problem of lifting for leaning on, fixed operation.
To achieve the goals above, the present invention provides a kind of operating sticks, comprising: mobile jib, work department and auxiliary rod, work
Portion includes hook and insulation sleeve, and insulation sleeve is fixed on the first end of mobile jib, and hook is at least partially disposed in insulation sleeve, is linked up with
Second state of first state and opening with closure;Auxiliary rod is arranged in parallel with mobile jib, and auxiliary rod is connected with hook, so that
The extending direction linked up with along mobile jib moves.
Further, hook includes hook base and coupler body, and the middle part of coupler body and hook base are pivotable by the first pivotal axis
Ground connection, when hook is in first state, the first end of coupler body is in contact so as to link up with closure with hook base.
Further, spring is provided in hook base, the first end of spring is fixed on hook base, when linking up with closure,
The second end of spring supports the second end in coupler body, to apply elastic force to coupler body.
Further, work department further includes the circlip being fixedly connected with hook, and the first end of auxiliary rod is provided with card slot, is blocked
Spring is set in the card slot of auxiliary rod.
Further, the second end of auxiliary rod is operation portion, and auxiliary rod is provided with limiting section close to the position of operation portion, is limited
Position portion includes along the equally distributed annular spacing groove in auxiliary rod direction and multiple arcs limiting slot, and arc limit slot setting exists
Surface of the auxiliary rod far from mobile jib.
Further, operating stick further includes retaining component, and retaining component and limiting section cooperate to limit to auxiliary rod,
Retaining component includes the retaining box being fixed on mobile jib, and the opposite two sides of retaining box is provided with through-hole, and auxiliary rod passes through through-hole, and
And limiting section is at least partially situated in retaining box.
Further, retaining component further includes elastic component, locking card and unblock button, and elastic component and unblock button are fixed on
Far from the inner surface of mobile jib, locking card is fixed in retaining box retaining box by the second pivotal axis.
Further, elastic component and unblock button are located at the two sides of the second pivotal axis, and elastic component and locking card
First end upper surface abut, unblock button is abutted with the upper surface of the second end of locking card, under the first end of locking card
Surface and annular spacing groove or arc limit slot cooperate.
Further, auxiliary rod includes the first rod segment and the second rod segment, and the first rod segment is isolation material, and hook is fixed on the
In one rod segment, the second rod segment is metal material, and the second rod segment includes operation portion and limiting section, and the first rod segment and the second rod segment are with exhausted
Edge sleeve is connected, and insulating sleeve is arranged between retaining box and insulation sleeve.
Further, the first end of insulation sleeve is at least partly set on mobile jib and auxiliary rod, the second end of insulation sleeve
It is provided with groove compatible with hook and auxiliary rod.
It applies the technical scheme of the present invention, operating stick includes mobile jib, work department and auxiliary rod, and work department is including hook and absolutely
Edge set, when opening of hook, hook can be connected or separate with by operation object, and when linking up with closure, operator operates behaviour
Make bar, so that work department drives by the lifting of operation object, fixed, mobile and rotation etc..When due to carrying out aforesaid operations, hook is in
The first state of closure, operation above-mentioned in this way are reliable.Technical solution of the present invention efficiently solves in the prior art
Insulating bar the problem of cannot achieve reliable lifting, fixed operation.
Detailed description of the invention
The accompanying drawings constituting a part of this application is used to provide further understanding of the present invention, and of the invention shows
Examples and descriptions thereof are used to explain the present invention for meaning property, does not constitute improper limitations of the present invention.In the accompanying drawings:
Fig. 1 shows the top view schematic cross-sectional view of the embodiment of operations according to the instant invention bar;And
Fig. 2 shows the main view schematic cross-sectional views of operating stick shown in FIG. 1.
Wherein, the above drawings include the following reference numerals:
10, mobile jib;20, work department;21, it links up with;211, hook base;212, coupler body;22, insulation sleeve;30, auxiliary rod;31,
Operation portion;32, limiting section;321, annular spacing groove;33, the first rod segment;34, the second rod segment;40, retaining component;41, retaining
Box;42, elastic component;43, locking card;44, unblock button;50, insulating sleeve.
Specific embodiment
It should be noted that in the absence of conflict, the features in the embodiments and the embodiments of the present application can phase
Mutually combination.The present invention will be described in detail below with reference to the accompanying drawings and embodiments.
As depicted in figs. 1 and 2, a kind of operating stick of the present embodiment, comprising: mobile jib 10, work department 20 and auxiliary rod 30, work
Making portion 20 includes hook 21 and insulation sleeve 22, and insulation sleeve 22 is fixed on the first end of mobile jib 10, and hook 21 is at least partly arranged
In insulation sleeve 22, hook 21 has the first state of closure and the second state of opening;Auxiliary rod 30 is parallel with mobile jib 10 to be set
It sets, auxiliary rod 30 is connected with hook 21, so that hook 21 is moved along the extending direction of mobile jib 10.
Using the technical solution of the present embodiment, operating stick includes mobile jib 10, work department 20 and auxiliary rod 30, and work department 20 is wrapped
Hook 21 and insulation sleeve 22 are included, when hook 21 is opened, hook 21 can be connected or separate with by operation object, when hook 21 closes
When conjunction, operator operates operating stick, so that work department 20 drives by the lifting of operation object, fixed, mobile and rotation etc..Due into
When row aforesaid operations, for hook 21 in the first state being closed, operation above-mentioned in this way is reliable.The technical side of the present embodiment
Case efficiently solves the problems, such as that insulating bar in the prior art cannot achieve reliable lifting, fixed operation.
As depicted in figs. 1 and 2, in the technical scheme of this embodiment, hook 21 includes hook base 211 and coupler body 212, hook
The middle part of body 212 is pivotably connected with hook base 211 by the first pivotal axis, when hook 21 is in first state, coupler body 212
First end be in contact with hook base 211 so that link up with 21 closure.When hook 21 is in first state, hook 21 is located at insulation sleeve
In 22, by the ring structure for the closure that operation object is fixed on the first end of coupler body 212 and hook base 211 is formed, at this moment lead to
Cross operation 10 pairs of operations pulled down, lift by operation object, rotating of mobile jib.
As depicted in figs. 1 and 2, in the technical scheme of this embodiment, it is provided with spring in hook base 211, the of spring
One end is fixed on hook base 211, and when hook 21 is closed, the second end of spring supports the second end in coupler body 212, to hook
Body 212 applies elastic force.When hook 21 stretches out insulation sleeve 22, coupler body 212 rotates under the action of elastic force, also, coupler body 212
First end and hook base 211 separate, at this point it is possible to operating stick is separated with by operation object, at this point, to far from work department 20
Direction pulls auxiliary rod 30, and under the action of the edge of insulation sleeve 22, coupler body 212 is rotated, the first end and extension of coupler body 212
Hook seat 211 contacts, 21 closure of hook, and links up with 21 and enter in insulation sleeve 22.
As depicted in figs. 1 and 2, in the technical scheme of this embodiment, work department 20 further includes being fixedly connected with hook 21
Circlip, the first end of auxiliary rod 30 is provided with card slot, and circlip is set in the card slot of auxiliary rod 30.The card slot of auxiliary rod 30
Diameter is less than the internal diameter of circlip, so auxiliary rod 30 can relatively rotate with hook 21, but the card slot of auxiliary rod 30
The diameter at both ends is both greater than the internal diameter of circlip, so the axis direction for pulling auxiliary rod 30 that can make hook 21 along insulation sleeve 22
It is mobile.
As depicted in figs. 1 and 2, in the technical scheme of this embodiment, the second end of auxiliary rod 30 is operation portion 31, auxiliary
Bar 30 is provided with limiting section 32 close to the position of operation portion 31, and limiting section 32 includes equally distributed one along 30 direction of auxiliary rod
Surface of the auxiliary rod 30 far from mobile jib 10 is arranged in annular spacing groove 321 and multiple arcs limiting slot, arc limit slot.Annular limit
Position slot 321 is close to operation portion 31.
As depicted in figs. 1 and 2, in the technical scheme of this embodiment, operating stick further includes retaining component 40, retaining component
40 and the cooperation of limiting section 32 to be limited to auxiliary rod 30, retaining component 40 includes the retaining box 41 that is fixed on mobile jib 10,
The opposite two sides of retaining box 41 is provided with through-hole, and auxiliary rod 30 passes through through-hole, and limiting section 32 is at least partially situated at retaining
In box 41.Annular spacing groove 321 or arc limit slot on retaining component 40 and limiting section 32 cooperate, so that by auxiliary rod 30
Position fix.
As depicted in figs. 1 and 2, in the technical scheme of this embodiment, retaining component 40 further includes elastic component 42, locking card
43 and unblock button 44, elastic component 42 and unblock button 44 be fixed on inner surface of the retaining box 41 far from mobile jib 10, locking card
43 are fixed in retaining box 41 by the second pivotal axis.When locking card 43 and annular spacing groove 321 cooperate, 21 closure of hook, quilt
Operation object can be more freely rotatable outside insulation sleeve 22, but not be fallen, and unblock button 44 is pressed, and pull auxiliary rod
30, it is drawn into insulation sleeve 22 by operation object, and cooperate the arc limit slot on locking card 43 and auxiliary rod 30, to prevent
Auxiliary rod 30 is fallen back, and can will be securely fixed in by operation object in insulation sleeve 22, and at this moment can be carried out to by operation object in this way
It the operation such as lifts, pull down, rotating, and locking card 43 can be kept different from auxiliary rod 30 according to by the different length of operation object
The arc limit slot of position cooperates.
As depicted in figs. 1 and 2, in the technical scheme of this embodiment, elastic component 42 and unblock button 44 are located at
The two sides of two pivotal axis, and elastic component 42 is abutted with the upper surface of the first end of locking card 43, unblock button 44 and locking card
The upper surface of 43 second end abuts, and lower surface and the annular spacing groove 321 or arc limit slot of the first end of locking card 43 are matched
It closes.The first end of unblock button 44 is abutted with locking card 43, and the second end of unblock button 44 exposes 41 surface of retaining box, presses solution
Button 44 is locked, locking card 43 can be made to rotate around the second pivotal axis, the lower surface of the first end of locking card 43 is detached from annular limit
Position slot 321 and arc limit slot make end and the retaining box of the operation portion 31 of auxiliary rod 30 at this point it is possible to pull auxiliary rod 30
Insulation sleeve 22 is exposed in 41 contacts, at this moment, hook 21, and hook 21 is opened.When locking card 43 and arc limit slot cooperate, will assist
Bar 30 is rotated by 90 ° (can certainly less than 90 °, such as 80 ° also possible), and locking card 43 is detached from arc limit slot, at this moment
Auxiliary rod 30 can be moved more neatly, but locking card 43 is not, can cross annular spacing groove 321 close to operation portion 31, this
Sample can guarantee that hook 21 is closed always, be fallen with preventing from being operated object.
As depicted in figs. 1 and 2, in the technical scheme of this embodiment, auxiliary rod 30 includes the first rod segment 33 and the second bar
Section 34, the first rod segment 33 are isolation material, and hook 21 is fixed in the first rod segment 33, and the second rod segment 34 is metal material, second
Rod segment 34 includes operation portion 31 and limiting section 32, and the first rod segment 33 is connected with the second rod segment 34 with insulating sleeve 50, insulating sleeve
50 are arranged between retaining box 41 and insulation sleeve 22.Mobile jib 10 is also that isolation material is made, and is arranged in the first rod segment 33
There is supporting element, supporting element is fixed on mobile jib 10, and via hole is provided on supporting element, and auxiliary rod 30 passes through the via hole on supporting element,
In this manner it is ensured that the movement of longer auxiliary rod 30 is soon parallel with the axis direction of mobile jib 10 eventually, supporting element can be prevented
Auxiliary rod 30 twists when moving.
As depicted in figs. 1 and 2, in the technical scheme of this embodiment, the first end of insulation sleeve 22 is at least partly arranged
On mobile jib 10 and auxiliary rod 30, the second end of insulation sleeve 22 is provided with groove compatible with hook 21 and auxiliary rod 30.Absolutely
Edge set 22 is fixed on mobile jib 10, but auxiliary rod 30 and hook 21 can move in groove, and by operation object
It can be moved in groove.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field
For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, made any to repair
Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.
Claims (10)
1. a kind of operating stick characterized by comprising
Mobile jib (10),
Work department (20), the work department (20) include that hook (21) and insulation sleeve (22), the insulation sleeve (22) are fixed on institute
The first end of mobile jib (10) is stated, the hook (21) is at least partially disposed in the insulation sleeve (22), the hook (21)
Second state of first state and opening with closure;
Auxiliary rod (30), the auxiliary rod (30) are arranged in parallel with the mobile jib (10), the auxiliary rod (30) and the hook
(21) it is connected, so that the hook (21) is mobile along the extending direction of the mobile jib (10).
2. operating stick according to claim 1, which is characterized in that the hook (21) includes hook base (211) and coupler body
(212), the middle part with the hook base (211) of the coupler body (212) are pivotably connected by the first pivotal axis (213), institute
When stating hook (21) and being in the first state, the first end of the coupler body (212) be in contact with the hook base (211) so that
Hook (21) closure.
3. operating stick according to claim 2, which is characterized in that be provided with spring, the bullet in the hook base (211)
The first end of spring is fixed on the hook base (211), and when the hook (21) closure, the second end of the spring is supported
The second end of the coupler body (212), to apply elastic force to the coupler body (212).
4. operating stick according to claim 3, which is characterized in that the work department (20) further includes and the hook (21)
The circlip being fixedly connected, the first end of the auxiliary rod (30) are provided with card slot, and the circlip is set in the auxiliary rod (30)
Card slot in.
5. operating stick according to claim 4, which is characterized in that the second end of the auxiliary rod (30) is operation portion
(31), the auxiliary rod (30) is provided with limiting section (32) close to the position of the operation portion (31), limiting section (32) packet
It includes along the equally distributed annular spacing groove (321) in the auxiliary rod (30) direction and multiple arcs limiting slot, the arc
Limiting slot setting is on the surface of the auxiliary rod (30) far from the mobile jib (10).
6. operating stick according to claim 5, which is characterized in that the operating stick further includes retaining component (40), described
Retaining component (40) and the limiting section (32) cooperation are to limit the auxiliary rod (30), retaining component (40) packet
The retaining box (41) being fixed on the mobile jib (10) is included, the opposite two sides of the retaining box (41) is provided with through-hole, described auxiliary
Bar (30) are helped to pass through the through-hole, and the limiting section (32) is at least partially situated in the retaining box (41).
7. operating stick according to claim 6, which is characterized in that the retaining component (40) further include elastic component (42),
Locking card (43) and unblock button (44), the elastic component (42) and the unblock button (44) are fixed on the retaining box (41)
On inner surface far from the mobile jib (10), the locking card (43) is fixed on the retaining box (41) by the second pivotal axis
It is interior.
8. operating stick according to claim 7, which is characterized in that the elastic component (42) and the unblock button (44) point
Not Wei Yu second pivotal axis two sides, and the upper surface of the first end of the elastic component (42) and the locking card (43)
It abutting, the unblock button (44) abuts with the upper surface of the second end of the locking card (43), and the of the locking card (43)
The lower surface of one end and the annular spacing groove (321) or arc limit slot cooperate.
9. operating stick according to claim 6, which is characterized in that the auxiliary rod (30) includes the first rod segment (33) and the
Two rod segments (34), first rod segment (33) are isolation material, and the hook (21) is fixed on first rod segment (33), institute
Stating the second rod segment (34) is metal material, and second rod segment (34) includes the operation portion (31) and the limiting section (32),
First rod segment (33) is connected with second rod segment (34) with insulating sleeve (50), and the insulating sleeve (50) is arranged in institute
It states between retaining box (41) and the insulation sleeve (22).
10. operating stick according to claim 1, which is characterized in that the first end of the insulation sleeve (22) is at least partly
It is set on the mobile jib (10) and the auxiliary rod (30), the second end of the insulation sleeve (22) is provided with and the hook
(21) and the compatible groove of auxiliary rod (30).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811578123.8A CN109861128B (en) | 2018-12-20 | 2018-12-20 | Operating rod |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811578123.8A CN109861128B (en) | 2018-12-20 | 2018-12-20 | Operating rod |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109861128A true CN109861128A (en) | 2019-06-07 |
CN109861128B CN109861128B (en) | 2022-02-08 |
Family
ID=66891958
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811578123.8A Active CN109861128B (en) | 2018-12-20 | 2018-12-20 | Operating rod |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109861128B (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202108092U (en) * | 2011-06-16 | 2012-01-11 | 周文静 | Sewer dredging pipeline with fluke |
CN202208237U (en) * | 2011-09-14 | 2012-05-02 | 宁波天益齿轴齿轮有限公司 | Retractor |
CN203911304U (en) * | 2014-06-10 | 2014-10-29 | 李希银 | Multifunctional insulation operating rod |
CN204349342U (en) * | 2015-02-05 | 2015-05-20 | 国家电网公司 | Electric power facility is adjustable barrier clearing device |
CN204391602U (en) * | 2014-12-10 | 2015-06-10 | 国网浙江省电力公司台州供电公司 | Charged the continuing of suspended insulated guide wire uses operation tool |
CN205384961U (en) * | 2016-03-15 | 2016-07-13 | 国家电网公司 | Novel test electric lighting integration type insulating bar |
CN205670656U (en) * | 2016-06-07 | 2016-11-02 | 国网山东省电力公司莱芜供电公司 | Device removed by power equipment bird's nest |
CN208257265U (en) * | 2018-05-14 | 2018-12-18 | 广东电网有限责任公司 | A kind of transmission line of electricity removes foreign matter insulating bar |
-
2018
- 2018-12-20 CN CN201811578123.8A patent/CN109861128B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202108092U (en) * | 2011-06-16 | 2012-01-11 | 周文静 | Sewer dredging pipeline with fluke |
CN202208237U (en) * | 2011-09-14 | 2012-05-02 | 宁波天益齿轴齿轮有限公司 | Retractor |
CN203911304U (en) * | 2014-06-10 | 2014-10-29 | 李希银 | Multifunctional insulation operating rod |
CN204391602U (en) * | 2014-12-10 | 2015-06-10 | 国网浙江省电力公司台州供电公司 | Charged the continuing of suspended insulated guide wire uses operation tool |
CN204349342U (en) * | 2015-02-05 | 2015-05-20 | 国家电网公司 | Electric power facility is adjustable barrier clearing device |
CN205384961U (en) * | 2016-03-15 | 2016-07-13 | 国家电网公司 | Novel test electric lighting integration type insulating bar |
CN205670656U (en) * | 2016-06-07 | 2016-11-02 | 国网山东省电力公司莱芜供电公司 | Device removed by power equipment bird's nest |
CN208257265U (en) * | 2018-05-14 | 2018-12-18 | 广东电网有限责任公司 | A kind of transmission line of electricity removes foreign matter insulating bar |
Also Published As
Publication number | Publication date |
---|---|
CN109861128B (en) | 2022-02-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10283882B2 (en) | Locking grounding clamp | |
USRE47349E1 (en) | Hook | |
US11245227B2 (en) | Plug connection having a locking clip having a catch, and method for locking and unlocking a plug connection | |
US11035437B2 (en) | Shackle clamp assembly | |
DE202017005939U1 (en) | Rail clamp | |
JP2015020897A (en) | Hook latching device | |
CN105870671A (en) | Controllable anti-disengagement high-voltage power line personal security line | |
CN109861128A (en) | Operating stick | |
US9670041B2 (en) | Remote activation of scissor lift cylinder prop | |
US1853598A (en) | Grapple | |
DE1151580B (en) | Multipole electrical connector with U-shaped locking bracket | |
US11897732B2 (en) | System and method for controlling the lifting and handling of a load | |
US1071650A (en) | Safety-hook. | |
CN208844516U (en) | A kind of hydraulic automatic grabbing beam convenient for docking | |
KR102579044B1 (en) | Indirect hot line working tool for exchanging shackle and shackle demolition method using thereof | |
KR200493001Y1 (en) | Safety device for bridge inspection | |
DE102010036549A1 (en) | Shaft ring gripper, has case slidably formed between stop and guide ring, and releasing and/or blocking switching device operative between guide ring and draw pipe based on relative displacement of guide ring and draw pipe | |
KR200495986Y1 (en) | Safety hook for industrial | |
CA2533187A1 (en) | Pipe engaging and lifting apparatus | |
DE19939715A1 (en) | Claw for pulling single crystals has arms with holding jaws arranged on the side of the crystal block opposite the tilting bearings | |
KR102424945B1 (en) | Safety hook for indirect live wire work with operating bit formed by locking opening/closing control lever | |
JP2022156106A (en) | Hanging sheave for stringing construction | |
CN216651651U (en) | Telescopic link and lift table that has this telescopic link | |
CN106531498B (en) | A kind of switch handle external member | |
US1947842A (en) | Elevator |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |