CN204371341U - 预控顶中深孔采矿法新型二步矿房 - Google Patents
预控顶中深孔采矿法新型二步矿房 Download PDFInfo
- Publication number
- CN204371341U CN204371341U CN201420630341.2U CN201420630341U CN204371341U CN 204371341 U CN204371341 U CN 204371341U CN 201420630341 U CN201420630341 U CN 201420630341U CN 204371341 U CN204371341 U CN 204371341U
- Authority
- CN
- China
- Prior art keywords
- step mineral
- studding
- buildings
- long hole
- novel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
Abstract
本实用新型目的在于提供一种预控顶中深孔采矿法新型二步矿房,属于矿房领域,设有一步矿房和二步矿房,一步矿房与二步矿房平行排列构成采掘单元,两个采掘单元之间设有临时间柱,两个中间设有临时间柱的采掘单元两侧设有间柱,在回采过程中不会发生整体垮冒事故,安全可靠。
Description
技术领域
本实用新型目的在于提供一种预控顶中深孔采矿法新型二步矿房,属于矿房领域。
背景技术
在预控顶中深孔采矿法回采过程中,根据回采工艺安排,分为一步矿房回采和二步矿房回采。其原有的回采思路为一步矿房、二步矿房间隔回采。本方法二步矿房回采难度较大,同时二步矿房顶板难于管理,易于发生整体垮冒,造成了较大的安全性问题。
实用新型内容
本实用新型目的在于提供一种预控顶中深孔采矿法新型二步矿房,在回采过程中不会发生整体垮冒事故,安全可靠。
本实用新型所述的预控顶中深孔采矿法新型二步矿房,设有一步矿房和二步矿房,一步矿房与二步矿房平行排列构成采掘单元,两个采掘单元之间设有临时间柱,两个中间设有临时间柱的采掘单元两侧设有间柱。
所述的预控顶中深孔采矿法新型二步矿房,中深孔回采矿房跨度为100m,其中两侧为预留间柱,用于回采进入服务,尾期回采,在矿房的中间位置即一步矿房与二步矿房之间设置宽度为10m的临时间柱,使本过程得以实现,对本矿房的一步矿房回采采用预控顶回采法正常回采,并进行相应的充填,对一步矿房采用预控顶回采法继续上行回采并进行相应填充,然后再对二步矿房进行回采,以上一步矿房与二步矿房均为单侧充填体矿房,提高回采安全系数,最后对临时间柱一侧的二步矿房进行回采,其一侧为胶结充填体,另一侧为全尾充填体,在全尾侧预留3m宽的间柱作为永久损失支撑,另一侧为胶结充填体。通过以上方式大大的提高了安全性,保证了回采过程中矿房不会发生整体垮冒的情况。
所述的预控顶中深孔采矿法新型二步矿房,两个间柱间距离为100m。
所述的预控顶中深孔采矿法新型二步矿房,临时间柱的宽度为10m。
所述的预控顶中深孔采矿法新型二步矿房,使间柱在回采的爆破过程中提供足够的支撑力,避免了爆破使矿房发生整体垮冒的情况,大大的提高了安全性
本实用新型与现有技术相比有益效果为:
所述的预控顶中深孔采矿法新型二步矿房,中深孔回采矿房跨度为100m,其中两侧为预留间柱,用于回采进入服务,尾期回采,在矿房的中间位置即一步矿房与二步矿房之间设置宽度为10m的临时间柱,使本过程得以实现,对本矿房的一步矿房回采采用预控顶回采法正常回采,并进行相应的充填,对一步矿房采用预控顶回采法继续上行回采并进行相应填充,然后再对二步矿房进行回采,以上一步矿房与二步矿房均为单侧充填体矿房,提高回采安全系数,最后对临时间柱一侧的二步矿房进行回采,其一侧为胶结充填体,另一侧为全尾充填体,在全尾侧预留3m宽的间柱作为永久损失支撑,另一侧为胶结充填体。通过以上方式大大的提高了安全性,保证了回采过程中矿房不会发生整体垮冒的情况。
所述的预控顶中深孔采矿法新型二步矿房,使间柱在回采的爆破过程中提供足够的支撑力,避免了爆破使矿房发生整体垮冒的情况,大大的提高了安全性
附图说明
图1为本实用新型实施例结构示意图。
图中:1、一步矿房;2、二步矿房;3、临时间柱;4、间柱。
具体实施方式
下面结合本实用新型对本实用新型实施例做进一步说明:
实施例1:如图1所示,本实用新型所述的预控顶中深孔采矿法新型二步矿房,设有一步矿房1和二步矿房2,一步矿房1与二步矿房2平行排列构成采掘单元,两个采掘单元之间设有临时间柱3,两个中间设有临时间柱3的采掘单元两侧设有间柱4。
实施例2:在实施例1所述的结构基础上,两个间柱4间距离为100m,临时间柱3的宽度为10m。
操作步骤与工作原理:
本实用新型所述的预控顶中深孔采矿法新型二步矿房,设有一步矿房1和二步矿房2,一步矿房1与二步矿房2平行排列构成采掘单元,两个采掘单元之间设有临时间柱3,两个中间设有临时间柱3的采掘单元两侧设有间柱4。
所述的预控顶中深孔采矿法新型二步矿房,中深孔回采矿房跨度为100m,其中两侧为预留间柱4,用于回采进入服务,尾期回采,在矿房的中间位置即一步矿房1与二步矿房2之间设置宽度为10m的临时间柱3,使本过程得以实现,对本矿房的一步矿房1回采采用预控顶回采法正常回采,并进行相应的充填,对一步矿房1采用预控顶回采法继续上行回采并进行相应填充,然后再对二步矿房2进行回采,以上一步矿房1与二步矿房2均为单侧充填体矿房,提高回采安全系数,最后对临时间柱3一侧的二步矿房2进行回采,其一侧为胶结充填体,另一侧为全尾充填体,在全尾侧预留3m宽的间柱4作为永久损失支撑,另一侧为胶结充填体。通过以上方式大大的提高了安全性,保证了回采过程中矿房不会发生整体垮冒的情况。
Claims (3)
1.一种预控顶中深孔采矿法新型二步矿房,其特征在于,设有一步矿房(1)和二步矿房(2),一步矿房(1)与二步矿房(2)平行排列构成采掘单元,两个采掘单元之间设有临时间柱(3),两个中间设有临时间柱(3)的采掘单元两侧设有间柱(4)。
2.根据权利要求1所述的预控顶中深孔采矿法新型二步矿房,其特征在于,两个间柱(4)间距离为100m。
3.根据权利要求1所述的预控顶中深孔采矿法新型二步矿房,其特征在于,临时间柱(3)的宽度为10m。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420630341.2U CN204371341U (zh) | 2014-10-28 | 2014-10-28 | 预控顶中深孔采矿法新型二步矿房 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420630341.2U CN204371341U (zh) | 2014-10-28 | 2014-10-28 | 预控顶中深孔采矿法新型二步矿房 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204371341U true CN204371341U (zh) | 2015-06-03 |
Family
ID=53327570
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420630341.2U Expired - Fee Related CN204371341U (zh) | 2014-10-28 | 2014-10-28 | 预控顶中深孔采矿法新型二步矿房 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204371341U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106014477A (zh) * | 2016-06-15 | 2016-10-12 | 山东华联矿业股份有限公司 | 充填体稳定性填充方法 |
-
2014
- 2014-10-28 CN CN201420630341.2U patent/CN204371341U/zh not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106014477A (zh) * | 2016-06-15 | 2016-10-12 | 山东华联矿业股份有限公司 | 充填体稳定性填充方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102644476B (zh) | 保护层机巷高位钻场穿层钻孔抽采被保护层瓦斯的方法 | |
CN104863592A (zh) | 一种大结构分段凿岩阶段出矿嗣后充填采矿法 | |
CN102587960A (zh) | 一种高瓦斯煤层回采工作面巷道的布置方法 | |
CN204299617U (zh) | 一种防刮裂型沿空留巷充填气囊 | |
CN204371341U (zh) | 预控顶中深孔采矿法新型二步矿房 | |
CN104343453A (zh) | 一种缓倾斜中厚矿床充填采矿方法 | |
CN203961365U (zh) | 地下核电站核岛厂房地下洞室群垂直于山体纵深方向的施工布置 | |
CN206299396U (zh) | 一种用于安放锚固剂的装置 | |
CN105545308A (zh) | 预控顶中深孔采矿法新型二步矿房 | |
CN204152527U (zh) | 隐式中墙连拱隧道的组合式初期支护系统 | |
CN104047448B (zh) | 地下核电站核岛洞室群呈环形结构的施工布置 | |
CN106050235A (zh) | 一种大结构采场切割槽快速形成工艺 | |
CN104153781A (zh) | 一种倒阶序诱导致裂崩落采矿法 | |
CN203961366U (zh) | 地下核电站核岛洞室群呈环形结构的施工布置 | |
CN203961364U (zh) | 地下核电站组合洞室群沿山体纵深方向的施工布置 | |
CN102748028B (zh) | 地下采矿底部结构标准化预制模块积木式构筑方法 | |
CN202250119U (zh) | 一种巷道支护用全封闭u型棚支架 | |
CN204612623U (zh) | 一种海绵炮孔塞 | |
CN105041369A (zh) | 一种本煤层瓦斯治理方法 | |
CN206859203U (zh) | 一种地连墙成槽 | |
CN203321521U (zh) | 一种短穿式联合采矿设备 | |
CN203146012U (zh) | 充填体托顶硐室 | |
CN204199122U (zh) | 煤矿立井改绞用滑板道 | |
CN104060858A (zh) | 地下核电站组合洞室群沿山体纵深方向的施工布置 | |
CN204551367U (zh) | 一种小流量岩质排水洞结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150603 Termination date: 20161028 |