CN203146012U - 充填体托顶硐室 - Google Patents

充填体托顶硐室 Download PDF

Info

Publication number
CN203146012U
CN203146012U CN 201320118890 CN201320118890U CN203146012U CN 203146012 U CN203146012 U CN 203146012U CN 201320118890 CN201320118890 CN 201320118890 CN 201320118890 U CN201320118890 U CN 201320118890U CN 203146012 U CN203146012 U CN 203146012U
Authority
CN
China
Prior art keywords
jacking
layering
chambers
filling body
chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320118890
Other languages
English (en)
Inventor
王永定
于长春
陈永强
李季秀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinchuan Group Co Ltd
Original Assignee
Jinchuan Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinchuan Group Co Ltd filed Critical Jinchuan Group Co Ltd
Priority to CN 201320118890 priority Critical patent/CN203146012U/zh
Application granted granted Critical
Publication of CN203146012U publication Critical patent/CN203146012U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本实用新型公开了一种充填体托顶硐室,包括分层联络道和分层联络道回填层,所述分层联络道回填层的上层、所述分层联络道的一侧或两侧设有托顶硐室。该充填体托顶硐室,当充填过程发生中断、离析、分层或充填不接顶的现象时,由于新增了托顶硐室,托顶硐室与分层联络道、分层道充填体构成的整体充填体,可以受矿柱或原岩的支撑,避免脱层现象的发生,提高了混凝砼分层道充填体顶板的稳定性,保证人员在充填体顶板下工作的安全性。以前分层联络道的使用时间不能超过45天,45天后将发生开裂和变形现象,现在分层联络道的使用时间可超过60天。

Description

充填体托顶硐室
技术领域
本实用新型涉及一种硐室,尤其涉及一种充填体托顶硐室。 
背景技术
目前,下向分层胶结充填采矿法的分层联络道两侧无进路,进行下一分层回采时,充填体顶板靠两侧夹制力稳定,一旦充填过程发生离析、分层、充填不接顶或充填体下采空区放置时间过长的现象,会导致充填体发生脱层。而且,脱层前无任何征兆,严重威胁人身安全。 
实用新型内容
本实用新型的目的在于提供一种可以解决分层联络道或分层道充填体脱层的问题,有效提高分层联络道、分层道充填体的稳定性的充填体托顶硐室。
为实现上述目的,本实用新型采取的技术方案是:
一种充填体托顶硐室,包括分层联络道和分层联络道回填层,所述分层联络道回填层的上层、所述分层联络道的一侧或两侧设有托顶硐室。
所述托顶硐室为是间隔一定距离开挖的硐室。
所述托顶硐室为连续开挖的硐室。
采用本实用新型提供的充填体托顶硐室,当充填过程发生中断、离析、分层或充填不接顶的现象时,由于新增了托顶硐室,托顶硐室与分层联络道、分层道充填体构成的整体充填体,可以受矿柱或原岩的支撑,避免脱层现象的发生,提高了混凝砼分层道充填体顶板的稳定性,保证人员在充填体顶板下工作的安全性。以前分层联络道的使用时间不能超过45天,45天后将发生开裂和变形现象,现在分层联络道的使用时间可超过60天。
附图说明
图1是本实用新型的一分层联络道的主视图。
图2是本实用新型的一分层联络道的的A-A剖视图。
图3是本实用新型的二分层道联络道的主视图。
图中,1-一分层分层联络道,2-托顶硐室,3-一分层分层联络道回填层,4-整体充填体,5-二分层原岩帮或矿柱,6-二分层分层联络道。
具体实施方式
下面结合具体实施例及其附图,对本实用新型作进一步的详细说明,但本实用新型的实施方式不限于此。
如图1和图2所示,本实用新型提供的一种充填体托顶硐室,包括一分层分层联络道1和一分层分层联络道回填层3,在一分层分层联络道回填层3的上层,一分层分层联络道1的一侧或两侧开挖有托顶硐室2。托顶硐室2可以是间隔一定距离开挖的硐室,也可以是开挖连续的硐室。
当一分层采场回采结束后,对一分层分层联络道1进行回填,当一侧无进路时,在一分层分层联络道回填层3的上层一侧开挖充填体托顶硐室2;当两侧均无进路时,在一分层分层联络道回填层3的上层两侧开挖充填体托顶硐室2,托顶硐室2宽1~3m,高2~4m,深2~4m,间距为3~5m。根据实际情况,托顶硐室2还可以是开挖连续的硐室。
如图3所示,当一分层充填结束后,一分层分层联络道1的充填体和托顶硐室2的充填体形成一个整体充填体4。二分层分层联络道6掘进后,人员在整体充填体4的下面作业,整体充填体4受到二分层原岩帮或矿柱5的支撑,从而形成稳定的充填体,确保生产人员的安全。
以上所述的仅是本实用新型的较佳实施例,并不局限本实用新型。应当指出对于本领域的普通技术人员来说,在本实用新型所提供的技术启示下,还可以做出其它等同变型和改进,均可以实现本实用新型的目的,都应视为本实用新型的保护范围。 

Claims (3)

1.一种充填体托顶硐室,包括分层联络道(1)和分层联络道回填层(3),其特征在于,所述分层联络道回填层(3)的上层、所述分层联络道(1)的一侧或两侧设有托顶硐室(2)。
2.根据权利要求1所述充填体托顶硐室,其特征在于,所述托顶硐室(2)为是间隔一定距离开挖的硐室。
3.根据权利要求1所述充填体托顶硐室,其特征在于,所述托顶硐室(2)为连续开挖的硐室。
CN 201320118890 2013-03-15 2013-03-15 充填体托顶硐室 Expired - Fee Related CN203146012U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320118890 CN203146012U (zh) 2013-03-15 2013-03-15 充填体托顶硐室

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320118890 CN203146012U (zh) 2013-03-15 2013-03-15 充填体托顶硐室

Publications (1)

Publication Number Publication Date
CN203146012U true CN203146012U (zh) 2013-08-21

Family

ID=48973548

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320118890 Expired - Fee Related CN203146012U (zh) 2013-03-15 2013-03-15 充填体托顶硐室

Country Status (1)

Country Link
CN (1) CN203146012U (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109736769A (zh) * 2019-01-15 2019-05-10 中国矿业大学 一种冻土层天然气水合物水平分支井网开采系统与方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109736769A (zh) * 2019-01-15 2019-05-10 中国矿业大学 一种冻土层天然气水合物水平分支井网开采系统与方法

Similar Documents

Publication Publication Date Title
CN101761338B (zh) 一种固体充填采煤半断面单腿棚沿空留巷方法
CN103147761B (zh) 一种缓倾斜松软顶板薄矿床充填采矿方法
CN103233751B (zh) 极软弱顶板煤巷双层锚固平衡拱支护系统
AU2013354613B2 (en) Method of local filling to control surface subsidence in worked-out area
CN103277106B (zh) 公路隧道三台阶五步开挖施工方法
AU2015345830B2 (en) Coal mining method with digging, mining and filling parallel operations under control of cover rock cracks and surface subsidence
CN104533482A (zh) 一种提高沿空掘巷小煤柱稳定性的加固方法
CN105134216B (zh) 破碎顶板110工法巷旁防塌落结构
CN103422469A (zh) 一种煤矿地下水库的人工挡水坝及其与煤柱坝体和围岩的连接方法
CN204551487U (zh) 一种能够实现相邻基坑同步施工的钢支撑结构
CN104847406B (zh) 一种致裂相邻采煤工作面遗留充填墙体的方法
CN207813624U (zh) 一种留小煤柱综合机械化采煤支护结构
CN104863588A (zh) 超前预设墩柱沿空留巷方法
CN103953346A (zh) 一种无煤柱开采方法
CN105240012A (zh) 一种实现煤柱同采的f型区段采煤方法
CN103557001A (zh) 一种低段高无底柱留矿嗣后充填采矿法
CN103527199B (zh) 一种孤岛工作面窄煤柱沿空掘巷围岩变形控制方法
CN203146012U (zh) 充填体托顶硐室
CN104727847A (zh) 充填墙体自消除的无煤柱沿空留巷方法
CN103628890A (zh) 软弱千枚岩隧道开挖变形控制方法
CN103244121B (zh) 一种有轨与无轨耦合的底部出矿系统
CN103850690A (zh) 一种用于无煤柱开采的混凝土砌块配合锚索切顶沿空留巷方法
CN106050235A (zh) 一种大结构采场切割槽快速形成工艺
CN103982191A (zh) 预留土柱上下分步左右同步开挖工法
CN203669899U (zh) 一种用于隔离工作面后方巷道与采空区的条带钢筋网

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130821

Termination date: 20190315